L&T-SUCG JV CC-27 DMRC Project Delhi

Measurement Book
Sub-Contractor Jaganath Site
Period 26-May-16 25-Jun-16 Shift

Sno Description
Fixing of scaffolding and Unit No L B/H H
dismantling / shifting of
1 scaffolding to the next slab
including fixing of walers, H-Beams
Column
and Plywood. Cum 16 1.525 1.525 4.8

3 L/C for shortcrete shifting Cum

4 L/C for welding works MT

L/C giving direction to crane


5 Nos
operator
Delhi

RKP STATION
Day/ Night

Qty Rate Amount

178.61 35 6,251

32.00 610 19,520

0.20 8,500 19,520

40.00 20 800

47,791
L&T-SUCG JV CC-27 DMRC Project Delhi
Daily Labour Report

Sub Contractor Amba Construction


From 26-May To 25-Jun-16

SSK
Date USK OT
Sup OT Painter OT Carp

89 264.5 - ###
- -

L&T-SUCG JV CC-27 DMRC Project Delhi


Daily Labour Report

Sub Contractor Kalayan Sah


From 26-May To 25-Jun-16

SSK
Date USK OT Khalas
Sup OT Plmb OT
i

253 775.5 54 180 26 102

80 282

L&T-SUCG JV CC-27 DMRC Project Delhi


Daily Labour Report

Sub Contractor Varsha Enterprises


From 26-May To 25-Jun-16

SSK

Date USK OT Plum/


Sup OT OT TO
Elec/ Mech

169 529.5 44 106 27 108 20


91 307
Carpenters
OT
Supervisor
OT

L&T-SUCG JV CC-27 DMRC Project Delhi


Daily Labour Report

Sub Contractor Krishna Enterprises


From 26-May To 25-Jun-16

SSK
Date USK OT
Sup OT Fitt OT Carp

203 696 - ###


- -
oject Delhi
t

Shift Day
Site RKP

SKL SSK

OT Mas OT Wel OT Fit OT

### - 27 75

27 75

oject Delhi
t

Shift Day/Night
Site RKP

SKL

OT Rig OT Mas OT Wel OT

- - 19 48 26 93

282 45 141

oject Delhi
t

Shift Day/Night
Site RKP

SKL

OT Mas OT Wel OT Rig OT

93 - - ### - 50 125
307 50 125
oject Delhi
t

Shift Day/Night
Site RKP

SKL
OT Mas OT Rig OT Wel OT

12 59
12 59
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Amba Construction
Period 26-May-16 25-Jun-16

USL SSL SKL

32752 0 12096
MD
OT 12167 0 8344

5% CONT PROFIT ON EXCLUDING OT


GRAND TOTAL

L&T-SUCG JV CC-27 DMRC Project Delhi


Measurement Book
Sub-Contractor Kalayan Sah
Period 26-May-16 25-Jun-16

USL SSL SKL


MAN DAYS 93104 32560 20160

14347
OT 35673 15736

5% CONT PROFIT ON EXCLUDING OT


## GRAND TOTAL

L&T-SUCG JV CC-27 DMRC Project Delhi


Measurement Book
Sub-Contractor 0
Period 26-May-16 25-Jun-16

USL SSL SKL


MD 62192 37037 22400

24357 15593 14000


OT

5% CONT PROFIT ON EXCLUDING OT


GRAND TOTAL
USL SSL SKL
MD 0 0 0
OT 0 0 0

5% CONT PROFIT ON EXCLUDING OT


GRAND TOTAL

L&T-SUCG JV CC-27 DMRC Project Delhi


Measurement Book
Sub-Contractor 0
Period 26-May-16 25-Jun-16

USL SSL SKL


MD 74704 0 5376
OT 31993 0 6552

5% CONT PROFIT ON EXCLUDING OT


GRAND TOTAL
Delhi

Site : RKP
Shift: Day/Night

Total

44848

20511
65359
2242
67,601

Delhi

Site : RKP
Shift: Day/Night

Total
145824

65756
211580
0
211,580

Delhi

Site : RKP
Shift: Day/Night

Total
121629

53950
175579
6081
181,661
Total
0
0
0
0
0

Delhi

Site : RKP
Shift: Day/Night

Total
80080
38545
118625
4004
122,629
Amba Construction
Sno. Activities Sub-Activities Unit
Wooden Lagging Shifting No
Wooden scrap shifting No
1 L/C for Internal carting of material Doka Shifting No
TMT scrap & offcut shifting No
Misc No
Ancillary Building m2
2 Dressing/Base Preparation
Misc m2
RS m2
3 L/C for Surface Preparation for Screed/ Waterproofing CS m2
PS m2
4 L/C for road washing m2
Waterproofing m3
5 L/C for Backfilling ES05 Soldier pile backfilling m3
Misc m3
Cleaning Nos
6 Barrication boards Shifting(100m)/ Dismantling Nos
Shifting(200-250m) Nos
Entry m3
7 L/C for PCC/ Concreting
Misc m3
RS m3
8 L/C for Screed CS/PS m3
BS m3
Entry m2
Ancillary Building m2
9 Labour charges for curing
Column m2
Misc m2
Lintel & Mullion m2
CJ m2
10 L/C for chipping
Column Hacking m2
CS & Undercroft Hacking m2
PS m2
CS m2
BS/PS m2
Ground Level m2
Fabrication Yard m2
11 L/C for Housekeeping
Misc- Wheel wash, office m2
Entry 03, 04 m2
Entry 02,01 m2
CC RS m2
CC Ground Level m2
12 L/C for repairing RM
13 L/C for Dewatering m2
14 L/C for welding works MT
15 L/C for giving direction to crane operator for lifting material(Rigger) No
16 L/C for scrap segregation/Rebar Shifting MT
17 L/C for loading & unloading of material MT
18 L/C for plaster work m2
19 Cleaning Of Spilled Concrete m2
20 L/C for dismantling Wooden Battens m2
21 Fixing of timber lagging m2
22 Dismantling of Brick Work m3
23 Compaction of soil for PCC m2
24 DWall cleaning m2
25 Hand Railing Fixing Rm
26 Toe Guard m3
Brickwork
27 Other m3
Kalayan Sah
Sno. Activities Sub-Activities Unit
Wooden Lagging Shifting No
Wooden scrap shifting No
1 L/C for Internal carting of material Doka Shifting No
TMT scrap & offcut shifting No
Misc No
Entry m2
2 Dressing/Base Preparation
Misc m2
RS m2
3 L/C for Surface Preparation for Screed/ Waterproofing CS m2
Entry m2
4 L/C for road washing m2
Waterproofing m3
5 L/C for Backfilling CC SP & wall gap filling m3
Misc m3
Cleaning Nos
6 Barrication boards Shifting(100-150m)/ Fixing Nos
Shifting(150-200m) Nos
Station m3
7 L/C for PCC/ Concreting
Misc m3
RS m3
8 L/C for Concrete Manually CS m3
BS m3
Station m2
PS m2
9 Labour charges for curing
Column m2
Misc
Station/Entry m2
CJ&Entry wall m2
10 L/C for chipping
Column Hacking m2
CS/Undercroft Hacking m2
PS m2
CS m2
BS m2
Ground Level m2
Fabrication Yard m2
11 L/C for Housekeeping
Misc- Wheel wash, office, m2
Entry 03, 04 m2
CC BS m2
CC RS m2
CC Ground Level m2
12 L/C for repairing RM
13 L/C for Dewatering m2
14 L/C for welding works MT
15 L/C for giving direction to crane operator for lifting material(Rigger) No
16 L/C for scrap segregation/Rebar Shifting MT
17 L/C for loading & unloading of material MT
18 L/C for plaster work m2
19 Cleaning Of Spilled Concrete m2
20 L/C for dismantling Wooden Battens m2
21 Fixing of timber lagging m2
22 Dismantling of Brick Work m3
23 Compaction of soil for PCC m2
24 DWall cleaning m2
25 Hand Railing Fixing Rm
26 Dismantling of civil str Station area m3
27 Other m3
Varsha Enterprises
Sno. Activities Sub-Activities Unit
Wooden Lagging Shifting No
Wooden scrap shifting No
1 L/C for Internal carting of material Doka Shifting No
TMT scrap & offcut shifting No
Misc No
Station, Entry m2
2 Dressing/Base Preparation
Misc m2
RS m2
3 L/C for Surface Preparation for Screed/ Waterproofing CS m2
BS m2
4 L/C for road washing m2
Waterproofing m3
5 L/C for Backfilling CC SP & wall gap filling m3
Misc m3
Cleaning Nos
6 Barrication boards Shifting(100m) Nos
Shifting(200-250m)
Station, Entry m3
7 L/C for PCC/ Concreting
Misc m3
Station, Entry m2
Ancillary Building m2
9 Labour charges for curing
Column m2
Misc
Station, Entry m2
CJ m2
10 L/C for chipping
Column Hacking m2
Undercroft Hacking m2
RS m2
CS m2
BS m2
Ground Level m2
Fabrication Yard m2
11 L/C for Housekeeping
Misc- Wheel wash, office, m2
Entry 02,03, 04,05 m2
CC BS m2
CC RS m2
CC Ground Level m2
12 L/C for repairing RM
13 L/C for Dewatering m2
14 L/C for welding works MT
15 L/C for giving direction to crane operator for lifting material(Rigger) No
16 L/C for scrap segregation/Rebar Shifting MT
17 L/C for loading & unloading of material MT
18 L/C for plaster work m2
19 Cleaning Of Spilled Concrete m2
20 L/C for dismantling Wooden Battens m2
21 Fixing of timber lagging m2
22 Dismantling of Brick Work m3
23 Compaction of soil for PCC m2
24 DWall cleaning m2
25 Hand Railing Fixing Rm
26 Toe Guard m3
Brickwork
27 Other m3
28 Dismantling of civil str Station area m3
Krishna Enterprises
Sno. Activities Sub-Activities Unit
Wooden Lagging Shifting No
Wooden scrap shifting No
1 L/C for Internal carting of material Doka Shifting No
TMT scrap & offcut shifting No
Misc No
Station, Entry m2
2 Dressing/Base Preparation
Misc m2
RS m2
3 L/C for Surface Preparation for Screed/ Waterproofing CS m2
BS m2
4 L/C for road washing m2
Waterproofing m3
5 L/C for Backfilling CC SP & wall gap filling m3
Misc m3
Cleaning Nos
6 Barrication boards Shifting(100m)/Fixing Nos
Shifting(200-250m) Nos
Station, Entry m3
7 L/C for PCC/ Concreting
Misc m3
Station, Entry m2
Ancillary Building m2
9 Labour charges for curing
Column m2
Cut & Cover m2
10 Station, Entry m2
CJ m2
L/C for chipping
Column Hacking m2
Undercroft Hacking m2
RS m2
CS m2
BS m2
Ground Level m2
Fabrication Yard m2
11 L/C for Housekeeping
Misc- Wheel wash, office, m2
Entry 03, 04,05 m2
CC BS m2
CC RS m2
CC Ground Level m2
12 L/C for repairing RM
13 L/C for Dewatering m2
14 L/C for welding works MT
15 L/C for giving direction to crane operator for lifting material(Rigger) No
16 L/C for scrap segregation/Rebar Shifting MT
17 L/C for loading & unloading of material MT
18 L/C for plaster work m2
19 Cleaning Of Spilled Concrete m2
20 L/C for dismantling Wooden Battens m2
21 Fixing of timber lagging m2
22 Dismantling of Brick Work m3
23 Compaction of soil for PCC m2
24 DWall cleaning m2
25 Hand Railing Fixing Rm
26 Toe Guard m3
Brickwork
27 Other m3
28 L/C For Manual Concreting Station, Entry m3
29
Total Qty Given Qty Balance Qty Nos L B H
104 48 56
104 48 56
104 61 43
104 31 73
104 70 34
2,086 1,124 963
2,086 1,890 196
5,318 1,204 4,114
5,318 3,157 2,161
5,318 1,100 4,218
62,592 31,861 30,731 1 50.0 6.50
1,490 - 1,490
3,477 38 3,439 1 10.7 5.50 0.65
3,477 2,520 957
20,864 14,320 6,544 85
200 164 36
- - 0
5,977 102 5,875 2 21.7 4.7 0.50
2,000 544 1,456
1,064 97 966
1,064 157 906
1,064 - 1,064
15,648 10,269 5,379
15,648 3,569 12,079 2 21.65 27
15,648 675 14,973
15,648 - 15,648
313 209 104
313 108 205
313 - 313
313 - 313
25,037 26,698 1,661 3 120 10.65
25,037 25,696 659 2 65.65 21.57
25,037 22,864 2,173
25,037 19,080 5,957
25,037 12,600 12,437
25,037 8,400 16,637
25,037 18,000 7,037
25,037 2,700 22,337
25,037 - 25,037
25,037 - 25,037
10,432 1,010 9,422
62,592 - 62,592
242 97 146
24,235 - 24,235
1,391 52 1,339 15
- 12 12 12
500 152 348
31,296 14,800 16,496
- - 0
- - 0
- - 0
4,000 4,000 0
- - 0
1,000 175 825 25
- - 0
- - 0
Diff
Total Qty Given Qty Balance Qty Nos L B H
130 130 23
130 130 30
130 130 37
130 130 45
130 130
1,299 1,299 1 15.7 10.60
1,299 1,299
1,299 1,299
1,299 1,299
1,299 1,299
77,969 77,969
928 928
2,166 2,166
2,166 2,166
25,990 25,990
- 0
- 0
4,968 4,968 1 22.8 45 0.40
- 0
260 260
260 260 2 12.33 4.6 0.45
260 260 2 12.65 4.5 0.65
19,492 19,492 1 11.5 12.65
19,492 19,492
19,492 19,492
19,492 19,492
195 195
195 195
195 195
195 195
19,492 19,492
19,492 19,492 1 215 20.65
19,492 19,492 2 265 21.57
19,492 19,492 2 125 21.65
19,492 19,492 6 50 6.5
19,492 19,492 10 25 5.65
19,492 19,492 10 36.56 10.65
19,492 19,492
19,492 19,492
19,492 19,492
33,121 33,121
38,985 38,985
302 302
30,189 30,189 245
866 866 15
- 0
- 0
38,985 38,985 2 21.65 12.1397229
- 0
- 0
- 0
- 0
- 0 6 31.75 5.35
- 0
- 0 2 6.55 21.65 0.35
- 0
Diff
Total Qty Given Qty Balance Qty Nos L B H
104 104 0
104 109 5
104 195 91
104 91 13
104 98 6
2,086 2,618 532 1 16.9 5.65
2,086 1,048 1,039
2,086 1,806 280
2,086 2,082 5
2,086 - 2,086
62,592 55,188 7,404
1,490 1,035 455
3,477 592 2,886
3,477 671 2,806 1 5.2 3.00
20,864 12,440 8,424 520
- - 0
- - 0
5,977 542 5,434 7 7.8 6.6
2,000 202 1,798 1 10 5 1.00
15,648 16,457 809 6 20.7 12.65
15,648 13,088 2,560 1 15.65 5.65
15,648 3,055 12,593
15,648 10,080 5,568
- - 0
- - 0
- - 0
- - 0
18,778 13,481 5,296
18,778 18,227 551
18,778 16,932 1,845
18,778 37,830 19,052 3 200 20.65
18,778 24,142 5,364 3 105.6 20.65
18,778 17,670 1,108 12 11.5 10.65
18,778 26,250 7,472
18,778 18,775 3
18,778 18,775 3
18,778 15,550 3,228
- - 0
- - 0
242 93 149
24,235 10,325 13,910 225
1,391 641 750
100 61 40
- - 0
11,500 8,160 3,340
2,845 1,406 1,439
1,647 150 1,497
- - 0
- - 0
- - 0
- - 0
- - 0
- - 0
- - - 1 22.35 4.772 0.30
Diff
Total Qty Given Qty Balance Qty Nos L B H
130 130
130 130
130 130 10
130 130 10
130 130 10
1,299 1,299
1,299 1,299
1,299 1,299
1,299 1,299
1,299 1,299
77,969 77,969
928 928
2,166 2,166
2,166 2,166 1 10.0 6.50 1.5
12,995 12,995 350
- 0
- 0
4,968 4,968
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
11,695 11,695
11,695 11,695 5 120 21.57
11,695 11,695
11,695 11,695
11,695 11,695
11,695 11,695
11,695 11,695 5 44.5 5.5
11,695 11,695
11,695 11,695
11,695 11,695
33,121 33,121
- 0
- 0
15,094 15,094
- 0
- 0
- 0
38,985 38,985 3 22 20.65
1,772 1,772
1,026 1,026
- 0
- 0
- 0
- 0
- 0
- 0

Diff
Amba Construction
Qty Rate Amount USL SSL SKL
- 600 - MD 32752 0 12096
- 600 - OT 12167 0 8344
- 600 -
- 600 - 5% PROFIT
- 600 - GRAND TOTAL
- 30 -
- 30 -
- 30 -
- 30 -
- 30 -
325.00 5 1,625
- 70 -
38.07 70 2,665
- 70 -
85.00 15 1,275
- 180 -
- 170 -
101.76 100 10,176
- 100 -
- 250 -
- 250 -
- 250 -
- 5 -
1,169.10 5 5,846
- 5 -
- 5 -
- 250 -
- 250 -
- 250 -
- 250 -
3,834.00 5 19,170
2,832.14 5 14,161
- 5 -
- 5 -
- 5 -
- 5 -
- 5 -
- 5 -
- 5 -
- 5 -
- 30 -
- 5 -
- 2000 -
- 20 -
20.00 225 4,500
12.00 75 900
- 75 -
- 10 -
- 110 -
- 190 -
- 388 -
- 20 -
- 30 -
25.00 172 4,300
- 600 -
- 275 -
1,633 64,617
Kalayan Sah
Qty Rate Amount USL SSL SKL
23.00 600 13,800 MD 93104 32560 20160
30.00 600 18,000 OT 35673 14347 15736
37.00 600 22,200
45.00 600 27,000 5% PROFIT
- 600 - GRAND TOTAL
165.89 30 4,977
- 30 -
- 30 -
- 30 -
- 30 -
- 5 -
- 70 -
- 70 -
- 70 -
- 15 -
- 180 -
- 170 -
410.40 100 41,040
- 100 -
- 250 -
51.05 250 12,762
74.00 250 18,501
145.65 5 728
- 5 -
- 5 -
- 5 -
- 250 -
- 250 -
- 250 -
- 250 -
- 5 -
4,439.75 5 22,199
11,432.10 5 57,161
5,412.50 5 27,063
1,950.00 5 9,750
1,412.50 5 7,063
3,893.64 5 19,468
- 5 -
- 5 -
- 5 -
- 30 -
- 5 -
- 2000 -
245.00 20 4,900
15.00 225 3,375
- 75 -
- 75 -
525.65 10 5,257
- 110 -
- 190 -
- 388 -
- 20 -
1,019.18 30 30,575
- 172 -
97.85 600 58,708
- 275 -
197,176 404,525 116800
Varsha Enterprises
Qty Rate Amount USL SSL SKL
- 600 -
- 600 - MD 62192 37037 22400
- 600 - OT 24357 15593 14000
- 600 -
- 600 - 5% PROFIT
95.65 30 2,870 GRAND TOTAL
- 30 -
- 30 -
- 30 -
- 30 -
- 5 -
- 70 -
- 70 -
15.65 70 1,096
520.00 15 7,800
- 180 -
- 170 -
360.36 100 36,036
50.00 250 12,500
1,567.34 5 7,837
88.42 5 442
- 5 -
- 5 -
- 250 -
- 250 -
- 250 -
- 250 -
- 5 -
- 5 -
- 5 -
12,390.00 5 61,950
6,541.92 5 32,710
1,469.70 5 7,349
- 5 -
- 5 -
- 5 -
- 5 -
- 30 -
- 5 -
- 2000 -
225.00 20 4,500
44.00 225 9,900
36.50 75 2,738
- 75 -
- 10 -
- 110 -
- 190 -
- 388 -
- 20 -
- 30 -
- 172 -
- 600 -
- 275 -
32.00 600 19,198
28,896 206,923
Krishna Enterprises
Qty Rate Amount USL SSL SKL
- 600 - MD 74704 0 5376
- 600 - OT 31993 0 6552
10.00 600 6,000
10.00 600 6,000 5% PROFIT
10.00 600 6,000 GRAND TOTAL
30 30
- 30 -
- 30 -
- 30 -
- 30 -
- 5 -
- 70 -
- 70 -
97.50 70 6,825
350.00 15 5,250
- 180 -
- 170 -
- 100 -
- 100 -
- 5 -
- 5 -
- 5 -
- 5 -
- 250 -
- 250 -
- 250 -
- 250 -
- 5 -
12,942.00 5 64,710
- 5 -
- 5 -
- 5 -
- 5 -
1,223.75 5 6,119
- 5 -
- 5 -
- 5 -
- 30 -
- 5 -
- 2000 -
- 20 -
- 225 -
35.00 75 2,625
- 75 -
1,341.22 10 13,412
- 110 -
- 190 -
- 388 -
- 20 -
- 30 -
- 172 -
- 600 -
- 275 -
- 250 -
- -
3,205 116,971
Total
44848
20511
65359
3268
68627
Total
145824
65756
211580
10579
222159
Total

121629
53950
175579
8779
184358
Total
80080
38545
118625
5931
124556
AMBA Construction

Vendor code S0042815


Station RKP

Dear sir

Kindly release the bill payment for the above mentioned period.

Sno. Activities Sub-Activities Unit


Wooden Lagging Shifting No
Wooden scrap shifting No
L/C for Internal carting of No
1 Doka Shifting
material
TMT scrap & offcut shifting No
Misc No
Entry m2
2 Dressing/Base Preparation
Misc m2
RS m2
L/C for Surface Preparation for
3 CS m2
Screed/ Waterproofing
BS m2
4 L/C for road washing m2
Waterproofing m3
5 L/C for Backfilling CC SP & wall gap filling m3
Misc m3
Cleaning Nos
6 Barrication boards Shifting(100m)/ Dismantling Nos
Shifting(200-250m) Nos
Entry m3
7 L/C for PCC/ Concreting
Misc m3
RS m3
8 L/C for Screed CS m3
BS m3
Entry m2
Ancillary Building m2
9 Labour charges for curing
Column m2
Misc m2
Entry m2
CJ m2
10 L/C for chipping
Column Hacking m2
CS & Undercroft Hacking m2
RS m2
CS m2
BS/PS m2
Ground Level m2
Fabrication Yard m2
11 L/C for Housekeeping
Misc- Wheel wash, office m2
Entry 03, 04 m2
CC BS m2
CC RS m2
CC Ground Level m2
12 L/C for repairing RM
13 L/C for Dewatering m2
14 L/C for welding works MT
15 L/C for giving direction to crane operator for lifting material(Rigger) No
16 L/C for scrap segregation/Rebar Shifting MT
17 L/C for loading & unloading of material MT
18 L/C for plaster work m2
19 Cleaning Of Spilled Concrete m2
20 L/C for dismantling Wooden Battens m2
21 Fixing of timber lagging m2
22 Dismantling of Brick Work m3
23 Compaction of soil for PCC m2
24 DWall cleaning m2
25 Hand Railing Fixing Rm
26 Toe Guard m3
Brickwork
27 Other m3
Kalyan Enterprises

Dear sir

Kindly release the bill payment for the above mentioned period.

Sno. Activities Sub-Activities Unit


Wooden Lagging Shifting No
Wooden scrap shifting No
L/C for Internal carting of Doka Shifting No
1
material
TMT scrap & offcut shifting MT
Misc No
Entry m2
2 Dressing/Base Preparation
Misc m2
RS m2
L/C for Surface Preparation for
3 CS m2
Screed/ Waterproofing
BS m2
4 L/C for road washing m2
Waterproofing m3
5 L/C for Backfilling CC SP & wall gap filling m3
Misc m3
Cleaning Nos
6 Barrication boards Shifting(100-150m)/ Fixing Nos
Shifting(150-200m) Nos
Station m3
7 L/C for PCC/ Concreting
Misc m3
RS m3
8 L/C for Screed CS m3
BS m3
Station m2
Ancillary Building m2
9 Labour charges for curing
Column m2
Misc
Station/Entry m2
CJ m2
10 L/C for chipping
Column Hacking m2
CS/Undercroft Hacking m2
RS m2
CS m2
BS m2
Ground Level m2
Fabrication Yard m2
11 L/C for Housekeeping
Misc- Wheel wash, office, m2
Entry 03, 04 m2
CC BS m2
CC RS m2
CC Ground Level m2
12 L/C for repairing RM
13 L/C for Dewatering m2
14 L/C for welding works MT
15 L/C for giving direction to crane operator for lifting material(Rigger) No
16 L/C for scrap segregation/Rebar Shifting MT
17 L/C for loading & unloading of material MT
18 L/C for plaster work m2
19 Cleaning Of Spilled Concrete m2
20 L/C for dismantling Wooden Battens m2
21 Fixing of timber lagging m2
22 Dismantling of Brick Work m3
23 Compaction of soil for PCC m2
24 DWall cleaning m2
25 Hand Railing Fixing Rm
26 Toe Guard m3
Brickwork
27 Other m3
Varsha Enterprises
Vendor code SNV00012
Station RKP

Dear sir

Kindly release the bill payment for the above mentioned period.

Sno. Activities Sub-Activities Unit


Wooden Lagging Shifting No
Wooden scrap shifting No
L/C for Internal carting of
1 Doka Shifting No
material
TMT scrap & offcut shifting MT
Misc No
Station, Entry m2
2 Dressing/Base Preparation
Misc m2
RS m2
L/C for Surface Preparation for
3 CS m2
Screed/ Waterproofing
BS m2
4 L/C for road washing m2
Waterproofing m3
5 L/C for Backfilling CC SP & wall gap filling m3
Misc m3
6 L/C for PCC/ Concreting Station, Entry m3
7 L/C Manual Concreting Misc m3
RS m3
8 L/C for Screed CS m3
BS m3
Station, Entry m2
Ancillary Building m2
9 Labour charges for curing
Column m2
Misc
Station, Entry m2
CJ m2
10 L/C for chipping
Column Hacking m2
Undercroft Hacking m2
RS m2
CS m2
BS m2
Ground Level m2
Fabrication Yard m2
11 L/C for Housekeeping
Misc- Wheel wash, office, m2
Entry 02,03, 04,05 m2
CC BS m2
CC RS m2
CC Ground Level m2
12 L/C for repairing RM
13 L/C for Dewatering m2
14 L/C for welding works MT
15 L/C for giving direction to crane operator for lifting material(Rigger) No
16 L/C for scrap segregation/Rebar Shifting MT
17 L/C for loading & unloading of material MT
18 L/C for plaster work m2
19 Cleaning Of Spilled Concrete m2
20 L/C for dismantling Wooden Battens m2
21 Fixing of timber lagging m2
22 Dismantling of Brick Work m3
23 Compaction of soil for PCC m2
24 DWall cleaning m2
25 Hand Railing Fixing Rm
26 Toe Guard m3
Brickwork
27 Other m3
28 Dismantling of Civil works Station, Entry m3
Krishna Enterprises

Vendor code
Station

Dear sir

Kindly release the bill payment for the above mentioned period.

