You are on page 1of 51

INDIVIDUAL PERFORMANCE COMMIT

Name of Employee:__________________________________
Position:MASTER TEACHER I (HS)
Review:____________________________________
Bureau/Center/Service:_________________________________
TO BE FILLED IN DURING PLANNING

MFQO's KEY RESULT AREAS Objectives Time Frame Weight per KRA
OUTSTANDING
(5)

PROFESSIONAL 1. Attended Trainings, Attended at least 5


GROWTH & Seminars or Workshops trainings, seminars
DEVELOPMENT (School, Division, Regional Year Round and related activities
-30% or National) 10% and submitted all the
required outputs within
the school year.

2. Served as trainer/ facilitator/ Trained, facilitated,


chairman in school - based INSET Semestral Chaired in committee
5% in at least 2 INSETs
with accomplishment
report within the rating
period.

3. Served as demonstration 2 lessons demonstration


June 2016-
served with complete
teacher in the school/ district/ March 2017
division level 5% documentation within
the school year

4. Conducted action
research related to school or Year Round Conducted at least one action
classroom concerns during the year. research and utilized division
wide supported by the following
5% evidences:
Research proposal (in complete format)
Research Report
Proposed interventions and programs
Proposed M & E for results outcome
5.Participated in the preparation and 100- 93% active participation
enrichment of curriculum; led in the in the preparation and enrichment
June 2016-
5% of curriculum; led in the dis-
discussion of professional ideas, prob- March 2017
lems, issues and concern. cussion of professional ideas,
problems, issues and concern.

INSTRUCTIONAL 1. Prepared daily lesson plans/DLLs 100- 93% well prepared


June 2016-
COMPETENCE submitted, and imple-
and visual aids related to the lessons. March 2017
-30% 3% mented lesson plans /
DLLs within the school year

2. Conducted remedial/enrichment/reinforcement episodes Planned,implemented and monitored at le


June 2016-March
for slow learners remedial classes with
2017
complete intervention mate-
5% rials, accomplishment report
and progress chart of students
within the school year

3. Introduced innovative teaching Introduced at least 3 innovative


June 2016-March
approaches and strategies and led in teaching approaches and strate-
2017 3%
the preparation of instructional materials gies and led in the preparation of
instructional materials within
the school year.

4. Carried regular teaching load for 100% required teaching load


June 2016-March
the grade / subject area 2017 2% handled every year.

5. Undertaken activities to improve performance


Increased/decreased specified
indicators through
June 2016-March
access, quality and efficiency: indicators to at least more than
2017
5% 2% over the previous year.
a.1 MPS in Periodical Tests/ NAT
a.2 Drop-out rate
a.3 Repetition rate
a.4 Promotion rate
6. Evaluated teacher - made tests, Submitted validated reports on
June 2016-March
monitored and interpreted the the evaluation monitoring
2017
result. 2% and interpretation of results of
the teacher made test with at
least 3 activities before the
due date.
7. Checked lesson plans/DLLs 100 - 93% checked actual no. of
June 2016-March
of teachers in the assigned grade/ teachers' LPs/DLLs and prepared
2017
subject area. 5% at least 5 lesson exemplars in
grade grade/ subject area within
the school year.
8. Reported on time in the workplace and
workstation
a. Attendance No recorded absences or incurred at
least 1-3 absences within the school
June 2016- year
5%
b. Punctuality March 2017
No recorded tardiness/undertime or
incurred 1-9 times of
tardiness/undertime within the school
year

INSTRUCTIONAL
SUPERVISION 1. Assisted department head/school head in inJune 2016-March 2017 100 - 91% of the teachers
-25% tional monitoring classes 5% assigned were monitored
with monitoring reports
within the rating period.
2. Conducted mentoring/coaching program to
teachers in the department/school
Observed 100%-93% of the teachers
June 2016- under your supervision and conducted
5%
March 2017 at least 4 mentoring/coaching
programs within the school year
3. Designed and validated training programs
for teachers Served at least 2 times as chairman in
designing and validating training
Year Round 5%
programs for teachers in the
department/school

Assisted in evaluating and rating the


4. Assisted in rating the performance of performance following the RPMS cycle
Semestral 5%
teachers following the RPMS Cycle of 100%-93% of teachers in the
department within the rating period

