Insumo Unidad

AGUA
M3
ALAMBRE NEGRO RECOCIDO #16
KG
ALAMBRE NEGRO RECOCIDO #8
KG
ALAMBRE NEGRO RECOCIDO 8
KG
ARENA GRUESA
M3
CAL HIDRATADA DE 30 Kg
BLS
CAL HIDRATADA DE 30kg
BLS
CEMENTO PORTLAND TIPO I
BLS
CLAVOS PARA MADERA
KG
CLAVOS PARA MADERA C/C 3"
KG
CORDEL
ML
EQUIPO
(empty)
FIERRO CORR. 5/8" SIDERPERU G-60
KG
HERRAMIENTAS MANUALES
%MO
HORMIGON
M3
P2
LADRILLO K.K. DE ARCILLA 9X14X24
UND
LADRILLO P/TECHO DE 12X30X30 4 HCOS.
UND
MADERA TORNILLO
P2
MANO DE OBRA
(empty)
MATERIALES
(empty)
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
HM
MEZCLADORA CONCRETO TROMPO 8HP 9 P3
HM
MEZCLADORA DE CONCRETO 20-35HP 16P3
HM
MEZCLADORA TAMBOR 18HP 11P3
HM
OFICIAL
HH
OPERARIO
HH
PEON
HH
PIEDRA CHANCADA 1/2"
M3
PIEDRA MEDIANA
M3
REGLA DE MADERA
P2
VIBRADOR DE CONCRETO 4HP 2.40"
HM
WINCHA DE 50m
UND
(empty)
(empty)
Total Result
(empty)
Partida Codigo Insumo Unidad
1.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR
1.01
1.01 MATERIALES
1.01 300101 CAL HIDRATADA DE 30kg BLS
1.01 440016 MADERA TORNILLO P2
1.01 MANO DE OBRA
1.01 470032 OPERARIO HH
1.01 470103 OFICIAL HH
1.01 470104 PEON HH
1.01 EQUIPO
1.01 370339 WINCHA DE 50m UND
1.01 370241 CORDEL ML
1.01 370101 HERRAMIENTAS MANUALES %MO
1.02 LIMPIEZA DE TERRENO MANUAL
1.02
1.02 MANO DE OBRA
1.02 470103 OFICIAL HH
1.02 470104 PEON HH
1.02 EQUIPO
1.02 370101 HERRAMIENTAS MANUALES %MO
1.03 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL
1.03
1.03 MANO DE OBRA
1.03 470103 OFICIAL HH
1.03 470104 PEON HH
1.03 EQUIPO
1.03 370101 HERRAMIENTAS MANUALES %MO
1.04 EXCAVACION PARA ZAPATAS DE 1.4 MT HASTA 1.7 MT DE PROFUNDIDAD
1.04
1.04 MANO DE OBRA
1.04 470103 OFICIAL HH
1.04 470104 PEON HH
1.04 EQUIPO
1.04 370101 HERRAMIENTAS MANUALES %MO
1.04 SOLADO PARA ZAPATAS DE 2" MEZCLA CEMENTO-HORMIGON
1.04
MATERIALES
210000 CEMENTO PORTLAND TIPO I BLS
380000 HORMIGON P2
431652 REGLA DE MADERA P2
1.04 MANO DE OBRA
0 470032 OPERARIO HH
0 470103 OFICIAL HH
0 470104 PEON HH
0 EQUIPO
MEZCLADORA CONCRETO TROMPO 8HP
370101 HM
1.04 9 P3
0 370101 HERRAMIENTAS MANUALES %MO
1.05 CONCREO SOBRECIMIENTO DE1:8 CEM-HOR 25% P.M. ANCHO=15CM
1.05
1.05 MATERIALES
1.05 210000 CEMENTO PORTLAND TIPO I BLS
1.05 380000 HORMIGON P2
1.05 050010 PIEDRA MEDIANA M3
1.05 390500 AGUA M3
1.05 MANO DE OBRA
1.05 470032 OPERARIO HH
1.05 470103 OFICIAL HH
1.05 470104 PEON HH
1.05 EQUIPO
MEZCLADORA CONCRETO TAMBOR 18HP
370339 HM
1.05 11P3
1.05 370101 HERRAMIENTAS MANUALES %MO
1.06 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
1.06
1.06 MATERIALES
1.06 020008 ALAMBRE NEGRO RECOCIDO 8 KG
1.06 020105 CLAVOS PARA MADERA C/C 3" KG
1.06 450101 MADERA TORNILLO P2
1.06 MANO DE OBRA
1.06 470032 OPERARIO HH
1.06 470103 OFICIAL HH
1.06 470104 PEON HH
1.06 EQUIPO
1.06 370101 HERRAMIENTAS MANUALES %MO
1.06 CONCRETO EN FALSO PISO DE 4" DE 1:8 CEM-HOR
1.06
1.06 MATERIALES
1.06 210000 CEMENTO PORTLAND TIPO I BLS
1.06 380000 HORMIGON M3
1.06 390500 AGUA M3
1.06 431652 REGLA DE MADERA P2
1.06 MANO DE OBRA
1.06 470032 OPERARIO HH
1.06 470103 OFICIAL HH
1.06 470104 PEON HH
1.06 EQUIPO