Sno. Activities Sub-Activities Unit


Wooden Lagging Shifting No
Wooden scrap shifting No
L/C for Internal carting of
1 Doka Shifting No
material
TMT scrap & offcut shifting MT
Misc No
Station, Entry m2
2 Dressing/Base Preparation
Misc m2
RS m2
L/C for Surface Preparation for
3 CS m2
Screed/ Waterproofing
BS m2
4 L/C for road washing m2
Waterproofing m3
5 L/C for Backfilling CC SP & wall gap filling m3
Misc m3
Station, Entry m3
7 L/C for PCC/ Concreting
Misc m3
RS m2
8 L/C for Screed CS m2
BS m2
Station, Entry m2
Ancillary Building m2
9 Labour charges for curing
Column m2
Cut & Cover m2
10 Station, Entry m2
CJ m2
L/C for chipping
Column Hacking m2
Undercroft Hacking m2
RS m2
CS m2
BS m2
Ground Level m2
Fabrication Yard m2
11 L/C for Housekeeping
Misc- Wheel wash, office, m2
Entry 03, 04 m2
CC BS m2
CC RS m2
CC Ground Level m2
12 L/C for repairing RM
13 L/C for Dewatering m2
14 L/C for welding works MT
15 L/C for giving direction to crane operator for lifting material(Rigger) No
16 L/C for scrap segregation/Rebar Shifting MT
17 L/C for loading & unloading of material MT
18 L/C for plaster work m2
19 Cleaning Of Spilled Concrete m2
20 L/C for dismantling Wooden Battens m2
21 Fixing of timber lagging m2
22 Dismantling of Brick Work m3
23 Compaction of soil for PCC m2
24 DWall cleaning m2
25 Hand Railing Fixing Rm
26 Toe Guard m3
Brickwork
27 Other m3
ction

Pan card no AAWFA9247R


Contact no 9711312963

Qty Rate Amount


- 600 -
- 600 -
- 600 -
- 600 -
- 600 -
- 30 -
- 30 -
- 30 -
- 30 -
- 30 -
325.00 5 1,625
- 70 -
38.07 70 2,665
- 70 -
85.00 15 1,275
- 180 -
- 170 -
101.76 100 10,176
- 100 -
- 250 -
- 250 -
- 250 -
- 5 -
1,169.10 5 5,846
- 5 -
- 5 -
- 250 -
- 250 -
- 250 -
- 250 -
3,834.00 5 19,170
2,832.14 5 14,161
- 5 -
- 5 -
- 5 -
- 5 -
- 5 -
- 5 -
- 5 -
- 5 -
- 30 -
- 5 -
- 2000 -
- 20 -
20.00 225 4,500
12.00 75 900
- 75 -
- 10 -
- 110 -
- 190 -
- 388 -
- 20 -
- 30 -
25.00 172 4,300
- 600 -
- 275 -
64,617
ises

Qty Rate Amount


23.00 600 13,800
30.00 600 18,000
37.00 600 22,200
45.00 600 27,000
- 600 -
165.89 30 4,977
- 30 -
- 30 -
- 30 -
- 30 -
- 5 -
- 70 -
- 70 -
- 70 -
- 15 -
- 180 -
- 170 -
410.40 100 41,040
- 100 -
- 250 -
51.05 250 12,762
74.00 250 18,501
145.65 5 728
- 5 -
- 5 -
- 5 -
- 250 -
- 250 -
- 250 -
- 250 -
- 5 -
4,439.75 5 22,199
11,432.10 5 57,161
5,412.50 5 27,063
1,950.00 5 9,750
1,412.50 5 7,063
3,893.64 5 19,468
- 5 -
- 5 -
- 5 -
- 30 -
- 5 -
- 2000 -
245.00 20 4,900
15.00 225 3,375
- 75 -
- 75 -
525.65 10 5,257
- 110 -
- 190 -
- 388 -
- 20 -
1,019.18 30 30,575
- 172 -
97.85 600 58,708
- 275 -
404,525
ises
Pan card no BPJPS9306E
Contact no 8750783003

Qty Rate Amount


- 600 -
- 600 -
- 600 -
- 600 -
- 600 -
95.65 30 2,870
- 30 -
- 30 -
- 30 -
- 30 -
- 5 -
- 70 -
- 70 -
15.65 70 1,096
360.36 100 36,036
50.00 250 12,500
- 250 -
- 250 -
- 250 -
1,567.34 5 7,837
88.42 5 442
- 5 -
- 5 -
- 250 -
- 250 -
- 250 -
- 250 -
- 5 -
- 5 -
- 5 -
12,390.00 5 61,950
6,541.92 5 32,710
1,469.70 5 7,349
- 5 -
- 5 -
- 5 -
- 5 -
- 30 -
- 5 -
- 2000 -
225.00 20 4,500
44.00 225 9,900
36.50 75 2,738
- 75 -
- 10 -
- 110 -
- 190 -
- 388 -
- 20 -
- 30 -
- 172 -
- 600 -
- 275 -
32.00 600 19,198
206,923
rises

Pan card no
Contact no

Qty Rate Amount


- 600 -
- 600 -
10.00 600 6,000
10.00 600 6,000
10.00 600 6,000
- 30 -
- 30 -
- 30 -
- 30 -
- 30 -
- 5 -
- 70 -
- 70 -
97.50 70 6,825
- 100 -
- 100 -
- 250 -
- 250 -
- 250 -
- 5 -
- 5 -
- 5 -
- 5 -
- 250 -
- 250 -
- 250 -
- 250 -
- 5 -
12,942.00 5 64,710
- 5 -
- 5 -
- 5 -
- 5 -
1,223.75 5 6,119
- 5 -
- 5 -
- 5 -
- 30 -
- 5 -
- 2000 -
- 20 -
- 225 -
35.00 75 2,625
- 75 -
1,341.22 10 13,412
- 110 -
- 190 -
- 388 -
- 20 -
- 30 -
- 172 -
- 600 -
- 275 -
116,941
Amba Construction
Sno. Activities Sub-Activities Unit
Sep-15 Oct-15 Nov-15 Total
1 Wooden Lagging Shifting No - - 48
Wooden scrap shifting No - - 48
L/C for Internal carting of
Doka Shifting No 5 5 61
material
TMT scrap & offcut shifting MT 5 5 31
Misc No - - 70
2 BS (3-10a)/AB m2 150 200 1,124
Base Preparation
Misc m 2
- - 1,890
3 RS m 2
- 1,204
L/C for Surface Preparation for
CS m2 - 200 3,157
Screed/ Waterproofing
BS m2 - 220 1,100
4 L/C for road washing m 2
3,942 3,942 31,536
5 Waterproofing m 3
- - -
L/C for Backfilling CC SP & wall gap filling m3 - - -
Misc m 3
120 120 2,520
6 Cleaning Nos 1,098 1,098 14,235
Barrication boards Shifting(100m) Nos - - 164
Shifting(200-250m) - - -
7 BS (3-10a) m3 - - -
L/C for PCC
Misc m 3
96 96 544
8 RS m 3
- - 97
L/C for Screed CS m3 22 22 157
BS m3 - - -
9 BS (3-10a) m 2
2,567 - 10,269
Ancillary Building m2 - 2,400 2,400
Labour charges for curing
Column m2 - - 675
Misc - - -
10 BS (3-10a) m2 33 44 209

L/C for chipping


CJ m2 22 22 108
L/C for chipping
Column Hacking m2 - - -
Undercroft Hacking m2 - - -
11 RS m2
- - 22,864
CS m2
- - 22,864
BS m2 - - 22,864

L/C for Housekeeping


Ground Level m2 - - 19,080
Fabrication Yard m2 - - 12,600
L/C for Housekeeping
Misc- Wheel wash, office, m2 300 300 8,400
Entry 03, 04 m2
1,500 1,500 18,000
CC BS m2
- 2,700 2,700
CC RS m2 - - -
CC Ground Level m2
- - -
12 L/C for repairing RM 120 240 1,010
13 L/C for Dewatering m2 - - -
14 L/C for welding works MT 12 12 97
15 L/C for giving direction to crane operator for lifting material(Rig No - - -
16 L/C for scrap segregation MT - - 32
17 L/C for loading & unloading of material MT - - -
18 L/C for plaster work m2 - - 152
19 Cleaning Of Spilled Concrete m2
400 800 14,800
20 Cutting of Wooden Battens m2
- - -
21 Fixing of timber lagging m2
- - -
22 Dismantling of Brick Work m3 - - -
23 Compaction of soil fpr PCC m2
100 - 4,000
24 DWall cleaning m2
- - -
25 Hand Railing Fixing Rm 20 30 150
26 Toe Guard m3 - - -
Brickwork
27 Other m3
- - -
Kalayan Sah
Sep-15 Oct-15 Nov-15 Total ###
8 8 189
##
11 11 210
##
8 8 196
##
12 10 170
##
8 8 560
##
145 145 2,666#
360 180 3,240#
201 201 1,606#
431 431 3,451#
- - 110#
11,826 11,826 90,666
###
- - -#
104 104 418#
240 240 1,200#
2,166 2,166 12,891
###
- - 110#
- - 100#
291 291 1,631#
- - -#
49 - 342#
22 - 151#
32 - 226#
2,482 2,482 20,110
###
4,200 4,800 33,150#
1,126 402 8,281
###
400 400 1,200#
160 64 1,053#
259 86 863#
155 18 992#
110 440 1,386#
2,400 2,400 40,930
###
2,157 2,157 37,208
###
2,157 2,157 37,208#
4,240 4,240 36,040#
2,100 2,100 22,400
###
450 450 5,550
###
1,500 2,250 12,750
###
7,680 11,520 42,240#
7,680 11,520 34,560#
1,280 2,560 14,080#
2,000 600 13,400
###
16,800 5,040 70,140#
27 27 206#
1,211 - 9,377#
100 100 684#
- - 381#
- - 1,230#
7,200 - 32,400#
- - -#
- - -#
- - -#
- - -#
- - 5,850#
- - -#
- - -#
- - 6#
Varsha Enterprises Krishna Enterprises
Sep-15 Oct-15 Nov-15 Total Sep-15 Oct-15 Nov-15 Total
5 - 104 10 10 92
- - 109 12 12 128
- - 195 8 8 122
20 20 91 5 5 54
5 - 98 7 7 114
65 437 2,522 277 277 2,216
262 262 1,048 - 170 2,207
361 361 1,806 317 - 2,854
431 140 2,082 399 - 2,793
- - - - - -
11,826 15,768 55,188 4,371 2,186 37,156
518 - 1,035 173 173 1,795
104 278 592 - - 4,176
17 504 655 189 189 1,287
2,080 2,080 11,920 1,083 1,083 10,174
- - - - - 132
- - - - - 10
59 59 182 280 280 2,067
32 32 152 - - 328
- - - - - -
- - - - - -
- - - - - -
- 513 14,890 - - 15,404
4,200 400 13,000 - - 1,200
1,351 241 3,055 - - 4,320
1,680 1,680 10,080 - - 18,503
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- 2,588 13,481 - - -
3,451 3,451 18,227 431 431 863
3,451 3,451 16,932 431 431 863
- - 25,440 640 640 17,840
5,600 3,600 17,600 2,016 2,016 16,548
4,500 4,500 16,200 900 150 2,250
- - 26,250 1,500 750 12,750
- - 18,775 1,000 1,000 24,700
- - 18,775 1,000 1,000 24,700
800 1,600 15,550 - - 12,258
- - - 1,620 180 4,680
- - - - - -
15 15 93 - - 1
1,350 1,550 10,100 1,100 1,100 2,200
70 110 597 - - 120
5 5 24 - - 150
- - - - - 152
1,500 1,800 8,160 2,500 1,000 5,500
19 75 1,406 140 - 1,636
19 47 150 94 66 722
- - - - - -
- - - - - -
- - - 21 21 536
- - - - - -
- - - - - -
- - - - - -
Description Rate Required Duration
SNo.
Month Amba Kalyan Sah
Wooden Lagging Shifting Sep-16 1,420 Const. 1
Wooden scrap shifting Sep-16 1,420
L/C for Internal
1 Doka Shifting 600 Sep-16 1,420
carting of material
TMT scrap & offcut shifting Sep-16 1,420
Misc Sep-16 1,420
Dressing/Base Entry /Exit Sep-16 1,420 1
2
Preparation Misc Sep-16 1,420
L/C for Surface RS 30 Sep-16 1,420 1 1
Preparation for
3 CS Sep-16 1,420
Screed/
Waterproofing BS Sep-16 1,420
L/C for road 1,420 1
4 5 Sep-16
washing
Waterproofing Sep-16 1,420 1
5 L/C for Backfilling CC SP & wall gap filling 70 Sep-16 1,420
Misc Sep-16 1,420
Cleaning 15 Sep-16 1,420 1
6 Barrication boards Shifting(100m) 180 Sep-16 1,420
Shifting(200-250m) 170 Sep-16 1,420
L/C for PCC/ Entry /Exit/Station Sep-16 1,420 1 1 1
7 100
Concreting Misc Sep-16 1,420
RS Sep-16 1,420 1 1
8 L/C for Screed CS 250 Sep-16 1,420
BS Sep-16 1,420
Entry /Exit/Station Sep-16 1,420 1
Labour charges for Ancillary Building Sep-16 1,420
9 5
curing Column Sep-16 1,420
Misc Sep-16 1,420
Entry /Exit Sep-16 1,420 1

10 L/C for chipping 250


CJ Sep-16 1,420
10 L/C for chipping 250
Column Hacking Sep-16 1,420
Undercroft Hacking Sep-16 1,420
RS Sep-16 1,420 4
CS Sep-16 1,420
BS Sep-16 1,420
Ground Level Sep-16 1,420
L/C for Fabrication Yard Sep-16 1,420
11 5
Housekeeping Misc- Wheel wash, office Sep-16 1,420
Entry 02,03, 04,05 Sep-16 1,420
CC BS Sep-16 1,420
CC RS Sep-16 1,420
CC Ground Level Sep-16 1,420
12 L/C for repairing 30 Sep-16 1,420 1
13 L/C for Dewatering 5 Sep-16 1,420
14 L/C for welding works 2000 Sep-16 1,420 1 1
15 L/C for giving direction to crane operator for lifting ma 20 Sep-16 1,420 1 1
16 L/C for scrap segregation/Rebar Shifting 225 Sep-16 1,420 1
17 L/C for loading & unloading of material 75 Sep-16 1,420
18 L/C for plaster work 75 Sep-16 1,420
19 Cleaning Of Spilled Concrete 10 Sep-16 1,420 1
20 L/C for dismantling Wooden Battens 110 Sep-16 1,420
21 Fixing of timber lagging 190 Sep-16 1,420
22 Dismantling of Brick Work 388 Sep-16 1,420
23 Compaction of soil for PCC 20 Sep-16 1,420
24 DWall cleaning 30 Sep-16 1,420
25 Hand Railing Fixing 172 Sep-16 1,420
26 Toe Guard 600 Sep-16 1,420
Brickwork
27 Other 275 Sep-16 1,420
5 - 17 3 -
22 28
L&T- SUCG JV CC 27 DELHI
(A Joint Venture between Larsen & Toubro Limited and Shanghai Urban Constructio
Balance work
Manpower
Sah Harendra Varsha Ent Krishna Ent Amount Amba Qty Qty act Kalyan Sah
1 Paswan 1 1 1 4,614,710 7,691.18 104 4,614,710
- - 104 -
- - 104 -
- - 104 -
- - 104 -
1 1 1 1 4,614,710 153,824 2,086 4,614,710
- - 2,086 -
1 1 1 1 11,761,697 392,057 5,318 4,614,710
- - 5,318 -
- - 5,318 -
1 1 1 1 23,073,548 4,614,710 62,592 23,073,548
1 1 1 1 7,691,183 109,874 1,490 7,691,183
- - 3,477 -
- - 3,477 -
1 1 1 1 23,073,548 1,538,237 20,864 23,073,548
- - 200 -
- - - -
1 1 1 1 1 1 58,808,485 588,085 5,977 58,808,485
- - 2,000 -
2 1 1 19,602,828 78,411 1,064 15,382,366
- - 1,064 -
- - 1,064 -
2 1 1 5,768,387 1,153,677 15,648 11,536,774
- - 15,648 -
- - 15,648 -
- - 15,648 -
2 5,768,387 23,074 313 11,536,774
- - 313 -
- - 313 -
- - 313 -
5 2 3 2 9,229,419 1,845,884 25,037 11,536,774
- - 25,037 -
- - 25,037 -
- - 25,037 -
- - 25,037 -
- - 25,037 -
- - 25,037 -
- - 25,037 -
- - 25,037 -
- - 25,037 -
4 1 1 23,073,548 769,118 10,432 92,294,194
- - 62,592 -
1 35,734,937 17,867 242 35,734,937
1 35,734,937 1,786,747 24,235 35,734,937
1 1 23,073,548 102,549 1,391 23,073,548
- - - -
- - 500 -
1 23,073,548 2,307,355 31,296 23,073,548
1 1 - - - -
1 1 - - - -
- - - -
- - 4,000 -
1 - - - 23,073,548
- - 1,000 -
- - - -
- - - -
25 1 - 9 3 - 15 1 - 14 314,697,423 409,468,296
28 10 18 15
93
AY 6,790,000 7,577,500
nstruction Group)

Bifurcation
Kalyan Qty Qty act Harendra Harendra Qty Varsha Ent Varsha Qty
7,691.18 200 Paswan
4,614,710 7,691.18 4,614,710 7,691.18
- 200 - - - -
- 200 - - - -
- 200 - - - -
- 600 - - - -
153,824 2,086 4,614,710 153,824 4,614,710 153,824
- 2,086 - - - -
153,824 2,086 4,614,710 153,824 4,614,710 153,824
- 2,086 - - - -
- 2,086 - - - -
4,614,710 62,592 23,073,548 4,614,710 23,073,548 4,614,710
109,874 1,490 7,691,183 109,874 7,691,183 109,874
- 3,477 - - - -
- 3,477 - - - -
1,538,237 20,864 23,073,548 1,538,237 23,073,548 1,538,237
- 200 - - - -
- 200 - - - -
588,085 7,977 35,734,937 357,349 58,808,485 588,085
- - - - - -
61,529 835 - - 7,691,183 30,765
- 835 - - - -
- 835 - - - -
2,307,355 31,296 - - 5,768,387 1,153,677
- 31,296 - - - -
- 31,296 - - - -
- 31,296 - - - -
46,147 626 - - - -
- 626 - - - -
- 626 - - - -
- 626 - - - -
2,307,355 31,296 4,614,710 922,942 6,922,065 1,384,413
- 31,296 - - - -
- 31,296 - - - -
- 31,296 - - - -
- 31,296 - - - -
- 31,296 - - - -
- 31,296 - - - -
- 31,296 - - - -
- 31,296 - - - -
- 31,296 - - - -
3,076,473 41,728 23,073,548 769,118 - -
- 62,592 - - - -
17,867 242 - - 35,734,937 17,867
1,786,747 24,235 - - 35,734,937 1,786,747
102,549 1,391 - - 23,073,548 102,549
- 1,000 - - - -
- 2,500 - - - -
2,307,355 31,296 - - - -
- - - - 23,073,548 209,760
- - - - 23,073,548 121,440
- - - - - -
- - - - - -
769,118 10,432 - - - -
- - - - - -
- - - - - -
- 50 - - - -
131,105,604 287,563,048

3,045,000 5,442,500
Qty act Krishna Ent Krishna Qty Qty act
104 4,614,710 7,691.18 104
104 - - 104
104 - - 104
104 - - 104
104 - - 104
2,086 4,614,710 153,824 2,086
2,086 - - 2,086
2,086 4,614,710 153,824 2,086
2,086 - - 2,086
2,086 - - 2,086
62,592 23,073,548 4,614,710 62,592
1,490 7,691,183 109,874 1,490
3,477 - - 3,477
3,477 - - 3,477
20,864 23,073,548 1,538,237 20,864
- - - 200
- - - 200
5,977 58,808,485 588,085 5,977
2,000 - - 2,000
417 7,691,183 30,765 417
417 - - 417
417 - - 417
15,648 5,768,387 1,153,677 15,648
15,648 - - 15,648
15,648 - - 15,648
15,648 - - 15,648
- - - -
- - - -
- - - -
- - - -
18,778 4,614,710 922,942 -
18,778 - - -
18,778 - - -
18,778 - - 25,037
18,778 - - 12,518
18,778 - - 12,518
18,778 - - 12,518
18,778 - - 25,037
18,778 - - 25,037
18,778 - - 12,518
- 23,073,548 769,118 10,432
- - - -
242 - - 2
24,235 - - -
1,391 - - 200
100 - - 200
- - - 200
11,500 - - 2,000
2,845 23,073,548 209,760 2,845
1,647 23,073,548 121,440 1,647
- - - -
- - - -
- - - 500
- - - -
- - - -
- - - -
213,785,819

4,165,000
L&T- SUCG JV CC 27 DE
(A Joint Venture between Larsen & Toubro Limited and Shan
Balance work
Duration Sub- contractor
Required
Sno Description Rate Kalyan Sah
Till Month
SKL SSK USK
Wooden Lagging Shifting May-16 12 2
Wooden scrap shifting May-16 12 2
L/C for Internal
1 Doka Shifting 600 May-16 12 2
carting of material
TMT scrap & offcut shifting May-16 12 2
Misc May-16 12 2
Dressing/Base Entry /Exit May-16 12 1
2
Preparation Misc May-16 12 1
L/C for Surface RS 30 May-16 12 1
Preparation for
3 CS May-16 12 1
Screed/
Waterproofing BS May-16 12 1
L/C for road 12 2
4 5 May-16
washing
Waterproofing May-16 12 1
5 L/C for Backfilling CC SP & wall gap filling 70 May-16 12 1
Misc May-16 12 1
Cleaning 15 May-16 12 2
6 Barrication boards Shifting(100m) 180 May-16 12
Shifting(200-250m) 170 May-16 12
L/C for PCC/ Entry /Exit/Station May-16 12 1 1
7 100
Concreting Misc May-16 12
RS May-16 12 1
8 L/C for Screed CS 250 May-16 12 1
BS May-16 12 1
Entry /Exit/Station May-16 12 2
Labour charges for Ancillary Building May-16 12 2
9 5
curing Column May-16 12 2
Misc May-16 12 2
Entry /Exit May-16 12 1
CJ May-16 12 1
10 L/C for chipping 250
Column Hacking May-16 12 1
Undercroft Hacking May-16 12 1
RS May-16 12 5
CS May-16 12 5
BS May-16 12 5
Ground Level May-16 12 5
L/C for Fabrication Yard May-16 12 5
11 5
Housekeeping Misc- Wheel wash, office May-16 12 5
Entry 02,03, 04,05 May-16 12 5
CC BS May-16 12 5
CC RS May-16 12 5
CC Ground Level May-16 12 5
12 L/C for repairing 30 May-16 12 2 2
13 L/C for Dewatering 5 May-16 12 1
14 L/C for welding works 2000 May-16 12 2
15 L/C for giving direction to crane operator for lifting ma 20 May-16 12 2
16 L/C for scrap segregation/Rebar Shifting 225 May-16 12 1
17 L/C for loading & unloading of material 75 May-16 12
18 L/C for plaster work 75 May-16 12
19 Cleaning Of Spilled Concrete 10 May-16 12 2
20 L/C for dismantling Wooden Battens 110 May-16 12
21 Fixing of timber lagging 190 May-16 12
22 Dismantling of Brick Work 388 May-16 12
23 Compaction of soil for PCC 20 May-16 12
24 DWall cleaning 30 May-16 12 -
25 Hand Railing Fixing 172 May-16 12
26 Toe Guard 600 May-16 12
Brickwork
27 Other 275 May-16 12
C 27 DELHI
ted and Shanghai Urban Construction Group)
May-15
ontractor
Krishna Ent
Kalyan Sah Quantity Krishna Ent Quantity
SKL SSK USK
2 77,969 130 77,969 130
2 77,969 130 77,969 130
2 77,969 130 77,969 130
2 77,969 130 77,969 130
2 77,969 130 77,969 130
1 38,985 1,299 38,985 1,299
1 38,985 1,299 38,985 1,299
1 38,985 1,299 38,985 1,299
1 38,985 1,299 38,985 1,299
1 38,985 1,299 38,985 1,299
2 389,847 77,969 389,847 77,969
1 64,975 928 64,975 928
1 64,975 2,166 64,975 2,166
1 64,975 2,166 64,975 2,166
1 389,847 25,990 194,924 12,995
- - - -
- - - -
1 1 496,810 4,968 496,810 4,968
- - - -
1 64,975 260 64,975 260
1 64,975 260 64,975 260
1 64,975 260 64,975 260
97,462 19,492 - -
97,462 19,492 - -
97,462 19,492 - -
97,462 19,492 - -
48,731 194.92 - -
48,731 195 - -
48,731 195 - -
48,731 195 - -
3 97,462 19,492 58,477 11,695
3 97,462 19,492 58,477 11,695
3 97,462 19,492 58,477 11,695
3 97,462 19,492 58,477 11,695
3 97,462 19,492 58,477 11,695
3 97,462 19,492 58,477 11,695
3 97,462 19,492 58,477 11,695
3 97,462 19,492 58,477 11,695
3 97,462 19,492 58,477 11,695
3 97,462 19,492 58,477 11,695
2 2 993,620 33,121 993,620 33,121
194,924 38,985 - -
603,772 302 - -
1 603,772 30,189 301,886 15,094
194,924 866 - -
- - - -
- - - -
2 389,847 38,985 389,847 38,985
1 - - 194,924 1,772
1 - - 194,924 1,026
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
6,791,371 4,716,171
M/S Prabhakar Rai
Workmen

Date Length of
Length of
Day Shift Night Shift pipeline
pipeline done
done
26-May-16 3 4
27-May-16 3 3
28-May-16 4 3
29-May-16 3 3

30-May-16 4 3

31-May-16 4 3
1-Jun-16 - -
2-Jun-16 3 3
3-Jun-16 3 4
4-Jun-16 3 4
5-Jun-16 4 4

6-Jun-16 4 3

7-Jun-16 4 3
8-Jun-16 - -
9-Jun-16 4 4
10-Jun-16 3 4
11-Jun-16 - -
12-Jun-16 4 4

13-Jun-16 3 4

14-Jun-16 3 4
15-Jun-16 - -
16-Jun-16 4 3

17-Jun-16 4 4

18-Jun-16 3 4
19-Jun-16 3 4

20-Jun-16 3 4

21-Jun-16 3 4
22-Jun-16 - -
23-Jun-16 4 4
24-Jun-16 3 4
25-Jun-16 3 4

Act Mandays 89 95
Theo Mandays 104 104

Nos
Nos
ai

Remarks

No concrete program

No concrete program

No concrete program

No concrete program

No concrete program

184
208

0.88
0.88
M/S Prabhakar Rai
Workmen

Date Length of
Length of
Day Shift Night Shift pipeline
pipeline done
done
26-May-16 4 3
27-May-16 4 3
28-May-16 4 3

29-May-16 4 4

30-May-16 4 3
31-May-16 4 4
1-Jun-16 4 3
2-Jun-16 4 3
3-Jun-16 4 3
4-Jun-16 4 3

5-Jun-16 4 4

6-Jun-16 4 3
7-Jun-16 4 4
8-Jun-16 4 3
9-Jun-16 4 3
10-Jun-16 4 3
11-Jun-16 4 3

12-Jun-16 4 4

13-Jun-16 4 3
14-Jun-16 4 4
15-Jun-16 4 3

16-Jun-16 4 3

17-Jun-16 4 3
18-Jun-16 4 3

19-Jun-16 4 4

20-Jun-16 4 3
21-Jun-16 4 4
22-Jun-16 4 -
23-Jun-16 4 3
24-Jun-16 4 -
25-Jun-16 4 3
Act Mandays 124 95
Theo Mandays 124 124

Nos
Nos
ai

Remarks

No concrete program

No concrete program

No concrete program

No concrete program

No concrete program

219
248

0.8831
0.8831
PROJECT
CLIENT : DELHI ME
CONTRACTO

Sub-Contractor's De

Site RKP STATION

Period Durati T
Sno. Sub- Contractors Section
From To on USK OT

1 Amba Construction 26-May-16 25-Jun-16 30 89 265

2 Kalayan Sah 26-May-16 25-Jun-16 30 253 776

3 Varsha Enterprises 26-May-16 25-Jun-16 30 169 530


Supply
4 Krishna Enterprises 26-May-16 25-Jun-16 30 203 696

7 MK Dubey 26-May-16 25-Jun-16 30 - -

6 K S Manpower 26-May-16 25-Jun-16 30 - -

5 Prabhakar Rai Pipeline 26-May-16 25-Jun-16 30

1 Zainath Enterprises 26-May-16 25-Jun-16 30

2 Rajan Engg 26-May-16 25-Jun-16 30

3 Malik Enterprises 26-May-16 25-Jun-16 30


Rebar
3 Sia Ram Sharma 26-May-16 25-Jun-16 30
Rebar

6 Mujeeb 26-May-16 25-Jun-16 30

4 Bum bum Shankar 26-May-16 25-Jun-16 30

1 Sri Sai Engineering 26-May-16 25-Jun-16 30


Fabrication
2 Hindustan Construction 26-May-16 25-Jun-16 30

Spar Geo Pile Retrieval 26-May-16 25-Jun-16 30

1 Raj Kumar 26-May-16 25-Jun-16 30


Boring
2 SB Construction 26-May-16 25-Jun-16 30

Manoj Kumar Debris Disposal 26-May-16 25-Jun-16 30

Rise 9 Infra 26-May-16 25-Jun-16 30


Concrete
Breaking
Saras Infra Build 26-May-16 25-Jun-16 30

Starcon Infra 26-May-16 25-Jun-16 30


Excavation
Rattiputra 26-May-16 25-Jun-16 30
SRS Earth Movers Pvt.
Disposal 26-May-16 25-Jun-16 30
Ltd
SAS Infratech Box Pushing 26-May-16 25-Jun-16 30

Inductofur Earthmat 26-May-16 25-Jun-16 30

Chanderlekha Wooden Lagging 26-May-16 25-Jun-16 30

Axiom 26-May-16 25-Jun-16 30


Core cutting
Concrete Solutions 26-May-16 25-Jun-16 30
Deepak Allied Utility Diversion 26-May-16 25-Jun-16 30

Cipy Water-proofing 26-May-16 25-Jun-16 30

Arkin Toilet 26-May-16 25-Jun-16 30

Rattiputra Breaker 26-May-16 25-Jun-16 30

2 Ashish Engineering Grouting 26-May-16 25-Jun-16 30

3 Pooja Constructtion 26-May-16 25-Jun-16 30


Cross Passage
Varsha Enterprises 26-May-16 25-Jun-16 30

Durga Construction 26-May-16 25-Jun-16 30

Shree Shyam Blockwork 26-May-16 25-Jun-16 30

United Associates 26-May-16 25-Jun-16 30

Zainath 26-May-16 25-Jun-16 30

Rajan Engg 26-May-16 25-Jun-16 30

Malik 26-May-16 25-Jun-16 30

Bum bum Shankar 26-May-16 25-Jun-16 30

Sia Ram Sharma 26-May-16 25-Jun-16 30

Mujeeb Shuttering 26-May-16 25-Jun-16 30

Ruby Roy 26-May-16 25-Jun-16 30

Yogendra Sah 26-May-16 25-Jun-16 30


Siddshwar Prashad
26-May-16 25-Jun-16 30
Gupta
Vikram Singh 26-May-16 25-Jun-16 30

Jha Construction 26-May-16 25-Jun-16 30

Total 714 2265


PROJECT : DMRC CC27
CLIENT : DELHI METRO RAIL CORPORATION
CONTRACTOR : L&T-SUCG JV

ontractor's Details

Mandays Verification
Total Acc to Time Office Actual amt. from Time Office
SSK OT SKL OT RKP Site Begampur

- - 27 75 67,601 64,617

80 282 45 141 211,580 404,525

91 307 50 125 181,661 206,923

- - 12 59 122,629 116,971

- - - - 0 0

- - - - 0 0

88,306 88,306

#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

343,834

595,200

126,204

373,463

60,185

121,480

1,867,500

27,160

55,097

83,375
2,943,475

53,136

7,000

90,084

725,773

16,410

16,747

12,653

Err:509

Err:509
116,368

Err:509

23,334

171 589 134 399 671,777 #REF!


