You are on page 1of 113

VALVESTAR 7

Training lectures Walk through

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01
Introduction
Introduction Introduction
Sizing

Fire Case
These Training Lectures for VALVESTAR 7 must be used by all teachers of
VALVESTAR 7 to ensure the most efficient training and the highest quality of training.
Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force
VALVESTAR 7, the sizing tool of LESER, is more than only a calculation tool:

Reporting VALVESTAR is a calculation tool for Safety Valves according


all world wide known and used rules and standards
Settings
VALVESTAR is a sizing tool for LESER Safety Valves
Language with an option configuration tool
Translation VALVESTAR is a product register of LESER Safety Valves
with all the product specific data in VALVE INFO
How to change data
VALVESTAR is a medium database with several specific
Copy and paste liquid- and gaseous medium data
Update via Internet VALVESTAR is a visual database with all drawings of LESER Safety Valves and
spotlights of possible options
www.valvestar.com
VALVESTAR is a documentation tool with three different types of documents and
Spare Parts many different available formats.
VALVESTAR is easy to handle with the Wizard which leads you through the sizing

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 2 / 113
Introduction
Introduction Introduction
Sizing Pop-up view of VALVESTAR 7.1.2 and higher

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 3 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case Service condition: Air, Set pressure = 10bar g, required massflow = 11500kg/h
Two Phase Flow Valve construction: Type 441, semi nozzle, Carbon Steel body (1.0619/WCB),
Add. Sizing, Noise Level,
closed bonnet, lifting device cap H4
Reaction Force

Reporting 1. Step: How to start

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com
or: see next page
Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 4 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 1. Step: How to start

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 5 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 2. Step: Sizing standard and additional calculation

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 6 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 3. Step: Medium database and medium selection

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 7 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 4. Step: Service condition

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 8 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 5. Step: Service condition

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 9 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 6. Step: Valve Finder

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 10 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 7. Step: Processing of all possible safety valves

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 11 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 8. Step: Connections

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 12 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case Flange Guide

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 13 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 9. Step: Options

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 14 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 10. Step: Materialist

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 15 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 11. Step: Valve Dimensions

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 16 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 12. Step: Finish Sizing

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 17 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 13. Step: Valve Calculation

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 18 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (steam/gases)

Fire Case 14 Step: ERRORs and Warnings

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste


Errors and warnings are shown at the end of a sizing or:
Update via Internet
during sizing, indicated by the flashing yellow label.
www.valvestar.com Click on the symbol for a listing of the errors and warnings.

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 19 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)

Fire Case Service condition: Heavy Oil, Set pressure = 500 bar g, Temperature 20C,
required massflow = 100000kg/h, viscosity = 0,038 Pa s.
Two Phase Flow
Valve construction: Type 526, Fullnozzle, Carbon Steel body (1.0619/WCB), closed
Add. Sizing, Noise Level,
Reaction Force bonnet, lifting divice cap H2, stainless steel bellows design.
Reporting
1. Step: Sizing Standard and additional calculation
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 20 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)

Fire Case 2. Step: Medium database and medium selection

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 21 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)

Fire Case 3. Step: Service condition

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 22 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)

Fire Case 4. Step: Valve Finder

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 23 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)

Fire Case 5. Step: Processing of all possible safety valves

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 24 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)

Fire Case 6. Step: Connection

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 25 / 113
Introduction Sizing
Sizing
Sizing Sizing according to ASME, (liquids)

Fire Case 7. Step: Sizing finished

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 26 / 113
Introduction Sizing of inlet pressure drop
Sizing
Sizing (according AD 2000-Markblatt A2)

Fire Case 1. Step: Additional calculation


When starting a new sizing:
Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 27 / 113
Introduction Sizing of inlet pressure drop
Sizing
Sizing (according AD 2000-Markblatt A2)

Fire Case 1. Step: Additional calculation


You can also start inlet pressure drop calculation in menu
Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data


or start in project tree
Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 28 / 113
Introduction Sizing of inlet pressure drop
Sizing
Sizing (according AD 2000-Markblatt A2)

Fire Case 2. Step: Dimension of inlet pipe and pipe components

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 29 / 113
Introduction Sizing of inlet pressure drop
Sizing
Sizing (according AD 2000-Markblatt A2)

