Professional Documents
Culture Documents
Name of Employee:__________________________________
Position:MASTER TEACHER I (HS)
Review:____________________________________
Bureau/Center/Service:_________________________________
TO BE FILLED IN DURING PLANNING
MFQO's KEY RESULT AREAS Objectives Time Frame Weight per KRA
OUTSTANDING
(5)
4. Conducted action
research related to school or Year Round Conducted at least one action
classroom concerns during the year. research and utilized division
wide supported by the following
5% evidences:
Research proposal (in complete format)
Research Report
Proposed interventions and programs
Proposed M & E for results outcome
5.Participated in the preparation and 100- 93% active participation
enrichment of curriculum; led in the in the preparation and enrichment
June 2016-
5% of curriculum; led in the dis-
discussion of professional ideas, prob- March 2017
lems, issues and concern. cussion of professional ideas,
problems, issues and concern.
INSTRUCTIONAL
SUPERVISION 1. Assisted department head/school head in inJune 2016-March 2017 100 - 91% of the teachers
-25% tional monitoring classes 5% assigned were monitored
with monitoring reports
within the rating period.
2. Conducted mentoring/coaching program to
teachers in the department/school
Observed 100%-93% of the teachers
June 2016- under your supervision and conducted
5%
March 2017 at least 4 mentoring/coaching
programs within the school year
3. Designed and validated training programs
for teachers Served at least 2 times as chairman in
designing and validating training
Year Round 5%
programs for teachers in the
department/school
2. Designed/organized/implemented program
in the district/division/regional level
4.500-5.000 Outstanding
3.500-4.499 Very Satisfactory
2.500-3.499 Satisfactory
1.500-2.499 Unsatisfactory
Below 1.499 Poor
Instructional Competence
2
1
Instructional Competence
1
1
Instructional Competence
5
5
Initiated improvements in instructional program
4
Evaluated teacher-made tests, monitor and
interpet the result
Instructional 1
Competence
4
Assisted in designing capacity development
programs for teachers
Assisted in designing capacity development
programs for teachers
1
23. Serves as trainer
in school-based
INSET
3
3
1
25. Checked regularly
Instructional Supervision
lesson plans for
5
teachers in the
4
assgined grade/
3
subject area
2
1
Instructional
Supervision
5
1
Instructional
Supervision
5
4
3
Conducted echo-seminars for co-teachers
Instructional
Supervision
5
4
Instructional
Supervision
5
IN DURING PLANNING
PERFORMANCE INDICATORS
QUALITY, EFFECIENCY, TIMELINESS
VERY SATISFACTORY UNSATISFACTORY POOR
SATISFACTORY (3) (2) (1)
(4)
Attended at least 4 Attended at least 3 Attended at least 1 No attendance in any
trainings, seminars trainings, seminars trainings, seminars trainings, seminars
and related activities and related activities and related activities and related activities
and submitted all the and submitted all the and submitted all the within the school year'
required outputs within required outputs within required outputs within
the school year. the school year. the school year.
Conducted at least one action Conducted at least one action Action Research conducted but not No Action Research conducted
research and utilized division research and utilized school/ district utilized
wide supported by the following wide supported by the following
evidences: evidences:
Research proposal (in complete forma Research proposal (in complete format)
Research Report Research Report
Proposed interventions and programs Proposed interventions and programs
Proposed M & E for results outcome
92 - 85% active participation 84 - 75% active participation 74 - 51% active participation 50% and below active participation
in the preparation and enrichment in the preparation and enrichment in the preparation and enrichment in the preparation and enrichment
of curriculum; led in the dis- of curriculum; led in the dis- of curriculum; led in the dis- of curriculum; led in the dis-
cussion of professional ideas, cussion of professional ideas, cussion of professional ideas, cussion of professional ideas,
problems, issues and concern. problems, issues and concern. problems, issues and concern. problems, issues and concern.
92- 85% well prepared 84 - 75% well prepared 74 - 51%prepared 50% & below prepared
submitted, and imple- submitted, and imple- submitted, and imple- submitted, and imple-
mented lesson plans / mented lesson plans / mented lesson plans / mented lesson plans /
DLLs within the school year DLLs within the school year DLLs within the school year DLLs within the school year
remedial classes with remedial class with remedial classes with implemented for slow
complete intervention mate- complete intervention mate- incomplete intervention mate- learners within the
rials, accomplishment report rials, accomplishment report rials, accomplishment report the school year
and progress chart of students and progress chart of students and progress chart of students
within the school year within the school year within the school year
Introduced at least 2 innovative Introduced at least 1 innovative Introduced at least 1 innovative No innovative teaching was intro-
teaching approaches and strate- teaching approaches and strate- teaching approaches and strate- duced within the school year.
gies and led in the preparation of gies and led in the preparation of gies but failed to prepare
instructional materials within instructional materials within instructional materials within
the school year. the school year. the school year.