Date 25-Jun-16
Prepared By Amrutesh G
Checked By PR Lenka
Supply Labour
Measurment Labour

S/C Submitted Submitted to planning on

3-Oct-15
3-Oct-15
3-Oct-15
3-Oct-15

3-Oct-15
4-Nov-15
4-Nov-15
4-Nov-15
4-Nov-15
4-Nov-15
30-Dec-99
4-Nov-15
4-Nov-15
4-Nov-15

3-Oct-15

4-Nov-15

4-Nov-15

4-Nov-15
4-Nov-15

4-Nov-15
4-Nov-15
4-Nov-15
4-Nov-15
4-Nov-15
4-Nov-15
4-Nov-15
L&T-SUCG JV CC-27 DMRC Project Delh
Measurement Book
Sub-Contractor BamBam
Period 26-May-16 25-Jun-16

Sno Description Unit No L B/H

1 Making shuttering boards

a Con TVS Shaft wall G20 sqm 4.000 24.800 2.800

sqm
b Lintel,Mullion sqm 40.000 2.400 0.300

Fixing,Shifting, Deshuttering shutter


2

a Con TVS Shaft wall G20 sqm 4.000 24.000 2.800


b Lintel,Mullion sqm 40.000 2.400 0.300
g sqm
Fixing of scaffolding and dismantling sqm
/ shifting of scaffolding to the next slab
3
including fixing of walers, H-Beams and
a Plywood.
TVS Shaft wall Cum 6.000 1.525 1.525
b Column cladding G16,10,11,17 Cum 20.000 1.525 1.525
c Block work at Plumbing shaft Cum 4.000 1.525 1.525
d Block at Switch Room trackside Cum 12.000 1.525 1.525
e Block Dismantling at EPR Room Cum 8.000 1.525 1.525
Cum
4 Fixing of Primary Member Rmt
5 Fixing
L/C of Walkway
of internal andof
carting Jalli
material Rmt 4.000 28.000
from store/stack yard to Working
5 MT
location

L&T-SUCG JV CC-27 DMRC Project Delh


Measurement Book
Sub-Contractor Yogendra Sah
Period 26-May-16 25-Jun-16

SNo. Description Unit No L B


Making shuttering boards (wooden
1 and /or steel) and packing properly using
jute, cotton and thermocole.
a ES02 Wall side stopper Sqm 4.000 2.65 0.6

a ES02 Wall near Site office Sqm 8.000 12.65 2.4


b Ancillary Nut Jalli beam sqm 16.667 2.4 1.2

Fixing,Shifting, Deshuttering shutter


2
ect Delhi

Site RKP STATION


Shift Day/ Night
Rate
H Qty Amount

277.760

277.760 172 47,775


28.800
28.800 65 1,872

268.800
28.800

297.600 240 71,424

10.250 143.026
10.650 495.358
3.650 33.954
5.510 153.770
4.585 85.304
911.412 35 31,899
0.000 201 -
112.000 172 19,264
100
35.000 3,500
175,734

ect Delhi

Site RKP STATION


Shift Day/ Night
Rate
H Qty Amount

6.360
6.360 65 413.4
0.000
242.880
48.000

290.880 172 50,031


RKP STATION
Period 26-May-16 25-Jun-16

Dear sir

Kindly release the bill payment for the above mentioned period.

SNo. Description Unit

Making shuttering boards (wooden and /or steel) and packing


1 sqm
properly using jute, cotton and thermocole.

Shifting the shuttering material from location of making and fixing,


2 using thermocole/plywood and removal and stacking of all sqm
shuttering. IN Wall

Shifting the shuttering material from location of making and fixing,


using thermocole/plywood and removal and stacking of all shuttering sqm
in Column

Shifting the shuttering material from location of making and fixing,


using thermocole/plywood and removal and stacking of all shuttering sqm
in Column

Fixing of scaffolding and dismantling / shifting of scaffolding to


4 Cum
the next slab including fixing of walers, H-Beams and Plywood.

Erection and dismantlilng / shifting of working staging as per safety


5 regulation, safe to work to the satisfaction of Engineer-in-Charge. All Cum
materials will be provided by L&T SUCG JV.

6 L/C Concrete Cum


Roof/ Base Slab Cum
Wall/Column Cum
7 Fixing of water bar, as required Rmt
8 L/C for internal carting of material Trips
Yogendra Sah
RKP STATION
Period 26-May-16 25-Jun-16

Dear sir

Kindly release the bill payment for the above mentioned period.

SNo. Description Unit

Making shuttering boards (wooden and /or steel) and packing


1 sqm
properly using jute, cotton and thermocole.

Shifting the shuttering material from location of making and fixing,


2 using thermocole/plywood and removal and stacking of all shuttering sqm
wall at ES01,ES04

Shifting the shuttering material from location of making and fixing,


3 using thermocole/plywood and removal and stacking of all shuttering sqm
wall at ES01,ES05

Fixing of scaffolding and dismantling / shifting of scaffolding to


4 Cum
the next slab including fixing of walers, H-Beams and Plywood.

Erection and dismantlilng / shifting of working staging as per safety


5 regulation, safe to work to the satisfaction of Engineer-in-Charge. All Cum
materials will be provided by L&T SUCG JV.

6 L/C Fixing of water bar as Required Rmt


7 L/C for internal carting of material Trips
Siddshwar Prashad Gupta
RKP STATION
Period 26-May-16 25-Jun-16

Dear sir

Kindly release the bill payment for the above mentioned period.

SNo. Description Unit

Making shuttering boards (wooden and /or steel) and packing


1 properly using jute, cotton and thermocole at Miscallaneous Works in sqm
Station

Making shuttering boards (wooden and /or steel) and packing


sqm
properly using jute, cotton and thermocole at wall at G1-3

Shifting the shuttering material from location of making and fixing,


using thermocole/plywood and removal and stacking of all
2 sqm
shuttering.

Shifting the shuttering material from location of making and fixing,


using thermocole/plywood and removal and stacking of all sqm
shuttering.

g Fixing of water bar, as required RM

Fixing of scaffolding and dismantling / shifting of scaffolding to


4 Cum
the next slab including fixing of walers, H-Beams and Plywood.

Erection and dismantlilng / shifting of working staging as per safety


5 regulation, safe to work to the satisfaction of Engineer-in-Charge. All Cum
materials will be provided by L&T SUCG JV.

6 L/C Concrete Cum


Roof/ Base Slab Cum
Wall/Column Cum
7 L/C for internal carting of material Trips
RKP STATION
Period 26-May-16 25-Jun-16

Dear sir

Kindly release the bill payment for the above mentioned period.

SNo. Description Unit

Making shuttering boards (wooden and /or steel) and packing


1 sqm
properly using jute, cotton and thermocole.

Shifting the shuttering material from location of making and fixing,


using thermocole/plywood and removal and stacking of all shuttering
2 IN Staircase sqm

Shifting the shuttering material from location of making and fixing,


using thermocole/plywood and removal and stacking of all shuttering
sqm
in Wall at Station,Ancillary

Shifting the shuttering material from location of making and fixing,


using thermocole/plywood and removal and stacking of all shuttering sqm
in Slab(Platform slab)

g Fixing of water bar, as required RM

Fixing of scaffolding and dismantling / shifting of scaffolding to


4 Cum
the next slab including fixing of walers, H-Beams and Plywood.

Erection and dismantlilng / shifting of working staging as per safety


5 regulation, safe to work to the satisfaction of Engineer-in-Charge. All Cum
materials will be provided by L&T SUCG JV.

6 L/C Concrete Cum


Roof/ Base Slab Cum
Wall/Column Cum
7 L/C for internal carting of material Trips
Jha Construction
RKP STATION
Period 26-May-16 25-Jun-16

Dear sir

Kindly release the bill payment for the above mentioned period.

SNo. Description Unit

Making shuttering boards (wooden and /or steel) and packing


1 sqm
properly using jute, cotton and thermocole.

Shifting the shuttering material from location of making and fixing,


2 using thermocole/plywood and removal and stacking of all sqm
shuttering.

Shifting the shuttering material from location of making and fixing,


using thermocole/plywood and removal and stacking of all sqm
shuttering.

g Fixing of water bar, as required RM

Fixing of scaffolding and dismantling / shifting of scaffolding to


4 Cum
the next slab including fixing of walers, H-Beams and Plywood.

Erection and dismantlilng / shifting of working staging as per safety


5 regulation, safe to work to the satisfaction of Engineer-in-Charge. All Cum
materials will be provided by L&T SUCG JV.

6 L/C Concrete Cum


Roof/ Base Slab Cum
Wall/Column Cum
7 L/C for internal carting of material Trips

Nabdip Mehty
RKP STATION

Period 26-May-16 25-Jun-16

Dear sir

Kindly release the bill payment for the above mentioned period.

SNo. Description Unit

Making shuttering boards (wooden and /or steel) and packing


1 sqm
properly using jute, cotton and thermocole.
Shifting the shuttering material from location of making and fixing,
2 using thermocole/plywood and removal and stacking of all sqm
shuttering.
Shifting the shuttering material from location of making and fixing,
using thermocole/plywood and removal and stacking of all
shuttering. sqm

g Fixing of water bar, as required RM

Fixing of scaffolding and dismantling / shifting of scaffolding to


4 Cum
the next slab including fixing of walers, H-Beams and Plywood.

Erection and dismantlilng / shifting of working staging as per safety


5 regulation, safe to work to the satisfaction of Engineer-in-Charge. All Cum
materials will be provided by L&T SUCG JV.
6 L/C Concrete Cum
Roof/ Base Slab Cum
Wall/Column Cum
7 L/C for internal carting of material Trips
Pancard no AVAPR3597G
Vendor code S0005781

Qty Rate Amount

Err:509 172 Err:509

Err:509 230 Err:509

297.60 240 71,424

Err:509 250 Err:509

35 -

- 35 -

100 -
100 -
250 -
Err:509 30 Err:509
600 -
Err:509
h
Pancard no PCCGXPS9434H
Vendor code S9003405

Qty Rate Amount

Err:509 172 Err:509

230 68,365
297.24

240
Err:509

- 35 -

525.59 35 18,396

117.20 30 3,516
600 -
Err:509
Gupta
Pancard no BKUPG0635E
Vendor code S0053466

Qty Rate Amount

14.60 65 949

136.32 172 23,447

Err:509 230

361.08 240 86,659

30 -

35 -

151.80 35 5,313

100 -
100 -
250 -
600 -
116,368
Pancard no CRPP59756
Vendor code S0068305

Qty Rate Amount

330.74 172 56,887

275 -

- 230 -

Err:509 240 Err:509

30 -

35 -

497.91 35 17,427

100 -
250 -
600 -
Err:509
on
Pancard no
Vendor code

Qty Rate Amount

42.00 172 7,224

Err:509 230

42.00 240 10,080

30 -

35 -

172.28 35 6,030

100 -
100 -
250 -
600 -
23,334

y
Pancard no

Vendor code

Qty Rate Amount

- 172 -

- 230 -

Err:509 240

30 -

35 -
-

Err:509 35 Err:509

100 -
100 -
250 -
600 -
Err:509
L&T-SUCG JV CC-27 DMRC Project
Measurement Book
Sub-Contractor Manoj Kumar
Period 26-May-16 25-Jun-16

SNo. Description

Transportation of D-wall muck from station locations to dumping yard at Kalindikunj or any other designated location for lead upto 26 km.
done by L&T SUCG JV. Measurement shall be as per actual material filled in dump truck. The wheels shall be cleaned at wheel washing ba
1 Contractor before leaving the site.

Transportation of Debris from station locations to dumping yard at Burari or any other designated location for lead upto 30 km. Loading o
L&T SUCG JV. Measurement shall be as per actual material filled in dump truck. The wheels shall be cleaned at wheel washing bay facility
2 leaving the site.
L&T-SUCG JV CC-27 DMRC Project
Measurement Book
Sub-Contractor M/sRajKumar
Period 26-May-16 25-Jun-16

Dim
SNo. Description Unit
No L

L/C for Drilling of pile of nominal dia 800mm in all kinds of soil strata upto a
1 Rmt 25
depth of 16m from GL at Entrys at RKP USING ROTARY Piling Rig Machine.
L&T-SUCG JV CC-27 DMRC Project
Measurement Book
Sub-Contractor Saras Infra Build
Period 26-May-16 25-Jun-16

Dim
SNo. Description Unit
No L
All Charges for breaking of RCC upto concrete grade of M20. Breaking shall be done
1
with JCB with breaker arrangement.
guidewall at ES02 Cum 1.000 16.000
1.000 5.000

All Charges for breaking of RCC upto concrete grade of M40. Breaking shall be done
2
with JCB with breaker arrangement.
a D-Wall breaking at ES02 TVS Shaft Cum 1.000 9.000
1.000 3.550
1.000 3.000
L&T-SUCG JV CC-27 DMRC Project
Measurement Book
Sub-Contractor SAS Infratech
Period 26-May-16 25-Jun-16

Distributi
SNo. Description Unit Previous Qty
on

1 Preparation & suppy of structural drawings based on tender drawing & bill of LS 100% 100%
permanent works & other items as per scope.

2 LS 35% 35%
Completion of Thrust Bed & all necessary arrangement for starting Box Pushing

3 Completion of jack fixing & pushing of box segments LS 50% 50.00%

4 LS 15% 0%
Completion in all respects including House Keeping of structure and Demobalization.
Measurement Book
Sub-Contractor M/s Allure Interiors
Period 26-May-16 25-Jun-16

SNo. Description Unit Scope

Providing and applying two coats of Heritage surface texture paint after
applying corresponding roller coat as primer on pre plaster surface as per
1 approved shade,The first coat to be applied by brush or wool as a base Sqm 240
coat,diluted with sufficient water final to be applied by trowel to maintain
with or without Grooves.
Measurement Book
Sub-Contractor Chanderlekha
Period 26-May-16 25-Jun-16

SNo. Description Unit Total Quantity

1 Fixing wooden lagging between 2 soldier piles at RK Puram cut & cover & box pushing
as directed by eic.
a Cut & cover sqm 5884.58
b Box Pushing 663.00
c ES04 635.68
d ES01 34.58
e ES02 937.43
f ES05 951.41
g ES03 576.89

2 Removal of wooden lagging between 2 soldier piles at RK Puram cut & cover & box
pushing as directed by eic.
a Cut & cover 5884.58
b Box Pushing/ES01 667.30
c ES02 989.14
d ES04 668.71
e ES05 Box 951.41
Measurement Book
Sub-Contractor Amba Construction
Period 26-May-16 25-Jun-16

SNo. Description Unit Total Quantity

1 Fixing of wooden lagging between 2 soldier piles at RK Puram cut & cover & box sqm
pushing as directed by eic.
a Box Pushing 0
b Cut & cover 0
Total
Measurement Book
Sub-Contractor Spar Geo Infra Pvt Ltd
Period 26-May-16 25-Jun-16

SNo. Description Unit Total Quantity

1.1
Extraction of soldier Pile
a Cut&Cover m 3,924.99
b ES01 m 886.55
c ES02 m 589.18
d ES03 m 5.00
e ES04 m 315.51
Measurement Book
Sub-Contractor Axiom
Period 26-May-16 25-Jun-16

SNo. Description Unit Total Quantity

Core cutting with diamond core cutting method od dia 200mm & depth of 800mm.
Concrete debris generated shall be stacked properly at a loction inside station area as
directed by eic.
Core cutting with diamond core cutting method od dia 200mm & depth of 800mm.
Concrete debris generated shall be stacked properly at a loction inside station area as
directed by eic.
1 Station Nos 11
Measurement Book
Sub-Contractor Concrete Solutions
Period 26-May-16 25-Jun-16

SNo. Description Unit Total Quantity

2 L/C for core cutting of Dia 150mm of depths as follow

a)200mm depth MM 1,600


b)300mm depth MM 900
c)400mm depth MM 5,600
d)800mm depth MM 6,400

Station Nos 1
3 Cutting of tunnel eye in RKP Head Wall
a Wall cutting using wire saw cutting sqm 88

b Nos 79
Core cutting with diamond core cutting method od dia 100mm & depth of 800mm
Placing & fixing 12mm dia MS nozzle of 70 mm length at leakage point on the entire
3 retaining wall after concreting by drilling or making holes with suitable tools Nos 188
Placing & fixing 12mm dia MS nozzle of 70 mm length at leakage point on the entire
3 retaining wall after concreting by drilling or making holes with suitable tools Nos 188

Supply & application of shrinkage free low viscosity, moisture toletant, epoxyinjection
1 adhesive above column heads product- Sikadue-52. Rate included packer also of Kg 96
approved quantity.
Measurement Book
Sub-Contractor Deepak Allied
Period 26-May-16 25-Jun-16

SNo. Description Unit Total Quantity Comp

Charges for construction of launching pit/manhole with all required material,


equipments like JCB, Crane, welding and cutting machine, tools and tackles, in confined
excavation of shafts of size 3.5m X 3.5m X 4.00m for required depth. The work
includes boring of 350 dia hole lowering of ISMB 300 section upto required depth, layer
wise excavation with fixing of wooden laggings of size 100mm X 100mm X 1.50mm
1 Nos -
and installation os struts and wallers of ISMB 200 section as per approved drawings
and as per istruction of Engineer-in-charge. the work also includes backfilling of pit
after completion of work i.e. pushing of pipes and construction of manholes, removal of
struts and wallers etc complete. Crane or pick and carry crane shall be provided by L&T
SUCG JV.

Installation of HDPE Pipe made out of size 355mm PE-80, PN-4 conforming to IS-14333
suitable for welding joints including weldings as per Direction of Engineer-in-Charge
with all labour as a complete job including all tools and plants, machinery all
2
equipments like JCB Crane, Welding and Cutting plant including material. Physical
Mtr
verification of utilities by digging of holes, mobilization and demobilization of
equipments and manpower as required.

a 355mm dia
Supplying and fixing 355mm dia (Outer dia) HDPE PN-4 pipe conforming to DJB
3 Mtr
standard and IS Code 14333 and as directed by Engineer-In-charge.

Construction of manhole of size 1.52m internal dia at bottom and 0.56m dia at top of
4 nos
required depth as per DJB pattern.

Pumping out water caused by springs, tidal or river seepage, broken water mains or
5 KL
drains and likes.

6 Making connection with the existing sewer line. Mtr

Note: Hold 10% of total amount of the bill after submitting of Revised Drawing of diverted
L&T-SUCG JV CC-27 DMRC Project
Measurement Book
Sub-Contractor HCH Engineering
Period 26-May-16 25-Jun-16

SNo. Description Unit Scope

1 Nos 183

2 Nos 732

3 Nos 732

4 Core cutting without machine for OTE duct Nos 255


5 Core cutting with machine for OTE duct & drop base Nos 257
L&T-SUCG JV CC-27 DMRC Project
Measurement Book
Sub-Contractor Cipy
Period 26-May-16 25-Jun-16

Description
SNo. Unit Scope Given No L

L/C for application of polymer coating on roof


1
slab at RKP
G(23-24) m2 284.72 284.72
a Month: Oct-14 G(24-26) m2 420.62 420.62
Air Shaft m 2
25.11 25.11
G(2-15) (C-E) m 2
1,441.03 1,441.03
b Month: Jan-15
G(2-15) (C-E) Jn m2 42.18 42.18
G(2-15) (C-E) Pedestral m 2
39.60 39.60
G(11-15) (A-C) m 2
516.19 516.19
G(11-15) (A-C) Jn m2 26.85 26.85
G(11-15) (A-C) Beam m2 53.70 53.70
c Month: Feb-15
c Month: Feb-15 G(9-10) (A-C) m2 100.93 100.93
G(9-10) (A-C) Jn m2 5.25 5.25
G(9-10) (A-C) Beam m2 10.50 10.50
G(5-7) (A-C) m2
218.11 218.11
G(5-7) (A-C) Jn m2
11.34 11.34
Balance Station m2 2,378.10 2,378.10
d Month: Apr-15
Cut & Cover m2
1,100.00 1,100.00
Cut & Cover m2
1,100.00 1,100.00
d Month: Apr-15

e Month:July-15 1,323.55 1,323.55


Cut & Cover m2
Month:July-15
f Month:Sep-15 Cut & Cover m2 871.00 871.00
g Month:Apr-16 Roof Opening m3
221.40 -

10,139.95 9,047.55

Note:
1) The above mentione qty is of only application

2) For the payment purpose for material is total qty payble is :252sqm
L&T-SUCG JV CC-27 DMRC Project
Measurement Book
Sub-Contractor Rattiputra
Period 26-May-16 25-Jun-16

Dim
SNo. Description Unit
No L
L/c For backfilling of Soil ,it includes cost of soil,transportation &Unloading of soil as
1
per EIC
PCC for piling of ES05 Trip 7.00
-
7.00
2

2
a
L&T-SUCG JV CC-27 DMRC Project
Measurement Book
Sub-Contractor Ashish Engineering
Period 26-May-16 25-Jun-16

SNo. Description Unit Scope

Supply & application of shrinkage free low viscosity, moisture toletant, epoxyinjection adhesive above
1 Kg
column heads product- Sikadue-52. Rate included packer also of approved quantity.

