Professional Documents
Culture Documents
Road alignments were very close to the river bed level (4 5m)
Abutments of the Bridges were not properly tied to the valley flanks
Rill Erosion
2012
6
Road alignments were very
close to the river bed level (4
5m) Silli, Rudraprayag
Present is the
key to past
Present
holds the
key for
future
Avoid settlements close to T0, T-1 terraces, on old slide dump, areas
falling in the run out trajectory of a major slide.
No encroachment into the flood plains of major rivers and into the
flanks of nala channels