Flow
Average Flow = 4 MLD
= 166.6667 m3/ hr
3
= 0.046296 m / sec
BOD5 = 10 mg/L
COD = 50 mg/L
TSS = 10 mg/L
NH4-N = 5 mg/L
TN = 10 mg/L
TP = 1 mg/L
PRIMARY TREATMENT UNITS
Inlet Chamber
2
Considering Maximum area of opening = 0.128600823 m
Slope Provided.
Headloss
V2 = 0.382614019 m/s
V1 needed = 0.687704936 m/s
V1 assumed = 0.9 m/s
H=0.0729(V1^2 - V2^2)
Headloss required = 0.023805101 m
Kirshmer's Method
Velovity head of flow approaching rack = 0.024104897 m/s
Velocity head assumed as approaching rack = 0.041284404 m/s
Assume angle of bar inclination = 75 degrees
Headloss required = 0.02178948 m/s
Headloss for assumed velocity = 0.037318795 m/s
The screen chamber design can be used since headloss < 0.15m
Headloss suggested = 0.043 m
Headloss at 50% clogged condition
For assumed peak velocity = 0.05490605 m
For calculated peak velocity = 0.09403747 m
The screen chamber design can be used since headloss < 0.30m
Headloss
V2 = 0.236205593 m/s
V1 needed = 0.645874669 m/s
V1 assumed = 0.9 m/s
Kirshmer's Method
PARSHALL FLUME
SLUDGE PRODUCTION
3
Time (Hr) Flow (m /hr) Cumulative Flow Cum. Avg. Flow Cum Flow - Avg Flow
Equalisation Tank
4500
4000
3500
3000
2500
2000
1500
1000
500
0
0 5 10 15 20 25 30
SLUDGE FLOWS
Q = 4 MLD
= 0.046296296 m3/ sec
BOD (So) = 355 mg/L
Se = 10 mg/L
TKN = 35 mg/L
Biokinetic Parameters
Operating Temperature 25 C
Biokinetic Parameters at 25 C
Assumptions:
F/M = 0.35
Xt = 3000 mg/L
K = 0.2 L/mg/day
Yt = 0.5
Ks = 80 mg/L
Xs = 10000 mg/L
CONVENTIONAL ASP
q = K* Se
q = 2 /day
Va = Qavg * (So - Se)/FM/Xt/q
= 657142.8571 L
= 657.1428571 m3
c (ASP) = Va*Xt/((Yt*Q*(So- Se) - (Va*Xt*Kd))
= 4.347826087 days
Nitrification:
n + Kdn = [(n,max*Ne)/(Kn+Ne)]*[Do/(Kd+Do)]
Assuming
Ne = 0.5 mg/L
Do = 2 mg/L
Ko = 0.5 mg/L
Theoretical SRT
c (necessary) = 1/n
= 5.228617732 days
Biomass Production
NO3- concn.
Ne = 0.5 mg/L
Nox = TKN - Ne - 0.122(X/Q) = 24.24624495 mg/L
Observer Yield:
Oxygen Demand
If F/Mb = 0 to 20, figure 8.23, Metcalf and Eddy shows SDNR = 0.42 gNO3-N/g-biomass/day @ 20deg C
a = 0.6 hour
Nox Feed / No3-N capacity = 0.78
Qavg = 4 MLD
Qpeak = 10 MLD
X = 3000 mg/L
Xr = 8000 mg/L
R = 0.6
Hydraulic application rate (16 to 28 ) = 25 m3/m2/day
Area of clarifier = 160 m2
Solid Loading Rate = (1+R)Q.MLSS/A = 120 Kg MLSS/m2/day
SLR = 5 Kg/M2/hr
SLR is within the rate of 4 to 6 Kg/m2/hr
Biological Phosphorus Removal
Assume:
PAOs produced:
Yobs*bsCOD = 31.69643 mg/L
Heterotrophs produced
Yobs*(bCOD -bsCOD) = 63.39286 mg/L
F = (1+R)/(1+(1-)*R)^2
F = 2.366863905
Total Efficiency
E = ((So-Se)/So)*100
= 94.36619718
E = 0.95
W1 = Q*So
= 1420000000 mg/day
= 1420 kg/day
Assume E1 = 0.8
W2 = (1-E1)W1
= 284 kg/day
E2 = 0.75
By Solver
E1 E2 W1 W2 V1 V2 Absolute Error
0.843425013 0.681 1420 222.33648 3370.3 3370.3 8.42037E-08
By Iteration
E1 E2 W1 W2 V1 V2 Absolute Error
0.8 0.75 1420 284 1858.405 5226.76 3368.35928
0.81 0.737 1420 269.8 2110.976 4792.73 2681.753233
0.82 0.722 1420 255.6 2410.478 4362.09 1951.612167