Application of cement grout with injection technology. Cement grout shall be provided by L&T SUCG JV
2 free of cost. Rates includes packer also of approved quality. Subcontractor shall bring injection machine per packer
of required capacity.
Placing & fixing 12mm dia MS nozzle of 70 mm length at leakage point on the entire retaining wall after
3 concreting by drilling or making holes with suitable tools Nos

Supply & application of " CICO polygrout reactive water barrier grouting system" by injection
4 grouting machine. Nos

Sealing the wet cracks through cement using " CICO Quick Set No.3 " to avoid wastage of " CICO
5 Polygrout -Reactive Water Barrier Grouting System". m
L&T-SUCG JV CC-27 DMRC Project
Measurement Book
Sub-Contractor Pooja Constructtion
Period 26-May-16 25-Jun-16

SNo. Description Unit Scope

1 Charges for Cross Passage aas per approved drawings and direction of eic.

a CP14 with Sump Nos 1.00


b CP15 Nos 1.00

Debit Remarks
1 Downline door erection by M/S Sri Sai 1.264MT x RS 7400 9354
2 Upline ring girder shifting by supply labor.(12labors) 6000
Balance Work Remarks
1 Ring girder dismantling/shifting for downline 9.604MT x 2660Rs 25546.64
2 Sump excavation /shortcrete done by M/S Varsha 1.4 Lakh will not be provided
40900.24

L&T-SUCG JV CC-27 DMRC Project


Measurement Book
Sub-Contractor Varsha Enterprises
Period 26-May-16 25-Jun-16
SNo. Description Unit Scope

1 Charges for Cross Passage aas per approved drawings and direction of eic.

a CP15 Nos 1.00


b CP14-Sump Nos 1.00

Debit
Description
1 UL Ring erection & Dismantling by M/S Sri Sai
2 UL Door Frame erection by M/S Sri Sai
3 DL Ring Dismantling by M/S Sri Sai
4 DL Ring erection by M/S HCH
5 DL Door Frame erection by M/S HCH
L&T-SUCG JV CC-27 DMRC Project
Measurement Book
Sub-Contractor M/S Dipesh Enterprises
Period 26-May-16 25-Jun-16

SNo. Description Unit Scope

Providing and laying integral based water proofing treatment including prepration of surface as required
for roof,balconies,terraces etc,consisting of following actvities:a)applying slurry coat of 2.75kg/sqm
admixed with water proofing compound &confirming to IS:2645&approved by EIC at adjoining wall
upto300mm including the height treatement of wall,b)laying brick bat with mortor using broken bricks
1
25mm to 115mm size with 50% of cement mortor 1:5 admixed with waterproofing compound c)after two
days of curing applying second coat of slurry using 2.75kg/sqm of water proofing compound mixed with
cement. d)finishing the surface with 20mm thick jointless cement mortor of 1:4 and other operation as
per EIC

a With Avg Thickness of 120mm and minimum thk at Khurra as 65mm Sqm 1,250.00

Note: Materials like sand,Cement and water proofing compound will be

L&T-SUCG JV CC-27 DMRC Project


Measurement Book
Sub-Contractor M/S Koncept
Period 26-May-16 25-Jun-16
SNo. Description Unit Scope

Supplying,Fabricating Matte Finish,Ercetion of Required Height(900 to 1100mm) SS Handrailing as per


design comprsing of 50mm OD SS of Grade S304 3.15mm thk 25mm dia jointing pin SS Spider FittingsSS
1 Base Plate,M16X200mm SS Fastners for Fixing Railing in Floor/Staircase by Cutting Hole and covering Rmt 110
with SS Cover Plate and Toughened Glass fixed with SS Brackets and Hinges Making Good the flooring as
per specification and Drawing

Providing and Fixing of 3MM Thk SS304 Grade sheet cladding on Aluminium Base Frame 25mm thk
2 complete/(For payment purpose only SS shall be measured Alluminium item shall be paid as extra item Kg 13,044.45
under NDSR)

Providing and fixing of Alluminium Mill Finish SUB Frame work with Extra Built up Standard tubular
3 Kg 625.65
section of appproved Make confirming to IS:733 and IS:1285 fixed with raw Plugs and SS Screw

Providing and Fixing of Panals of 3mm Pressed Plate of Grade 304 SS Matte Finish including SS frame of
4 30X30X3mm All accessories and Fixtures of Removable Access Panals in Block work All complete as per Kg 717.66
drawings

Details of work:
Circular column G9 1nos
Rectangular Full height G16A 1nos

L&T-SUCG JV CC-27 DMRC Project


Measurement Book
Sub-Contractor M/S Rockmech
Period 26-May-16 25-Jun-16
SNo. Description Unit Scope

1 Fabrication&Erection of MS Handrailing of 50MM&25mm dia 3.15mm thick with polyurethane paint Kg 499.28

Add 12.5% Vat


Project Delhi
ok
Site RKP STATION
Shift Day/ Night

Total
Unit Rate
Qty Amount
o 26 km. Loading of muck shall be
ashing bay facility by Sub-
cum 195 - -

Loading of muck shall be done by


ay facility by Sub-Contractor before
cum 257 - -

Total -
Project Delhi
ok
Site RKP STATION
Shift Day/ Night

Dimension
Qty Rate Amount
B/ H

13.0 324.75 1,150 373,463

-
-
- 0

-
- 0
373,463
Project Delhi
ok
Site RKP STATION
Shift Day/ Night

Dimension
Qty Rate Amount
B/ H

0.226 1.000 2.8353


0.200 0.800 0.8000
3.6353 1800 6543.61344

0.800 2.250 16.2000


0.575 1.050 2.1433
0.800 3.000 7.2000

25.5433 2100 53641


60,185
Project Delhi
ok
Site RKP STATION
Shift Day/ Night

Current Qty Rate Amount

0 -

0% -

0% 12450000 -

15% 12450000 1,867,500

1,867,500
ok
Site RKP STATION
Shift Day/ Night

Qty Paid This Bill Qty Rate Amount

100 140 194 27,160

27,160
ok
Site RKP STATION
Shift Day/ Night

Given Qty Current Qty Rate Amount

5884.58 -
663.00 -
635.68 -
34.58 -
937.43 -
951.41 -
383.33 193.560

190.00
193.56 36776.40
302.55
266.87
479.51 166.55
119.52 -
4.20 -

166.55 110.00 18320.50


55,097
ok
Site RKP STATION
Shift Day/ Night

Given Qty Current Qty Rate Amount

0 -
0 -
- 190 -
-
ok
Site RKP STATION
Shift Day/ Night

Given Qty Current Qty Rate Amount

3,924.99 - 400 0.00


886.55 - 400 0.00
589.18 - 400 0.00
- - 400 0.00
- 315.51 400 126204.00
- 0
126204
ok
Site RKP STATION
Shift Day/ Night

Given Qty Current Qty Rate Amount


11 -
- 5100 0
0
ok
Site RKP STATION
Shift Day/ Night

Given Qty Current Qty Rate Amount

- 1,600 5.75 9200.00


- 900 5.75 5175.00
- 5,600 5.75 32200.00
- 6,400 5.75 36800.00

1 - 5100 0

88 - 11200 0

79 - 3000 0

188 - 200 -
188 - 200 -

96 - 500 -

83,375
ok
Site RKP STATION
Shift Day/ Night

Total Qty Given Current Qty Rate Amount

- 2.00 290,000.00 580,000

81.50 23,000.00 1,874,500


81.50 4,650.00 378,975

2.00 65,000.00

- 64.00 -

2.00 55,000.00 110,000

2,943,475
verted line to DJB For Approval
Project Delhi
ok
Site RKP STATION
Shift Day/ Night

Comp Given Qty Current Qty Rate Amount

183 166 17 8685 147,645

732 664 68 75 5,100

660 310 350 165 57,750

255 255 - 400 -


257 155 102 2000 204,000

414,495
Project Delhi
ok
Site RKP STATION
Shift Day/ Night

B H Qty Rate Amount

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

221.40

221.40 240 53,136


53,136
Project Delhi
ok
Site RKP STATION
Shift Day/ Night

Dimension
Qty Rate Amount
B/ H

-
-
7.000 1000 7000

7,000
Project Delhi
ok
Site RKP STATION
Shift Day/ Night

Comp Given Qty Current Qty Rate Amount

94 94 - 1000 -

452 432 20 250 5,000


90 22 68.00 288 19,584

96 30.5 65.50 1000 65,500

12 12 - 175 -

90,084
Project Delhi
ok
Site RKP STATION
Shift Day/ Night

Comp Given Qty Current Qty Rate Amount

1.00 1.00 - 800000 -


- - - 800000 -
-

9250

Project Delhi
ok
Site RKP STATION
Shift Day/ Night
Comp Given Qty Current Qty Rate Amount

1.00 - 1.00 800000 800,000


1.00 - 1.00 180000 180,000
980,000

Unit Qty Rate Amount


LS 0.500 245,000 122,500
MT 1.264 3,650 4,614
MT
0.500 245,000 122,500
MT
MT 1.264 3,650 4,614
254,227
Project Delhi
ok
Site RKP STATION
Shift Day/ Night

Comp Given Qty Current Qty Rate Amount

210.00 - 347.65 725 252,046

will be debited through Store

Project Delhi
ok
Site RKP STATION
Shift Day/ Night
Comp Given Qty Current Qty Rate Amount

48.00 - 48.00 8000 384,000

7,867.27 6,271.44 344 548,966


1,595.83

241.14 - 344 82,952


241.14

79.74 - 344 27,431


79.74
1,015,918

Project Delhi
ok
Site RKP STATION
Shift Day/ Night
Comp Given Qty Current Qty Rate Amount

499.28 - 499.28 130 64,906

-
-
8,113
73,020
Equipments Rate Hrs Amt Diesel(L)
7.5 9375.00 45
TFC 1250 3 3750.00 18
2.25 2812.50 13.5
65 TON CRANE 1000 1.5 1500.00 10.5
PICK & CARRY CRANE 116 2.5 288.75 8.75
48 95.75 4596.00
22322.25
Debit M/s Allure Interiors
USL SSL SKL Total
MD 9200 2035 0 11235
OT 1150 254 0 1404
12639

5% PROFIT 632
GRAND TOTAL 13271
Wooden Lagging Recon

Theoritical Consumption for Wooden Lagging in Cut & Cover


No L H Area 23.735
Head Wall 23.735 19.65 466
HW to KP 18, FS 1 173.469 17.00 2949 177.48
HW to KP 18, RS 1 170.724 17.00 2902

Theoritical consumption 6318

Billing Status
Palnivel
Month Unit
CC BP ES04 ES03 ES01 ES02
RA 1, Apr '14 sqm 512.00 400.00
RA 2, May '14 sqm 566.40 263.00
RA 3, Jun '14 sqm 575.00

sqm
RA 4, Jul '14 791.88
RA 5, Aug '14 sqm 1,036.95
RA 6, Sep '14 sqm 922.59
RA 7, Oct '14 sqm 767.10
RA 8, Nov '14 sqm 495.66 120.76
RA 9, Dec '15 sqm - 125.92
RA 10, Jan '15 sqm 217.00 389.00
RA 11, Mar '15 sqm 104.93
RA 12, Apr '15 sqm 34.58 327.68
RA 12, May '15 sqm 330.84
RA 13, Nov '15 sqm 114.09 45.45
RA 14, Dec '15 sqm 128.54
RA 15, Jan '16 sqm 74.9
RA 16, Feb '16 sqm 144.498
RA 17, Mar '16 sqm 49.841
RA 18, Apr '16 sqm 193.56
Actual Consumptio sqm 5885 663 636 577 35 937

Completion
Area Unit Scope
Theoritical Actual
Box Pushing sqm 667 667 663
Cut & Cover sqm 6468 6468 6467
ES4 sqm 668.7076 669 636
ES02 sqm 989 989 937
ES05 sqm 1002 1002 -
661.5
6m
52m HDPE Pipe

6m

9m 9m

0.685
1.5
m
m
L&T HCH
251 217 468
183
Scope
Location Unit No L B Area
G(24-26),(1-3) m2 2 17.00 24.57 835.38
G(23-24) m2
1 13.20 21.57 284.72
G(1-3) m2
2 17.00 0.30 10.20
G(2-3),G(24-25) m2
4 1.50 0.30 1.80
G(23-26) Jn m2
2 30.20 0.30 18.12
G(1,26) Jn m2
2 24.57 0.30 14.74
G(3-20) m2 1 190.40 21.57 4,106.93
G(3-20) Jn m2
2 190.40 0.30 114.24
G(1-7),(23-26) Pedest m2
72 2.75 0.60 118.80
RB5- G(7-10) m2
2 30.88 0.59 36.43
RB5- G(17-20) m2 2 31.15 0.59 36.76
RB5- G(11-16) m2 2 51.50 0.59 60.77
RB 6A- G(16-17),G(10 m2 4 18.00 0.59 42.48
RB 3 m2
2 13.05 0.70 18.27
m2
2 2.75 0.70 3.85
RB 8 m2
1 19.82 0.50 9.91
m2
1 19.82 0.50 9.91
RB1 m2
1 17.80 0.60 10.68
m2
1 1.50 0.60 0.90
RB2 m2
1 19.00 0.60 11.40
m2
1 0.25 0.60 0.15
RB4 m2
1 17.65 0.60 10.59
m2
2 0.25 0.60 0.30
m2 1 12.10 0.60 7.26
RB7 m2
1 18.03 0.60 10.82
m2 1 0.25 0.60 0.15
Air Shaft m2 1 20.70 0.30 6.21
RSS Shaft at grid 01 m 2
1 5.85 0.30 1.75
Pipe line Support Ped m 2
9 2.80 0.30 7.56
Temp Wall- G8, G10 m 2
2 28.00 0.30 16.80

D wall at jun For RB 1 m2 1 17.80 0.30 5.34


D wall at jun For RB 2 m 2
1 19.00 0.30 5.70 1400
D wall at jun For RB 4 m 2
1 29.75 0.30 8.93
D wall at jun For RB 7 m 2
1 18.03 0.30 5.41
RSS Shaft at grid 01 m 2
1 (1.75*3)-(0.5*1.15*1.074) 4.63
Air Shaft m2 1 8.10 3.10 25.11
Temp Cutout m 2
3 8.50 5.50 140.25
m 2
1 10.00 8.50 85.00
Plumb Shaft m3 2 2.00 0.90 3.60
(2,557)

5,524

Location Unit No L B Area


CC Roof Surface m2 1 167 25.45 4,250.15
CC Beam Outer Lengt m 2
2 50 1 100.00

m2
CC Beam Inner Lengt 2 49.5 1 99.00
CC Beam Outer Bread m 2
2 12.45 1 24.90
CC Beam Inner Bread m 2
2 10.25 1 20.50
Opening m 2
1 20 5 100.00
4,394.55
USL
SSK
SKL
Shree Shyam
ES05 CC CC
302
180

115.45
340.6257
333.088
115.707
46.538

951 302 180


Percenta
ge
Scrap %
completio
-1% n100%
0% 100%
-5% 100%
-6% 100%
33m
Bal

Bal
Sno Sub-Contractor Fore OT Hel OT Sup OT Cap OT Wel OT Mas OT
1 Ruby Rai 0 0 0 0 0 0

Shutter
2 Jha Const/Siddeshwar. 196 601 18 49 186 605
3 Vikram 130 470 0 0 130 500
4 Yogendra 188 555 23 66.5 109 354.5
4 Bum bum Shankar 235 957.5 25 82.5 65 230.5
Rebar

5 Alam Ali 149 372.5 8 17.5 12 30


6 Malik 48 144 27 81.5
7 Rajan Engg 32 94 0 0
Malik 54 173 0 0 29 91.5
Block

Nabadwip Mathi 40 100 9 22.5 28 70 39 97.5


ocean king 0 0 0 0 0 0 0 0 0 0
Rajan Engg 114 325 0 0 82 238
1 PipeliPrabhakar Rai
CP14 Pooja Const
Fitt OT Paint OT Mandays MB Difference
0 175,734 ###
226,801 217,946 8,855
155,700 164,984 -9,284
176,142 168,938 7,204
168 793 306,597 320,339 -13,742
64 160 120,801 109,878 10,923
80 272 90,495 86,166 4,329
54 163 49,420 42,009 7,411

235,666
45,946 0
11 25 69,273 0

0
0 0 0
22 89 120,448 0
0 88,306
-160,038
###
Description Wt of Rebar L(m)
ES03 Pit slab 3.438
ES05 Subway Roof 4.498
ES05 Wall on Thrust Bed 9.386
ES02 Roof Slab G(8-9) 3.050
ES02 TVS Vent shaft 10.010
RSS Shaft 0.902
TOM 0.853
Ancillary Building Column 1.850
Staircase Center wall 8.092
ES01 Grade Slab 3.231
ES01&ES02 Pit slab(Grade) 0.946
ES02 Lift wall 1.356
BS Col --1200
BS Col -1500x700
CS Col -1000x700
CS Col -1200x600
CS Col --1200
CS Col -1500x700
Total Scope 47.612
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Rajan Engg
Period 26-May-16 25-Jun-16

According to Mandays for meas

USL SSL

MAN DAYS Err:509 Err:509


OT Err:509 Err:509

5% CONT PROFIT
GRAND TOTAL
Date USL SSL

10-Apr-14 25 2
28-Apr-14 5 1

30 3
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Zainath Enterprises
Period 26-May-16 25-Jun-16
According to Mandays for meas

USL SSL
MAN DAYS 0 0
OT 0 0

5% CONT PROFIT
GRAND TOTAL
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Zainath Enterprises
Period 26-May-16 25-Jun-16
According to Mandays

USL SSL
MAN DAYS 0 0
OT 0 0

5% CONT PROFIT
GRAND TOTAL
B(m) H(m)

181
5.85
Site : IIT GATE
Shift: Day/Night

measurement

SKL Total

Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
SKL OT

9
4

13 0
16589
elhi

Site : IIT GATE


Shift: Day/Night
measurement

SKL Total
0 0
0 0
0
0
0
elhi

Site : IIT GATE


Shift: Day/Night
ndays

SKL Total
0 0
0 0
0
0
0
Sno Item Unit
Scope
1 Cutting, bending ES03 Pit slab MT 8.25
ES05 Subway Roof MT 4.50
ES05 Wall on Thrust Bed MT 9.39
ES02 Roof Slab G(8-9) MT 3.05
ES02 TVS Vent shaft MT 10.01
RSS Shaft MT
TOM MT 0.85
Ancillary Building Column MT 1.85
Staircase Center wall MT 8.09
ES01 Grade Slab MT 3.23
RSS Shaft MT 0.90
ES02 Lift wall MT 1.36
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
2 Fixing ES03 Pit slab MT 8.25
ES05 Subway Roof MT 4.50
ES05 Wall on Thrust Bed MT 9.39
ES02 Roof Slab G(8-9) MT 3.05
ES02 TVS Vent shaft MT 10.01
RSS Shaft MT 0.90
TOM MT 0.85
Ancillary Building Column MT 1.85
Staircase Center wall MT 8.09
ES01 Grade Slab MT 3.23
ES01&ES02 Pit slab(Grade) MT 0.95
ES02 Lift wall MT 1.36
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
3 Coupler Box6,7 No 150
Loosening RSS Shaft No
ES05 Wall on Thrust Bed No 267
ES02 Roof Slab G(8-9) No 100
Cooling Tower Foundation @AB No 300
RSS Shaft No 621
TOM No 750
ES02 Roof G(1-3) No 201
ES02 TVS Vent shaft No 236
ES05 Subway Roof No 819
box No 440
4 Coupler Fixing Box6,7 No 200
Cooling Tower Foundation @AB No 300
ES05 Wall on Thrust Bed No 267
ES02 Roof Slab G(8-9) No 100
RSS Shaft No 621
TOM No 750
ES02 TVS Vent shaft No 236
ES02 Roof G(1-3) No 201
ES05 Subway Roof No 819
Box No 440
5 Shifting steel MT
ES05 Subway Roof MT 9.0
ES05 Wall on Thrust Bed MT 18.77
ES02 Roof Slab G(8-9) MT 6.10
ES02 TVS Vent shaft MT 20.02
RSS Shaft MT 1.80
TOM MT 1.71
Ancillary Building Column MT 3.70
AB Sump Roof MT 16.18
Box1(ES05) MT 16.50
ES01&ES02 Pit slab(Grade) MT 1.89
ES02 Lift wall MT 2.71
ES01 Grade Slab MT 1.10
BS Col -1500x700 MT -
ES03 Pit slab MT 6.88
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
6 Loading/ ES03 Pit slab MT 6.88
Unloading ES05 Subway Roof MT 9.0
ES05 Wall on Thrust Bed MT 18.77
ES02 Roof Slab G(8-9) MT 6.10
ES02 TVS Vent shaft MT 20.02
RSS Shaft MT 1.80
TOM MT 1.71
Ancillary Building Column MT 3.70
Staircase Center wall MT 16.18
ES01 Grade Slab MT 1.10
ES01&ES02 Pit slab(Grade) MT 1.89
ES02 Lift wall MT 2.71
BS Col --1200 MT -
BS Col -1500x700 MT -
ES01 Grade Slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
7 Concreting cum
cum
cum
cum
cum
Prepared by 1 Prepared by 2
Zainath Enterprises
Sno. Activity Unit Qty
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
1 Cutting, bending
ES01 Grade Slab MT -
RSS Shaft MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
2 Fixing
ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
Box6,7 No -
RSS Shaft No -
ES05 Wall on Thrust Bed No -
Coupler
3 ES02 Roof Slab G(8-9) No -
Loosening
ES02 TVS Vent shaft No -
ES05 Subway Roof No -
box No -
Box6,7 No -
#REF! #REF! #REF!
ES05 Wall on Thrust Bed No -
4 Coupler Fixing ES02 Roof Slab G(8-9) No -
ES02 TVS Vent shaft No -
ES05 Subway Roof No -
Box -
- No -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
AB Sump Roof MT -
5 Shifting steel
Box1(ES05) MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
ES01 Grade Slab MT -
BS Col -1500x700 MT -
ES03 Pit slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Loading/ Staircase Center wall MT -
6
Unloading ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
ES01 Grade Slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
- cum -
- cum -
- cum -
7 Concreting
- cum -
- cum -
- - -
Rajan Engg
Sno. Activity Unit Qty
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT 2.950
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
1 Cutting, bending
ES01 Grade Slab MT -
RSS Shaft MT 2.550
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT 2.950
RSS Shaft MT 2.550
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
2 Fixing
ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
Box6,7 No -
RSS Shaft No -
ES05 Wall on Thrust Bed No -
Coupler
3 ES02 Roof Slab G(8-9) No -
Loosening
ES02 TVS Vent shaft No -
ES05 Subway Roof No -
box No -
Box6,7 No -
#REF! #REF! #REF!
ES05 Wall on Thrust Bed No -
4 Coupler Fixing ES02 Roof Slab G(8-9) No -
ES02 TVS Vent shaft No -
ES05 Subway Roof No -
Box No -
- MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT 2.950
RSS Shaft MT 2.550
TOM MT -
Ancillary Building Column MT -
AB Sump Roof MT -
5 Shifting steel
Box1(ES05) MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
ES01 Grade Slab MT -
BS Col -1500x700 MT -
ES03 Pit slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT 2.950
RSS Shaft MT 2.550
TOM MT -
Ancillary Building Column MT -
Loading/ Staircase Center wall MT -
6
Unloading ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
ES01 Grade Slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
- cum -
- cum -
7 Concreting - cum -
- cum -
- cum -
Malik Enterprises
Sno. Activity Unit Qty
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT 0.950
ES02 Roof Slab G(8-9) MT 0.550
ES02 TVS Vent shaft MT 2.280
RSS Shaft MT 5.850
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
ES01 Grade Slab MT -
1 Cutting, bending
RSS Shaft MT -
ES02 Lift wall MT 6.320
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT 0.950
ES02 Roof Slab G(8-9) MT 0.550
ES02 TVS Vent shaft MT 2.280
RSS Shaft MT 5.850
TOM MT 6.320
Ancillary Building Column MT -
Staircase Center wall MT -
ES01 Grade Slab MT -
2 Fixing
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
Box6,7 No -
RSS Shaft No -
ES05 Wall on Thrust Bed No -
ES02 Roof Slab G(8-9) No 221.000
Coupler
3 ES02 TVS Vent shaft No -
Loosening
ES05 Subway Roof No -
box No -
Box6,7 No -
#REF! #REF! -
ES05 Wall on Thrust Bed No #REF!
ES02 Roof Slab G(8-9) No 221.000
4 Coupler Fixing ES02 TVS Vent shaft No -
ES05 Subway Roof No -
Box No -
- MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT 0.950
ES02 Roof Slab G(8-9) MT 0.550
ES02 TVS Vent shaft MT 2.280
RSS Shaft MT 5.850
TOM MT 6.320
Ancillary Building Column MT -
AB Sump Roof MT -
Box1(ES05) MT -
5 Shifting steel
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
ES01 Grade Slab MT -
BS Col -1500x700 MT -
ES03 Pit slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT 0.950
ES02 Roof Slab G(8-9) MT 0.550
ES02 TVS Vent shaft MT 2.280
RSS Shaft MT 5.850
TOM MT 6.320
Ancillary Building Column MT -
Staircase Center wall MT -
Loading/ ES01 Grade Slab MT -
6
Unloading ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
ES01 Grade Slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
- cum -
- cum -
- cum -
7 Concreting - cum -
- cum -
- - -
Bum bum Shankar
Sno. Activity Unit Qty
ES03 Pit slab MT 8.250
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT 19.560
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
1 Cutting, bending
ES01 Grade Slab MT -
RSS Shaft MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT 8.250
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT 19.560
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
2 Fixing
ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 No -
CS Col -1500x700 No -
Box6,7 No -
RSS Shaft No -
ES05 Wall on Thrust Bed No -
Coupler
3 ES02 Roof Slab G(8-9) No -
Loosening
ES02 TVS Vent shaft No 265.000
ES05 Subway Roof No -
box #REF! -
Box6,7 No -
#REF! No #REF!
ES05 Wall on Thrust Bed No -
4 Coupler Fixing ES02 Roof Slab G(8-9) No -
ES02 TVS Vent shaft - 265.000
ES05 Subway Roof No -
Box MT -
- MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT 19.560
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
AB Sump Roof MT -
5 Shifting steel
Box1(ES05) MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
ES01 Grade Slab MT -
BS Col -1500x700 MT -
ES03 Pit slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT 8.250
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT 19.560
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Loading/ Staircase Center wall MT -
6
Unloading ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
ES01 Grade Slab MT -
CS Col -1200x600 MT -
CS Col --1200 cum -
CS Col -1500x700 cum -
- cum -
- cum -
7 Concreting - cum -
- cum -
- cum -
Sia Ram Sharma
Sno. Activity Unit Qty
ES03 Pit slab MT -
ES05 Subway Roof - -
ES05 Wall on Thrust Bed Unit -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
1 Cutting, bending
ES01 Grade Slab MT -
RSS Shaft MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
2 Fixing
ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
Box6,7 MT -
RSS Shaft MT -
ES05 Wall on Thrust Bed MT -
Coupler
3 ES02 Roof Slab G(8-9) No -
Loosening
ES02 TVS Vent shaft No -
ES05 Subway Roof No -
box No -
Box6,7 No -
#REF! No #REF!
ES05 Wall on Thrust Bed No -
4 Coupler Fixing ES02 Roof Slab G(8-9) No -
ES02 TVS Vent shaft #REF! -
ES05 Subway Roof No -
Box No -
- No -
ES05 Subway Roof No -
ES05 Wall on Thrust Bed No -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
AB Sump Roof MT -
5 Shifting steel
Box1(ES05) MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
ES01 Grade Slab MT -
BS Col -1500x700 MT -
ES03 Pit slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Loading/ Staircase Center wall MT -
6
Unloading ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
ES01 Grade Slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
- cum -
- cum -
7 Concreting - cum -
- cum -
- cum -
VK Singh
Sno. Activity Unit Qty
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
1 Cutting, bending
ES01 Grade Slab MT -
RSS Shaft MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
2 Fixing
ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
Box6,7 No -
RSS Shaft No -
ES05 Wall on Thrust Bed No -
Coupler
3 ES02 Roof Slab G(8-9) No -
Loosening
ES02 TVS Vent shaft No -
ES05 Subway Roof No -
box No -
Box6,7 No -
#REF! #REF! #REF!
ES05 Wall on Thrust Bed No -
4 Coupler Fixing ES02 Roof Slab G(8-9) No -
ES02 TVS Vent shaft No -
ES05 Subway Roof No -
Box No -
- MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
AB Sump Roof MT -
5 Shifting steel
Box1(ES05) MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
ES01 Grade Slab MT -
BS Col -1500x700 MT -
ES03 Pit slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Loading/ Staircase Center wall MT -
6
Unloading ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
ES01 Grade Slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
CS Col -1500x700 MT -
- cum -
7 Concreting
- cum -
Lokeshwar
Sno.
1 Activity Unit Qty
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
Cutting, bending
ES01 Grade Slab MT -
RSS Shaft MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
2 CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Staircase Center wall MT -
Fixing
ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
CS Col -1000x700 MT -
CS Col -1200x600 MT -
CS Col --1200 No -
3 CS Col -1500x700 No -
Box6,7 No -
RSS Shaft No -
ES05 Wall on Thrust Bed No -
Coupler
ES02 Roof Slab G(8-9) No -
Loosening
ES02 TVS Vent shaft No -
ES05 Subway Roof No -
4 box #REF! -
Box6,7 No -
#REF! No #REF!
ES05 Wall on Thrust Bed No -
Coupler Fixing ES02 Roof Slab G(8-9) No -
ES02 TVS Vent shaft - -
ES05 Subway Roof No -
5 Box MT -
- MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
AB Sump Roof MT -
Shifting steel
Box1(ES05) MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
ES01 Grade Slab MT -
BS Col -1500x700 MT -
ES03 Pit slab MT -
CS Col -1200x600 MT -
CS Col --1200 MT -
6 CS Col -1500x700 MT -
ES03 Pit slab MT -
ES05 Subway Roof MT -
ES05 Wall on Thrust Bed MT -
ES02 Roof Slab G(8-9) MT -
ES02 TVS Vent shaft MT -
RSS Shaft MT -
TOM MT -
Ancillary Building Column MT -
Loading/ Staircase Center wall MT -
Unloading ES01 Grade Slab MT -
ES01&ES02 Pit slab(Grade) MT -
ES02 Lift wall MT -
BS Col --1200 MT -
BS Col -1500x700 MT -
ES01 Grade Slab MT -
CS Col -1200x600 MT -
CS Col --1200 cum -
7 CS Col -1500x700 cum -
- - -
Concreting
Quantity
Zainath EnterRajan Engg Malik EnterprBum bum ShSia Ram Sha Lokeshwar
8.250
0.950
0.550
2.280
2.950 5.850 19.560

2.550 6.32

- - - 8.250 - -
- - 0.950 - - -
- - 0.550 - - -
- - 2.280 - - -
- 2.950 5.850 19.560 - -
- 2.550 6.320 - - -
- - - - - -
- - - - - -
- - - - - -
- - - - -
- -

221
-

- 265
-
-
- - - - - -

- - 221 - - -
- - - - - -
- - -
- -
- - - 265 - -
-
- - - - - -
- - - - - -

- 0.950 -
- 0.5500 -
- - 2.280 - - -
- 2.950 5.850 19.560
2.550 6.320 -
-
- -
-
- -
-

- - 8.250
- 0.950 -
- - 0.550
- - 2.280 - -
- 2.950 5.850 19.560
2.550 6.320 -
-
- ### -
-
-
-

-
Checked by Approved by Approved by
Rate Amount
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
15 -
15 -
15 -
15 -
15 -
15 -
15 -
15 -
15 #REF!
15 -
15 -
15 -
15 -
15
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
100 -
100 -
100 -
100 -
100 -
101 -
#REF!
Rate Amount
1500 -
1700 -
1700 -
1700 -
1700 5,015
1700 -
1700 -
1700 -
1700 -
1700 -
1700 4,335
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
2200 -
2400 -
2400 -
2400 -
2400 7,080
2400 6,120
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
15 -
15 -
15 -
15 -
15 -
15 -
15 -
15 -
15 #REF!
15 -
15 -
15 -
15 -
15 -
100 -
100 -
100 -
100 -
100 295
100 255
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
75 -
75 -
75 -
75 -
75 221
75 191
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
100 -
100 -
100 -
100 -
100 -
#REF!
Rate Amount
1500 -
1700 1,615
1700 935
1700 3,876
1700 9,945
1700 -
1700 -
1700 -
1700 -
1700 -
1700 10,744
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
2400 -
2400 2,280
2400 1,320
2400 5,472
2400 14,040
2400 15,168
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
15 -
15 -
15 3,315
15 -
15 -
15 -
15 -
15 -
15 #REF!
15 3,315
15 -
15 -
15 -
15 -
100 -
100 95
100 55
100 228
100 585
100 632
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
75 -
75 71
75 41
75 171
75 439
75 474
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
100 -
100 -
100 -
100 -
100 -
#REF!