491013 MEZCLADORA DE CONCRETO 20-35HP 16P3 HM


1.06
1.06 370101 HERRAMIENTAS MANUALES %MO
1.06
1.07 CONCRETO EN ZAPATAS F'C=210 KG/CM2
1.07
1.07 MATERIALES
1.07 210000 CEMENTO PORTLAND TIPO I BLS
1.07 380000 PIEDRA CHANCADA 1/2" M3
1.07 050010 ARENA GRUESA M3
1.07 390500 AGUA M3
1.07 MANO DE OBRA
1.07 470032 OPERARIO HH
1.07 470103 OFICIAL HH
1.07 470104 PEON HH
1.07 EQUIPO
1.07 491013 MEZCLADORA TAMBOR 18HP 11P3 HM
1.07 490704 VIBRADOR DE CONCRETO 4HP 2.40" HM
1.07 370101 HERRAMIENTAS MANUALES %MO
1.08 ACERO PARA ZAPATAS FY= 4200
1.08
1.08 MATERIALES
1.08 020007 ALAMBRE NEGRO RECOCIDO #16 KG
1.08 020018 FIERRO CORR. 5/8" SIDERPERU G-60 KG
1.08 MANO DE OBRA
1.08 470032 OPERARIO HH
1.08 470103 OFICIAL HH
1.08 470104 PEON HH
1.08 EQUIPO
1.08 370101 HERRAMIENTAS MANUALES %MO
1.09 CONCRETO EN VIGA DE CIMENTACION F'C=210 KG/CM2
1.09
1.09 MATERIALES
1.09 210000 CEMENTO PORTLAND TIPO I BLS
1.09 380000 PIEDRA CHANCADA 1/2" M3
1.09 050010 ARENA GRUESA M3
1.09 390500 AGUA M3
1.09 MANO DE OBRA
1.09 470032 OPERARIO HH
1.09 470103 OFICIAL HH
1.09 470104 PEON HH
1.09 EQUIPO
1.09 491013 MEZCLADORA TAMBOR 18HP 11P3 HM
1.09 490704 VIBRADOR DE CONCRETO 4HP 2.40" HM
1.09 370101 HERRAMIENTAS MANUALES %MO
1.10 ACERO PARA VIGA DE CIMENTACION FY= 4200
1.10
1.10 MATERIALES
1.10 020007 ALAMBRE NEGRO RECOCIDO #16 KG
1.10 020018 FIERRO CORR. 5/8" SIDERPERU G-60 KG
1.10 MANO DE OBRA
1.10 470032 OPERARIO HH
1.10 470103 OFICIAL HH
1.10 470104 PEON HH
1.11 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION
1.11
1.11 MATERIALES
1.11 020008 ALAMBRE NEGRO RECOCIDO #8 KG
1.11 020105 CLAVOS PARA MADERA KG
1.11 050003 MADERA TORNILLO P2
1.11 MANO DE OBRA
1.11 470103 OFICIAL HH
1.11 470104 PEON HH
1.11 EQUIPO
1.11 370101 HERRAMIENTAS MANUALES %MO
1.12 CONCRETO EN COLUMNAS F'C=210 KG/CM2
1.12
1.12 MATERIALES
1.12 210000 CEMENTO PORTLAND TIPO I BLS
1.12 050104 ARENA GRUESA M3
1.12 050003 PIEDRA CHANCADA 1/2" M3
1.12 390500 AGUA M3
1.12 MANO DE OBRA
1.12 470032 OPERARIO HH
1.12 470103 OFICIAL HH
1.12 470104 PEON HH
1.12 EQUIPO
MEZCLADORA CONCRETO TAMBOR 18HP
370339 HM
1.12 11P3