5. Assisted school selection committees in


evaluation of credentials when Assisted the selection committee at
hiring/promoting teachers June 2016- least 3 times in evaluation of
5%
March 2017 credentials when hiring/promoting
teachers within the school year

COMMUNITY 1. Participated/Involved in Participated/Involved to at least 4


INVOLVEMENT (10%) programs/projects/activities in the programs/projects/activities in the
school/community sponsored or funded by school/community sponsored or
external stakeholders funded by external stakeholders
Year Round 5% properly documented within the
school year

2. Assisted in updating parents on children's Assisted to at least 6 conducted PTA


progress and problems through dialogues, meetings/conferences/home
conferences and PTA meetings visitations/invitation to parents to
update parents' on thier children's
Quarterly 5%
progress and problems
Plus Factors (5%) At least 3 performance indicators were
Rendered services over and beyond met
duties and responsibilities
1. Conducted at least one action research,
the findings/results of which can be utilized in
the improvement of instruction in the subject
area/school

2. Designed/organized/implemented program
in the district/division/regional level

3. Designed evaluation and monitoring Year Round


program in the district/division/regional level

4. Published at least one article in


professional magazines and periodicals of
division/regional/ national circulation related
to the area

5. Served as Resource speaker/consultant in


the district/division/region

Others: Pls. Specify:

4.500-5.000 Outstanding
3.500-4.499 Very Satisfactory
2.500-3.499 Satisfactory
1.500-2.499 Unsatisfactory
Below 1.499 Poor

Overall rating/assessment for the accomplishments shall fall withinthe following


adjectival ratings and shall be in three(3) decimal points.
Ratee
5

Instructional Competence

Prepared daily lesson plans and visual aids related


to the lesson
4

2
1

Conducts remedial episodes classes fro slow


learners.

Instructional Competence

Updates Parents on Children's progress and


problems through dialogues, conferences and PTA 1
Meetings

1
1

Enriched the curriculum of his/her field of


1
specialization

Instructional Competence
5

5
Initiated improvements in instructional program
4
Evaluated teacher-made tests, monitor and
interpet the result

Instructional 1
Competence

Constructed the needed Instructional Materials


available to teachers and pupils
3

4
Assisted in designing capacity development
programs for teachers
Assisted in designing capacity development
programs for teachers

1
23. Serves as trainer
in school-based
INSET

3
3

1
25. Checked regularly
Instructional Supervision
lesson plans for

5
teachers in the

4
assgined grade/

3
subject area

2
1
Instructional
Supervision
5

6. Carried regular teaching load for assigned 3


grade

1. Assisted the guidance counselor in handling 3


students with problems.

1
Instructional
Supervision
5
4

3
Conducted echo-seminars for co-teachers

2. Mentored co-teachers in content and skills


difficulties.
3

Instructional
Supervision

5
4

3. Helped in the proper and accurate


dissemination implementation of school
policies. 3

1. Assisted the principal in instructional 3


monitoring of teachers

Instructional
Supervision
5

2. Guided co-teachers in the performance of


2. Guided co-teachers in the performance of
3
duties and responsibilities

3. Assisted the school head in class


monitoring
MANCE COMMITMENT AND REVIEW FORM (IPCRF)
Name of Rater:_____________________________________________________
Position: _____________________________________________________________
Date of Review:________________________________________________

IN DURING PLANNING
PERFORMANCE INDICATORS
QUALITY, EFFECIENCY, TIMELINESS
VERY SATISFACTORY UNSATISFACTORY POOR
SATISFACTORY (3) (2) (1)
(4)
Attended at least 4 Attended at least 3 Attended at least 1 No attendance in any
trainings, seminars trainings, seminars trainings, seminars trainings, seminars
and related activities and related activities and related activities and related activities
and submitted all the and submitted all the and submitted all the within the school year'
required outputs within required outputs within required outputs within
the school year. the school year. the school year.

Trained, facilitated, Served as member of Served as member of Served as member of


Chaired in committee a committee in at least a committee in at least a committee in at least
in at least 1 INSET 2 INSETs with accom- 2 INSETs but failed to submit accom- 1 INSET but failed to submit accom-
with accomplishment plishment report within plishment report within plishment report within
report within the rating the rating period. the rating period. the rating period.
period.