At least 90% required At least 80% required teaching At least 70% required 69% and below required
teaching load handled load handled every year. teaching load handled every teaching load handled
every year. year every year.
Increased/decreased specified Increased/decreased specified Increased/decreased specified
Maintained rate on specified
indicators to at least indicators to at least indicators to at least
indicaticators over previous
1% over the previous year. year. 1% over the previous year. 2% over the previous year.
Submitted validated reports on Submitted validated reports on Submitted validated reports on Submitted validated reports on
the evaluation monitoring the evaluation monitoring the evaluation monitoring the evaluation monitoring
and interpretation of results of and interpretation of results of and interpretation of results of and interpretation of results of
the teacher made test with at the teacher made test with at the teacher made test with at the teacher made test with
least 2 activities before the least 1 activity within the least 1 activity beyond the no activity beyond the
due date. due date. due date. due date.
92 - 85% checked actual no. of 84 - 75% checked actual no. of 74 - 51% checked actual no. of 50% and below checked actual no. of
teachers' LPs/DLLs and prepared teachers' LPs/DLLs and prepared teachers' LPs/DLLs and prepared teachers' LPs/DLLs and prepared
at least 4 lesson exemplars in at least 3 lesson exemplars in at least 2 lesson exemplars in at least lesson exemplar in
grade grade/ subject area within grade grade/ subject area within grade grade/ subject area within grade grade/ subject area within
the school year. the school year. the school year. the school year.
Incurred at least 4-8 absences Incurred at least 9-11 absences within Incurred at least12-14 absences within Incurred at least 15 absences and
within the school year the school year the school year above within the school year
Incurred at least 10-14 Incurred at least 15-19 Incurred at least 20-24 Incurred at least 25 and above
tardiness/undertime within the tardiness/undertime within the school tardiness/undertime within the school tardiness/undertime within the school
school year year year year
90- 76% of the teachers 75 - 50% of the teachers 49- 31% of the teachers 30% and below of the
assigned were monitored assigned were monitored assigned were monitored teachers assigned were
with monitoring reports with monitoring reports with monitoring reports monitored with monitoring
within the rating period. within the rating period. within the rating period. reports within the rating period.
Assisted in evaluating and rating Assisted in evaluating and rating the Assisted in evaluating and rating the Assisted in evaluating and rating the
the performance following the RPMS performance following the RPMS performance following the RPMS cycle of performance following the RPMS cycle
cycle of 92%-85% of teachers in the cycle of 84%-75% of teachers in the 74%-51% of teachers in the department of 50% and below of teachers in the
department within the rating period department within the rating period within the rating period department within the rating period
Assisted to at least 5 conducted PTA Assisted to at least 4 conducted PTA Assisted to at least 2-3 conducted PTA Assisted to at least 1 conducted PTA
meetings/conferences/home meetings/conferences/home meetings/conferences/home meetings/conferences/home
visitations/invitation to parents to visitations/invitation to parents to visitations/invitation to parents to visitations/invitation to parents to
update parents' on thier children's update parents' on thier children's update parents' on thier children's update parents' on thier children's
progress and problems progress and problems progress and problems progress and problems
At least 2 performance indicators At least 1 performance indicator was At least 1 performance indicator was No performance indicator was met
were met met met but no evidence
At least one
Coordinated with the Head indicator
51 - 62% - Accomplished indicator 1
Teacher/School Head was met beyond
the targeted time-frame.
All activities covered in indicators 1,2,3,4,
Carried the regular teaching load for
5 were implemented before the targeted 100% - Accomplished indicators 1, 2, 3, 4 , 5
the assigned grade/level
time-frame.
Conducted meetings with the Grade At least one activity covered in indicators
Chairman to discuss about the school 1,2,3,4, 5 were not implemented within 87 - 99% - Accomplished indicators 1, 2, 3, 4
problems/ awards/ promotion the targeted time-frame.
At least two activities covered in
Scheduled meeting/s with the grade
indicators 1,2,3,4, 5 were not
chairman whenever needed concerning 75 - 86 % - Accomplished indicators 1, 2, 3,
implemented within the targeted time-
school problems/ awards/ promotion
frame.
At least three activities covered in
indicators 1,2,3,4, 5 were not
Sought the approval of the school head 63 - 74 % - Accomplished indicators 1, 2
implemented within the targeted time-
frame.