You are on page 1of 1

L = VARIABLE

SUBGRADE ELEVATION

ASPHALTIC CONCRETE SURFACE


TYPE 1A BASE COURSE
TYPE 3 SUBBASE COURSE
GROUND IMPROVEMENT MATERIAL

PAVEMENT SECTION
( UNDER SUBGRADE ELEVATION)
SCALE: WITHOUT SCALE

L = VARIABLE

PROJECT ELEVATION

ASPHALTIC CONCRETE SURFACE


1.5 1.5
1
TYPE 1A BASE COURSE 1

TYPE 3 SUBBASE COURSE SUBGRADE ELEVATION

PAVEMENT SECTION
( OVER SUBGRADE ELEVATION)
SCALE: WITHOUT SCALE

GENERAL IMPLANTATION SUMMARY LAYER THICKNESSES OF FLEXIBLE PAVEMENT


Scale : 1:17500

version no. legend client project title drawing title date

ZONE 1-B AND ZONE 2 ( GROUND 04-2017


ZONE 1A New Guayaquil International Airport
IMPROVEMENT MATERIAL ) FLEXIBLE PAVEMENT ZONES OF THE NAIG submitted by:

WAYS
consultans
OVERPASSES ZONE ZONE 1B
drawing no. scale

PARKING ZONE ZONE 2 DWG_1/1 INDICATED