Job Safety Job Description: Scaffolding; Erection, Modification, Inspection and Dismantling
Non-standard
Analysis
Plant: OLEFINS Equipment: Date:
Implementation sheet
No. Job Steps Potential Hazards Mitigation Plan Responsibility
Only allow qualified/certified Scaffolders to do the
Scaffolding Job.
Use proper PPE's (Full body harness & rubber coated
gloves).
Full body harness shall be 100% tied off.
Slips and Falls
Do not work in pipes, use single plank with 'C' clamp.
Required PPE:
Agreement for execution that I understand the criticality of task and all hazards related to job steps. I am expected & obliged to take all
measures in job step hazards control to mitigate risk level associated with this task.
Approved by: Maintenance specialist/Supervisor:
Name: Badge # Signature:
Department: Environment Change Yes No Type of JSA.
Standard
Job Safety Job Description: Excavation, Backfilling and Compaction
Non-standard
Analysis
Plant: Equipment: Date:
Implementation sheet
No. Job Steps Potential Hazards Mitigation Plan Responsibility
Tool box talk prior to start of work.
Barricade the work area.
Personal injury like hand
Obtain cold work permit for light duty work.
Mobilization, injury, body injury.
1 preparation and Use of PPE like leather gloves, safety hat, safety
handling of tools goggles, safety shoes.
Damage of property due to fall Only experienced and compitent person shall allowed
of structure to do the job
Required PPE:
Agreement for execution that I understand the criticality of task and all hazards related to job steps. I am expected & obliged to take all
measures in job step hazards control to mitigate risk level associated with this task.
Approved by: Maintenance specialist/Supervisor:
Name: Badge # Signature:
Department: Environment Change Yes No Type of JSA.
Standard
Job Safety Job Description: Dismantling and Erection of steel structure, piping and equipment
Non-standard
Analysis
Plant: Equipment: Date:
Implementation sheet
No. Job Steps Potential Hazards Mitigation Plan Responsibility
Tool box talk & briefing of JSA before start of job
Appropriate PPE's
Material to be barricaded
Certified lifting tools and equipment
Certified crane operator
Dropping of load during lifting Area barricading + safety signs
No personal under suspended load
Close monitoring by competent supervision
Check position of crane and trailer
Experienced & certified crane operator and signal
Erection of Steel man
structure, Piping Compact the ground
2
spools and Approved rigging plan
equipments Swinging of load
Two men with tag line for control load movement
Close monitoring by area supervisor
No work during high wind and rain
Area barricade for crane and load movement
3rd Party certified crane and lifting tools
Equipment failure Crane and lifting tools inspected by SK
Qualified crane operator and signal man
Required PPE:
Agreement for execution that I understand the criticality of task and all hazards related to job steps. I am expected & obliged to take all
measures in job step hazards control to mitigate risk level associated with this task.
Approved by: Maintenance specialist/Supervisor:
Name: Badge # Signature:
Department: Environment Change Yes No Type of JSA.
Standard
Job Safety Job Description: Hot Work; Preparation, Grinding and Welding
Non-standard
Analysis
Plant: Equipment: Date:
Implementation sheet
No. Job Steps Potential Hazards Mitigation Plan Responsibility
Proper tightness of disc (Proper tool for disc replacement) & the
Grinding by Electric disc with rotating guard
2
Grinder Disc broken
Check quality of disc
Disc RPM should be equal or greater than grinder RPM
Eye Injury Appropriate PPE's (Face shield, Glasses, Gloves )
Gas testing as per permit requirement
Area covered with fire blanket
Fire
Fire extinguisher
Fires watch man certified by SK
Valid PTW
Required PPE:
Agreement for execution that I understand the criticality of task and all hazards related to job steps. I am expected & obliged to take all
measures in job step hazards control to mitigate risk level associated with this task.
Approved by: Maintenance specialist/Supervisor:
Name: Badge # Signature:
Department: Environment Change Yes No Type of JSA.
