Description: Automatic Voltage Regulator Page 1 of 12
TAPCON260 Drawing ref.:
Contractor : Contract no.: Substation No :
3. CT & VT SETTING:
PRIMARY VLOTAGE 13.8 kV
PRIMARY CURRENT 2510 A
Desired Voltage Level (REF. VOLT) 120 V
TAPCON 240
Vn
SEC. INJ. KIT
In
110V DC
SUPPLY
Test Procedure :
Observe the reading on the relay display in secondary values and in primary
values.
Inject Current in Terminal:
and Apply Voltage in Terminal:
4.1.Voltage Measurements:
Test Procedure :
Voltage for
Voltage for pickup(V)
Setting drop off(V) Timing test(sec)
Value(V)
Expected Measured Measured
Setting Measured
70% 84.0 6
80% 96.0 10
110% 132.0
120% 144.0
9. Operating Time test for Timer: Linear with time delay T2:
Set
Time-delay Time delay Operating time Operating time
bandwidth
T1 (Sec) T2 (Sec) expected (sec) (T2) measured (sec)
(%)
10 5 5
3.0 10 8 8
10 10 10
10. Operating Time test for Timer: Integral (Desired voltage level
120V) T2 off :
FOR LOWER
Set Time
Applied Measured Operating time Operating time
Bandwidth delay
Volts (V) U% Expected (sec) Measured (sec)
(%) (Sec)
130 10 3.33
2.0
125 40 20.67
FOR RAISE
Set Time
Applied Measured Operating time Operating time
Bandwidth delay
Volts (V) U% Expected (sec) Measured (sec)
(%) (Sec)
110 10 3.33
2.0
105 40 7.33
110 5.5
120 6.0
2 2
3 3
Binary Output
No.
Terminal No. Purpose Check
1 I/O-X1: 08-09 (NC) MANUAL (OUTPUT) Ok
Binary I/O
No.
Terminal No. Purpose Check
1 UC1-X1: 1,2 PARALLEL FAILURE (OUTPUT) Ok
Binary I/O
No.
Terminal No. Purpose Check
1 UC2-X1:1,2 MASTER (OUTPUT) Ok
125 VDC
Set
Voltage To Raise (V) Voltage to lower (V) Expected Measured
bandwidt
bandwidth bandwidth
h
Expected Measured Expected Measured (%) (%)
(%)
2.3. Over Voltage Detection 110% (AVR lowering fast when over voltage
detected)
Test Equipments :
AL-BABTAIN