0
Rate Amount
1500 12,375
1700 -
1700 -
1700 -
1700 33,252
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
2200 18,150
2400 -
2400 -
2400 -
2400 46,944
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
15 -
15 -
15 -
15 -
15 3,975
15 -
15 -
15 -
15 #REF!
15 -
15 -
15 3,975
15 -
15 -
100 -
100 -
100 -
100 -
100 1,956
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
75 619
75 -
75 -
75 -
75 1,467
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
100 -
100 -
100 -
100 -
100 -

#REF!
Rate Amount
1500 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
2200 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
15 -
15 -
15 -
15 -
15 -
15 -
15 -
15 -
15 #REF!
15 -
15 -
15 -
15 -
15 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
100 -
100 -
100 -
100 -
100 -
#REF!
Rate Amount
1500 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
2200 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
15 -
15 -
15 -
15 -
15 -
15 -
15 -
15 -
15 #REF!
15 -
15 -
15 -
15 -
15 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
100 -
100 -
#REF!
Rate Amount
1500 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
1700 -
2200 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
2400 -
15 -
15 -
15 -
15 -
15 -
15 -
15 -
15 -
15 #REF!
15 -
15 -
15 -
15 -
15 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
100 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
75 -
100 -
25-Jun-16
Paid Diff
8.250 0.00
0.950 3.55
0.550 8.84
2.280 0.77
28.360 18.35
- 0.00
- 0.85
- 1.85
- 8.09
- 3.23
8.870 7.97
- 1.36
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
8.250 0.00
0.950 3.55
0.550 8.84
2.280 0.77
28.360 18.35
8.870 7.97
- 0.85
- 1.85
- 8.09
- 3.23
- 0.95
- 1.36
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 150
- 0
221 46
- 100

265 29
- 819
- 440
- 200

221 46
- 100
265 29

- 819
- 440
8.250 8.25
0.950 8.05
18.77
2.280 3.82
28.360 8.34
1.80
- 1.71
- 3.70
- 16.18
- 16.50
8.870 6.98
- 2.71
- 1.10
- 0.00
- 6.88
- 0.00
- 0.00
- 0.00
8.250 1.37
0.950 8.05
- 18.77
2.280 3.82
28.360 8.34
- 1.80
- 1.71
- 3.70
- 16.18
- 1.10
8.870 6.98
- 2.71
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
L&T-SUCG JV CC-27 DMRC Project Delh
Measurement Book
Sub-Contractor Alam Ali
Period 26-May-16 25-Jun-16

Sno Description Unit No L B/H


Fixing of scaffolding and dismantling /
shifting of scaffolding to the next slab
4
including fixing of walers, H-Beams and
Plywood.
Staircase Center wall Cum 12 1.525 1.525
ES05 Thrust bed wall Cum 12 1.525 1.525
AB Column Cum 12 1.525 1.525
Cum
Cum
Cum

L&T-SUCG JV CC-27 DMRC Project Delh


Measurement Book
Sub-Contractor Rajan Engg
Period 26-May-16 25-Jun-16

Sno Description Unit No L B/H


Fixing of scaffolding and dismantling /
shifting of scaffolding to the next slab
4
including fixing of walers, H-Beams and
Plywood.
Canopy Column Cum 14 1.525 1.525
AB Nut jalli Column Cum 11 1.525 1.525
Anti Dust Paint at TVF1,2 Cum 10 1.525 1.525

HookFixing at TVF Cum 10 1.525 1.525

TVS Shaft wall at Grid 24 Platofrm Cum


Cum
Cum

L&T-SUCG JV CC-27 DMRC Project Delh


Measurement Book
Sub-Contractor Malik
Period 26-May-16 25-Jun-16

SNo. Description Unit No L B

g Fixing ofofwater
Fixing bar, as required
scaffolding and dismantling / RM
shifting of scaffolding to the next slab
4
including fixing of walers, H-Beams and
Plywood.
TVF Wall ES02 Cum 12 1.525 ###
Lintel Mullion Cum 12 1.525 1.525
Damper wall at Platform G5 Cum 5 1.525 1.525
ES02 Side wall Cum 4 1.525 1.525
Groove making in Block Cum
ject Delhi

Site RKP STATION


Shift Day/ Night

H Qty Rate Amount

5.65 157.68
4.55 126.98 -
6.6 184.19
-
-
468.85 35 16,410
16,410

ject Delhi

Site RKP STATION


Shift Day/ Night

H Qty Rate Amount

4.65 151.40
3.65 93.37
4.55 105.82 -

5.5
127.91

-
478.50 35 16,747
16,747

ject Delhi

Site RKP STATION


Shift Day/ Night

H Qty Rate Amount

- 30 -

5.65 157.677
3.65 101.862
4.25 49.420
5.65 52.559
Alam Ali
RKP STATION Pancard no

Period 26-May-16 25-Jun-16 Vendor code

Dear sir

Kindly release the bill payment for the above mentioned period.

Sno Item Unit Qty

1 L/C C,B,F of (Wall+Binder) at Platform slab,Internal wall MT 10.905

2 L/C C,B,F of Subway Grade Slab MT 4.177


3 Loading/ Unloading MT 14.136

4 Shifting of Steel MT 14.136


Rajan Engg
RKP STATION Pancard no

Period 26-May-16 25-Jun-16 Vendor code

Dear sir

Kindly release the bill payment for the above mentioned period.

Sno Item Unit Qty


1 L/C for C,B,F of Subway Base,Roof MT 3.050
3 Coupler Loosening Nos 75.0
4 Coupler Fixing Nos 75.0
5 Shifting of steel MT 3.050
6 Loading/ Unloading MT 3.050

7 L/C C,B,F Of column reinforcement upto 12mm size MT 1.3

8 Err:509
a Roof/ Base Slab cum
b Wall/Column cum

Making shuttering boards (wooden and /or steel) and


9 sqm
packing properly using jute, cotton and thermocole.

Fixing,Shifting, Deshuttering shutter


10

Roof Slab,Base Slab, Entry/exit, Ancillary, UPE wall, Platform


a Slab,Cut-out Slab. sqm -

b Columns (0-6 m) sqm -


c Staircase, miscellaneous sqm -
d Fixing of water bar sqm -
Malik
RKP STATION Pancard no

Period 26-May-16 25-Jun-16 Vendor code

Dear sir

Kindly release the bill payment for the above mentioned period.

Sno Item Unit Qty


1 L/C C,B,F of (Wall+Binder) at Platform slab,Internal wall MT 11.360
3 Coupler Loosening Nos 160.0
4 Coupler Fixing Nos 160.0

L/C for loading&Unloading of Steel from location of cutting to


5 MT 11.310
fixing area

6 L/C For shifting of steel MT 11.310

Making shuttering boards (wooden and /or steel) and packing


7 sqm -
properly using jute, cotton and thermocole.

Fixing of Shutter ,Deshuttering including shifting from the


8 sqm -
making point

L/c for scaffolding erection&dismantling of the same


9 Cum 361.52
Bumbum
RKP STATION Pancard no

Period 26-May-16 25-Jun-16 Vendor code


Dear sir

Kindly release the bill payment for the above mentioned period.

Sno Item Unit Qty


1 L/C for C,B,F of Subway Base,Roof MT 7.936
2 L/C for C,B,F of Subway wall MT 9.386
3 Coupler Loosening Nos 575.0
4 Coupler Fixing Nos 575.0
5 Shifting of steel MT 23.8
6 Loading/ Unloading MT 23.8

7 L/C C,B,F Of column reinforcement upto 12mm size MT 3.6

8 L/C C,B,F of (Wall+Binder) at Platform slab,Internal wall MT 2.850


a Roof/ Base Slab cum -
b Wall/Column cum -

Making shuttering boards (wooden and /or steel) and packing


9 sqm -
properly using jute, cotton and thermocole.

Fixing,Shifting, Deshuttering shutter


10

Roof Slab,Base Slab, Entry/exit, Ancillary, UPE wall, Platform


a Slab,Cut-out Slab. sqm -

b Columns (0-6 m) sqm -


c Staircase, miscellaneous sqm -
d Fixing of water bar sqm -
Sia Ram
RKP STATION Pancard no

Period 26-May-16 25-Jun-16 Vendor code

Dear sir

Kindly release the bill payment for the above mentioned period.

Sno Item Unit Qty


1 Cutting, bending of steel MT -
2 Fixing of steel MT -
3 Coupler Loosening Nos -
4 Coupler Fixing Nos -
5 Shifting of steel MT -
6 Loading/ Unloading MT -

Fixing of scaffolding and dismantling / shifting of scaffolding


7 to the next slab including fixing of walers, H-Beams and cum -
Plywood.

8 Err:509
a Roof/ Base Slab cum -
b Wall/Column cum -

Making shuttering boards (wooden and /or steel) and


9 sqm -
packing properly using jute, cotton and thermocole.

Fixing,Shifting, Deshuttering shutter


10 sqm

Roof Slab,Base Slab, Entry/exit, Ancillary, UPE wall, Platform


a Slab,Cut-out Slab. sqm -

Roof Slab,Base Slab, Entry/exit, Ancillary, UPE wall, Platform


b Slab,Cut-out Slab. sqm -

c Columns (0-6 m) sqm -


d Staircase, miscellaneous sqm -
e Fixing of water bar sqm -
Lokeshwar
RKP STATION Pancard no

Period 26-May-16 25-Jun-16 Vendor code

Dear sir

Kindly release the bill payment for the above mentioned period.

Sno Item Unit Qty


1 Cutting, bending of steel MT -
2 Fixing of steel MT -
3 Coupler Loosening Nos -
4 Coupler Fixing Nos -
5 Shifting of steel MT -
6 Loading/ Unloading MT -

Fixing of scaffolding and dismantling / shifting of scaffolding


7 to the next slab including fixing of walers, H-Beams and cum -
Plywood.

8 Err:509
a Roof/ Base Slab cum -
b Wall/Column cum -

Making shuttering boards (wooden and /or steel) and


9 sqm -
packing properly using jute, cotton and thermocole.

Fixing,Shifting, Deshuttering shutter


10 sqm

Roof Slab,Base Slab, Entry/exit, Ancillary, UPE wall, Platform


a Slab,Cut-out Slab. -

b Columns (0-6 m) sqm


c Staircase, miscellaneous sqm
d Fixing of water bar sqm -
ALEPJ1958K

e S0056741

Rate Amount

5750
62,704
6350 26,524
75 1,060

225 3,181

93,469
e SLL00130

Rate Amount
4300 13,115
15 1,125
15 1,125
225 686
75 229

7100 8,982

100 -
250 -

172.00 -

240.00 -

250 -
275 -
30 -
25,262
e

Rate Amount
5750 65,320
15 2,400
15 2,400

75 848

225.00 2,545

172.00 -

240.00 -

35.00 12,653

86,166
VMTP54243K

e S0026667

Rate Amount
4300 34,125
4700 44,114
15 8,625
15 8,625
75 1,783
225 5,350

7100 25,596

5750 16,388
100 -
150 -

172.00 -

240.00 -

250 -
275 -
30 -
144,605
DRVPS1217N

e S0051712

Rate Amount
1700 -
2400 -
15 -
15 -
100 -
75 -

35 -

100 -
250 -

172.00 -

240.00 -

275.00 -

250 -
275 -
30 -
0
e

Rate Amount
1700 -
2400 -
15 -
15 -
100 -
75 -

35 -

100 -
250 -

172.00 -

240.00 -

250 -
275 -
30 -
0
Summary for Rebar & Shuttering
Sno Item Unit Rate Alam Ali Rajan Engg Malik Err:509 Sia Ram Mujeeb

1 Cutting, bending of steel MT 1,700 10.91 3.05 11.36 7.94 - -


2 Fixing of steel MT 2,400 Err:509 Err:509 Err:509 Err:509 - -
3 Coupler Loosening Nos 15 4.18 75.00 160.00 575.00 - -
4 Coupler Fixing Nos 15 14.14 75.00 160.00 575.00 - -
5 Shifting of steel MT 100 Err:509 3.05 Err:509 Err:509 - -
6 Loading/ Unloading of Steel MT 75 Err:509 3.05 Err:509 Err:509 - -
Erection and dismantlilng / shifting of working
staging as per safety regulation, safe to work to the
7 cum 35 14.14 1.27 11.31 3.61 - -
satisfaction of Engineer-in-Charge. All materials will be
provided by L&T SUCG JV.
8 Err:509
a Roof/ Base Slab cum 100 Err:509 - Err:509 - - -
b Wall/Column cum 250 Err:509 - Err:509 - - -
Making shuttering boards (wooden and /or steel)
9 and packing properly using jute, cotton and sqm 172 Err:509 - 11.31 - Err:509 -
thermocole.
10 Shifting ,fixing, Deshuttering shutter
Base slab, Concourse Slab and Roof Slab of Station
a Box. sqm 140

b Base slab of Entry / Exit sqm 140


c Walls for station box sqm 230
Roof Slab and Base Slab,Entry/exit, Entry / Exit roof
d Slab, Vent Shaft Wall, Plenum wall, UPE wall, Platform sqm 240 Err:509 - Err:509 - - -
Slab, Station Cut-out Slab.
e Columns (0 to 6 mtr) heights sqm 250 Err:509 - Err:509 - - -
f Stair case and any other miscellaneous item. sqm 275 Err:509 - Err:509 - - -
g Fixing of water bar, as required m 30 Err:509 - Err:509 - - -
Fixing of scaffolding and dismantling / shifting of
11 scaffolding to the next slab including fixing of walers, cum 35
H-Beams and Plywood.
Erection and dismantlilng / shifting of working
staging as per safety regulation, safe to work to the
12 cum 35
satisfaction of Engineer-in-Charge. All materials will be
provided by L&T SUCG JV.
13 L/C Concrete 100
a Roof/ Base Slab cum 100
b Wall/Column cum 250
14 L/C for internal carting of material Nos 600

Planning Engg
25-Jun-16
Siddshwar Jha
0 Yogendra Sah 0
Prashad Gupta Construction

Err:509 Err:509 14.60 330.74 42.00

297.24 Err:509 -

Err:509 Err:509 Err:509 - Err:509

Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 - - -

- - - - -

- 525.59 151.80 497.91 172.28

- 117.20 - - -
- Err:509 - - -
- Err:509 - - -
- - - - -

Station Manager
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Sri Sai Engineering
Period 26-May-16 25-Jun-16

Sno Description Unit

Charges for lowering of soldier piles of section UB 610x229x125.1 as per drawing as


1.1
directed by eic.
b Cut & Cover Nos
Charges for splicing of soldier piles of section UB 610x229x125.1 as per drawing &
1.2
stacking of fabricated material as directed by eic.
a Box Pushing Nos
b Cut & Cover(12 extra joints till date) Nos
c ES5 Nos
Charges for fixing and dismantling of Temporary structure for Cross Passage construction
1.3
on both sides of CP.
a Ring fixing&Removing in UL Nos

Glousing & cleaning the old / used structural steel including cutting of extra small bits of
1.4
steel from the main section, grinding & general cleaning.

a Cut & Cover,ES03 MT

Dismantling, lifting and stacking of structural steel members at ground level including
1
struts, walers etc as per requirement and instructions of Engineer-in-Charge.

a Cut & Cover, Station,Soil Collapse Plate,Entry(ES01,02,04),es03 MT


b Plunge Column MT
c Cross Passage MT
2 Charges for miscellaneous items
a Fabrication MT
b Errection MT
Fabrication of steel structure - Strut, waler,runner, splay,etc as per approved drawings with
3 the application of one coat of red oxide zinc chromate primer & stacting of fabricated
material as directed by eic.
Fabrication of steel structure - Strut, waler,runner, splay,etc as per approved drawings with
3 the application of one coat of red oxide zinc chromate primer & stacting of fabricated
material as directed by eic.
a Cut & Cover-1st Layer MT
b Cut & Cover - 2nd Layer MT
c Water pipeline support arrangement MT
d ES4, ES02,ES03 MT
e Cross Passage MT
Cumulative MT
Loading the fabrication steel on trailer, unloading at the station & erection & fixing of
4 structural steel fabricated by sub-contractor under item 3 above as per approved drawings,
as required.
a Cut & Cover-1st Layer MT
b Cut & Cover - 2nd Layer MT
c Water pipeline support arrangement MT
d ES4, ES02,es03 MT
Cumulative MT
Note- 30% dismantling has been hold till recon is finalized.

L&T-SUCG JV CC-27 DMRC Project Delhi


Measurement Book
Sub-Contractor Shree Shyam
Period 26-May-16 25-Jun-16

Sno Description Unit

Charges for splicing of soldier piles of section UB 610x229x125.1 as per drawing &
1
stacking of fabricated material as directed by eic.
a Bottom up D-wall Nos
b Cut & Cover Nos

Glousing & cleaning the old / used structural steel including cutting of extra small bits of
2
steel from the main section, grinding & general cleaning.

a Cut & Cover MT


Fabrication of steel structure - Strut, waler,runner, splay,etc as per approved drawings with
2 the application of one coat of red oxide zinc chromate primer & stacting of fabricated
material as directed by eic.
a Box Pushing MT
b Cut & Cover MT
c Water supporting arrangement MT
Cumulative MT
Loading the fabrication steel on trailer, unloading at the station & erection & fixing of
structural steel fabricated by sub-contractor under item 3 above as per approved drawings,
3 as required. The rate shall include necessary welding at joints,connecting of joints with
bolts, nuts & anchor, fastner as per approved drawings.

a Box Pushing MT
b Cut & Cover MT
Cumulative MT
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Hindustan Construction
Period 26-May-16 25-Jun-16

Sno Description of Work Unit

Charges for lowering of soldier piles of section UB 610x229x125.1 as per drawing as


1
directed by eic.
Cut & Cover Nos
ES3 Nos
ES5 Nos
Charges for splicing of soldier piles of section UB 610x229x125.1 as per drawing &
2
stacking of fabricated material as directed by eic.
Cut & Cover( 14extra joints till date) Nos
ES3 Nos
ES5 Nos

Glousing & cleaning the old / used structural steel including cutting of extra small bits of
3
steel from the main section, grinding & general cleaning.

Cut & Cover MT


Entry (ES02,05) MT
Dismantling, lifting and stacking of structural steel members at ground level including
struts, walers etc as per requirement and instructions of Engineer-in-Charge. The work
4
includes breaking of packing concrete. The concrete debris to be lifted upto the ground
level.
a Cut & Cover, Water Pipeline Support,Station, Entry MT
b Box Pushing MT
b Plunge Column MT
c Cross Passage MT
5 Charges for miscellaneous items
a Fabrication MT
b Errection MT
Fabrication of steel structure - Strut, waler,runner, splay,etc as per approved drawings with
6 the application of one coat of red oxide zinc chromate primer & stacting of fabricated
material as directed by eic.
a Cut & Cover-1st Layer MT
b Cut & Cover - 2nd Layer MT
c Box Pushing MT
d ES4,ES2,ES05 MT
e ES02 Water pipeline support MT
f Cross Passage MT
g Ancillary Foundations&Vent shaft MT
Cumulative MT
L/C For shifiting&Erection of 2 sets Ring beam in Cross passage to enable works as per EIC
7 MT

Loading the fabrication steel on trailer, unloading at the station & erection & fixing of
structural steel fabricated by sub-contractor under item 3 above as per approved drawings,
8 as required. The rate shall include necessary welding at joints,connecting of joints with
bolts, nuts & anchor, fastner as per approved drawings.

a Cut & Cover-1st Layer MT


b Cut & Cover - 2nd Layer MT
c Box Pushing MT
d ES4,ES2,ES05 MT
e ES02 Water pipeline support MT
f Cross Passage MT
g Ancillary Foundations&Vent shaft MT
Cumulative MT
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor SB Construction
Period 26-May-16 25-Jun-16

Sno Description Unit

Charges for lowering of soldier piles of section UB 610x229x125.1 as per drawing as


1.1
directed by eic.
a Cut & Cover Nos
b ES4 Nos
Charges for splicing of soldier piles of section ISMB 600x210x123 as per drawing &
1
stacking of fabricated material as directed by eic.
a Cut & Cover Nos
b ES4 Nos
27 DMRC Project Delhi
rement Book
Site : RKP
Shift: Day/Night

Total Qty Qty Given Present Qty Rate Amount

99 98 - 1,920 -

41 ### - 6,000 -
111 110 - 6,000 -
7 7 - 6,000 -

1 - 122,500 -

59.779 52.818 6.961 2,200 15,314

468.112 466.838 1.274 2,660 3,389


- 2,660 -
18.071 18.071 - 2,660 -

13.410 13.410 - 8,500 -


30.465 27.670 2.795 4,000 11,180
288.446 288.446 -
31.550 31.550 -
18.876 18.876 -
81.777 51.404 30.373
32.151 32.151 -
452.800 422.427 30.373 5,850 177,682

304.609 304.609 -
42.974 42.974 -
18.876 18.876 -
88.738 51.404 37.334
455.197 417.863 37.334 3,650 136,269
Total 343,834
27 DMRC Project Delhi
rement Book
Site : RKP
Shift: Day/Night

Total Qty Qty Given Present Qty Rate Amount

2 2 - 6000 0.00
13 13 - 6000 0.00

5.955 ### - 2,200 -

35.840 35.840 -
109.001 109.001 -
12.720 ### -
157.561 157.561 - 5850 0.00

44.801 ### -
12.993 12.993 -
57.794 57.794 - 3650 0.00
Total -
27 DMRC Project Delhi
rement Book
Site : RKP
Shift: Day/Night

Total Qty Given Qty Present Qty Rate Amount

106 105 - 1,920 -


33 33 - 1,920 -
10 10 - 1,920 -

119 117 - 6,000 -


58 58 - 6,000 -
10 10 - 6,001 -

116.041 116.041 - 2200 -


69.410 65.558 3.852 2200 8,474

667.445 631.988 35.457 2660 94,316


57.246 57.246 (0.000) 2660 (0)
42.984 40.416 2.568 2,660 6,830
- 2,660 -

64.189 59.627 4.562 8500 38,777


78.863 74.301 4.562 4000 18,248
27.083 27.083 -
353.510 353.510 -
15.058 15.058 -
64.158 64.158 -
11.997 ### -
10.196 10.196 - 5850 -
2.088 2.088 - 5850 -
482.002 482.002 - 5850 -

8.385 ### - 6000 -

30.226 30.226 -
427.192 427.192 -
15.058 15.058 -
127.043 123.191 3.852
11.997 ### -
- -
2.088 2.088 - 3650 -
611.516 607.664 3.852 3650 14,060
Total 180,705
27 DMRC Project Delhi
rement Book
Site : RKP
Shift: Day/Night

Total Qty Qty Given Present Qty Rate Amount

31 ### - 1,920 0
42 42 - 1,920 0

31 31 - 6000 0
42 42 - 6000 0
Total 0
No of piles
Month Sri Sai Shree Shyam HCH
Remark
BP CC ES5 CC Water Supp CC
Jan '14 10 31 13 20
Feb '14 30 12 18
Mar '14 7
Apr '14 1 1 Extra Joint 2 11
May '14 9 7 Extra Joints 10
Jun '14 20 25
Jul '14 19 4EJ - 1 SP Hold 21
Aug '14 1

Sep '14
Oct '14
Nov '14
Dec '14 7
Oct '15

Total 40 99 7 13 2 106

Area No of Piles Length(m)


Water Supporting Arrangement 2 22
ES1- Box Pushing 40 15
Cut & cover 247 21/22
ES4 53 Variable
ES2 -
ES5 7
ES3 53

Ipsita Tikader Rohit Gogar PR Lenka


Prepared by Checked by Approved by
59.485

57.135
53.063
50.863 25.323
220.546
570.230 285.247
285.247 285.247

59.485 6.291
50.066 7.069
53.063
50.863
213.477 13.36

35.46
-

3.85

8.41

3.85
25-Jun-16
HCH SBC
Remark Remark
ES3 ES05 CC ES4 ES2

2 Extra Joints
3 Extra Joints
17
(2KP)7 E 12 2 Extra Joints
1 Extra Joint-Ho 34 ES4-Only 23 Joints

19
15
33 10 ES05 not paid

53 10 29 53 0
PR Lenka
Approved by
373.99
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Raj Kumar
Period 26-May-16 25-Jun-16

Total Qty
SNo. Description Unit Qty Given
Comp

Drilling of pile of nominal diameter 750mm in all kinds of soil strata upto a depth
1 of 16m from ground level for Box Pushing at RK Puram Station using TMR Piling Rig m 656.00 656.00
Machine having higher torque & requisite associated tools as per direction of eic.