Standard
Job Safety Job Description: Runnig of Generator
Non-standard
Analysis
Plant: Equipment: Date:
Implementation sheet
No. Job Steps Potential Hazards Mitigation Plan Responsibility
Valid PTW
1 Preparation Gas leak JSA briefing before start of job
Gas testing as per permit requirement
High Noise Use of ear plugs & muffs
Gas testing as per permit requirement
Area covered with fire blanket
Fire
Fire extinguisher
Fires watch man certified by SK
Required PPE:
Agreement for execution that I understand the criticality of task and all hazards related to job steps. I am expected & obliged to take all
measures in job step hazards control to mitigate risk level associated with this task.
Approved by: Maintenance specialist/Supervisor:
Name: Badge # Signature:
Department: Environment Change Yes No Type of JSA.
Standard
Job Safety Job Description: Lifting & Rigging activities
Non-standard
Analysis
Plant: Equipment: Date:
Implementation sheet
No. Job Steps Potential Hazards Mitigation Plan Responsibility
Valid PTW
Approved rigging plan / Red flag at extended load
Equipment failure
Third party certified crane and rigging gears
Third party certified crane operator.
Appropriate PPEs
Impact Injury Minimum personal near activity
Close monitoring by competent supervision
Check proper position of crane
Compacted ground/Proper leveled
Wrong positioning of crane Outriggers to be fully extended with rigging pads
Follow the load chart work with a safe working load.
1 Lifting of load Experienced and certified crane operator and signal
man
Certified lifting tools and equipment
Area barricading + safety signs
Dropped load
No personal under suspended load
Close monitoring by competent supervision
Tag line to be used
Swing the load No lifting during heavy wind
Close monitoring by area supervisor
Ensure only one certified person signals to operator
Direct eye to eye contact between crane operator and
Poor Sight
signal man
Proper lighting arrangements for night working
Required PPE:
Agreement for execution that I understand the criticality of task and all hazards related to job steps. I am expected & obliged to take all
measures in job step hazards control to mitigate risk level associated with this task.
Approved by: Maintenance specialist/Supervisor:
Name: Badge # Signature:
Department: Environment Change Yes No Type of JSA.
Standard
Job Safety Job Description: Hydro-testing of piping
Non-standard
Analysis
Plant: Equipment: Date:
Implementation sheet
No. Job Steps Potential Hazards Mitigation Plan Responsibility
Valid PTW
Tool box talk before start of job
Non-compliance with safety
Area shall be barricaded with safety signs.
procedure
Use of Proper PPE's like hard hat, safety goggles and
1 Planning safety shoes.
Unsafe depressurization of
Ensure the safe depressurization of the hydro-test fluid
hydro-test fluid
Required PPE:
Agreement for execution that I understand the criticality of task and all hazards related to job steps. I am expected & obliged to take all
measures in job step hazards control to mitigate risk level associated with this task.
Approved by: Maintenance specialist/Supervisor:
Name: Badge # Signature:
Department: Environment Change Yes No Type of JSA.
Standard
Job Safety Job Description: Material Shifting
Non-standard
Analysis
Plant: Equipment: Date:
Implementation sheet
No. Job Steps Potential Hazards Mitigation Plan Responsibility
Valid PTW
Approved rigging plan / Red flag at extended load
Equipment failure
Third party certified crane and rigging gears
Third party certified crane operator.
1 Material Loading
Certified lifting tools and equipment
Area barricading + safety signs
Dropped load
No personal under suspended load
Close monitoring by competent supervision
Valid License holder & experienced driver
Follow speed limits
Road Accident
Follow SK route / Reverse horn
Use of seat belt / flagman
2 Vehicle Movement
Condition of the vehicle should be checked
Poor Condition of Vehicle
Vehicle inspection by SK
Brake failure and improper Use stopper and hand break while parking
parking Banks man while reversing the vehicle
Appropriate PPEs
Impact Injury Minimum personal near activity
Close monitoring by competent supervisor
3 Material offloading Certified lifting tools and equipment
Area barricading + safety signs
Dropped load
No personal under suspended load
Close monitoring by competent supervision
Required PPE:
Agreement for execution that I understand the criticality of task and all hazards related to job steps. I am expected & obliged to take all
measures in job step hazards control to mitigate risk level associated with this task.
Approved by: Maintenance specialist/Supervisor:
Name: Badge # Signature: