You are on page 1of 31

:

6.)
lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google

945.

Model CB-1-60, is

nce of all concerned.


are

ot be con-

encies.

ne

end of

nect

ne cord

measure-

nes rated

e in

espond-

elow
-60 Cycles

Volts 25-60 Cycles

nce requirements of radio

ls which can only be main-

nent parts. These parts,

ust have satisfactory electrical

ted functions properly, if

rom receivers.

n reception, long before

he problem of determining the

enser requires a complete

esistance and power factor.

ers used in connection with

a somewhat similar service

requirements of radio

sive instruments which will

ctrical characteristics of all

mer and air condensers.

leakage, opens, shorts,

ral color-coded scales

ent of capacity and resistance.

with five direct reading

on the CC. The power

read directly from a scale

actor. The capacity range

70 mfd., and the resistance


lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google
C cm

ts testing

asure-

nde-

degree

his

gement

ensitive

ridge.

ower

settings

hich may

arly,

radio

nsulation

y of this

t will be

anode tab,

leakage

r factor

in-

set in

o be used

have

con-

ndensers

n opera-

eration.
at condensers used in

ay be more, or possibly less

pacity, or power factor re-

ese exceptional cases can be

est instrument after careful

nying instructions.

uired measurements

must be used in the applica-

ng whether a condenser is

c circuit.

bridge control knob,

ion at the

0" tubes into the respec-

anel of the Model CC. Insert

es in the sockets of the Model

d over 6E5 tube. Then con-

roper voltage and frequency,

on the panel of the

of the panel to the "ON"

This is the neutral position

terminals. Consequently,

er of shock. After allowing

up, proceed with testing as

g made before for capacity:

s marked "COND". Set

lace capacity control at

ecurely to clips. Adjust "S"

he capacitor being tested and

on glow tube marked "Leakage"


lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google
a rate

everal

ne per

y as

ent

er).

nsers

cond

ory for

r coupling

in Fig. 1
o receivers in the A.F.

position will result in a loss

d tube. Coupling condensers

he flashes under test occur

inal strips often show

s across the fibre. When

here the leakage itself is not

n to be across the terminal

here is, of course, no reason for

ps may be detected as de-

eous Applications" described

e used across low voltage

esistance may drop to values

flash twice each second

ed unsatisfactory.

DENSERS

ect test leads across

tip jack. Rotate capacity

ontrol at Electrolytic and con-

lytic condenser to the red test

lead. For non-polarized con-

pes make two leakage tests.

garding polarity, and make

onnections and make similar

observe indications given

e".
lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google
n one

s,

tory.

tinguish

one

ace

arid

ds.

ong

e leakage

e" Neon
REMENTS OF

ONDENSERS

the tips of the test leads

nect condenser to test clips.

itch "S" in positions cor-

he condenser being tested, as

Multiply

s. Set P.P. Setting for Scale

Switch "S" Reading By

CX.0001 .0001

01 .01

ytic CX 1. 1.

lytic HX 1. 1.
lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google

kwise direction from

ears in the green light in-

ube. Adjust this control until

d. This is the "balance

ken directly.

pacity control first, then

ximum shadow angle. Then

scale.

sure more than 30% lower

by ones of the correct

t need generally be
n-

ytic

actory

n" on

"S"

shorted

e,

is not

be

power

ensers

position

test

re

be held

hoke

n plus or

ass filters

the limits

elow,

Best

ser leads

obtainable
metal panel of the analyzer

any convenient ground

which a complete balance

Power Factor Control will

he case of high voltage wet

ower factors are not of

e range of the power factor

ons require a lower power

re the electrolytic condensers

and as R.F. bypass con-


lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google
r

uits

eral if the

ry for this

rs, of

atisfactory

et

o have

respect

exercised

ements.
tering efficiency of con-

multiplying the measured

nser by the efficiency shown

e result indicates what

lace the electrolytic condenser

electrolytic condensers

or is above 20%. A motor

ondenser but within a short


lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google
sure-

re

The chart

d values

"S" to
e

esistance

ectly

ction from position

ears in the green light in-

ube. Adjust the large control

esistance readings directly

f switch "S".

e coils and transformer

instrument, although insula-

y be measured by the leakage

ly described, this test

r applications, in both the

s are enumerated below:

windings of transformers,

ay be measured easily. This

m pin jacks "COND" to the

tor Control in position

position 4 and Capacity

ance may be determined

f the "Leakage" Neon lamp

rminal strips one of the

ny of the terminals on the

hed to the fibre or other


lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google
om the

mp

akage.

by

S" at

y high

; for all

rmits rapid

onent

age

on anode)

o detect

ily by

es in this

s effective-

one

e leakage

the

and
ued)

he test instrument, short

d section to the common

If there is appreciable

eable spark will occur every

is test should be repeated

nds each time before the leads

he first time or after the

nger periods than five

may be neglected for all

GUISHED

aboratory and the radio

Bridge Method of capacity

Analyzer is a precision

ated as such. It is not essen-

nts, but it is carefully

t be disturbed. Should the

resetting, the Analyzer must

mall charge for this calibra-

or "IV" tubes (except

rt circuit terminals

"Paper-Mica" and adjust

110 volts, the Neon should

s given it should be replaced.


lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google
lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google
ative

res special

se of

kes

ual break-

and

devised

protec-

nd

d fungi-

o TB SIG

ment, for

ureproof-

ired in

led.
lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google

eproofing and fungiproofing

tureproofing and fungiproofing


ents,

re-

, thus pre-

ment.

ak or in-

ket (S,

divider

ay from

m the

connec-

be

varnished.

y,
nd connection at the trans-

been removed.

h end of the voltage divider.

g. 10) located in the upper

. This is to insure proper

und, and voltage divider

lamps and dry "for 4 to 6

mpregnating compound

ase the

me 1 hour

e.

nd fungiproofing varnish

1-2202 (Stock No. 6G1005.3),

to 20 minutes at 140 F before

unit and both inside and

uipment is dried. If var-

re condenses on the equip-

e peels off readily after the

arnish to the shield of the

longer than 1 inch.

not to peel varnish from

ipment by following instruc-

a complete operational check

d operating condition.

eatment to the right of the

of the front panel of the

ING AFTER REPAIRS

ve varnish had been punc-

ent is not needed to reseal the

fected part. Be sure the break


lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google
lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google
lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google
lic Domain, Google-digitized / http://www.hathitrust.org/access_use#pd-google

You might also like