Drilling of pile of nominal diameter 750mm in all kinds of soil strata upto a depth
of 21m from ground level for Cut & cover at RK Puram Station using TMR Pilling
2 Rig Machine having higher torque & requisite associated tools as per direction of m 1,793.00 1,793.00
eic.

a Cut & cover - 18nos, 21m


b Bottom up panel - 2nos, 22m
c ES01 - 6nos-12m; 2nos-9m
Total

12.85
9.728
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor SB Construction
Period 26-May-16 25-Jun-16

Total Qty
SNo. Description Unit Qty Given
Comp
Drilling of pile of nominal diameter 750mm for Cut & cover at RK Puram Station
1 using TMR Rig Machine as per direction of eic.
Depth -21m m 2,751.00 2,751.00
Depth -22m m 198.00 198.00
Drilling of pile of nominal diameter 750mm for Cut & cover at RK Puram Station
2 using Rotatry Piling Rig Machine as per direction of eic.
Depth -21m,0nos m 378.00 378.00
Depth -22m,0nos m 198.00 198.00
Drilling of pile of nominal diameter 750mm for ES4 at RK Puram Station using
3 Rotatry Piling Rig Machine as per direction of eic.
Depth -Variable,17nos m 155.85 155.85
Depth -13.6m,20nos m 272.00 272.00
Depth -14m,6nos m 84.00 84.00
Depth -14.5m,4nos m 58.00 58.00
Depth -15m,6nos m 90.00 90.00
Drilling of pile of nominal diameter 750mm for ES2 at RK Puram Station using
4 Rotatry Piling Rig Machine as per direction of eic.
Depth -Variable,7nos m 59.50 59.50
Depth -13.5m,40nos m 540.00 540.00
Depth -15.5m,9nos m 139.50 139.50
Drilling of pile of nominal diameter 750mm for ES3 at RK Puram Station using
5 Rotatry Piling Rig Machine as per direction of eic.
Depth -Variable,11nos m 94.17 94.17
Depth -11.645m,29nos m 337.71 337.71
Depth -13.145m,8nos m 105.16 105.16
Drilling of pile of nominal diameter 750mm for ES5 at RK Puram Station using
6 Rotatry Piling Rig Machine as per direction of eic.
Depth -11.1m,1nos m 11.10 11.10
Depth -12.1m,1nos m 12.10 12.10
Depth -12.5m,42nos m 525.00 525.00
Depth -13.1m,1nos m 13.10 13.10
Depth -14m,7nos m 98.00 98.00
Depth -16m,3nos m 48.00 48.00
Total 6,168.18 6,168.18
Site RKP STATION
Shift Day/ Night

Total Total
Qty for this
month Rate Amount

- 1,150 -

- 800 -

al -
Site RKP STATION
Shift Day/ Night

Qty for this


Rate Amount
month

- 800 -
- 800 -

- 1,235 -
- 1,235 -

- 1,235 -
- 1,235 -
- 1,235 -
- 1,235 -
- 1,235 -

- 1,235 -
- 1,235 -
- 1,235 -

- 1,235 -
- 1,235 -
- 1,235 -

- 1,235 -
- 1,236 -
- 1,235 -
- 1,235 -
- 1,236 -
- 1,237 -
- 0
Boring Summery R0
SC Area Jan '14 Feb '14 Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14

BP 21 8 11
Raj Kumar
CC 25 8 2 2 24
CC 42 13 5 18 34 31
SBC

Mahalakshmi CC

Cut & Cover 204


Box Pushing 40
Boring Summery R0
SC Area Jan '14 Feb '14 Mar '14 Apr '14 May '14 Jun '14 Jul '14 Aug '14

ES1 21 8 11
Raj Kumar CC 25 8 2 2 24 18
HW 2
CC 44 13 5 18 38 31 17
ES4 34
SBC ES2
ES3
ES5
Mahalakshmi CC

Location No of piles
Cut & Cover 245 5390
Head Wall 2 44
ES1 48 672
ES4 53
ES2 56 784
ES3 48 672
ES5 55 770
507 8,332

Breakdown Period
To From No of Days
14-Oct-14 18-Oct-14 5
9-Nov-14 1
12-Nov-14 17-Nov-14 6
12
Ipsita Tikader Rohit Goggar PR Lenka
Prepared by Checked by Approved by
Total

40
61
143
25-Jun-16
Sep'14 Oct'14 Nov '14 Dec '14 May'15 Total

8 48

79
2
166
19 53
43 11 2 56
48 48
55 55
-
507
L&T-SUCG JV CC-27 DMRC Proje
Final Measurment
Sub-Contractor Starcon Infra
Period : 26-May-16 25-Jun-16

Sno Description Unit

1 All charges for excavation in station, shaft & cut & cover portion by appropriate
means using the appropriate machinery.
Roof Shaft {Grid(24-26),(1-3)} cum
Roof Station(Upto Grid 3-4) cum
Beam RB1, RB2, RB4 cum
Deduction cum
a Roof Cumulative cum
Concourse Shaft {Grid(24-26),(1-3)} cum
Concourse Station (Grid(9-10) cum
Plunge Column Pile Concrete Deduction cum
b Concourse Cumulative cum
Base Shaft- Till Track Bed(24-26) cum
Base Shaft- Undercroft(24-26) cum
Base Station-Till Track Bed(3-24) cum
Base Station- Undercroft(3-24) cum
Base Station-Earthmat (18-22),(10-15),(5-8) cum
Base Station-Sump @ Grid 20,10,7 cum
Base Shaft-(1-3) cum
Base PCC cum
Plunge Column Pile Concrete Deduction cum
c Base Cumulative cum
Cut & Cover Upto Strut 1- From Head wall to KP 18 cum
Cut & Cover Upto Strut 2- From Head wall to KP 18 cum
Cut & Cover Upto Base,Haunch -Till 15.8m, (Sec 3) cum
Cut & Cover Upto Base,Undercroft -Till 15.8m, (Sec3) cum
Cut & Cover Upto Base,Corners -Till 15.8m, (Sec 3) cum
Cut & Cover Upto - From Head wall to KP 7, KP13-KP17 (Sec 1),excluding haunch cum
Cut & Cover Upto - From Head wall to KP 7, KP13-KP17 (Sec 1), Only Haunch cum
Cut & Cover Upto - From Head wall to KP 13 (Sec 2),excluding haunch cum
Cut & Cover Upto - From Head wall to KP 13 (Sec 2),Beam cum

d Cut & Cover Cumulative cum


ES2 (2-8), Slab cum
ES2 (8-9), Exclator Pit cum
ES2 (8-11), Staircase cum
e ES2 Cumulative cum
Box Pushing (Ground level to Strut 1) cum
Total cum
Loading & disposal of excavated materials at dumping yard for all lifts as
2
directed by eic.
Roof Shaft {Grid(24-26),(1-3)} cum
Roof Station(Upto Grid 3-4) cum
Beam RB1, RB2, RB4 cum
Deduction cum
a Roof Cumulative cum
Concourse Shaft {Grid(24-26),(1-3)} cum
Concourse Station (Grid(9-10) cum
Plunge Column Pile Concrete Deduction cum
b Concourse Cumulative cum
Base Shaft- Till Track Bed(24-26) cum
Base Shaft- Undercroft(24-26) cum
Base Station-Till Track Bed(3-24) cum
Base Station- Undercroft(3-24) cum
Base Station-Earthmat (18-22),(10-15),(5-8) cum
Base Station-Sump @ Grid 20,10,7 cum
Base Shaft-(1-3) cum
Base PCC cum
Plunge Column Pile Concrete Deduction cum
c Base Cumulative cum
Cut & Cover Upto Strut 1- From Head wall to KP 18 cum
Cut & Cover Upto Strut 2- From Head wall to KP 18 cum
Cut & Cover Upto Base,Haunch -Till 15.8m, (Sec 3) cum
Cut & Cover Upto Base,Undercroft -Till 15.8m, (Sec3) cum
Cut & Cover Upto Base,Corners -Till 15.8m, (Sec 3) cum
Cut & Cover Upto - From Head wall to KP 7, KP13-KP17 (Sec 1),excluding haunch cum
Cut & Cover Upto - From Head wall to KP 7, KP13-KP17 (Sec 1), Only Haunch cum
Cut & Cover Upto - From Head wall to KP 13 (Sec 2),excluding haunch cum
Cut & Cover Upto - From Head wall to KP 13 (Sec 2),Beam cum
Cut & Cover Half Pile cum
d Cut & Cover Cumulative cum
ES2 (2-8), Slab cum
ES2 (8-9), Exclator Pit cum
ES2 (8-11), Staircase cum
e ES2 Cumulative cum
Box Pushing (Ground level to Strut 1) cum
DW Soil 106, 3, 7, 9, 10, 4, 5, 6 cum
Jai Bhagwan's Box Pushing Soil cum
Debris & Cut & Cover bushes cum
f Misc Cumulative cum
Total cum

20 km lead 169,174 cum


Disposal for (0-3)Km lead 6,982 cum
Internal Shifting 5,171 cum
181,327 cum

M/S Starcon Planning Station Manager Planning Manager


L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Starcon Infra
Period : 26-May-16 16-Jun-16

Sno Description

Charges for lifting the excavated material below the roof slab using crane & bucket system/long boom/any other suitable e
1
same on ground level. The charges include equipment , manpower,consumables,fuel,etc. & work shall be executed as per

a Nov '14
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Starcon Infra
Period : 16-May-16 25-Jun-16
Description
Sno Unit

Charges for lifting the excavated material below from Entry/ Exit(Box Pushing) using
crane & bucket system/long boom/any other suitable equipment & dumping the same on
1
ground level. The charges include equipment , manpower,consumables,fuel,etc. & work
shall be executed as per direction eic.

Box 1,2,3,4,5,6,7,8,9 cum


Loading & disposal of excavated materials o Cross Passage at dumping yard for all lifts
2
within 20 km as directed by eic.
CP 17- Crown Portion cum
CP 17- Rectangular Portion cum
CP 17- Sump cum
L&T-SUCG JV CC-27 DMRC Proje
Measurement Book
Sub-Contractor Rattiputra
Period : 26-May-16 25-Jun-16

Sno Description Unit

All charges for excavation in station, shaft & cut & cover portion by appropriate
1
means using the appropriate machinery.
ES05 Subway Excavation(GL to Strut1) G2-5 cum

Total cum

2
Loading & disposal of excavated materials at dumping yard for all lifts within (50-
500)m as directed by eic.
ES05 Subway Excavation(GL to Strut1) G2-5 cum

Total cum
Transportation of Debris from station locations to dumping yard at Burari or any other
3
designated location for lead upto 30 km or internal shifting.
Debris for tunnel eye- SUCG-(4Trips) cum
Internal sisposal: Debris for tunnel eye- SUCG-(17Trips) cum
Total cum
Charging for backfilling with selected soil over RS. Rate includes cost of soil, loading,
4 transportation, unloading at RKP with min volume of 12cum.
July-15 Trip
Total cum
CG JV CC-27 DMRC Project Delhi
Final Measurment
Site RKP STATION
Shift Day/ Night
Total Qty Previously Dimension Current
Total Socpe Rate Amount
Comp Given L/No B/ H Qty

3,195 3,195 3,195 - 24.57 3.83 -


19,059 19,059 19,059 - 21.57 3.83 -
427 427 427 - -
- 21.57 3.83 -
22,681 22,681 22,681 - 144 -
4,845 4,845 4,845 - 24.57 5.80 -
28,899 28,899 28,899 - 21.57 5.80 -
266 266 266 - 1.50 5.80 -
33,478 33,478 33,478 - 144 -
3,308 3,308 3,308 - 24.57 8.26 -
106 106 106 - 11.85 0.55 -
38,615 38,615 38,615 - 21.57 7.76 -
2,992 2,992 2,992 - 12.35 1.05 -
362 362 362 - -
266 266 266 - 4.50 3.00 -
4,151 4,151 4,151 - 24.57 9.45 -
407 407 407 - 21.96 0.07 -
405 405 405 - 1.50 8.81 -
49,396 49,803 49,803 - 144 -
8,820 8,820 8,820 - 24.95 2.108 -
24,268 24,268 24,268 - 24.95 5.80 -
1,208 1,208 1,208 - 7.45 9.65 -
1,690 1,690 1,690 - 10.24 9.82 -
1,128 1,128 1,128 - 7.26 9.25 -
21,076 21,076 21,076 - 25.57 8.75 -
147 147 147 - 3.90 0.40 -
12,652 12,652 12,652 - 25.57 8.75 -
131 131 131 - 1.50 0.70 -
-
71,120 71,120 71,120 - 144 -
5,826 1,136 1,136 - 9.400 1.935 -
799 (0.00) - 9.60 6.950 - -
401 - - 16.364 8.050 - -
7,026 1,136 1,136 - 144 -
432 432 36.00 12.000 - - 144 -
183,702 178,651 178,651 - -
3,195 3,195 3,195 - 24.57 3.83 -
19,059 19,059 19,059 - 21.57 3.83 -
427 427 427 - -
- 21.57 3.83 -
22,681 22,681 22,681 - 197 -
4,845 4,845 4,845 - 24.57 5.80 -
28,899 28,899 28,899 - 21.57 5.80 -
266 266 266 - 1.50 5.80 -
33,478 33,478 33,478 - 197 -
3,308 3,308 3,308 - 24.57 8.26 -
106 106 106 - 11.85 0.55 -
38,615 38,615 38,615 - 21.57 7.76 -
2,992 2,992 2,992 - 12.35 1.05 -
362 362 362 - -
266 266 266 - 4.50 3.00 -
4,151 4,151 4,151 - 24.57 9.45 -
407 407 407 - 21.96 0.07 -
405 405 405 - 1.50 8.81 -
49,803 49,803 49,803 - 197 -
8,820 8,820 8,820 - 24.95 2.108 -
24,268 24,268 24,268 - 24.95 5.80 -
1,208 1,208 1,208 - 7.45 9.65 -
1,690 1,690 1,690 - 10.24 9.82 -
1,128 1,128 1,128 - 7.26 9.25 -
21,076 21,076 21,076 - 25.57 8.75 -
147 147 147 - 3.90 0.40 -
12,652 12,652 12,652 - 25.57 8.75 -
131 131 131 - 1.50 0.70 -
820 820 820 - 0.75 16.66 -
71,940 71,940 71,940 - 197 -
5,826 1,136 1,136 - 9.400 1.935 -
799 (0.00) - 9.60 6.950 - -
401 - - 16.364 8.050 - -
7,026 1,136 1,136 - 197 -
756 756 36.00 12.00 - -
732 732 - - - -
288 288 16.00 12.00 - -
512 512 512 -
512 2,288 2,288 - 197 -
185,441 181,327 180,191 - -
0

Planning Manager Project Director Project Director


Site RKP STATION
Shift Day/ Night

Unit Qty Rate Amount

m/long boom/any other suitable equipment & dumping the


. & work shall be executed as per direction eic.

cum 0 55 0
0
Site RKP STATION
Shift Day/ Night
Total Qty Previously Dimension Current
Total Socpe Rate Amount
Comp Given L/Area B/ H Qty

2,066 2,066 2,066 - 5.70 5.68 - 250 -

17.55 17.55 17.55 1.755 - -


116.60 116.60 116.60 3.340 10.00 - -
68.74 68.74 68.74 3.340 4.90 - -
202.89 202.89 202.89 - 197 -
0
CG JV CC-27 DMRC Project Delhi
Measurement Book
Site RKP STATION
Shift Day/ Night
Total Qty Previously Dimension Current
Scope Rate Amount
Comp Qty Given L/No B/Dia H Qty

7026.556514 6503.39803 5,806 8.75 7.650 10.430 698.16

7,027 6,503 5,806 698.16 144 100535

7953.603714 7,761 5,806 8.75 7.650 10.430 698.16

7,954 7,761 5,806 698.16 30 20945

0
0

Total Amount 121,480


Rattiputra

Sno Date Trips From To


1 12-Jun-15 13 Kidiwai Nagar RKP
2 13-Jun-15 6 Kidiwai Nagar RKP
3 15-Jun-15 2 Kidiwai Nagar RKP
4 16-Jun-15 17 Kidiwai Nagar RKP
5 17-Jun-15 8 Kidiwai Nagar RKP
6 18-Jun-15 6 Kidiwai Nagar RKP
7 19-Jun-15 26 Kidiwai Nagar RKP
8 20-Jun-15 15 Kidiwai Nagar RKP
9 21-Jun-15 28 Kidiwai Nagar RKP
10 22-Jun-15 35 Kidiwai Nagar RKP
11 23-Jun-15 44 Kidiwai Nagar RKP
12 24-Jun-15 19 Kidiwai Nagar RKP
13 25-Jun-15 34 Kidiwai Nagar RKP
253
United Associates
Sno. Activity Unit
No L B H CS-RS Rate Amt
1 D Wall Cleaning m2 - 30 -
2 Block Lowering & shifting Nos - -
3 Sand Shifting m3 -
4 Doka Tower Erection m 3
- 35 -
5 Housekeeping m 2
5
6 Block Fixing(<1.5m) m3 1 72.95 0.20 1.50 21.89 1,700 37,205
Aug'14

7 Block Fixing(1.5m-3.5m) m3 1 53.90 0.20 0.85 9.16 1,825 16,722


8 Block Fixing(>3.5m) m 3
1 - 1,950 -
9 Drilling Dowels(Soffit of Top Slab) Nos - 110 -
10 Drilling Dowels(Bottom of Slab) Nos 162 162 95 15,390
11 Lintel Beam- Rebar, Shutt, Conc m 3
- 3,900 -
12 Column- Rebar, Shutt, Conc m 3
2 2.3 0.3 0.2 0.28 3,900 1,076
13 Scupper Drain m 119.45 119.5 495 59,128
129,521
1 D Wall Cleaning m2 19.70 5.00 98.50 30 2,955
2 Block Lowering & shifting Nos 1,000 1,000 -
3 Sand Shifting m 3
20.00 -
4 Doka Tower Erection m3 1 69.80 1.52 4.00 424.4 35 14,853
5 Housekeeping m 2
5
Sept'14

6 Block Fixing(<1.5m) m 3
1 49.70 0.20 1.50 14.91 1,700 25,347
7 Block Fixing(1.5m-3.5m) m3 1 49.70 0.20 0.85 8.45 1,825 15,419
8 Block Fixing(>3.5m) m3 1 69.80 0.20 1.50 20.94 1,950 40,833
9 Drilling Dowels(Soffit of Top Slab) Nos 120 120 110 13,200
10 Drilling Dowels(Bottom of Slab) Nos 78 78 95 7,410
11 Lintel Beam- Rebar, Shutt, Conc m3 1 102.9 0.30 0.20 6.17 3,900 24,079
12 Column- Rebar, Shutt, Conc m 3
23 2.3 0.3 0.2 3.17 3,900 12,379
13 Scupper Drain m 19.7 19.70 495 9,752
166,227
1 D Wall Cleaning m2 25.00 5.00 125.0 30 3,750
2 Block Lowering & shifting Nos - -
3 Sand Shifting m3 -
4 Doka Tower Erection m3
- 35 -
5 Housekeeping m2
5
6 Block Fixing(<1.5m) m3 1 73.25 0.20 1.50 21.98 1,700 37,358
Oct'14

7 Block Fixing(1.5m-3.5m) m3
1 74.33 0.20 0.85 12.64 1,825 23,061
8 Block Fixing(>3.5m) m3
1 19.72 0.20 1.80 7.10 1,950 13,843
9 Drilling Dowels(Soffit of Top Slab) Nos - 110 -
10 Drilling Dowels(Bottom of Slab) Nos 60 60 95 5,700
11 Lintel Beam- Rebar, Shutt, Conc m3
45.5 0.30 0.20 - 3,900 -
12 Column- Rebar, Shutt, Conc m3
12 2.3 0.3 0.2 1.66 3,900 6,458
13 Scupper Drain m 25 25.00 495 12,375
102,545
DurgaConstruction Shree Shyam
No L B H CS-RS Rate Amt No L B H CS-RS Rate Amt
- 30 - 105.0 5.00 525.0 30 15,750
- - - -
- -
- 35 - - 35 -
- 5 - - 5 -
- 1,700 - 1 104.5 0.20 1.10 22.99 1,700 39,083
- 1,825 - 1 104.5 0.20 0.85 17.77 1,825 32,421
- 1,950 - - 1,950 -
- 110 - - 110 -
- 95 - 168 168 95 15,960
- 3,900 - 1 75.00 0.30 0.20 4.50 3,900 17,550
- 3,900 - 20 2.35 0.30 0.20 2.82 3,900 10,998
- 495 - 133.0 133.0 495 65,835
- 197,597
24.00 5.00 120.00 30 3,600 - 30 -
- - - -
- -
- 35 - - 35 -
- 5 - - 5 -
1 69.53 0.20 1.50 20.86 1,700 35,460 1 7.85 0.20 1.50 2.36 1,700 4,004
1 37.07 0.20 1.20 8.897 1,825 16,237 1 102.6 0.20 1.15 23.59 1,825 43,045
1 - 1,950 - 1 102.6 0.20 1.25 25.64 1,950 49,993
- 110 - 168 168 110 18,480
60 60 95 5,700 9 9 95 855
- 3,900 - 11 2.35 0.20 0.30 1.55 3,900 6,049
5 2.30 0.30 0.20 0.69 3,900 2,691 46.60 0.20 0.30 - 3,900 -
44.07 44.07 495 21,815 8.75 8.75 495 4,331
85,503 126,757
18.10 5.00 90.50 30 2,715 - 30 -
1,300 1,300 - - -
- -
1 40.00 1.58 3.00 189.0 35 6,615 - 35 -
100 12 1,200 5 6,000 - 5 -
1 74.75 0.20 1.50 22.43 1,700 38,123 - 1,700 -
1 63.75 0.20 0.85 10.84 1,825 19,778 - 1,825 -
1 - 1,950 - - 1,950 -
- 110 - - 110 -
78 78 95 7,410 - 95 -
31.50 0.20 0.30 - 3,900 - - 3,900 -
7 2.30 0.20 0.30 0.97 3,900 3,767 - 3,900 -
36.75 36.75 495 18,191 - 495 -
102,600 -
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Narayani Site RKP STATION
Period : 26-May-16 25-Jun-16
Debit Note Shift Day/ Night
Days
Sno Description Unit No Qty Rate
From To Duration
1 Cuplock standard L-1.5m Nos 500 0 0.00 0.35
2 Cuplock ledger L-1.5m Nos 1500 0 0.00 0.35
3 Adjustable Base Jack Nos 484 0 0.00 0.23
4 Adjustable U Jack Nos 450 0 0.00 0.23
5 Adjustable Base Jack Nos 16 0 0.00 0.23
6 Adjustable U Jack Nos 50 0 0.00 0.23
KP STATION
Day/ Night

Amount

-
-
-
-
-
-
0
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Durga Construction
Period ### 25-Jun-16

Total Qty
SNo. Description Unit Qty Given
Comp
1 L/C for block laying at all levels
a Upto 1.5m height cum -
b Between (1.5-3.5)m height cum -
c Above 3.5m height cum -
2 L/C for construction of RCC stiffener column / wind post 200mm x 200mm cum -
3 L/C for construction of RCC runner beam / tie beam cum -
4 L/C for construction of scupper drain 400mm wide & 300mm cum -
Total
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor Shree Shyam
Period ### 25-Jun-16

Total Qty
SNo. Description Unit Qty Given
Comp
1 L/C for block laying at all levels
a Upto 1.5m height cum -
b Between (1.5-3.5)m height cum -
c Above 3.5m height cum -
2 L/C for construction of RCC stiffener column / wind post 200mm x 200mm cum -
3 L/C for construction of RCC runner beam / tie beam cum -
4 L/C for construction of scupper drain 400mm wide & 300mm cum -
Total
L&T-SUCG JV CC-27 DMRC Project Delhi
Measurement Book
Sub-Contractor United Associates
Period ### 25-Jun-16

Total Qty
SNo. Description Unit Qty Given
Comp
1 L/C for block laying at all levels
a Upto 1.5m height cum -
b Between (1.5-3.5)m height cum -
c Above 3.5m height cum -
2 L/C for construction of RCC stiffener column / wind post 200mm x 200mm cum -
3 L/C for construction of RCC runner beam / tie beam cum -
4 L/C for construction of scupper drain 400mm wide & 300mm cum -
Total
Site RKP STATION
Shift Day/ Night

Qty for
current Rate Amount
month

-
-
-
-
-
-
-
Site RKP STATION
Shift Day/ Night

Qty for
current Rate Amount
month

-
-
-
-
-
-
-
Site RKP STATION
Shift Day/ Night

Qty for
current Rate Amount
month

-
-
-
-
-
-
-
Balance Work Scope Amba Construction Kalayan Sah Harendra Paswan

Sno Item Qty Amount Qty Amount Qty

L/C for Internal carting of


1 40 24192 76 45360 18
material

2 Base Preparation 419 4187 785 7850 183

L/C for Surface Preparation


3 2296 22955 4304 43041 1004
for Screed/ Waterproofing

4 L/C for road washing 34059 170294 63860 319302 14901

5 L/C for Backfilling 312 124929 586 234241 137

960 14400 1800 27000 420


6 Barrication boards
38 6912 72 12960 17

7 L/C for PCC 31 1833 57 3437 13

8 L/C for Screed 252 20120 472 37726 110

9 Labour charges for curing 6282 31408 11778 58891 2748

10 L/C for chipping 534 133585 1002 250472 234


10 L/C for chipping 534 133585 1002 250472 234

11 L/C for Housekeeping 490716 2453582 920093 4600467 214688

12 L/C for repairing 1272 63600 2385 119250 557


13 L/C for Dewatering 10080 50400 18900 94500 4410
14 L/C for welding works 5 52800 9 99000 2
15 L/C for giving direction to cran 1152 23040 2160 43200 504
16 L/C for scrap segregation 8 4800 15 9000 4
17 L/C for loading & unloading of 19 2880 36 5400 8
18 L/C for manual Excavation
3205918 6011097
ndra Paswan Varsha Enterprises

Amount Qty

10584 60

1832 628

10043 3443

74504 51088

54656 468

6300 1440
3024 58

802 46

8803 377

13741 9423

58444 802
58444 802

1073442 736075

27825 1908
22050 15120
23100 7
10080 1728
2100 12
1260 29

1402589
a Enterprises Shivlal Kushwaha Krishna Enterprises MK Dubey

Amount Qty Amount Qty Amount Qty Amount

36288 8 4536 35 21168 10 6048

6280 78 785 366 3663 105 1047

34433 430 4304 2009 20086 574 5739

255442 6386 31930 29802 149008 8515 42574

187393 59 23424 273 109313 78 31232

21600 180 2700 840 12600 240 3600


10368 7 1296 34 6048 10 1728

2749 6 344 27 1604 8 458

30181 47 3773 220 17605 63 5030

47113 1178 5889 5496 27482 1570 7852

200378 100 25047 468 116887 134 33396


200378 100 25047 468 116887 134 33396

3680374 92009 460047 429377 2146885 122679 613396

95400 239 11925 1113 55650 318 15900


75600 1890 9450 8820 44100 2520 12600
79200 1 9900 4 46200 1 13200
34560 216 4320 1008 20160 288 5760
7200 2 900 7 4200 2 1200
4320 4 540 17 2520 5 720

4808877 601110 2805178 801480


K S Manpower

Qty Amount Months

18 10584 ###

183 1832 ###

1004 10043 ###

14901 74504 ###

137 54656 ###

420 6300 ###


17 3024 ###

13 802 ###

110 8803 ###

2748 13741 ###

234 58444 ###


234 58444

214688 1073442 ###

557 27825 ###


4410 22050 ###
2 23100 ###
504 10080 ###
4 2100 ###
8 1260 ###

1402589
Sno. Sub Contractors Aug'14 Sep'14 Oct'14 Avg Extended LOI

1 Amba Construction 517,487 550,595 67,601 378,561 2,271,367


2 Kalayan Sah 904,817 1,159,691 211,580 758,696 4,552,176
3 Harendra Paswan 177,714 252,627 - 143,447 860,682
4 Varsha Enterprises 928,184 346,638 181,661 485,494 2,912,964
5 Shivlal Kushwaha - 106,530 - 35,510 213,060
6 Krishna Enterprises 127,774 785,425 122,629 345,276 2,071,656
7 MK Dubey 83,280 215,207 - 99,496 596,973
8 K S Manpower 20,480 335,515 - 118,665 711,989
14,190,868
ended LOI Perc