1.12 490704 VIBRADOR DE CONCRETO 4HP 2.40" HM
1.12 370101 HERRAMIENTAS MANUALES %MO
1.13 ENCOFRADO Y DESENCOFRADO EN COLUMNAS
1.13
1.13 MATERIALES
1.13 020008 ALAMBRE NEGRO RECOCIDO #8 KG
1.13 020105 CLAVOS PARA MADERA KG
1.13 050003 MADERA TORNILLO P2
1.13 MANO DE OBRA
1.13 470103 OFICIAL HH
1.13 470104 PEON HH
1.13 EQUIPO
1.13 370101 HERRAMIENTAS MANUALES %MO
1.14 ACERO EN COLUMNAS FY= 4200
1.14
1.14 MATERIALES
1.14 020007 ALAMBRE NEGRO RECOCIDO #16 KG
1.14 030018 FIERRO CORR. 5/8" SIDERPERU G-60 KG
1.14 MANO DE OBRA
1.14 470103 OFICIAL HH
1.14 470104 PEON HH
1.14 EQUIPO
1.14 370101 HERRAMIENTAS MANUALES %MO
1.15 CONCRETO EN VIGAS F'C=210 KG/CM2
1.15
1.15 MATERIALES
1.15 210000 CEMENTO PORTLAND TIPO I BLS
1.15 050104 ARENA GRUESA M3
1.15 050003 PIEDRA CHANCADA 1/2" M3
1.15 390500 AGUA M3
1.15 MANO DE OBRA
1.15 470032 OPERARIO HH
1.15 470103 OFICIAL HH
1.15 470104 PEON HH
1.15 EQUIPO
MEZCLADORA CONCRETO TAMBOR 18HP
370339 HM
1.15 11P3
1.15 490704 VIBRADOR DE CONCRETO 4HP 2.40" HM
1.15 370101 HERRAMIENTAS MANUALES %MO
1.6 ENCOFRADO Y DESENCOFRADO EN VIGAS
1.6
1.6 MATERIALES
1.6 020008 ALAMBRE NEGRO RECOCIDO #8 KG
1.6 020105 CLAVOS PARA MADERA KG
1.6 450101 MADERA TORNILLO P2
1.6 MANO DE OBRA
1.6 470103 OFICIAL HH
1.6 470104 PEON HH
1.6 EQUIPO
1.6 370101 HERRAMIENTAS MANUALES %MO
1.7 ACERO EN VIGAS FY= 4200
1.7
1.7 MATERIALES
1.7 020007 ALAMBRE NEGRO RECOCIDO #16 KG
1.7 030018 FIERRO CORR. 5/8" SIDERPERU G-60 KG
1.7 MANO DE OBRA
1.7 470103 OFICIAL HH
1.7 470104 PEON HH
1.7 EQUIPO
1.7 370101 HERRAMIENTAS MANUALES %MO
1.8 CONCRETO EN LOSAS ALIGERDAS F'C=210 KG/CM2
1.8
1.8 MATERIALES
1.8 210000 CEMENTO PORTLAND TIPO I BLS
1.8 050104 ARENA GRUESA M3
1.8 050003 PIEDRA CHANCADA 1/2" M3
1.8 390500 AGUA M3
1.8 MANO DE OBRA
1.8 470032 OPERARIO HH
1.8 470103 OFICIAL HH
1.8 470104 PEON HH
1.8 EQUIPO
MEZCLADORA CONCRETO TAMBOR 18HP
370339 HM
1.8 11P3
1.8 490704 VIBRADOR DE CONCRETO 4HP 2.40" HM
1.8 370101 HERRAMIENTAS MANUALES %MO
1.9 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS
1.9
1.9 MATERIALES
1.9 020008 ALAMBRE NEGRO RECOCIDO #8 KG