1 lesson demonstration 1 lesson demonstration 1 lesson demonstration No demonstration


served with complete served with satisfactory served with unsatisfactory teaching done
documentation and with very remarks within the school remarks within the school year within the
satisfactory remarks within year school year
the school year

Conducted at least one action Conducted at least one action Action Research conducted but not No Action Research conducted
research and utilized division research and utilized school/ district utilized
wide supported by the following wide supported by the following
evidences: evidences:
Research proposal (in complete forma Research proposal (in complete format)
Research Report Research Report
Proposed interventions and programs Proposed interventions and programs
Proposed M & E for results outcome
92 - 85% active participation 84 - 75% active participation 74 - 51% active participation 50% and below active participation
in the preparation and enrichment in the preparation and enrichment in the preparation and enrichment in the preparation and enrichment
of curriculum; led in the dis- of curriculum; led in the dis- of curriculum; led in the dis- of curriculum; led in the dis-
cussion of professional ideas, cussion of professional ideas, cussion of professional ideas, cussion of professional ideas,
problems, issues and concern. problems, issues and concern. problems, issues and concern. problems, issues and concern.

92- 85% well prepared 84 - 75% well prepared 74 - 51%prepared 50% & below prepared
submitted, and imple- submitted, and imple- submitted, and imple- submitted, and imple-
mented lesson plans / mented lesson plans / mented lesson plans / mented lesson plans /
DLLs within the school year DLLs within the school year DLLs within the school year DLLs within the school year

Planned, implemented and monitored at Planned,


l implemented and monitored at lePlanned and implemented at least 1 No remedial classes were

remedial classes with remedial class with remedial classes with implemented for slow

complete intervention mate- complete intervention mate- incomplete intervention mate- learners within the
rials, accomplishment report rials, accomplishment report rials, accomplishment report the school year
and progress chart of students and progress chart of students and progress chart of students
within the school year within the school year within the school year

Introduced at least 2 innovative Introduced at least 1 innovative Introduced at least 1 innovative No innovative teaching was intro-

teaching approaches and strate- teaching approaches and strate- teaching approaches and strate- duced within the school year.

gies and led in the preparation of gies and led in the preparation of gies but failed to prepare
instructional materials within instructional materials within instructional materials within
the school year. the school year. the school year.

At least 90% required At least 80% required teaching At least 70% required 69% and below required

teaching load handled load handled every year. teaching load handled every teaching load handled
every year. year every year.
Increased/decreased specified Increased/decreased specified Increased/decreased specified
Maintained rate on specified
indicators to at least indicators to at least indicators to at least
indicaticators over previous
1% over the previous year. year. 1% over the previous year. 2% over the previous year.
Submitted validated reports on Submitted validated reports on Submitted validated reports on Submitted validated reports on

the evaluation monitoring the evaluation monitoring the evaluation monitoring the evaluation monitoring

and interpretation of results of and interpretation of results of and interpretation of results of and interpretation of results of
the teacher made test with at the teacher made test with at the teacher made test with at the teacher made test with
least 2 activities before the least 1 activity within the least 1 activity beyond the no activity beyond the
due date. due date. due date. due date.
92 - 85% checked actual no. of 84 - 75% checked actual no. of 74 - 51% checked actual no. of 50% and below checked actual no. of
teachers' LPs/DLLs and prepared teachers' LPs/DLLs and prepared teachers' LPs/DLLs and prepared teachers' LPs/DLLs and prepared
at least 4 lesson exemplars in at least 3 lesson exemplars in at least 2 lesson exemplars in at least lesson exemplar in
grade grade/ subject area within grade grade/ subject area within grade grade/ subject area within grade grade/ subject area within
the school year. the school year. the school year. the school year.

Incurred at least 4-8 absences Incurred at least 9-11 absences within Incurred at least12-14 absences within Incurred at least 15 absences and
within the school year the school year the school year above within the school year

Incurred at least 10-14 Incurred at least 15-19 Incurred at least 20-24 Incurred at least 25 and above
tardiness/undertime within the tardiness/undertime within the school tardiness/undertime within the school tardiness/undertime within the school
school year year year year

90- 76% of the teachers 75 - 50% of the teachers 49- 31% of the teachers 30% and below of the
assigned were monitored assigned were monitored assigned were monitored teachers assigned were
with monitoring reports with monitoring reports with monitoring reports monitored with monitoring
within the rating period. within the rating period. within the rating period. reports within the rating period.