3,205,918 16.01%
6,011,097 32.08%
1,402,589 6.07%
4,808,877 20.53%
601,110 1.50%
2,805,178 14.60%
801,480 4.21%
1,402,589 5.02%
21,038,839
Balance Work Scope L B H Total Qty

Sno Item Unit


Wooden Lagging Shifting No 60
Wooden scrap shifting No 60
L/C for Internal carting of Doka Shifting No 60
1
material
TMT scrap & offcut shifting No 60
Misc No
BS (3-10a) m2 81.25 24.45 1987
2 Base Preparation
Misc m2 60.00 8.00 480
RS m2 265.00 21.57 5716
L/C for Surface Preparation
3 CS m 2
265.00 21.57 5716
for Screed/ Waterproofing
BS m 2 265.00 11.00 2915
4 L/C for road washing m2 365.00 10.80 212868
Waterproofing m 3
265.00 21.57 0.20 1143
5 L/C for Backfilling CC SP & wall gap filling m 3
30.00 0.60 5.80 209
Misc m3 100.00 30.00 0.20 600
Cleaning Nos 6000
6 Barrication boards Shifting Nos 240
Nos
BS (3-10a) m3 81.25 24.45 0.08 159
7 L/C for PCC
Misc m3 40.00 5.00 0.08 32
RS m2 265.00 21.570 0.075 429
8 L/C for Screed CS m 2
265.00 21.57 0.10 572
BS m 2 265.00 21.57 0.10 572
BS (3-10a) m2 81.25 24.45 13906
Ancillary Building m 2
80.00 30.00 16800
9 Labour charges for curing
Column m 2
1.20 13.40 8555
Misc
BS (3-10a) m2 81.25 1.10 179
CJ m2 21.57 1.00 86
10 L/C for chipping
Column Hacking m2 1.20 0.70 160
Undercroft Hacking m2
265.00 11.00 2915
RS m2
265.00 21.57 685926
CS m2 265.00 21.57 685926
BS m2
265.00 21.57 685926
Ground Level m2
265.00 8.00 763200
Fabrication Yard m2 100.00 70.00 84000
11 L/C for Housekeeping
Misc- Wheel wash, office, m2
30.00 5.00 27000
Entry 03, 04 m2
30.00 25.00 135000
CC BS m2
CC RS m2
CC Ground Level m2
12 L/C for repairing RM 265.00 7950
13 L/C for Dewatering m2 200.00 21.00 63000
14 L/C for welding works MT 30
15 L/C for giving direction to crane operator for lifting material(Rigger) No 7200
16 L/C for scrap segregation MT 50
17 L/C for loading & unloading of material MT 120
18 L/C for plaster work m2
19 Cleaning Of Spilled Concrete m2
20 Cutting of Wooden Battens m2
21 Fixing of timber lagging m2
22 Dismantling of Brick Work m3
23 Compaction of soil for PCC m2
24 DWall cleaning m2
25 Hand Railing Fixing Rm
Toe Guard m3
26 Brickwork
26 Brickwork
Other m3
Amba Varsha Krishna
Kalayan Sah Harendra Paswan Shivlal Kushwaha MK Dubey
Construction Enterprises Enterprises

11 20 5 16 2 9 3
11 20 5 16 2 9 3
10 18 4 14 2 8 2
10 18 4 14 2 8 2

318 596 139 477 60 278 79


101 189 44 151 19 88 25
915 1715 400 1372 171 800 229
915 1715 400 1372 171 800 229
466 875 204 700 87 408 117
34059 63860 14901 51088 6386 29802 8515
183 343 80 274 34 160 46
33 63 15 50 6 29 8
96 180 42 144 18 84 24
960 1800 420 1440 180 840 240
300 400 17 58 7 400 10
400 100
25 48 11 38 5 22 6
5 10 2 8 1 4 1
69 129 30 103 13 60 17
91 171 40 137 17 80 23
91 171 40 137 17 80 23
2225 4172 973 3337 417 1947 556
2688 5040 1176 4032 504 2352 672
1369 2566 599 2053 257 1198 342
29 54 13 43 5 25 7
14 26 6 21 3 12 3
26 48 11 38 5 22 6
466 875 204 700 87 408 117
109748 205778 48015 164622 20578 96030 27437
109748 205778 48015 164622 20578 96030 27437
109748 205778 48015 164622 20578 96030 27437
122112 228960 53424 183168 22896 106848 30528
13440 25200 5880 20160 2520 11760 3360
4320 8100 1890 6480 810 3780 1080
21600 40500 9450 32400 4050 18900 5400
20000 20000
20000 20000
10000 10000
1272 2385 557 1908 239 1113 318
10080 18900 4410 15120 1890 8820 2520
32 60 14 48 6 28 8
1152 2160 504 1728 216 1008 288
8 300 4 12 2 600 2
19 500 8 29 4 1000 5
320 320 - 1,540 600
2,000 6,400 - 5,600 2,000
- - - 239 192
- - - - 600
- - - - 40
6,000 720 - - 2,000
- - - - 1,000
160 - - 140 210
- - - - 180
- 32 - 112 120
K S Manpower

5
5
4
4

139
44
400
400
204
14901
80
15
42
420
17

11
2
30
40
40
973
1176
599
13
6
11
204
48015
48015
48015
53424
5880
1890
9450

557
4410
14
504
4
8
L&T- SUCG JV CC 27 DELHI
(A Joint Venture between Larsen & Toubro Limited and Shanghai Urban Construction Gro
Balance work Feb-15
Quantity
SNo. Description
Amba Const. Kalyan Sah Harendra
Wooden Lagging Shifting 45,915 45,915 Paswan 22,958
Wooden scrap shifting 45,915 45,915 22,958
L/C for Internal
1 Doka Shifting 45,915 45,915 22,958
carting of material
TMT scrap & offcut shifting 45,915 45,915 22,958
Misc 45,915 45,915 22,958
Dressing/Base Entry /Exit 81,471 58,513 58,513
2
Preparation Misc 81,471 58,513 58,513
L/C for Surface RS 81,471 58,513 58,513
Preparation for
3 CS 81,471 58,513 58,513
Screed/
Waterproofing BS 81,471 58,513 58,513
L/C for road
4 114,788 114,788 114,788
washing
Waterproofing 38,263 38,263 38,263
5 L/C for BackfillingCC SP & wall gap filling 38,263 38,263 38,263
Misc 38,263 38,263 38,263
Cleaning 229,577 344,365 114,788
6 Barrication boards Shifting(100m) - - -
Shifting(200-250m) - - -
L/C for Entry /Exit/Station 407,354 407,354 177,777
7
PCC/Concreting Misc - - -
RS 135,785 174,048 -
8 L/C for Screed CS 135,785 174,048 -
BS 135,785 174,048 -
Entry /Exit/Station 57,394 57,394 -
Labour charges for Ancillary Building 57,394 57,394 -
9
curing Column 57,394 57,394 -
Labour charges for
9
curing
Misc 57,394 57,394 -
Entry /Exit 101,839 101,839 -
CJ 101,839 101,839 -
10 L/C for chipping
Column Hacking 101,839 101,839 -
Undercroft Hacking 101,839 101,839 -
RS 86,651 109,608 40,735
CS 86,651 109,608 40,735
BS 86,651 109,608 40,735
Ground Level 86,651 109,608 40,735
L/C for Fabrication Yard 86,651 109,608 40,735
11
Housekeeping Misc- Wheel wash, office 86,651 109,608 40,735
Entry 02,03, 04,05 86,651 109,608 40,735
CC BS 86,651 109,608 40,735
CC RS 86,651 109,608 40,735
CC Ground Level 86,651 109,608 40,735
12 L/C for repairing 177,777 814,708 241,678
13 L/C for Dewatering 114,788 114,788 -
14 L/C for welding works 177,777 177,777 -
15 L/C for giving direction to crane operator for lifting ma 177,777 177,777 -
16 L/C for scrap segregation/Rebar Shifting 114,788 114,788 -
17 L/C for loading & unloading of material - - -
18 L/C for plaster work - - -
19 Cleaning Of Spilled Concrete 114,788 459,154 -
20 L/C for dismantling Wooden Battens - - -
21 Fixing of timber lagging - - -
22 Dismantling of Brick Work - - -
23 Compaction of soil for PCC - - -
24 DWall cleaning - 114,788 -
25 Hand Railing Fixing - - -
26 Toe Guard - - -
Brickwork
27 Other - - -
4,291,929 5,732,379 1,578,529
tion Group)
eb-15

Varsha Ent Krishna Ent


45,915 45,915
45,915 45,915
45,915 45,915
45,915 45,915
45,915 45,915
58,513 35,555
58,513 35,555
58,513 35,555
58,513 35,555
58,513 35,555

114,788 114,788

38,263 38,263
38,263 38,263
38,263 38,263
229,577 229,577
- -
- -
292,566 292,566
- -
97,522 80,559
97,522 80,559
97,522 80,559
28,697 28,697
28,697 28,697
28,697 28,697
28,697 28,697
- -
- -
- -
- -
52,214 40,735
52,214 40,735
52,214 40,735
52,214 40,735
52,214 40,735
52,214 40,735
52,214 40,735
52,214 40,735
52,214 40,735
52,214 40,735
- 114,788
- -
355,555 -
177,777 -
114,788 -
- -
- -
- -
229,577 229,577
229,577 229,577
- -
- -
- -
- -
- -
- -
3,310,633 2,496,836
L&T- SUCG JV CC 27 DELHI
(A Joint Venture between Larsen & Toubro Limited and Shanghai Urban Construction Gro
Balance work
Description Rate Required Duration
SNo.
Month Amba Const.
Wooden Lagging Shifting Sep-16 19 1
Wooden scrap shifting Sep-16 19 1
L/C for Internal
1 Doka Shifting 600 Sep-16 19 1
carting of material
TMT scrap & offcut shifting Sep-16 19 1
Misc Sep-16 19 1
Dressing/Base Entry /Exit Sep-16 19 1
2
Preparation Misc Sep-16 19 1
L/C for Surface RS 30 Sep-16 19 1 1
Preparation for
3 CS Sep-16 19 1 1
Screed/
Waterproofing BS Sep-16 19 1 1
L/C for road 19 1
4 5 Sep-16
washing
Waterproofing Sep-16 19 1
5 L/C for Backfilling CC SP & wall gap filling 70 Sep-16 19 1
Misc Sep-16 19 1
Cleaning 15 Sep-16 19 1
6 Barrication boards Shifting(100m) 180 Sep-16 19
Shifting(200-250m) 170 Sep-16 19
L/C for PCC/ Entry /Exit/Station Sep-16 19 1 1
7 100
Concreting Misc Sep-16 19
RS Sep-16 19 1 1
8 L/C for Screed CS 250 Sep-16 19 1 1
BS Sep-16 19 1 1
Entry /Exit/Station Sep-16 19 1
Labour charges for Ancillary Building Sep-16 19 1
9 5
curing Column Sep-16 19 1
Misc Sep-16 19 1
Entry /Exit Sep-16 19 1

10 L/C for chipping 250


CJ Sep-16 19 1
10 L/C for chipping 250
Column Hacking Sep-16 19 1
Undercroft Hacking Sep-16 19 1
RS Sep-16 19 4
CS Sep-16 19 4
BS Sep-16 19 4
Ground Level Sep-16 19 4
L/C for Fabrication Yard Sep-16 19 4
11 5
Housekeeping Misc- Wheel wash, office Sep-16 19 4
Entry 02,03, 04,05 Sep-16 19 4
CC BS Sep-16 19 4
CC RS Sep-16 19 4
CC Ground Level Sep-16 19 4
12 L/C for repairing 30 Sep-16 19 1
13 L/C for Dewatering 5 Sep-16 19 1
14 L/C for welding works 2000 Sep-16 19 1
15 L/C for giving direction to crane operator for lifting ma 20 Sep-16 19 1
16 L/C for scrap segregation/Rebar Shifting 225 Sep-16 19 1
17 L/C for loading & unloading of material 75 Sep-16 19
18 L/C for plaster work 75 Sep-16 19
19 Cleaning Of Spilled Concrete 10 Sep-16 19 1
20 L/C for dismantling Wooden Battens 110 Sep-16 19
21 Fixing of timber lagging 190 Sep-16 19
22 Dismantling of Brick Work 388 Sep-16 19
23 Compaction of soil for PCC 20 Sep-16 19
24 DWall cleaning 30 Sep-16 19
25 Hand Railing Fixing 172 Sep-16 19
26 Toe Guard 600 Sep-16 19
Brickwork
27 Other 275 Sep-16 19
9 - 71
80
uction Group)

Manpower
Kalyan Sah Harendra Paswan Varsha Ent Krishna Ent Amount
1 1 1 1 62,592
1 1 1 1 62,592
1 1 1 1 62,592
1 1 1 1 62,592
1 1 1 1 62,592
1 1 1 1 62,592
1 1 1 1 62,592
1 1 1 1 159,531
1 1 1 1 159,531
1 1 1 1 159,531
1 1 1 1 312,961
1 1 1 1 104,320
1 1 1 1 104,320
1 1 1 1 104,320
1 1 1 1 312,961
-
-
1 1 1 1 1 1 1 797,656
-
2 1 1 265,885
2 1 1 265,885
2 1 1 265,885
2 1 1 78,240
2 1 1 78,240
2 1 1 78,240
2 1 1 78,240
2 78,240
2 78,240
2 78,240
2 78,240
5 2 3 2 125,184
5 2 3 2 125,184
5 2 3 2 125,184
5 2 3 2 125,184
5 2 3 2 125,184
5 2 3 2 125,184
5 2 3 2 125,184
5 2 3 2 125,184
5 2 3 2 125,184
5 2 3 2 125,184
4 1 1 312,961
1 312,961
1 1 484,695
1 1 484,695
1 1 312,961
-
-
1 312,961
1 1 -
1 1 -
-
-
1 -
-
-
-
3 - 96 1 - 36 3 - 56 1 - 46 7,549,930
99 37 59 47
322
AY 6,790,000
Feb-15
Bifurcation
Quantity Kalyan Sah Quantity Harendra Quantity Varsha Ent
104 62,592 104 Paswan 62,592 104 62,592
104 62,592 104 62,592 104 62,592
104 62,592 104 62,592 104 62,592
104 62,592 104 62,592 104 62,592
104 62,592 104 62,592 104 62,592
2,086 62,592 2,086 62,592 2,086 62,592
2,086 62,592 2,086 62,592 2,086 62,592
5,318 62,592 2,086 62,592 2,086 62,592
5,318 62,592 2,086 62,592 2,086 62,592
5,318 62,592 2,086 62,592 2,086 62,592
62,592 312,961 62,592 312,961 62,592 312,961
1,490 104,320 1,490 104,320 1,490 104,320
3,477 104,320 3,477 104,320 3,477 104,320
3,477 104,320 3,477 104,320 3,477 104,320
20,864 312,961 20,864 312,961 20,864 312,961
- - - - - -
- - - - - -
7,977 797,656 7,977 484,695 4,847 797,656
- - - - - -
1,064 208,641 835 - - 104,320
1,064 208,641 835 - - 104,320
1,064 208,641 835 - - 104,320
15,648 156,480 31,296 - - 78,240
15,648 156,480 31,296 - - 78,240
15,648 156,480 31,296 - - 78,240
15,648 156,480 31,296 - - 78,240
313 156,480 626 - - -
313 156,480 626 - - -
313 156,480 626 - - -
313 156,480 626 - - -
25,037 156,480 31,296 62,592 12,518 93,888
25,037 156,480 31,296 62,592 12,518 93,888
25,037 156,480 31,296 62,592 12,518 93,888
25,037 156,480 31,296 62,592 12,518 93,888
25,037 156,480 31,296 62,592 12,518 93,888
25,037 156,480 31,296 62,592 12,518 93,888
25,037 156,480 31,296 62,592 12,518 93,888
25,037 156,480 31,296 62,592 12,518 93,888
25,037 156,480 31,296 62,592 12,518 93,888
25,037 156,480 31,296 62,592 12,518 93,888
10,432 1,251,843 41,728 312,961 10,432 -
62,592 312,961 62,592 - - -
242 484,695 242 - - 484,695
24,235 484,695 24,235 - - 484,695
1,391 312,961 1,391 - - 312,961
- - - - - -
- - - - - -
31,296 312,961 31,296 - - -
- - - - - 312,961
- - - - - 312,961
- - - - - -
- - - - - -
- 312,961 10,432 - - -
- - - - - -
- - - - - -
- - - - - -
9,278,105 2,988,381 5,835,536

7,577,500 3,045,000 5,442,500


Quantity Krishna Ent Quantity
104 62,592 104
104 62,592 104
104 62,592 104
104 62,592 104
104 62,592 104
2,086 62,592 2,086
2,086 62,592 2,086
2,086 62,592 2,086
2,086 62,592 2,086
2,086 62,592 2,086
62,592 312,961 62,592
1,490 104,320 1,490
3,477 104,320 3,477
3,477 104,320 3,477
20,864 312,961 20,864
- - -
- - -
7,977 797,656 7,977
- - -
417 104,320 417
417 104,320 417
417 104,320 417
15,648 78,240 15,648
15,648 78,240 15,648
15,648 78,240 15,648
15,648 78,240 15,648
- - -
- - -
- - -
- - -
18,778 62,592 12,518
18,778 62,592 12,518
18,778 62,592 12,518
18,778 62,592 12,518
18,778 62,592 12,518
18,778 62,592 12,518
18,778 62,592 12,518
18,778 62,592 12,518
18,778 62,592 12,518
18,778 62,592 12,518
- 312,961 10,432
- - -
242 - -
24,235 - -
1,391 - -
- - -
- - -
- - -
2,845 312,961 2,845
1,647 312,961 1,647
- - -
- - -
- - -
- - -
- - -
- - -
4,553,185

4,165,000
SNo. Description Unit No L B H Qty

L/C for application of polymer


1
coating on roof slab at RKP
G(23-24) m2 1 13.20 21.57 284.72
Month:
a G(24-26) m2 1 17.00 24.57 417.69
Oct-14
Air Shaft m 2
1 8.10 3.10 25.11
Month: G(2-15) (C-E) m 2
1 3.00 10.04 30.11
b
Jan-15 G(2-15) (C-E) Jn m2 -
G(2-15) (C-E) Pedestral m2 24 2.75 0.60 39.60
G(11-15) (A-C) m 2
1 44.75 11.54 516.19
G(11-15) (A-C) Jn m 2
2 44.75 0.30 26.85
G(11-15) (A-C) Beam m2 2 44.75 0.60 53.70
Month:
c G(9-10) (A-C) m 2
1 8.75 11.54 100.93
Feb-15
G(9-10) (A-C) Jn m 2
2 8.75 0.30 5.25
G(9-10) (A-C) Beam m2 2 8.75 0.60 10.50
G(5-7) (A-C) m 2
1 18.90 11.54 218.01
G(5-7) (A-C) Jn m 2
2 18.90 0.30 11.34

1,689.78
Scope
Location Unit No L B Area
G(24-26),(1-3) m2 2 17.00 24.57 835.38
G(23-24) m 2
1 13.20 21.57 284.72
G(23-26) Jn m 2
2 30.20 0.30 18.12
G(1,26) Jn m 2
2 24.57 0.30 14.74
G(3-20) m 2
1 190.60 21.57 4,111.24
G(3-20) Jn m 2
2 190.60 0.30 114.36
G(1-7),(23-26) Pedestral m2 72 2.75 0.60 118.80
G(1-20) Beam m 2
2 152.48 0.60 182.97
m 2
4 35.30 0.60 84.72
RB1 m 2
1 17.80 0.60 10.68
m 2
1 14.36 0.80 11.49
m 2
1 2.50 2.30 5.75
RB2 m 2
1 19.00 0.60 11.40
m 2
1 19.00 1.05 19.95
RB4 m 2
1 20.20 0.60 12.12
m 2
1 20.20 1.10 22.22
m 2
1 20.23 0.60 12.14
m 2
1 20.23 1.10 22.25
RB7 m 2
1 20.20 0.60 12.12
m 2
1 20.20 1.05 21.21
Air Shaft m 2
1 8.10 3.10 25.11
Temp Cutout m 2
3 8.50 5.50 140.25
m 2
1 10.00 8.50 85.00
Plumb Shaft m 3
2 1.40 0.30 0.84
Fresh Air Shaft m3 2 1.00 0.30 0.60
4,839

Location Unit No L B Area


CC Roof Surface m2 1 167 23.45 3,916.15
CC Beam Outer Length wise m 2
2 50 1 100.00
CC Beam Inner Length wise m 2
2 49.5 1 99.00
CC Beam Outer Breadth wise m 2
2 12.45 1 24.90
CC Beam Inner Breadth wise m 2
2 10.25 1 20.50
Opening m 2
1 20 5 100.00
4,060.55 ## Bal
L&T-SUCG JV CC-27 DMRC Project Delhi
Credit Note for Electricity Charges

Date 25-Jun-16

Total This Month Reading


Total
SNo. Description Metre No Unit Reading
Reading Initial Final
Debited
1. M/S KS Manpower Units 3,434.00 -

Note- This is the credit note in reference to Debit note serial no 167.

Planning
Site RKP STATION
Shift Day/ Night

Net
Rate Amount
Reading

3,434.00 20.00 68,680


68,680

Station Manager
L&T-SUCG JV
Debit Note

Date 25-Jun-16

Total
Diesel
Sub-
SNo. Equipment per day Unit
Contractor Equipment
(L) Diesel
requisition

TFC 280 72 Days 1.06 76.50


1. M/S SAS 65T Crane 84 Days 0.13 10.50
PICK & CARRY C 42 Days 0.21 8.75
TFC 280 72 Days 1.50 108.00
Air
2. M/S SUCG 19 Days 1.00 19.00
Compressor
80 T crane 20 Days 3.00 60.00
TFC 280 72 Days 0.50 36.00
3. M/S E&M
65T Crane 84 Days 1.00 84.00

Planning
Bill Receiving
Si no Vendor Name MB No
1 Md Muzeeb 15432.15433.15434
lokeshwar 15147
2 Sia ram sharma 15148.15149
3 malik 15431
5 zenith 15145.15146
6 vikram singh 15428.1543
7 siddeshawar gupta 15425.15426.15427
8 yogender saw 15422.15423.15424
9 jha const 15421
10 ruby rai 15420,
11 amba(supply) 15133.15134
12 krishan(supply) 15137.15138
13 kalyan(supply) 15135.15136.
14 varhsa(supply) 15139.15140.
15 sas 15437
16 ashish 15438
17 prabhakar rai 15440
18 geo spar ltd 15436
19 hch 15131.15132
20 sri sai 15128.15129.15130
22 malik(block) 15260
23 krishna(block) 0
24 vimla(block) 0
25 mehti(block) 15261
26 rajan(block) 15262

Planning engineer Signtature of Reciever


L&T-SUCG JV CC-27 DMRC Project Delhi
Debit Note for Equipment Charges

Total Debited till now Current Requisition

Manpower Equipment Manpower Equipment Manpower


Diesel Diesel
(Rigger) requisition (Rigger) requisition (Rigger)

1.06 76.50 - - -
0.13 10.50 - - -
0.21 8.75 - - -
1.50 - ### - 1.50 108.00 1.50

1.00 - ### - 1.00 19.00 1.00

3.00 - ### - 3.00 60.00 3.00


4.00 - ### - 0.50 36.00 4.00
1.00 - ### - 1.00 84.00 1.00
Site RKP STATION
Shift Day/ Night

Rate

Amount
Equipment Manpower
Diesel
requisition (Rigger)

12,500 60 554.00 -
10,000 60 554.00 -
1,155 60 554.00 -
12,500 60 554.00 26,061

731 554.00 2,425


60
13,077 60 554.00 44,493
12,500 60 554.00 10,626
10,000 60 554.00 15,594

99,199

Station Manager
L&T-SUCG JV CC-27 DMRC Project Delhi

SNo. Description Unit

Restoration of IOCL Toilet


1 LS

2 LS

Total
Site RKP STATION
Shift Day/ Night

Unit Total Qty

LS 1.00

LS 1.000
L&T-SUCG JV CC-27 DMRC Project De
Measurement Book
Sub-Contractor Starcon Infra
Period : 26-May-16 25-Jun-16

Sno Description Unit Total Socpe Total Qty Comp

1 All charges for excavationin station, shaft & cut & cover portion by
appropriate means using the appropriate machinery.
Roof Shaft {Grid(24-26),(1-3)} cum 3,195 3,195
Roof Station(Upto Grid 3-4) cum 19,059 19,059
Beam RB1, RB2, RB4 cum 427 427
a Roof Cumulative cum 22,681 22,681
Concourse Shaft {Grid(24-26),(1-3)} cum 4,845 4,845
Concourse Station (Grid(9-10) cum 28,899 28,899
b Concourse Cumulative cum 33,745 33,745
Base Shaft- Till Track Bed(24-26) cum 3,308 3,308
Base Shaft- Undercroft(24-26) cum 106 106
Base Station-Till Track Bed(11-16a) cum 38,615 23,927
Base Station- Undercroft(11-16a) cum 2,992 1,854
Base Station-Earthmat (18-22)-SL:5632 cum 413 413
Base Station-Sump @ Grid 20 cum 75 75
Base Shaft-(1-3) cum 4,151 3,483
c Base Cumulative cum 49,659 33,165
Cut & Cover Upto Strut 1- From Head wall to KP 12 cum 8,820 6,022
Cut & Cover Upto Strut 2- From Head wall to KP 11 cum 24,268 15,267
Cut & Cover Upto Base,Haunch -Till 15.8m, (Sec 3) cum 1,208 1,208
Cut & Cover Upto Base,Undercroft -Till 15.8m, (Sec3) cum 1,690 1,690
Cut & Cover Upto Base,Corners -Till 15.8m, (Sec 3) cum 1,131 1,131
Cut & Cover Upto - From Head wall to KP 7 (Sec 1),excluding haunch cum 21,076 11,520
Cut & Cover Upto - From Head wall to KP 7 (Sec 1), Only Haunch cum 147 80
Cut & Cover Upto - From Head wall to KP 10 (Sec 2),excluding haunch cum 12,652 6,491
d Cut & Cover Cumulative cum 70,992 43,409
e Box Pushing (Ground level to Strut 1) cum 432
Total cum 177,077 133,432
Loading & disposal of excavated materials at dumping yard for all lifts
2
within 20 km as directed by eic.
Roof Shaft {Grid(24-26),(1-3)} cum 3,195 3,195
Roof Station(Upto Grid 3-4) cum 19,059 19,059
Beam RB1, RB2, RB4 cum 427 427
a Roof Cumulative cum 22,681 22,681
Concourse Shaft {Grid(24-26),(1-3)} cum 4,845 4,845
Concourse Station (Grid(9-10) cum 28,899 28,899
b Concourse Cumulative cum 33,745 33,745
Base Shaft- Till Track Bed(24-26) cum 3,308 3,308
Base Shaft- Undercroft(24-26) cum 106 106
Base Station-Till Track Bed(11-16a) cum 38,615 23,927
Base Station- Undercroft(11-16a) cum 2,992 1,854
Base Station-Earthmat (18-22) cum 413 413
Base Station-Sump @ Grid 20 cum 75 75
Base Shaft-(1-3) cum 4,151 3,483
c Base Cumulative cum 49,659 33,165
Cut & Cover Upto Strut 1- From Head wall to KP 12 cum 8,820 6,022
Cut & Cover Upto Strut 2- From Head wall to KP 11 cum 24,268 15,267
Cut & Cover Upto Base,Haunch -Till 15.8m, (Sec 3) cum 1,208 1,208
Cut & Cover Upto Base,Undercroft -Till 15.8m, (Sec3) cum 1,690 1,690
Cut & Cover Upto Base,Corners -Till 15.8m, (Sec 3) cum 1,131 1,131
Cut & Cover Upto - From Head wall to KP 7 (Sec 1),excluding haunch cum 21,076 11,520
Cut & Cover Upto - From Head wall to KP 7 (Sec 1), Only Haunch cum 147 80
Cut & Cover Upto - From Head wall to KP 10 (Sec 2),excluding haunch cum 12,652 6,491
d Cut & Cover Cumulative cum 70,992 43,409
e Box Pushing (Ground level to Strut 1) cum 432
Total cum 177,077 133,432

