Professional Documents
Culture Documents
Observations
W2-W1 W5
W3-W4 (W4-W1)-(W3-W2) W6
Specific Gravity=(W2-W1)/(W2-W1)-(W3-W4)
312 312
812 812
1826 1826
1514 1514
500 500
188 188
2.66 2.66
2.66
Test 1 Test 2
500 1325
495 1315
5 10
1.01 0.76
0.89%
Name of Work : Trial
Observations Test 1
1119
500
619
990
982
0.81
0.81
2.65
2.65
Gradation of Fine Aggregate
Name of Work : Trial
Weight Cummulative
I.S.Sieve Size Percent Percent Passing
Retained in Percent Retained
MM Retained % %
Gms %
Weight Cummulative
I.S.Sieve Size Percent Percent Passing
Retained in Percent Retained
MM Retained % %
Gms %
40MM 20MM
100
100.00 100.00
95--100 100
88.30 88.30
30--70 95--100
-79.90 -79.90
10--35 25--55
-197.60 -197.60
0--5 0--10
20mm
Concrete mix design(IS 10262-2009)
Name of Work:
53N/sq.mm.
3.15
2.65
2.66
0.81
0.89
Zone III
5
33.25Mpa
W/C Ratio-0.46
0.46
Lit/Cum-186
Min.
Exposure Cement
Mild-RCC 300
0.46 Moderate -RCC 300
404Kg/Cum Severe -RCC 320
300Kg/Cum Very severe -RCC 340
Extreme -RCC 360
Table 5
Max. WCR Min.
Grade
0.55 M20
0.50 M25
0.45 M30
0.45 M35
0.40 M40
Step F : Proportion of Coarse aggregate And Fine aggregate
IS specify volume of coarse
aggregate depends on zone of Maximum Aggregate Size Volume of Coar. Aggre. for san
sand, but for 50 mm. standard ZoneIV Zone III
slump as follows
10 mm 0.5 0.48
20 mm 0.66 0.64
40 mm 0.75 0.73
Note - if water cement ratio is lower than 0.50 the proportionof volume of coarse
aggregate is varies at the rate of - / + 0.01 for every +- 0.05 change in water cement
ratio
0.01 * (0.50 - *) / 0.05 = ** and the corrected aggreagte contendt will be***-**=
0.64
0.63
0.37
404 Kg/Cum
186 Kg/Cum
0.37 Cum
0.63 Cum
1 Cum
0.1283 Cum
0.186 Cum
0.686 Cum
1147 Kg
671 Kg
W.C. Ratio
0.50
Step L : Trials
Prepare mix using above mix proportion. Observe slump, texture cohesiveness, workaility of fresh
concrete. Make necessary adjustments based on observations. Take atleaset three trials by
increasing an / or decreasing the water cement ratio. For economy utilise miximum water cemen
ration. observe 7 days and 28 days strengths of cubes. finalise the mix based on strength.
esiveness, workaility of fresh
ke atleaset three trials by
tilise miximum water cement
he mix based on strength.
Name of Work :
1
2
3