Observed 85%-92% of the teachers Observed 75%-84% of the teachers


Observed 51%-74% of the teachers Observed 50% and below of the
under your supervision and under your supervision and
under your supervision and conducted at teachers under your supervision and
conducted at least 3 conducted at least 2
least 1 mentoring/coaching program failed to conduct mentoring/coaching
mentoring/coaching programs mentoring/coaching programs within
within the school year programs within the school year
within the school year the school year
Served at least once as chairman in Served at least 2 times as member in Served at least once as member in
Have not involved in designing and
designing and validating training designing and validating training designing and validating training
validating training programs for
programs for teachers in the programs for teachers in the programs for teachers in the
teachers in the department/school
department/school department/school department/school

Assisted in evaluating and rating Assisted in evaluating and rating the Assisted in evaluating and rating the Assisted in evaluating and rating the
the performance following the RPMS performance following the RPMS performance following the RPMS cycle of performance following the RPMS cycle
cycle of 92%-85% of teachers in the cycle of 84%-75% of teachers in the 74%-51% of teachers in the department of 50% and below of teachers in the
department within the rating period department within the rating period within the rating period department within the rating period

Have not assisted the selection


Assisted the selection committee at Assisted the selection committee at Assisted the selection committee at least
committee even once in the
least 2 times in evaluation of least once in evaluation of credentials once in evaluation of credentials when
evaluation of credentials when
credentials when hiring/promoting when hiring/promoting teachers hiring/promoting teachers but failed to
hiring/promoting teachers within the
teachers within the school year within the school year submit evidences within the school year
school year
Participated/Involved to at least 3 Participated/Involved to at least 2 Participated/Involved to at least 1 Have not participated/involved to any
programs/projects/activities in the programs/projects/activities in the program/project/activity in the program/project/activity in the
school/community sponsored or school/community sponsored or school/community sponsored or funded school/community sponsored or
funded by external stakeholders funded by external stakeholders by external stakeholders properly funded by external stakeholders
properly documented within the properly documented within the documented within the school year within the school year
school year school year

Assisted to at least 5 conducted PTA Assisted to at least 4 conducted PTA Assisted to at least 2-3 conducted PTA Assisted to at least 1 conducted PTA
meetings/conferences/home meetings/conferences/home meetings/conferences/home meetings/conferences/home
visitations/invitation to parents to visitations/invitation to parents to visitations/invitation to parents to visitations/invitation to parents to
update parents' on thier children's update parents' on thier children's update parents' on thier children's update parents' on thier children's
progress and problems progress and problems progress and problems progress and problems
At least 2 performance indicators At least 1 performance indicator was At least 1 performance indicator was No performance indicator was met
were met met met but no evidence

Overall Rating of Accomplishments


Rater Approving Authority
Evaluated, checked, improved and
prepared lesson plans in grade level
that: All indicators were met within the
100 % - Accomplished indicators 1, 2, 3, 4 , 5
targeted timeframe
- Provides adequacy and functionality in
the instruction.
Evaluated, checked and prepared
sample lesson plans for in grade level
that: All indicators were met within the
87 - 89% Accomplished indicators 1, 2, 3, 4
targeted timeframe
- Provided adequacy and functionality in
the instruction.
Evaluated prepared lesson plans in
grade level that: All indicators were met within the
75 - 86% Accomplished indicators 1, 2, 3,
- Provides adequacy and functionality in targeted timeframe
the instruction.
Evaluated, checked, improved prepared
sample lesson plans for in grade level
that: All indicators were met within the
63 - 74% Accomplished indicators 1, 2
targeted timeframe
- Provides adequacy and functionality in
the instruction.
Evaluated, checked, improved prepared
sample lesson plans for in grade level
that: Indicators were met beyond the targeted
51 - 62% Accomplished indicator 1
time-frame
- Provides adequacy and functionality in
the instruction.
All indicators were
Implemented remedial classes to met before the
100 % - Accomplished indicators 1, 2, 3, 4 , 5
address learning needs of students. targeted time
frame
All indicators were
met within the
Launched remedial classes 87 - 89% Accomplished indicators 1, 2, 3, 4
targeted time
frame
All indicators were
Submitted plan in remediation program met within the
75 - 86% Accomplished indicators 1, 2, 3,
to immdiate superior targeted time
frame
All indicators were
Developed strategic plan in conducting met within the
63 - 74% Accomplished indicators 1, 2
remediation targeted time
frame
Four or more
indicators were met
Proposed strategic remediation progran 51% - 62% Accomplished indicator 1
beyond the targeted
time-frame
All indicators were
Maintained/sustained communication met before the
100 % - Accomplished indicators 1, 2, 3, 4 , 5
with parents targeted time
frame