Fire Case 3. Step: Dimension of inlet pipe and pipe components

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 30 / 113
Introduction Sizing of built-up backpressure
Sizing
Sizing

Fire Case 1. Step: Dimension of inlet pipe and pipe components


When starting a new sizing:
Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 31 / 113
Introduction Sizing of built-up backpressure
Sizing
Sizing

Fire Case 1. Step: Dimension of outlet pipe and pipe components


You can also start built-up backpressure calculation in menu
Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

or start in project three


How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 32 / 113
Introduction Sizing of built-up backpressure
Sizing
Sizing

Fire Case 2. Step: Dimension of outlet pipe and pipe components

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 33 / 113
Introduction Sizing of built-up backpressure
Sizing
Sizing

Fire Case 3. Step: Calculation and warning

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 34 / 113
Introduction Fire case according to API RP 521
Sizing

Fire Case
Fire Case 3. Step: Calculation and warning

Two Phase Flow Service condition: water, temperature = 20C, Set pressure = 10bar g, effect of fire
Add. Sizing, Noise Level,
on the wetted surface of vessel, wetted surface = 10m, no
Reaction Force drainage, bare vessel, heat of evaporation 1998,5 kJ/kg
Reporting
Valve construction: Type 526, full nozzle, Carbon Steel body (1.0619/WCB),
Settings
closed bonnet, lifting device cap H2

Language
API RP 521
Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 35 / 113
Introduction Fire case according to API RP 521
Sizing

Fire Case
Fire Case API RP 521

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 36 / 113
Introduction Fire case according to API RP 521
Sizing

Fire Case
Fire Case API RP 521

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 37 / 113
Introduction Fire case according to API RP 521
Sizing

Fire Case
Fire Case API RP 521

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 38 / 113
Introduction Two Phase Flow
Sizing LESER mixed formula

Fire Case Service condition: hot water, temperature = 150C, Set pressure = 10bar g,
required massflow = 10000kg/h
Two Phase
Two Phase Flow
Flow
Valve construction: Type 441, semi nozzle, Carbon Steel body (1.0619/WCB),
Add. Sizing, Noise Level,
Reaction Force closed bonnet, lifting device cap H2, evaporation while
depressuring from 10bar g to environmental pressure in case
Reporting
of blow off.
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 39 / 113
Introduction Two Phase Flow
Sizing LESER mixed formula

Fire Case

Two Phase
Two Phase Flow
Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 40 / 113
Introduction Two Phase Flow
Sizing LESER mixed formula

Fire Case

Two Phase
Two Phase Flow
Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

All the next steps until finish are not shown.

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 41 / 113
Introduction Two Phase Flow
Sizing LESER mixed formula

Fire Case Result: Documentation on screen

Two Phase
Two Phase Flow
Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 42 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100

Fire Case Service condition: Butane, Set pressure = 10bar g, required massflow = 10000kg/h
Valve construction: Type 441, semi nozzle, Carbon Steel body (1.0619/WCB),
Two Phase
Two Phase Flow
Flow
closed bonnet, lifting device cap H2
Add. Sizing, Noise Level,
Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 43 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100

Fire Case

Two Phase
Two Phase Flow
Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 44 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100

Fire Case

Two Phase
Two Phase Flow
Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 45 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100

Fire Case

Two Phase
Two Phase Flow
Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 46 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100

Fire Case

Two Phase
Two Phase Flow
Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 47 / 113
Introduction Two Phase Flow
Sizing VdTV Merkblatt 100

Fire Case Result: Documentation on screen


Two Phase
Two Phase Flow
Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 48 / 113
Introduction Two Phase Flow
Sizing Omega method according API 520 Appendix D

Fire Case Service condition: Propene; Set pressure = 10bar g,


required massflow = 10000kg/h
Two Phase
Two Phase Flow
Flow

Add. Sizing, Noise Level,


Valve construction: Type 441, semi nozzle, Carbon Steel body (1.0619/WCB),
Reaction Force closed bonnet, lifting device cap H2
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 49 / 113
Introduction Additional Sizings, Noise Level,
Sizing Reaction Forces
Fire Case 1. Step: Reaction force and noise level

Two Phase Flow

Add.
Add. Sizing,
Sizing,Noise
NoiseLevel,
Reaction
Level, Force Force
Reaction

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 50 / 113
Introduction Additional Sizings, Noise Level,
Sizing Reaction Forces
Fire Case 1. Step: Reaction force and noise level