1.9 020105 CLAVOS PARA MADERA KG
1.9 450101 MADERA TORNILLO P2
1.9 MANO DE OBRA
1.9 470103 OFICIAL HH
1.9 470104 PEON HH
1.9 EQUIPO
1.9 370101 HERRAMIENTAS MANUALES %MO
2.00 ACERO EN LOSA ALIGERADA FY= 4200
2.00
2.00 MATERIALES
2.00 020007 ALAMBRE NEGRO RECOCIDO #16 KG
2.00 030018 FIERRO CORR. 5/8" SIDERPERU G-60 KG
2.00 MANO DE OBRA
2.00 470103 OFICIAL HH
2.00 470104 PEON HH
2.00 EQUIPO
2.00 370101 HERRAMIENTAS MANUALES %MO
2.1 LADRILLO HUECO/ARCILLA 12X30X30 P/TECHO ALIGERADO
2.1
2.1 MATERIALES
2.1 170100 LADRILLO P/TECHO DE 12X30X30 4 HCOS. UND
2.1 MANO DE OBRA
2.1 470103 OFICIAL HH
2.1 470104 PEON HH
2.1 EQUIPO
2.1 370101 HERRAMIENTAS MANUALES %MO
2.2 CONCRETO EN ESCALERAS F'C=210 KG/CM2
2.2
2.2 MATERIALES
2.2 210000 CEMENTO PORTLAND TIPO I BLS
2.2 050104 ARENA GRUESA M3
2.2 050003 PIEDRA CHANCADA 1/2" M3
2.2 390500 AGUA M3
2.2 MANO DE OBRA
2.2 470032 OPERARIO HH
2.2 470103 OFICIAL HH
2.2 470104 PEON HH
2.2 EQUIPO
MEZCLADORA CONCRETO TAMBOR 18HP
370339 HM
2.2 11P3
2.2 490704 VIBRADOR DE CONCRETO 4HP 2.40" HM
2.2 370101 HERRAMIENTAS MANUALES %MO
2.3 ENCOFRADO Y DESENCOFRADO EN ESCALERAS
2.3
2.3 MATERIALES
2.3 020008 ALAMBRE NEGRO RECOCIDO #8 KG
2.3 020105 CLAVOS PARA MADERA C/C 3" KG
2.3 450101 MADERA TORNILLO P2
2.3 MANO DE OBRA
2.3 470103 OFICIAL HH
2.3 470104 PEON HH
2.3 EQUIPO
2.3 370101 HERRAMIENTAS MANUALES %MO
2.4 ACERO EN ESCALERAS FY= 4200
2.4
2.4 MATERIALES
2.4 020007 ALAMBRE NEGRO RECOCIDO #16 KG
2.4 030018 FIERRO CORR. 5/8" SIDERPERU G-60 KG
2.4 MANO DE OBRA
2.4 470103 OFICIAL HH
2.4 470104 PEON HH
2.4 EQUIPO
2.4 370101 HERRAMIENTAS MANUALES %MO
2.5 MURO DE SOGA KING-KONG CON CEMENTO-CAL-ARENA
2.5
2.5 MATERIALES
2.5 020105 CLAVOS PARA MADERA C/C 3" KG
2.5 050104 ARENA GRUESA M3
2.5 170023 LADRILLO K.K. DE ARCILLA 9X14X24 UND
2.5 210000 CEMENTO PORTLAND TIPO I BLS
2.5 300101 CAL HIDRATADA DE 30 Kg BLS
2.5 390500 AGUA M3
2.5 440016 MADERA TORNILLO P2
2.5 MANO DE OBRA
2.5 470103 OFICIAL HH
2.5 470104 PEON HH
2.5 EQUIPO
2.5 370101 HERRAMIENTAS MANUALES %MO
Cuadrilla Cantidad Precio Parcial Subtotal IU
M2 1.90
Rendimiento 500.0000 M2/da