All indicators were


met within the
Followed up learners' progress 87 - 89% Accomplished indicators 1, 2, 3, 4
targeted time
frame
All indicators were
Conducted dialog/conferences on met within the
75 - 86% Accomplished indicators 1, 2, 3,
children's progress targeted time
frame
All indicators were
met within the
Prepared letter to parents 63 - 74% Accomplished indicators 1, 2
targeted time
frame
Four or more
Sought permission from the Principal to indicators were met
51 - 62% Accomplished indicator 1
Conduct Conference/PTA Meeting beyond the targeted
time-frame
National level enrichment of the All indicators were
curriculum of his/her field of met within the 100 % - Addresses learning gaps/difficulties
specialization. targeted timeframe
Regional level enrichment of the All indicators were
curriculum of his/her field of met within the 90% - Addresses learning gaps/difficulties
specialization. targeted timeframe
Division level enrichment of the All indicators were
curriculum of his/her field of met within the 85% - Addresses learning gaps/difficulties
specialization. targeted timeframe
School level enrichment of the All indicators were
curriculum of his/her field of met within the 70% - Addresses learning gaps/difficulties
specialization. targeted timeframe
Indicators were met
Locally enriches the curriculum of Below 70% - Addresses learning
beyond the targeted
his/her field of specialization gaps/difficulties
Locally enriches the curriculum of Below 70% - Addresses learning
his/her field of specialization gaps/difficulties
time-frame
All activities covered in indicators 1,2,3,4,
Implemented the approved instructional
5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
programs
time-frame.

At least one activity covered in indicators


Initiated the pilot implementation of the
1,2,3,4, 5 were not implemented within 87 - 89% Accomplished indicators 1, 2, 3, 4
approved instructional program.
the targeted time-frame.

At least two activities covered in


Presented the approved instructional indicators 1,2,3,4, 5 were not
75 -86% Accomplished indicators 1,2,3
programs to teachers. implemented within the targeted time-
frame.
At least three activities covered in
Sought for the approval of the
indicators 1,2,3,4, 5 were not
instructional program from the 63 - 74% Accomplished indicators 1, 2
implemented within the targeted time-
immediate superior.
frame.

Four or more of the activities covered in


Designed the intructional program indicators 1,2,3,4, 5 were implemented 51 - 62% Accomplished indicator 1
beyond the targeted time-frame.

Submitted validated reports on the


All activities covered in indicators
evaluation monitoring and
1,2,3,4,5 were implemented before the 100% - Accomplished indicators 1, 2, 3, 4 , 5
interpretation of results of the Teacher
targeted time-frame.
made test

At least one activity covered in indicators


LAC session on test preparation 1,2,3,4, 5 were not implemented within 87 - 99% - Accomplished indicators 1, 2, 3, 4
the targeted time-frame.

At least two activities covered in


Monitored the test results every indicators 1,2,3,4, 5 were not
75 - 86 % - Accomplished indicators 1, 2, 3,
Periodical Test implemented within the targeted time-
frame.
At least three activities covered in
indicators 1,2,3,4, 5 were not
Developed a Teacher made test 63 - 74 % - Accomplished indicators 1, 2
implemented within the targeted time-
frame.

Informed teachers regarding the Four or more activities covered in


schools teacher made test and indicators 1,2,3,4, 5 were implemented 51 - 62% - Accomplished indicator 1
consolidated test results beyond the targeted time-frame.