Two Phase Flow

Add.
Add. Sizing,
Sizing,Noise
NoiseLevel,
Reaction
Level, Force Force
Reaction

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 51 / 113
Introduction Reporting
Sizing

Fire Case 1. Step: Create a report

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 52 / 113
Introduction Reporting
Sizing

Fire Case 1. Step: Create a report

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 53 / 113
Introduction Reporting
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 54 / 113
Introduction Reporting
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 55 / 113
Introduction Reporting
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 56 / 113
Introduction Reporting
Sizing

Fire Case 1. Step: Create a report

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 57 / 113
Introduction Reporting
Sizing

Fire Case 2. Step: Create a one page report

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 58 / 113
Introduction Reporting
Sizing

Fire Case 2. Step: Create a one page report

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 59 / 113
Introduction Reporting
Sizing

Fire Case 2. Step: Create a one page report

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 60 / 113
Introduction Reporting
Sizing

Fire Case 3. Step: Create a project report

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 61 / 113
Introduction Reporting
Sizing

Fire Case 3. Step: Create a project report

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 62 / 113
Introduction Reporting
Sizing

Fire Case What is new for dimensions S1, S2, c?

Two Phase Flow


These data have been added to the database for all slip on flange based safety valve
and all full nozzle safety valve to get the correct bolt length or thread length.
Add. Sizing, Noise Level,
Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 63 / 113
Introduction Reporting
Sizing

Fire Case How I find it in the documentation

Two Phase Flow


In the report full-version the additional dimensions are listed if these are available

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 64 / 113
Introduction Reporting
Sizing

Fire Case How I find it in the documentation

Two Phase Flow


In the one-page report the additional dimensions are listed if these are available

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 65 / 113
Introduction Reporting
Sizing

Fire Case What is the Product datasheet ?

Two Phase Flow


The product datasheet is an overview of a single safety valve and its main features like
drawing, dimensions and weight, possible options, approval, ...
Add. Sizing, Noise Level,
Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 66 / 113
Introduction Reporting
Sizing

Fire Case What is the Product datasheet ?

Two Phase Flow


For product datasheet two different drawings as main drawing could be selected:
coloured drawing as standard and sectional drawing if needed.
Add. Sizing, Noise Level,
Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 67 / 113
Introduction Reporting
Sizing

Fire Case What is the Product datasheet ?

Two Phase Flow


With coloured drawing as standard

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 68 / 113
Introduction Reporting
Sizing

Fire Case What is the Product datasheet ?

Two Phase Flow


With sectional drawing

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 69 / 113
Introduction Reporting
Sizing

Fire Case What is different to a report or one-page report?

Two Phase Flow


The product datasheet is also available without sizing, with the feature Valve finder

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 70 / 113
Introduction Reporting
Sizing

Fire Case What is different to a report or one-page report?

Two Phase Flow


All possible options are listed and shown

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 71 / 113
Introduction Reporting
Sizing

Fire Case What is the report one-page-vertical ?

Two Phase Flow


This report is an advanced one-page report with additional data which are necessary
for completeness
Add. Sizing, Noise Level,
Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 72 / 113
Introduction Reporting
Sizing

Fire Case What is the report onepage-vertical ?

Two Phase Flow


This report is available as xls-file to change data for future redesign. The source of
template is preset.
Add. Sizing, Noise Level,
Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 73 / 113
Introduction Reporting
Sizing

Fire Case What is the report one-page-vertical ?

Two Phase Flow


Define a file

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 74 / 113
Introduction Reporting
Sizing

Fire Case What is the report one-page-vertical ?

Two Phase Flow


The page has to be adjusted to an A4-format

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 75 / 113
Introduction Reporting
Sizing

Fire Case What is the report one-page-vertical ?

Two Phase Flow


The page has to be adjusted to an A4-format

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 76 / 113
Introduction Reporting
Sizing

Fire Case What is the report one-page-vertical ?

Two Phase Flow


The EXCEL-file can be added with additional data from user.
Main data are picked from sizing data
Add. Sizing, Noise Level,
Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 77 / 113
Introduction Reporting
Sizing

Fire Case What is the feature name plate?