0.83 0.706 1420 241.4 2768.718 3935.45 1166.727955
0.84 0.688 1420 227.2 3201.393 3513.55 312.153985
0.841 0.686 1420 225.78 3249.512 3471.65 222.1406456
0.842 0.684 1420 224.36 3298.606 3429.82 131.2102205
0.843 0.682 1420 222.94 3348.7 3388.04 39.33815171
0.8431 0.681 1420 222.798 3353.766 3383.86 30.09818492
0.8432 0.681 1420 222.656 3358.841 3379.69 20.84852287
0.8433 0.681 1420 222.514 3363.927 3375.52 11.58913966
0.8434 0.681 1420 222.372 3369.024 3371.34 2.320009285
0.84341 0.681 1420 222.3578 3369.534 3370.93 1.392559151
0.84342 0.681 1420 222.3436 3370.044 3370.51 0.465011258
0.843425 0.681 1420 222.3365 3370.3 3370.3 0.001200644
W2 = W1 * (1-E1)
222.3364816 kg/day
To Calculate Volume
Assumed Depth = 3 m
Area of each trickling
filter = 1123.433422 m2
So = 355 mg/L
Se = 10 mg/L
Qo = 4 MLD
= 2.777777778 m3/min
n = 0.5
R = 2
Depth = 10 m
Si = (So + RSe)/(1+R) =
Si = 125 mg/L
0.08 = 0.080000004
By Solver:
Q = 0.173566577 m3/m2/min
No. Of tanks = 2
Q = 4 MLD
So = 355 mg/L
Se,n = 10 mg/L
SO,
Q(So - Se2) = Q(So - Se1) + P*A2*Se2/(Ks + Se2)
E2 = (E - E1)/(1 - E1)
By Solver:
abs(A1 -
E1 E2 Se1 A1 A2 A2)
E1 0.79
E2 0.866
Se1 74.57994341 mg/L
Area (A1 = A2) 92.99511851 m2
Reactor Volume
Vn = Q*So/OLR
= 311.2 m3
Vl = Vn/E
Vl = 389 m3
Reactor Dimensions
Area = Q/v
v is Design Upflow Superficial Velocity
Assuming totally soluble COD, From table 10.14 Metcalf and Eddy
v = 1 m/hr
= 24 m/day
Area = 166.6666667 m2
R = 7.282025314 m
When no solid is recycled and all the sludge is wasted in the effluent,
Qw = 0
SRT = V*Xtss/(Q*Xe)
Xe = 150 mg/L
Xtss = SRT * Q * Xe/Vn
Sulphate Consumed = 90 %
Methanogenic Bacteria
Alkalinity Required
Assumptions:
Gas phase contains = 35 % CO2
Alkalinit conc. Required for 35% CO2 = 1800 mg/L
Influent alkalinity = 140 mg/L
Alainity required = 1660 mg/L
Q 4 MLD
BOD 355 mg/L
TSS 250 mg/L
COD 778 mg/L
TKN 35 mg/L
Tf 4 Hours
Cycle time 8 Hrs
To avoid decanting of solids, 20% freeboard liquid volume above sludge blanket is provided
Vt 2222.222 m3/cycle
If F:M 0.1
No. Of basins 2
Width provided 20 m
Length provided 21 m
TO DETERMINE SRT
Inlet TKN 35
Outlet NH3-N 5 mg/L
Outlet NO3-N 3 mg/L
Nitrogen assimilated at BOD oxidation (5% BOD
removed) 17.25 mg/L
C'sth = Csth*0.5*[(Pd/Patm,H)+(Ot/21)]
SLUDGE WASTING:
No. Of Units 1
Design Flow 4 MLD
166.6666667 m3/hr
HRT @ Design Flow 1 hr
Volume of Cl2 contact tank 166.6666667 m3
SWD Provided = 4 m
Width Provided = 5 m
Length required = 8.333333333 m
Length Provided = 9 m
Volume Provided = 180 m3
Freeboard = 0.5 m
CHLORINATORS
Q = 4 MLD
BOD, So = 355 mg/L
BOD, Se = 10 mg/L
Mean temperature during winter = 18 deg C
Degradation rate constant ' k' = 0.3 /day at 20 deg C
d = 2.037037037 m
1 = 18.06875 days
Se = So/((1+kI)^n)
Taking L:B = 2
No = 2000000 FC/100mL
% disinfection = 99.99 %
Ne = 200 FC/100mL
Q = 4 MLD
Kd @ 20deg C = 2.6 /day
Kd @ 25 deg C = 6.204519516 /day
HRT = 10 days
Ne/No = 0.0001
no. of ponds = 3
Depth = 1 m
L/B = 3.00
3B^2 = 13333.33333 m2
Bredth = 66.66666667 m
Length = 200 m