All indicators were


Presented the instructional materials met within the
made by the teachers to the Immediate 100% - Accomplished indicators 1, 2, 3, 4 , 5
Superior targeted time
frame
Indicators were
Checked and validated the instructional met within the
87 - 99% - Accomplished indicators 1, 2, 3, 4
materials made by the Teachers. targeted time
frame
Indicators were not
Followed up the designed instructional met within the
75 - 86 % - Accomplished indicators 1, 2, 3,
materials targeted time
frame
Oriented the Teachers for needs of Indicators were not
instructional materials met within the 63 - 74 % - Accomplished indicators 1, 2
reproduction/improvisation targeted time frame
Indicators were not
Conducted inventory on instructional
met within the 51 - 62% - Accomplished indicator 1
materials.
targeted time frame
All activities covered in indicators 1,2,3,4,
Presented the approved design of the
5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
training program.
time-frame.

At least one activity covered in indicators


Sought for the approval of the training
1,2,3,4, 5 were not implemented within 87-99% - Accomplished indicators 1,2,3,4
matrix from the immediate superior.
the targeted time-frame.

At least two activities covered in


indicators 1,2,3,4, 5 were not
Drafted the training matrix. 75 - 86% - Accomplished indicators 1,2,3
implemented within the targeted time-
frame.
At least three activities covered in
Attended the planning committee indicators 1,2,3,4, 5 were not
63 - 74 % - Accomplished indicators 1, 2
meeting. implemented within the targeted time-
frame.

Four or more of the activities covered in


Informed/notified about the training
indicators 1,2,3,4, 5 were implemented 51 - 62% - Accomplished indicator 1
program
beyond the targeted time-frame.

All indicators were


implemented before the
targeted time-frame.
All
Conducted the monitoring tool on the indicators were
discipline between the teachers and 87-99% - Accomplished indicators 1,2,3,4
learners. implemented before the
targeted time-frame.
All
Oriented teachers on the monitoring indicators were
75 - 86% - Accomplished indicators 1,2,3
tool implemented within the
targeted time-frame.
All
Sought for approval from the Immediate indicators were
63 - 74 % - Accomplished indicators 1, 2
Superior implemented within the
targeted time-frame.
All
indicators were
Secured monitoring tool 51 - 62% - Accomplished indicator 1
implemented beyond the
targeted time-frame.
All
indicators were
Served as trainer in School-based INSET 100% - Accomplished indicators 1, 2, 3, 4 , 5
implemented before the
targeted time-frame.
All
Prepared materials needed for the indicators were
INSET such as handouts, powerpoint 87-99% - Accomplished indicators 1,2,3,4
etc. implemented before the
targeted time-frame.
Attended in the planning session for the All indicators were met
75 - 86% Accomplished indicators 1,2,3
INSET within the targeted time-frame.
Sought approval from the Immediate
63 - 74% Accomplished indicators 1,2
Superior
At least one
indicator
Wrote a letter of intent 51 - 62% - Accomplished indicator 1
was met beyond
the targeted time-frame.
All
Maintained a record of checked lesson indicators were
100% - Accomplished indicators 1, 2, 3, 4 , 5
plans within the year. implemented before the
targeted time-frame.
All
indicators were
Prepared a feedback report 87-99% - Accomplished indicators 1,2,3,4
implemented before the
targeted time-frame.
All indicators were met
Checked lesson plan of Teachers within the targeted time-frame.
75 - 86% Accomplished indicators 1,2,3
atleast four times a month
Checked lesson plan of Teachers
75 - 86% Accomplished indicators 1,2,3
atleast four times a month

Prepared a checklist of Teachers 63 - 74% Accomplished indicators 1,2

At least one
Coordinated with the Head indicator
51 - 62% - Accomplished indicator 1
Teacher/School Head was met beyond
the targeted time-frame.
All activities covered in indicators 1,2,3,4,
Carried the regular teaching load for
5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
the assigned grade/level
time-frame.

At least one activity covered in indicators


Signed and accepted the teaching loads 1,2,3,4, 5 were not implemented within 87 - 99% Accomplisehd indicators 1,2,3,4
the targeted time-frame.

At least two activities covered in


Assigned to handle the regular teaching indicators 1,2,3,4, 5 were not
75 - 86% Accomplished indicators 1,2,3
load. implemented within the targeted time-
frame.
At least three activities covered in
Attended the meeting for the indicators 1,2,3,4, 5 were not
63 - 74 % - Accomplished indicators 1,2
distribution of teaching loads implemented within the targeted time-
frame.