Two Phase Flow


Three current nameplates
are printed in the report
Add. Sizing, Noise Level,
Reaction Force full-version
Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 78 / 113
Introduction Reporting
Sizing

Fire Case How can I add data to the initial name plate?

Two Phase Flow


It is possible to add serial numbers and date of delivery later

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 79 / 113
Introduction Reporting
Sizing

Fire Case How can I add data to the initial name plate?

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 80 / 113
Introduction Reporting
Sizing

Fire Case After adding, what is new on name plate?

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 81 / 113
Introduction Settings
Sizing Profiles

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 82 / 113
Introduction Settings
Sizing Profiles

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 83 / 113
Introduction Settings
Sizing Profiles

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 84 / 113
Introduction Settings
Sizing Profiles

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 85 / 113
Introduction Settings
Sizing Profiles

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 86 / 113
Introduction Settings
Sizing Profiles

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 87 / 113
Introduction Settings
Sizing Profiles

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 88 / 113
Introduction Settings
Sizing Profiles

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 89 / 113
Introduction Settings
Sizing Profiles

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 90 / 113
Introduction Settings
Sizing Profiles

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 91 / 113
Introduction Settings
Sizing Profiles

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings
Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 92 / 113
Introduction Language
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language
Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 93 / 113
Introduction Translation
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation
Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 94 / 113
Introduction Translation
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation
Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 95 / 113
Introduction How to change data
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to
How to change
changedata
data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 96 / 113
Introduction How to change data
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation Not possible to


change
How to
How to change
changedata
data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 97 / 113
Introduction How to change data
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to
How to change
changedata
data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 98 / 113
Introduction How to change data
Sizing

Fire Case
How to manually input a reseller article no.
First: Do a standard sizing
Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to
How to change
changedata
data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 99 / 113
Introduction How to change data
Sizing

Fire Case
How to manually input a reseller article no.
Second: Add a reseller article no.
Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to
How to change
changedata
data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 100 / 113
Introduction Copy and Paste
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and
Copy andpaste
paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 101 / 113
Introduction Copy and Paste
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and
Copy andpaste
paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 102 / 113
Introduction How to change data
Sizing

Fire Case
What are the features for better handling?
Sort function in menue View
Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and
Copy andpaste
paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 103 / 113
Introduction How to change data
Sizing

Fire Case
What are the features for better handling?
Printing in one pdf-file for all sizings of one project can be done with documentation
Two Phase Flow
report full-version
Add. Sizing, Noise Level,
Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and
Copy andpaste
paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 104 / 113
Introduction How to change data
Sizing

Fire Case
Where is the pdf-filed automatically?
Filed in the project storage
Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and
Copy andpaste
paste

Update via Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 105 / 113
Introduction Update via Internet
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via
Update viaInternet
Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 106 / 113
Introduction Update via Internet
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via
Update viaInternet
Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 107 / 113
Introduction Update via Internet
Sizing Homepage www.leser.com

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via
Update viaInternet
Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 108 / 113
Introduction Update via Internet
Sizing www.leser.com/en/services/valvestar

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via
Update viaInternet
Internet

www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 109 / 113
Introduction www.valvestar.com
Sizing

Fire Case

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com
www.valvestar.com

Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 110 / 113
Introduction Spare Parts
Sizing

Fire Case What is the new feature spare parts?

Two Phase Flow


Two different listings of spare parts are available. Listing while single sizing
in the report full-version and a spir list of complete project spare parts.
Add. Sizing, Noise Level,
Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts
Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 111 / 113
Introduction Spare Parts
Sizing

Fire Case What is a spir list and how I generate a spir list?

Two Phase Flow


A spir list is a summerize of spare parts which are generated of a complete project.
If equal parts are used in different sized valves this will affect the maximum quantity
Add. Sizing, Noise Level,
Reaction Force of parts which are shown in the spir list
Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts
Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 112 / 113
Introduction Spare Parts
Sizing

Fire Case What is a spir list and how I generate a spir list?

Two Phase Flow

Add. Sizing, Noise Level,


Reaction Force

Reporting

Settings

Language

Translation

How to change data

Copy and paste

Update via Internet

www.valvestar.com

Spare Parts
Spare Parts

VALVESTAR 7 Training lectures Walk through | LESER GmbH & Co. KG | 25.02.2011 | Rev. 01 113 / 113

You might also like