0.0500 9.50 0.48


0.0200 2.00 0.04 0.52

1.000 0.0160 20.10 0.32


1.000 0.0160 16.50 0.26
3.000 0.0480 14.84 0.71 1.29

0.0030 12.00 0.04


0.0020 2.80 0.01
3.0000 1.29 0.04 0.09
M2 12.57
Rendimiento 40.0000 M2/da

1.000 0.2000 16.50 3.30


3.000 0.6000 14.84 8.90 12.20

3.0000 12.20 0.37 0.37


NORMAL M3 64.56
Rendimiento 4.0000 M3/da

1.000 2.0000 16.50 33.00


1.000 2.0000 14.84 29.68 62.68

3.0000 62.68 1.88 1.88


PROFUNDIDAD M3 103.30
Rendimiento 2.5000 M3/da

1.000 3.2000 16.50 52.80


1.000 3.2000 14.84 47.49 100.29

3.0000 100.29 3.01 3.01


GON M3 28.21
Rendimiento 80.0000 M3/da

0.2840 15.13 4.30


0.0940 38.14 3.59
0.1120 5.80 0.65 8.54
2.000 0.2000 20.10 4.02
3.000 0.3000 16.50 4.95
6.000 0.6000 14.84 8.90 17.87

1.000 0.1000 12.58 1.26


3.0000 17.87 0.54 1.80
CHO=15CM M3 219.64
Rendimiento 10.0000 M3/da

0.0500 15.13 0.76


0.9700 38.14 37.00
0.4100 25.42 10.42
0.1600 1.83 0.29 48.47

3.000 2.4000 20.10 48.24


1.000 0.8000 16.50 13.20
8.000 6.4000 14.84 94.98 156.42

1.000 0.8000 12.58 10.06


3.0000 156.42 4.69 14.75
M2 72.65
Rendimiento 16.0000 M2/da

0.2600 3.90 1.01


0.1300 3.81 0.50
4.8300 2.00 9.66 11.17

2.000 1.0000 20.10 20.10


3.000 1.5000 16.50 24.75
2.000 1.0000 14.84 14.84 59.69

3.0000 59.69 1.79 1.79


M2 32.76
Rendimiento 110.0000 M2/da

0.5000 15.13 7.57


0.1450 38.14 5.53
0.0180 1.83 0.03
0.0600 2.60 0.16 13.29

3.000 0.2182 20.10 4.39


4.000 0.2909 16.50 4.80
9.000 0.6545 14.84 9.71 18.90

1.000 0.0727 31.50


3.0000 18.90 0.57 0.57

M3 237.13
Rendimiento 25.0000 M3/da

9.7400 15.13 147.37


0.8500 55.08 46.82
0.4200 50.58 21.24
0.1840 1.83 0.34 215.77

3.000 0.2182 20.10 4.39


1.000 0.0727 16.50 1.20
8.000 0.5818 14.84 8.63 14.22

1.000 0.3200 15.05 4.82


1.000 0.3200 5.90 1.89
3.0000 14.22 0.43 7.14
KG 39.31
Rendimiento 250.0000 KG/da

0.0600 2.42 0.15


1.0700 35.45 37.93 38.08

0.300 0.0096 20.10 0.19


1.000 0.0320 16.50 0.53
1.000 0.0320 14.84 0.47 1.19

3.0000 1.19 0.04 0.04


M3 269.24
Rendimiento 35.0000 M3/da

9.7400 15.13 147.37


0.8500 55.08 46.82
0.4200 50.58 21.24
0.1840 1.83 0.34 215.77

2.000 0.4571 20.10 9.19


2.000 0.4571 16.50 7.54
9.000 2.0571 14.84 30.53 47.26

1.000 0.2286 15.05 3.44


1.000 0.2286 5.90 1.35
3.0000 47.26 1.42 6.21
KG 40.46
Rendimiento 230.0000 KG/da

0.0650 2.42 0.16


1.1000 35.45 39.00 39.16

0.300 0.0104 20.10 0.21


1.000 0.0348 16.50 0.57
1.000 0.0348 14.84 0.52 1.30
ON M2 50.19
Rendimiento 10.0000 M2/da

0.3000 3.90 1.17


0.1700 3.81 0.65
5.1600 2.00 10.32 12.14

1.000 0.8000 16.50 13.20


2.000 1.6000 14.84 23.74 36.94

3.0000 36.94 1.11 1.11


M3 426.70
Rendimiento 10.0000 M3/da

9.7400 15.13 147.37


0.4200 50.58 21.24
0.8500 55.08 46.82
0.1840 1.83 0.34 215.77

2.000 1.6000 20.10 32.16


2.000 1.6000 16.50 26.40
11.000 8.8000 14.84 130.59 189.15

1.000 0.8000 15.05 12.04


1.000 0.8000 5.09 4.07
3.0000 189.15 5.67 21.78
M2 59.71
Rendimiento 8.0000 M2/da

0.3000 3.90 1.17


0.1700 3.81 0.65
5.1600 2.00 10.32 12.14
1.000 1.0000 16.50 16.50
2.000 2.0000 14.84 29.68 46.18