Four or more of the activities covered in


Informed regarding the regular teaching
indicators 1,2,3,4, 5 were implemented
loads.
beyond the targeted time-frame.
51 - 62% - Accomplished indicator 1
All activities covered in indicators 1,2,3,4,
Submitted an accomplishment report 5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
time-frame.

At least one activity covered in indicators


Conducted follow up to students with
1,2,3,4, 5 were not implemented within 87 - 99% - Accomplished indicators 1, 2, 3, 4
problems
the targeted time-frame.

At least two activities covered in


indicators 1,2,3,4, 5 were not
Implemented the approved workplan 75 - 86 % - Accomplished indicators 1, 2, 3,
implemented within the targeted time-
frame.
At least three activities covered in
Sought the approval of the person in indicators 1,2,3,4, 5 were not
63 - 74 % - Accomplished indicators 1, 2
authority implemented within the targeted time-
frame.
Prepared a work plan in assisting the Four or more activities covered in
guidance counselor in handling indicators 1,2,3,4, 5 were implemented 51 - 62% - Accomplished indicator 1
students with problems in bullying beyond the targeted time-frame.

All activities covered in indicators 1,2,3,4,


Submitted an accomplishment report 5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
time-frame.

At least one activity covered in indicators


Conducted the echo seminar-workshop 1,2,3,4, 5 were not implemented within 87 - 99% - Accomplished indicators 1, 2, 3, 4
the targeted time-frame.

At least two activities covered in


Created technical working group,
indicators 1,2,3,4, 5 were not
organized planning/meeting on echo 75 - 86 % - Accomplished indicators 1, 2, 3,
implemented within the targeted time-
seminar-workshop
frame.
At least three activities covered in
Sought the approval of the person in indicators 1,2,3,4, 5 were not
63 - 74 % - Accomplished indicators 1, 2
authority implemented within the targeted time-
frame.

Four or more activities covered in


Prepared a training proposal indicators 1,2,3,4, 5 were implemented 51 - 62% - Accomplished indicator 1
beyond the targeted time-frame.

All activities covered in indicators 1,2,3,4,


Submitted monitoring report and
5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
accomplishment report for LAC session
time-frame.

At least one activity covered in indicators


Observed classes and Conducted LAC
1,2,3,4, 5 were not implemented within 87 - 99% - Accomplished indicators 1, 2, 3, 4
sessions
the targeted time-frame.

At least two activities covered in


Sought approval from immediate indicators 1,2,3,4, 5 were not
75 - 86 % - Accomplished indicators 1, 2, 3,
superior implemented within the targeted time-
frame.
At least three activities covered in
Created a work plan for mentoring/LAC indicators 1,2,3,4, 5 were not
63 - 74 % - Accomplished indicators 1, 2
session implemented within the targeted time-
frame.

Four or more activities covered in


Identified the teachers to be mentored indicators 1,2,3,4, 5 were implemented 51 - 62% - Accomplished indicator 1
beyond the targeted time-frame.

All activities covered in indicators 1,2,3,4,


Compiled the memorandum signed by
5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
the School Personnel
time-frame.
At least one activity covered in indicators
Disseminated the School Policies 1,2,3,4, 5 were not implemented within 87 - 99% - Accomplished indicators 1, 2, 3, 4
the targeted time-frame.

At least two activities covered in


Prepared a memorandum to
indicators 1,2,3,4, 5 were not
disseminate the School Policies signed 75 - 86 % - Accomplished indicators 1, 2, 3,
implemented within the targeted time-
by the School Head
frame.
At least three activities covered in
indicators 1,2,3,4, 5 were not
Reviewed the School Policies 63 - 74 % - Accomplished indicators 1, 2
implemented within the targeted time-
frame.

Four or more activities covered in


Downloaded/secured copy of School
indicators 1,2,3,4, 5 were implemented 51 - 62% - Accomplished indicator 1
Policies
beyond the targeted time-frame.

