You are on page 1of 8

Justin Ramirez

Stormwater Project Manager


PRELIMINARY DESIGN/ DATA COLLECTION
Project Management X
Meetings & Coordination X
Meeting Minutes X
Determine Project/Develop Problem Statement X
Review Existing Watershed and Drainage Data X
Review Existing Master Drainage Plan X
Site Visits/Photo Surveys X
Meet with city officials X
Preliminary Hydrology & Hydaulics Study
Develop Preliminary Hydrology and Hydraulics Report
Neighboring citits inlet/outlet X
Report templates X
Alternate design solutions X
Meeting with advisors X
Determine location for pipes X
Assessing As-Biults

50% Design
Master Plan - 50% Project X
-Executive Summary X
-Intoduction X
-Techinical Criteria
-Hydrologic Analysis
-Hydraulic Analysis
- Exisitng Topographial Profile
- ArcGIS drafting/modeling
- Design Requirements
- Watershsed Characteristics X
- Population Growth/Development Patterns X
- Manhole Locations X
- Roadway Drainage X
- Analyzing Existing Improvements
- Environmental Impact Report X
- Storm Water Data Report
- Recommended solution X
- Cost Estimates

Final Submittal
Project Presentation X
Review of Process X
Annika Bulat Armando Chavez
Environmental Engineer/GIS Analyst Civil/Environmental Engineer

X X
X X
X X
X X
X
X
X
X

X
X X
X X
X

X X
X X

X
X
X
X
X
X
X
X

X
X X
X
X X
X

X X
X X
Lou Her Raul Lerma III Megan Scott
Civil Analyst/CAD Designer Civil/Hydraulic Engineer Environmental Engineer

X X X
X X X
X X X
X X X
X X X
X X X
X
X X
X
X
X X X
X X X
X
X

X X X
X X X

X
X
X
X
X
X
X
X
X
X
X
X X X
X X
X X X
X

X
X X X
X X X

You might also like