3.0000 46.18 1.39 1.39


KG 39.60
Rendimiento 250.0000 KG/da

0.0600 2.42 0.15


1.0700 35.45 37.93 38.08

1.000 0.0320 16.50 0.53


2.000 0.0640 14.84 0.95 1.48

3.0000 1.48 0.04 0.04


M3 329.42
Rendimiento 20.0000 M3/da

9.7400 15.13 147.37


0.4200 50.85 21.36
0.8500 55.08 46.82
0.1840 1.83 0.34 215.89

2.000 0.8000 20.10 16.08


2.000 0.8000 16.50 13.20
11.000 4.4000 14.84 65.30 94.58

1.000 0.8000 15.05 12.04


1.000 0.8000 5.09 4.07
3.0000 94.58 2.84 18.95
M2 59.91
Rendimiento 8.5000 M2/da

0.2100 3.90 0.82


0.2400 3.81 0.91
6.7100 2.00 13.42 15.15

1.000 0.9412 16.50 15.53


2.000 1.8824 14.84 27.93 43.46

3.0000 43.46 1.30 1.30


KG 39.60
Rendimiento 250.0000 KG/da

0.0600 2.42 0.15


1.0700 35.45 37.93 38.08

1.000 0.0320 16.50 0.53


2.000 0.0640 14.84 0.95 1.48

3.0000 1.48 0.04 0.04


M3 309.93
Rendimiento 25.0000 M3/da

9.7400 15.13 147.37


0.4200 50.85 21.36
0.8500 55.08 46.82
0.1840 1.83 0.34 215.89

2.000 0.6400 20.10 12.86


2.000 0.6400 16.50 10.56
11.000 3.5200 14.84 52.24 75.66

1.000 0.8000 15.05 12.04


1.000 0.8000 5.09 4.07
3.0000 75.66 2.27 18.38
M2 43.34
Rendimiento 13.5000 M2/da

0.2100 3.90 0.82


0.2400 3.81 0.91
6.7100 2.00 13.42 15.15

1.000 0.5926 16.50 9.78


2.000 1.1852 14.84 17.59 27.37

3.0000 27.37 0.82 0.82


KG 39.60
Rendimiento 250.0000 KG/da

0.0600 2.42 0.15


1.0700 35.45 37.93 38.08

1.000 0.0320 16.50 0.53


2.000 0.0640 14.84 0.95 1.48

3.0000 1.48 0.04 0.04


DO UND 1.51
Rendimiento ### UND/da
1.0500 0.79 0.83 0.83

1.000 0.0040 16.50 0.07


10.000 0.0400 14.84 0.59 0.66

3.0000 0.66 0.02 0.02


M3 426.82
Rendimiento 10.0000 M3/da

9.7400 15.13 147.37


0.4200 50.85 21.36
0.8500 55.08 46.82
0.1840 1.83 0.34 215.89

2.000 1.6000 20.10 32.16


2.000 1.6000 16.50 26.40
11.000 8.8000 14.84 130.59 189.15

1.000 0.8000 15.05 12.04


1.000 0.8000 5.09 4.07
3.0000 189.15 5.67 21.78
M2 88.47
Rendimiento 5.0000 M2/da

0.0800 3.90 0.31


0.1500 3.81 0.57
5.7400 2.00 11.48 12.36

1.000 1.6000 16.50 26.40


2.000 3.2000 14.84 47.49 73.89

3.0000 73.89 2.22 2.22


KG 39.51
Rendimiento 266.6700 KG/da

0.0600 2.42 0.15


1.0700 35.45 37.93 38.08

1.000 0.0300 16.50 0.50


2.000 0.0600 14.84 0.89 1.39

3.0000 1.39 0.04 0.04


M2 70.76
Rendimiento 9.4100 M2/da

0.0200 2.42 0.05


0.0300 50.85 1.53
39.0000 0.58 22.62
0.1000 15.13 1.51
0.1300 9.50 1.24
0.0070 1.83 0.01
0.5800 5.80 3.36 30.32