Submitted and reported to the


pPrincipal the results of classroom All activities covered in indicators 1,2,3,4,
observation and suggested intervention 5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
to furher improve the teaching-learning time-frame.
process

Completely accomplished the


At least one activity covered in indicators
classroom observation tool and
1,2,3,4, 5 were not implemented within 87 - 99% - Accomplished indicators 1, 2, 3, 4
conducted a post-conference session
the targeted time-frame.
with the observed teachers
At least two activities covered in
Observed the targeted number of
indicators 1,2,3,4, 5 were not
teachers using the classroom 75 - 86 % - Accomplished indicators 1, 2, 3,
implemented within the targeted time-
observation tool
frame.
Conducted meetings with the teachers At least three activities covered in
to be observed and oriented them on indicators 1,2,3,4, 5 were not
63 - 74 % - Accomplished indicators 1, 2
the criteria of classroom observation implemented within the targeted time-
tool frame.

Listed the names of teachers to be Four or more activities covered in


observed in the instructional indicators 1,2,3,4, 5 were implemented 51 - 62% - Accomplished indicator 1
supervisory logbook beyond the targeted time-frame.

Made oneself available for teachers'


consultation regarding the betterment All activities covered in indicators 1,2,3,4,
of his/her performance of duties and 5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
responsibilities and held records for time-frame.
such in the logbook
Constantly reminded the teachers At least one activity covered in indicators
about the strengths and weaknesses 1,2,3,4, 5 were not implemented within 87 - 99% - Accomplished indicators 1, 2, 3, 4
through FGD and noted the agreements the targeted time-frame.

Conducted classroom visitation to At least two activities covered in


check the performance of teacher's indicators 1,2,3,4, 5 were not
75 - 86 % - Accomplished indicators 1, 2, 3,
duties and responsibilities and recorded implemented within the targeted time-
the observation in the logbook frame.

Conducted an orientation with the At least three activities covered in


teachers on the duties and indicators 1,2,3,4, 5 were not
63 - 74 % - Accomplished indicators 1, 2
responsibilities and the planned implemented within the targeted time-
activities to monitor such frame.
Listed the teachers' duties and
Four or more activities covered in
responsibilities and plotted schedule on
indicators 1,2,3,4, 5 were implemented 51 - 62% - Accomplished indicator 1
teachers' orientation and consultation
beyond the targeted time-frame.
session
All activities covered in indicators 1,2,3,4,
Prepared and submitted class
5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
monitoring report
time-frame.

At least one activity covered in indicators


Conducted follow-up class monitoring 1,2,3,4, 5 were not implemented within 87 - 99% - Accomplished indicators 1, 2, 3, 4
the targeted time-frame.

At least two activities covered in


Conducted post
indicators 1,2,3,4, 5 were not
conference/feedbacking with the School 75 - 86 % - Accomplished indicators 1, 2, 3,
implemented within the targeted time-
Head
frame.
At least three activities covered in
Conducted class monitoring with the indicators 1,2,3,4, 5 were not
63 - 74 % - Accomplished indicators 1, 2
School Head implemented within the targeted time-
frame.

Four or more activities covered in


Informed by the School Head on the
indicators 1,2,3,4, 5 were implemented 51 - 62% - Accomplished indicator 1
scheduled monitoring
beyond the targeted time-frame.

Submitted the minutes of the meeting


All activities covered in indicators 1,2,3,4,
with theGgrade Chairman to discuss
5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
about the school
time-frame.
problems/awards/promotion

Conducted meetings with the Grade At least one activity covered in indicators
Chairman to discuss about the school 1,2,3,4, 5 were not implemented within 87 - 99% - Accomplished indicators 1, 2, 3, 4
problems/ awards/ promotion the targeted time-frame.
At least two activities covered in
Scheduled meeting/s with the grade
indicators 1,2,3,4, 5 were not
chairman whenever needed concerning 75 - 86 % - Accomplished indicators 1, 2, 3,
implemented within the targeted time-
school problems/ awards/ promotion
frame.
At least three activities covered in
indicators 1,2,3,4, 5 were not
Sought the approval of the school head 63 - 74 % - Accomplished indicators 1, 2
implemented within the targeted time-
frame.

Got hold of the copy of Four or more activities covered in


memo/advisory/letter pertaining to indicators 1,2,3,4, 5 were implemented 51 - 62% - Accomplished indicator 1
school problems/awards/ promotion beyond the targeted time-frame.
TO BE FILLED DURING
EVALUATION

ACTUAL RATING SCORE


RESULTS
Approving Authority

You might also like