L&T-SUCG JV CC-27 DMRC Project De


Measurement Book
Sub-Contractor Starcon Infra
Period : 26-May-16 25-Jun-16

Sno Description

1 Charges for lifting the excavated material below the roof slab using crane & bucket system/long boom/any other suitable equipment & dumpi
ground level. The charges include equipment , manpower,consumables,fuel,etc. & work shall be executed as per direction eic.
*Debit Note attached
ject Delhi

Site RKP STATION


Shift Day/ Night
Previously Qty Dimension
Current Qty Rate Amount
Given L/No B/ H

3,195 - 24.57 3.83 -


19,059 - 21.57 3.83 -
427 - -
22,681 - 144 -
4,845 - 24.57 5.80 -
27,805 8.75 21.57 5.80 1,094
32,650 1,094 144 157,543
3,308 - 24.57 8.26 -
106 - 11.85 0.55 -
23,927 - 21.57 7.76 -
1,854 - 12.35 1.05 -
413 - -
75 - -
- 15.00 24.57 9.45 3,483
29,683 3,483 144 501,523
4,996 19.50 24.95 2.11 1,026
12,445 19.50 24.95 5.80 2,822
1,208 - 7.45 9.65 -
1,690 - 10.24 9.82 -
1,131 - 7.26 9.25 -
11,520 - 25.57 8.75 -
81 - 3.90 0.40 -
- 28.66 25.57 8.75 6,412
33,072 10,260 144 1,477,405
432 36.00 12.000 - - 144 -
118,518 14,837 2,136,471

3,195 - 24.57 3.83 -


19,059 - 21.57 3.83 -
427 - -
22,681 - 197 -
4,845 - 24.57 5.80 -
27,805 8.75 21.57 5.80 1,094
32,650 1,094 197 215,528
3,308 - 24.57 8.26 -
106 - 11.85 0.55 -
23,927 - 21.57 7.76 -
1,854 - 12.35 1.05 -
413 - -
75 - -
- 15.00 24.57 9.45 3,483
29,683 3,483 197 686,111
4,996 19.50 24.95 2.11 1,026
12,445 19.50 24.95 5.80 2,822
1,208 - 7.45 9.65 -
1,690 - 10.24 9.82 -
1,131 - 7.26 9.25 -
11,520 - 25.57 8.75 -
81 - 3.90 0.40 -
- 28.66 25.57 8.75 6,412
33,072 10,260 197 2,021,172
432 36.00 12.000 - - 197 -
118,518 14,837 2,922,811
Total Amount 5,059,283

ject Delhi

Site RKP STATION


Shift Day/ Night

Unit Qty Rate Amount

t & dumping the same on Months 1.00 300000 300000

300,000.00
Bill Receiving
Si no Vendor Name MB No
1 Md Muzeeb 15432.15433.15434
lokeshwar 15147
2 Sia ram sharma 15148.15149
3 malik 15431
5 zenith 15145.15146
6 vikram singh 15428.1543
7 siddeshawar gupta 15425.15426.15427
8 yogender saw 15422.15423.15424
9 jha const 15421
10 ruby rai 15420,
11 amba(supply) 15133.15134
12 krishan(supply) 15137.15138
13 kalyan(supply) 15135.15136.
14 varhsa(supply) 15139.15140.
15 sas 15437
16 ashish 15438
17 prabhakar rai 15440
18 geo spar ltd 15436
19 hch 15131.15132
20 sri sai 15128.15129.15130
22 malik(block) 15260
23 krishna(block) 0
24 vimla(block) 0
25 mehti(block) 15261
26 rajan(block) 15262

Planning engineer Signtature of Reciever


Spar Geo
date pile length location
26/10/2015 22
26/10/2015 20.85
26/10/2015 22
26/10/2015 21.1
22
22
28/10/2015
20.6
21.9
21.35
29/10/2015 22
22
21.8
22
30/10/2015 22
22
22
22
22
31/10/2015 21.5

C
22
22
21.5
21.9
21.9
2-Nov 21.9

u
21.8
22
22
21.6
21.3
21.6

t
3-Nov
22
22
22
22.05
22
6/11/2015

&
22
22
22.7
21.4
18.95
7/11/2015 21.85

C
21.6
22.2
7/11/2015

9/11/2015
21.1
20.5
22
C
o
22.4
21.8
21.6
22.4
10/11/2015 21.9
22.6

v
21.2
22
22
14/11/2015
22
22
15

e
15
15
15
15
15
16/11/2015

r
15
15
15
15
15
15
22
17/11/2015 22
19.07
22
22
18/11/2015

S
22
20.7
21.8
19/11/2015 21.5
22
22

P
18.35
22
20/11/2015
22
21.3
22.3
22
23/11/2015 22
22
20.3
21.1
24/11/2015
20.8
24/11/2015

21.8
22
21.8
26/11/2015
20.4
21.8
21
27/11/2015
22.3
22
22
22
28/11/2015
22
22
22
2197.17
Chandralekha
date sqm type
30/10/2015 19.2 F 274.99
31/10/2015 13 F
2/11/2015 11.55 F
3/11/2015 7.41 F
17/11/2015 49.34 F
16/11/2015 19.48 F
5/11/2015 30.49 F
19/11/2015 19.27 F
6/11/2015 29.18 F
23/11/2015 29.6 F
7/11/2015 17.53 F
21/11/2015 18.54 F
25/11/2015 10.4 F
19/10/2015 43.1025 R BP
20/10 80.175 R BP
26/10 44.49 R ES02
28/10 66.45 R CNC 302.055
29/10 47.475 R CNC 123.2775
30/10 81.39 R CNC 107.895
38.635 R ES02
3-Nov 24.77 R ES02
18/11/2015 106.74 R CNC
808.2175
WBC CONCRETE QTY

structure grade qty


Ancillary M35 102
ES02 M40 655
ES04 M40 169
ESO5,BOX,SUBWAY M40 1184
ES03 M40 425
Recon of Lagging
Fixing
Chandralekha
Structure Location measurement UOM qty
till now current bill
Headwall 23.735 19.15 sqm 454.52525
HW to KP7,KP13-G26 DW 107.24 19.15 2 sqm 4107.292
Cut&Cover
KP7 TO KP13 54 17.65 2 sqm 1906.2
Total qty 6468.01725 5885
G18,19 12.521 11.05 2 sqm 276.7141
Box Pushing G18-21 35.437 11.05 1 sqm 391.57885
Total qty 668.29295 663
G2 9.475 10 1 sqm 94.75
G2-8 63.1 10 1 sqm 631
ES02 G(8-9) 12 11.55 1 sqm 138.6
G9-10A 16.75 7.45 1 sqm 124.7875
Total qty 989.1375 937 -
HW Towards Mun 12.502 9.4 1 sqm 117.5188
HW Towards iit 2.25 11.4 1 sqm 25.65

towards iit hostel to before pit area 10.363 9.4 2 sqm 194.8244
ES04
pit area 7.65 10.9 1 sqm 83.385
pit area to GL(Stair) 10.791 3.8 2 sqm 82.0116
Towards road side 17.587 9.4 1 sqm 165.3178
Total qty 668.7076 636
G1-8 69 9.8 1 sqm 676.2
End wall at G8 6.5 9.8 1 sqm 63.7
ES05
Thrust bed area 24.98 10.5 1 sqm 262.29
Total qty 1002.19 951 0.000
HW Towards JNU 12.502 9.4 1 sqm 117.5188
HW Towards Bikaji 2.25 11.4 1 sqm 25.65
Flat area 10.363 9.4 2 sqm 194.8244
ES03 pit area 7.65 10.9 1 sqm 83.385
ES03
pit area to GL(Stair) 10.791 3.8 2 sqm 82.0116
Towards road side 17.587 9.4 1 sqm 165.3178
Total qty 668.7076 383.33 193.56
Total qty done 193.560
Fixing Removal
Krishna Varsha Shri shyam chandralekha
Current bill Current bill till now Till now current bill Remarks

482

479.51 166.550

120 0.000

-
Fixing 166.55 Removal
Shuettering & Reinforcement Details Of RKP
Total Distribution to each subcontractor at Site
Description Balance
UOM Rate Vikram Singh
Project
Sl.No Scope Qty Amount Till Nw Paid qty Current Bill Amount
4 REINFORCED CEMENT CONCRETE
Laying reinforcement cement concrete of specified grade as per
approved construction drawings using suitable equipment's,
vibrating/compacting, finishing smooth and as directed by Engineer-in-
charge and as per approved Construction drawings and specifications.
(Concrete of specified grade shall be supplied by Contractor free of cost
at ground level only in truck mixers). Concrete shall be laid with
stationary concrete pump including pipes/Boom Placer including diesel
supplied by Contractor. Payment shall be made by calculating the
cubical content based on the approved construction drawings. Including
for hacking/chipping the existing concrete surface to make it rough
before laying fresh concrete. Including cleaning of spilled pour, shifting
of vibrators, with all required quality procedures such as casting of test
cubes and curing for 14 days.
a Roof Slab cum 100 1450 104.167
b Concourse Slab/Intermediate slabs cum 125 69.7125
c Base Slab cum 100 1655.45
d Walls external cum 150 942.54 65.754
e Column cum 250 10.54
f UPE Wall, Platform slab and Platform walls. cum 250 75.45
5 SHUTTERING

Making shuttering panels (wooden and /or steel) and packing properly
using jute, cotton and thermocole. All materials including nails shall be
provided by Contractor in the station area.

For wall panels of Station box (in case of Bottom up method) and walls
a sqm 172 9616 1201.33 206,629.33 571.91 330.74 56,887.28
of Entry / Exits
b For all other members at all levels sqm 65 1450 95.8333 6,229.17

Shifting the shuttering material from location of making (or from


location of First fixing to the next one) and fixing, using
thermocole/plywood in position shuttering (wooden and / or steel) and
packing properly using jute, cotton and thermocole. All materials
6 including nails shall be provided by Contractor in the station area. The
rate shall include the fixing of fixtures if any, required for works,
making of cut-out boxes, if any, and removal and stacking of all
shuttering after completion of casting of concrete. Inclued for cleaning
and applying oil to shuttering material (oil supplied by Contractor).

(For Top down and Bottom up) Base slab, Concourse Slab and Roof Slab
a sqm 140 432
of Station Box.

b Base slab of Entry / Exit sqm 140 525.45 65.6813 9,195.38

c Walls for station box (in case of Bottom-up Method) sqm 230 845.45 140.908 32,408.92 138.00 - -

Roof Slab and Concourse Slab for Station Box (in case of bottom up
d method) walls for Entry/exit, Entry / Exit roof Slab, Vent Shaft Wall, sqm 240 6711.75 839 Err:509
Plenum wall, UPE wall, Platform Slab, Station Cut-out Slab.

e Columns (0 to 6 mtr) heights sqm 250 20.4


f Stair case and any other miscellaneous item. sqm 275 1125.45 562.725 154,749.38 433.91 -
g Fixing of water bar, as required RM 30 743

Loosening of couplers fixed on walls including aligning with the rebar


h Nos 15 3864
of Roof/Concourse/Base Slab and fixing of threaded bars to couplers.

Fixing of couplers in cut-out locations in slabs and walls with proper


i packing using shuttering tape and thermocole to power level and Nos 15 3864
alignment.

7 SCAFFOLDING

Fixing of scaffolding and dismantling / shifting of scaffolding to the


next slab including fixing of walers, H-Beams and Plywood. All materials
will be given by L&T SUCG JV. Include for shifting from store in the
station for 1st fixing.

a All floor slab (except raft) including beams, staircases etc. Cum 35 30559.3 5093.21 178,262.29 1,353.76 497.91 17,426.94

Erection and dismantlilng / shifting of working staging as per safety


regulation, safe to work to the satisfaction of Engineer-in-Charge. All
materials will be provided by L&T SUCG JV.

b At all Levels. Cum 35 54665.61


Total 74,314.22
Shuettering & Reinforcem

Description
UOM Rate
Sl.No

Placing plywood 3mm/4mm on PCC and fixing with nails and sealing the joints
1 with tape. All the materials (plywood, nails and tape) shall be supplied by sqm 30
Contractor free of cost within station area.

Blinding Concrete on Excavated Ground

Laying plain cement concrete of specified grade and thickness in position as


blinding concrete layer using suitable equipments, vibrating, compacting,
finishing, smooth & Curing the surface as per approved construction drawings,
2 specifications and as directed by Engineer-in-Charge. (Concrete of specified
grade shall be supplied by contractor free of cost at ground level only in
transit mixers. Include for fixing of wooden strip (to be supplied by
Contractor) around the periphery.

PCC for area development. cum 250

3 REINFORCEMENT

Reinforcement Bars of all sizes for Slab of Station Box at Roof Level,
a MT 3,700
Concourse level, Base Slab. (Top Down Construction)

Reinforcement Bars of all sizes for Slab of Station Box at Roof Level,
b MT 4,100
Concourse level, Base Slab. (Bottom up Construction) including Cut and Cover

Reinforcement Bars of all sizes for Columns, Platform slab, Entry Exit, UPE
c MT 4,100
Wall and other misc structures. (Both Top Down and Bottom Up Construction)

4 REINFORCED CEMENT CONCRETE

Laying reinforcement cement concrete of specified grade as per approved


construction drawings using suitable equipment's, vibrating/compacting,
finishing smooth and as directed by Engineer-in-charge and as per approved
Construction drawings and specifications. (Concrete of specified grade shall be
supplied by Contractor free of cost at ground level only in truck mixers).
Concrete shall be laid with stationary concrete pump including pipes/Boom
Placer including diesel supplied by Contractor. Payment shall be made by
calculating the cubical content based on the approved construction drawings.
Including for hacking/chipping the existing concrete surface to make it rough
before laying fresh concrete. Including cleaning of spilled pour, shifting of
vibrators, with all required quality procedures such as casting of test cubes
and curing for 14 days.

a Roof Slab cum 100


b Concourse Slab/Intermediate slabs cum 125
c Base Slab cum 100
d Walls external cum 250
e Column cum 250
f UPE Wall, Platform slab and Platform walls. cum 250
5 SHUTTERING

Making shuttering panels (wooden and /or steel) and packing properly using
jute, cotton and thermocole. All materials including nails shall be provided by
Contractor in the station area.

For wall panels of Station box (in case of Bottom up method) and walls of
a sqm 172
Entry / Exits

b For all other members at all levels sqm 65

Shifting the shuttering material from location of making (or from location of
First fixing to the next one) and fixing, using thermocole/plywood in position
shuttering (wooden and / or steel) and packing properly using jute, cotton and
thermocole. All materials including nails shall be provided by Contractor in the
6
station area. The rate shall include the fixing of fixtures if any, required for
works, making of cut-out boxes, if any, and removal and stacking of all
shuttering after completion of casting of concrete. Inclued for cleaning and
applying oil to shuttering material (oil supplied by Contractor).

(For Top down and Bottom up) Base slab, Concourse Slab and Roof Slab of
a sqm 140
Station Box.

b Base slab of Entry / Exit sqm 140

c Walls for station box (in case of Bottom-up Method) sqm 230

Roof Slab and Concourse Slab for Station Box (in case of bottom up method)
d walls for Entry/exit, Entry / Exit roof Slab, Vent Shaft Wall, Plenum wall, UPE sqm 240
wall, Platform Slab, Station Cut-out Slab.

e Columns (0 to 6 mtr) heights sqm 250


f Stair case and any other miscellaneous item. sqm 275
g Fixing of water bar, as required RM 30

Loosening of couplers fixed on walls including aligning with the rebar of


h Nos 15
Roof/Concourse/Base Slab and fixing of threaded bars to couplers.

Fixing of couplers in cut-out locations in slabs and walls with proper packing
i Nos 15
using shuttering tape and thermocole to power level and alignment.

7 SCAFFOLDING

Fixing of scaffolding and dismantling / shifting of scaffolding to the next slab


including fixing of walers, H-Beams and Plywood. All materials will be given by
L&T SUCG JV. Include for shifting from store in the station for 1st fixing.

a All floor slab (except raft) including beams, staircases etc. Cum 35

Erection and dismantlilng / shifting of working staging as per safety


regulation, safe to work to the satisfaction of Engineer-in-Charge. All materials
will be provided by L&T SUCG JV.

b At all Levels. Cum 35


ering & Reinforcement Details Of RKP

Total Balance Bum Bum Current Bill


Project Scope
Qty Amount Till now paid Qty Amount

691.09 84.54 21,135

63.58 26.54 98,198

28.54

594.2 83.2767 341,434 14 7.936 32,537.60

1450 104.167 10,417


69.7125 69.54 8,693
1655.45 123 12,300 0 -
942.54 65.754 16,439 0 -
10.54
75.45 15.09 3,773
9660 801.333 137,829 98 Err:509 Err:509

1450 95.8333 6,229

422

525.45 43.7875 6,130

845.45

6711.75 838.969 97.5 Err:509 Err:509

20.4
1125.45
743

3864 644 9,660 848 575 8,625.00

3864 644 9,660 848 575 8,625.00

30559.25

54665.6075 9110.93 318,883 1,564 3.605 126.18


Err:509
(empty)
Column A (empty)
1
2
3
4
5
6
7
8
9
10
11
12
13
Malik
Mehty
Ocean King
Rajan Engg
Si no
Total Amount
VIMLA
(empty)
Total Result
Mehty
Si no Details UOM Scope Rate Current qty Amount
1 Laying of BW Upto 1.5mtr ht Cum 62.54 2050 4.89 10024.5
2 Laying of BW B/N 1.5-3.5mtr ht Cum 36.58 2200 5.65 12430
3 Laying of BW B/N above 3.5mtr ht Cum 26.88 2400 6.85 16440
L/C Construction of RCC Stiffner column including all necessary
4 Cum 6.54 3900 0.5 1950
work,shuttering,concrteing&rebar
L/C Construction as perall
of RCC Stiffner Beam including EIC.
necessary
5 Cum 4.65 3900 0 0
work,shuttering,concrteing&rebar
L/C Drilling&Fixing of head restaint bar at soffitas
ofper EIC.
beam&block at top
6 Nos 60 110 15 1650
including all supporting works
L/C Drilling&Fixing of head restaint bar at soffit of beam&block at
7 Nos 95 95 15 1425
bottom including all supporting works
8 L/C Plastering work at required thickness as per EIC Sqm 1010 110 85 9350
9 L/C For application of chicken mesh at J/N of RCC&Block/on rcc surface Sqm 474.4 40 30 1200
10 L/C For erection of scaffolding for plaster at required area/Ht as per EIC Sqm 1000 50 85 4250
11 L/C Applicaion of Antidust Paint Sqm 6850 40 125 5000
12 L/C Block shifting,sand,cement Cum 125 17.39 2173.75
65893.25
Shuettering & Reinforcement Details Of RKP P
e
Distribution to each subcontractor at Site
Description r
Alam Ali i
o
Balance Scope d
UOM Rate
From Jan16 Current bill qty/June
Sl.No Qty Amount Amount Period of work
bill o
f

3 REINFORCEMENT w
o
r
a L/C For C,B,F of Staircase, Subway Grade Slab MT 6,350 16.5 4.95 31,433 4.177 26,524
k

b L/C For C,B,F of (wall+Binder) of internal wall at Paltform,concourse at station level MT 5,750 43.55 8.71 50,083 10.905 62,704

c L/C For C,B,F of Subway Base&Roof MT 4,300 384.146 39.13 168,259 -

L/C For C,B,F of Subway ,entry walls MT 4,700 194.65 38.93 182,971

L/C For C,B,F of Glazed Building&Others MT 4,650 10.56 0 -

L/C For C,B,F of Column Reinforcement upto 12dia bar MT 7,100 20.896 4.1792 29,672

L/C For C,B,F of column reinforcement above 12dia MT 6,800 9.65 1.93 13,124

5 SHUTTERING
Making shuttering panels (wooden and /or steel) and packing properly using jute, cotton and thermocole. All materials including nails shall be provided by
Contractor in the station area.
a For wall panels of Station box (in case of Bottom up method) and walls of Entry / Exits sqm 172 10,500.00 110 18,920
b For all other members at all levels sqm 65 1,550.00 0 -

Shifting the shuttering material from location of making (or from location of First fixing to the next one) and fixing, using thermocole/plywood in position
shuttering (wooden and / or steel) and packing properly using jute, cotton and thermocole. All materials including nails shall be provided by Contractor in the
6
station area. The rate shall include the fixing of fixtures if any, required for works, making of cut-out boxes, if any, and removal and stacking of all shuttering
after completion of casting of concrete. Inclued for cleaning and applying oil to shuttering material (oil supplied by Contractor).

a (For Top down and Bottom up) Base slab, Concourse Slab and Roof Slab of Station Box. sqm 140 0
b Base slab of Entry / Exit sqm 140 635.65 -
c Walls for station box (in case of Bottom-up Method) sqm 230 145

Roof Slab and Concourse Slab for Station Box (in case of bottom up method) walls for Entry/exit, Entry / Exit roof Slab, Vent Shaft Wall, Plenum wall, UPE wall,
d sqm 240 10,500.00
Platform Slab, Station Cut-out Slab.
e Columns (0 to 6 mtr) heights sqm 250 235
f Stair case and any other miscellaneous item. sqm 275 465.65
g Fixing of water bar, as required RM 30 825

h Loosening of couplers fixed on walls including aligning with the rebar of Roof/Concourse/Base Slab and fixing of threaded bars to couplers. Nos 15 12000 650 9,750 -

i Fixing of couplers in cut-out locations in slabs and walls with proper packing using shuttering tape and thermocole to power level and alignment. Nos 15 10000 650 9,750 -

7 SCAFFOLDING
Fixing of scaffolding and dismantling / shifting of scaffolding to the next slab including fixing of walers, H-Beams and Plywood. All materials will be given by L&T
SUCG JV. Include for shifting from store in the station for 1st fixing.

a All floor slab (except raft) including beams, staircases etc. Cum 35 35600

Erection and dismantlilng / shifting of working staging as per safety regulation, safe to work to the satisfaction of Engineer-in-Charge. All materials will be
provided by L&T SUCG JV.
b At all Levels. Cum 35 56765 14500 507,500 469 16,410

8 Labour charges for shifting of steel from lead of more than 50m to 500 m. MT 225 444.196 97 14.136 3,181

9 Labour charges for loading and unloading of steel MT 75 444.196 97 14.136 1,060

Fixing of walkway jalli&hand rail Rmt 172


10 18520

Fixing of Primary member for Box6 roof Rmt


11 201 2200

Labour charge for internal carting of material with four person with company provided vehicle including loading&unloading-Additional Description :Activity
12 MT 100 2150 -
includes shifting of construction materials from site to site,And within site etc.
Total 1,021,461.32 109,878.11
ECS1,2
Beams
9.791667 2.4 1.2 28.2
13 13
Balance Shutter Scope at RKP

Si no

b
c

a
b
c

e
f
g
7

b
8
9
10
Balance Shutter Scope at RKP

Description

SHUTTERING

Making shuttering panels (wooden and /or steel) and packing properly using jute, cotton and therm
All materials including nails shall be provided by Contractor in the station area.
For all other members at all levels
Labour charges for all type of board remaking excluding cost of wire nails.

Shifting the shuttering material from location of making (or from location of First fixing to the nex
and fixing, using thermocole/plywood in position shuttering (wooden and / or steel) and packing pr
using jute, cotton and thermocole. All materials including nails shall be provided by Contractor in
station area. The rate shall include the fixing of fixtures if any, required for works, making of cut
boxes, if any, and removal and stacking of all shuttering after completion of casting of concrete. In
for cleaning and applying oil to shuttering material (oil supplied by Contractor).

(For Top down and Bottom up) Base slab, Concourse Slab and Roof Slab of Station Box.
Base slab of Entry / Exit
Walls for station box (in case of Bottom-up Method)

Roof Slab and Concourse Slab for Station Box (in case of bottom up method) walls for Entry/exit, E
Exit roof Slab, Vent Shaft Wall, Plenum wall, UPE wall, Platform Slab, Station Cut-out Slab.

Columns (0 to 6 mtr) heights


Stair case and any other miscellaneous item.
Fixing of water bar, as required
SCAFFOLDING
Fixing of scaffolding and dismantling / shifting of scaffolding to the next slab including fixing of wal
Beams and Plywood. All materials will be given by L&T SUCG JV. Include for shifting from store in
station for 1st fixing.
All floor slab (except raft) including beams, staircases etc.
Erection and dismantlilng / shifting of working staging as per safety regulation, safe to work to
satisfaction of Engineer-in-Charge. All materials will be provided by L&T SUCG JV.
At all Levels.
Labour Charges For Hand Rail Fixing And Walk Way Jaali For Doka Works.
Labour Charges For Erection Of Primary Members (for Doka Works).
r person with company provided vehicle including loading&unloading-Additional Description :Activity include
Balance
Scope
From
UOM Rate Jan16

sqm 65 1550
sqm 35 5610

sqm 140 0
sqm 140 635.65
sqm 230 145

sqm 240 10520


sqm 285 235
sqm 315 425.65
RM 30 825

Cum 35 35600

Cum 35 56765
RMTR 172 18520
RMTR 201 2200
MT 100 2150
Description
UOM

Sr No.
1 REINFORCEMENT
a Column With couplers-top down MT
b Staircase MT

d Walls (Vertical + Binder) MT

e Subway base & Roof MT

f Subway walls MT

g Glazed Building & Other works MT


Column & beam reinforcement upto MT

h 12mm dia size-


Column & beam reinforcement For 16mm MT

i dia and above

Total
(Prepared By)
Planning Engineer

As Per Actual Site Con

Station
HK
IIT
RKP
MNK
VV+SV
Total
(MT)

Total (Crs)

12

10

0
Proposal for Revis

Total Scope Balance


Revised from 1stMay '16
Rate RKP(Only BamBam
Rebar&Shutter) Qty Amount

7,850 - 0.00 0.00


6,350 16.5 4.95 0.00
5,750 43.5500 13.07 0.01
0.00
4,300 195.6500 78.26 0.03
4,700 194.6500 77.86 0.04
4,650 10.5600 0.00 0.00
7,100
20.896 5.22 0.00

6,800
9.650 2.41 0.00

0.09
As Per Actual Site Condition
Balance Qty
till Date

Total (Crs)

12

10

6
Column D
4 Column E

0
Proposal for Revised Rates of Reinforcement work from 01.01.2016

RK Puram
BamBam Alam Ali(Rebar)
Qty Amount

4.95
8.71

39.13
38.93
0.00

4.18

1.93
m 01.01.2016

RK Puram
Alam Ali(Rebar) Malik enterprises
Qty Amount

0.00
3.30 0.00
10.89 0.01
0.00
39.13 0.02
38.93 0.02
5.28 0.00

7.31 0.01

3.38 0.00

0.05
Malik enterprises Rajan Engg
Qty Amount

0.00
3.30 0.00
10.89 0.01
0.00
39.13 0.02
38.93 0.02
5.28 0.00

4.18 0.00

1.93 0.00

0.05