1.000 0.8502 16.50 14.03


2.000 1.7003 14.84 25.23 39.26

3.0000 39.26 1.18 1.18


Metrado CT PT
Partida Codigo
1.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR
1.02 LIMPIEZA DE TERRENO MANUAL
1.03 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL
1.04 EXCAVACION PARA ZAPATAS DE 1.4 MT HASTA 1.7 MT DE PROFUNDIDAD
1.04 SOLADO PARA ZAPATAS DE 2" MEZCLA CEMENTO-HORMIGON
1.05 CONCREO SOBRECIMIENTO DE1:8 CEM-HOR 25% P.M. ANCHO=15CM
1.06 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
1.06 CONCRETO EN FALSO PISO DE 4" DE 1:8 CEM-HOR
1.07 CONCRETO EN ZAPATAS F'C=210 KG/CM2
1.08 ACERO PARA ZAPATAS FY= 4200
1.09 CONCRETO EN VIGA DE CIMENTACION F'C=210 KG/CM2
1.10 ACERO PARA VIGA DE CIMENTACION FY= 4200
1.11 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION
1.12 CONCRETO EN COLUMNAS F'C=210 KG/CM2
1.13 ENCOFRADO Y DESENCOFRADO EN COLUMNAS
1.14 ACERO EN COLUMNAS FY= 4200
1.15 CONCRETO EN VIGAS F'C=210 KG/CM2
1.6 ENCOFRADO Y DESENCOFRADO EN VIGAS
1.7 ACERO EN VIGAS FY= 4200
1.8 CONCRETO EN LOSAS ALIGERDAS F'C=210 KG/CM2
1.9 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS
2.00 ACERO EN LOSA ALIGERADA FY= 4200
2.1 LADRILLO HUECO/ARCILLA 12X30X30 P/TECHO ALIGERADO
2.2 CONCRETO EN ESCALERAS F'C=210 KG/CM2
2.3 ENCOFRADO Y DESENCOFRADO EN ESCALERAS
2.4 ACERO EN ESCALERAS FY= 4200
2.5 MURO DE SOGA KING-KONG CON CEMENTO-CAL-ARENA

COSTO DIRECTO
GASTOS GENERALES Y UTILIDAD
COSTO TOTAL
IMPUESTO GENERAL A LAS VENTAS
PRESUPUESTO TOTAL
Codigo Unidad Metrado Precio
TEO PRELIMINAR M2 1.90
NUAL M2 12.57
OS HASTA 1.00 MT TERRENO NORMAL M3 64.56
S DE 1.4 MT HASTA 1.7 MT DE PROFUNDIDAD M3 103.30
2" MEZCLA CEMENTO-HORMIGON M3 28.21
DE1:8 CEM-HOR 25% P.M. ANCHO=15CM M3 219.64
ADO DE SOBRECIMIENTO M2 72.65
DE 4" DE 1:8 CEM-HOR M2 32.76
=210 KG/CM2 M3 237.13
4200 KG 39.31
ENTACION F'C=210 KG/CM2 M3 269.24
NTACION FY= 4200 KG 40.46
ADO EN VIGAS DE CIMENTACION M2 50.19
F'C=210 KG/CM2 M3 426.70
ADO EN COLUMNAS M2 59.71
4200 KG 39.60
10 KG/CM2 M3 329.42
ADO EN VIGAS M2 59.91
KG 39.60
ERDAS F'C=210 KG/CM2 M3 309.93
ADO EN LOSAS ALIGERADAS M2 43.34
A FY= 4200 KG 39.60
12X30X30 P/TECHO ALIGERADO UND 1.51
F'C=210 KG/CM2 M3 426.82
ADO EN ESCALERAS M2 88.47
4200 KG 39.51
G CON CEMENTO-CAL-ARENA M2 70.76

10%

18%
Parcial Subtotal
INDICES UNFICADOS

Cdig Descripcin Cdig

1 ACEITE 40 LOSETA

ACERO DE CONSTRUCCION MADERA EN TIRAS PARA


2 41
LISO PISO

MADERA IMPORTADA PARA


3 ACERO DE CONSTRUCCION 42
ENCOF. Y

CORRUGADAGREGADO OF MADERA NACIONAL PARA


4 43
INO ENCOF. Y CARPINT.

MADERA TERCIADA PARA


5 AGREGADO GRUESO 44
CARPINTERIA

ALAMBRE Y CABLE DE MADERA TERCIADA PARA


6 45
COBRE ENCOFRADO

ALAMBRE Y CABLE TIPO TW


7 46 MALLA DE ACERO
Y THW

MANO DE OBRA INC. LEYES


8 ALAMBRE Y CABLE TIPO WP 47
SOCIALES

MAQUINARIA Y EQUIPO
9 ALCANTARILLA METALICA 49
IMPORTADO

APARATO SANITARIO CON MAQUINARIA Y EQUIPO


10 48
GRIFERIA NACIONAL

ARTEFACTO DE ALUMBRADO MARCO Y TAPA DE FIERRO


11 50
EXTERIO R FUNDIDO

ARTEFACTO DE ALUMBRADO
12 51 PERFIL DE ACERO LIVIANO
INTERIOR

13 ASFALTO 52 PERFIL DE ALUMINIO

14 BALDOSA ACUSTICA 53 PETROLEO DIESSEL

15 BALDOSA ASFALTICA 54 PINTURA LATEX


16 BALDOSA VINILICA 55 PINTURA TEMPLE

17 BLOQUE Y LADRILLO 56 PLANCHA DE ACERO LAC

19 CABLE NYY Y NKY 57 PLANCHA DE ACERO LAF

PLANCHA DE ASBESTO-
18 CABLE TELEFONICO 59
CEMENTO

20 CEMENTO ASFALTICO 60 PLANCHA DE POLIURETANO

21 CEMENTO PORTLAND TIPO I 61 PLANCHA GALVANIZADA

22 CEMENTO PORTLAND TIPO II 62 POSTE DE CONCRETO

23 CEMENTO PORTLAND TIPO V (*) POSTE DE FIERRO (ndice 65)

24 CERAMICA ESMALTADA Y SIN 64 TERRAZO

CERRAJERIA IMPORTADA TUBERIA DE ACERO NEGRO


(*) 65
( ndice 30 ) Y/O GALVANIZADO

TUBERIA DE ASBESTO-
26 CERRAJERIA NACIONAL 66
CEMENTO

27 DETONANTE 68 TUBERIA DE COBRE

TUBERIA DE CONCRETO
28 DINAMITA 70
REFORZADO

TUBERIA DE CONCRETO
(*) 29 DLAR (Indice 30) 69
SIMPLE

DOLAR (GENERAL TUBERIA DE FIERRO


30 71
PONDERADO) FUNDIDO

31 DUCTO DE CONCRETO 72 TUBERIA DE PVC PARA AGUA

32 FLETE TERRESTRE 73 DUCTO TELEFONICO DE PVC

TUBERIA DE PVC PARA


33 FLETE AEREO (*)
ELECTRICIDAD (SAP)

TUBERIA DE PVC PARA


34 GASOLINA (*)
ELECTRICIDAD (SEL)
VALVULA DE BRONCE
(*) GELATINA (*)
IMPORTADA (Indice 30)

VALVULA DE BRONCE
(*) GELIGNITA 77
NACIONAL

VALVULA DE FIERRO
37 HERRAMIENTA MANUAL 78
FUNDIDO NACIONAL

VIDRIO INCOLORO NACIONAL


38 HORMIGON (*)
(Indice 30)

INDICE GENERAL DE
39 (i) 80 CONCRETO PRE MEZCLADO
PRECIOS AL CONSUMIDOR
Descripcin

LOSETA

ADERA EN TIRAS PARA


PISO

DERA IMPORTADA PARA


ENCOF. Y

ADERA NACIONAL PARA


ENCOF. Y CARPINT.

ADERA TERCIADA PARA


CARPINTERIA

ADERA TERCIADA PARA


ENCOFRADO

MALLA DE ACERO

NO DE OBRA INC. LEYES


SOCIALES

MAQUINARIA Y EQUIPO
IMPORTADO

MAQUINARIA Y EQUIPO
NACIONAL

ARCO Y TAPA DE FIERRO


FUNDIDO

RFIL DE ACERO LIVIANO

PERFIL DE ALUMINIO

PETROLEO DIESSEL

PINTURA LATEX
PINTURA TEMPLE

ANCHA DE ACERO LAC

LANCHA DE ACERO LAF

LANCHA DE ASBESTO-
CEMENTO

NCHA DE POLIURETANO

LANCHA GALVANIZADA

POSTE DE CONCRETO

TE DE FIERRO (ndice 65)

TERRAZO

BERIA DE ACERO NEGRO


Y/O GALVANIZADO

TUBERIA DE ASBESTO-
CEMENTO

TUBERIA DE COBRE

UBERIA DE CONCRETO
REFORZADO

UBERIA DE CONCRETO
SIMPLE

TUBERIA DE FIERRO
FUNDIDO

ERIA DE PVC PARA AGUA

TO TELEFONICO DE PVC

TUBERIA DE PVC PARA


ELECTRICIDAD (SAP)

TUBERIA DE PVC PARA


ELECTRICIDAD (SEL)
VALVULA DE BRONCE
MPORTADA (Indice 30)

VALVULA DE BRONCE
NACIONAL

VALVULA DE FIERRO
FUNDIDO NACIONAL

RIO INCOLORO NACIONAL


(Indice 30)

NCRETO PRE MEZCLADO