COSTO HORARIO DE EQUIPO MECANICO


FACTOR ZONA ( SIERRA
ABRIL DE 2002

EQUIPO MECANICO POT. CAPACIDAD PESO


HP KG

MEZCLADORA DE CONCRETO DE 11p3 18 HP 2,200

LAVADORA DE FINOS 13,000

CAMION CISTERNA 5,000 gl 2,450

CAMION PLATAFORMA 6 X 4 300 HP 19 ton 26,000

CAMION VOLQUETE 15 m3 13,000

MOTOBOMBA 12 HP 4" 90

EQUIPO DE CORTE Y SOLDEO 2,500

COMPRESORA NEUMATICA 335-375 PCM, 93 HP 1,000

COMPRESORA NEUMATICA 87 HP 250-330 PCM 29

COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 18,585

RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 ton 23,400

RODILLO NEUMATICO AUTOPROPULSADO 81-100HP 5.5-20 ton 20,520

RODILLO TANDEM ESTATICO AUTOPROPULSADO 58-70HP 8-10 ton 4,320

CARGADOR SOBRE LLANTAS 160-195 HP 3.5 yd3 8,800

TRACTOR DE ORUGAS DE 190-240 HP 5,500

BARREDORA MECANICA 10-20 HP 7 p LONGITUD 7,300

CALENTADOR DE ACEITE 5 HP 468 p3 39,000

PLANTA ASFALTO EN FRIO MOTOR EQUIPO 3 0HP 30-65 ton/h 7,000

SECADOR ARIDOS 2 MOTOR EQUIPO 70 HP 60-115 ton/h 11,515

MARTILLO NEUMATICO DE 25 - 29 kg 12,000

VIBRADOR DE CONCRETO 4 HP 1.50" 22,700

ZARANDA VIBRATORIA 4" X 6" X 14" MOTOR ELECTRICO 15 HP

TRACTOR DE TIRO DE 80 HP

CHANCADORA PRIMARIA SECUNDARIA 1,500

MOTONIVELADORA DE 125 HP 2,000

Archivo:352704299.xlsx
Hoja:EQUIPO (2)
CAMION IMPRIMADOR 16,475

ZARANDA DE GRAVEDAD 0

GRUPO ELECTROGENO 230 HP 150 KW 4,000

PAVIMENTADORA ASFALTICA 69 HP

TEODOLITO

JALONES

MIRA PLEGABLE

MAQUINA PARA PINTAR MARCAS EN PAVIMENTO


* Los costos de tarifas de alquiler de equipo han sido coordinados y concordados con CETICOS TACNA

Archivo:352704299.xlsx
Hoja:EQUIPO (2)
#REF!
#REF!
#REF!
#REF!
#REF!

TO HORARIO DE EQUIPO MECANICO


FACTOR ZONA ( SIERRA ) : 1.02

TIPO DE CAMBIO :
COSTO DE COSTO TOTAL
ALQUILER DE UTILIZAC.
HORARIO
S/. S/.

18.79 19.17
24.09 24.57
83.33 85.00
160.59 163.80
80.88 82.50
2.30 2.35
12.06 12.30
70.00 71.40
44.20 45.08
12.00 12.24
95.00 96.90
95.00 96.90
90.00 91.80
105.88 108.00
166.67 170.00
15.85 16.17
30.00 30.60
58.82 60.00
65.00 66.30
11.76 12.00
10.28 10.49
29.41 30.00
49.02 50.00
110.00 112.20
110.40 112.61

Archivo:352704299.xlsx
Hoja:EQUIPO (2)
80.00 81.60
15.00 15.30
60.00 61.20
102.94 105.00
9.60 9.79
0.80 0.82
1.00 1.02
10.40 10.61

Archivo:352704299.xlsx
Hoja:EQUIPO (2)
#REF!
#REF!
#REF!
#REF!
#REF!

COSTO HORARIO DE EQUIPO MECANICO


FACTOR ZONA ( SIERRA ) :
JULIO DE 2001 TIPO DE CAMBIO :
COSTO DE
EQUIPO MECANICO POT. CAPACIDAD PESO ALQUILER
HP KG
S/.

MEZ. CONCRETO T.TAMBOR 23 11 p3 2,200 23.08


CISTERNA (4X2) AGUA 145 - 165 2000 gln 13,000 14.34
CAMIONETA PICK-UP C/SIMP. 107 1,000 kg 2,450 38.32
VOLQUETE 6*4 330 10 m3 26,000 135.50
CISTERNA (4X2) AGUA 145 - 165 2000 gln 13,000 84.18
EQUIPO DE SOLDAR 225 AMP 90 11.45
COMPRESORA NEUMATICA 87 250 - 330 PCM 2,500 58.44
BARREDORA MECANICA 10 - 20 7 P.LONG. 1,000 34.53
MARTILLO NEUMATICO 25-29 KG 29 10.83
CARGADOR SOBRE LLANTAS 160-195 3.5 yd3 18,585 169.23
RETROEXCAVADORA S/O 115-165 0.75-1.6 Yd3 23,400 132.38
TRACTOR SOBRE ORUGAS 190 - 240 20,520 223.78
TRACTOR DE TIRO MF 290 80 4,320 54.95
RODILLO TANDEM ESTATICO 58 - 70 8 - 10 Tn. 8,800 42.49
RODILLO NEUMATICO AUTOPR. 81 - 100 5.5 - 20 Tn. 5,500 56.30
RODILLO LISO VIB.AUTOP. 70 - 100 7 - 9 Tn. 7,300 62.47
CHANCADORA PRIM/SECUND. 0 46 - 70 Ton/h 39,000 196.15
ZARANDA VIBRATORIA 15 ME 11 Kw. 7,000 31.54
MOTONIVELADORA 125 11,515 112.84
PAVIMENTADORA 12,000 103.30
PLANTA DE ASFALTO 0 60 - 115 Ton/h 22,700 168.32
CALENTADOR DE ACEITE 0 28.42
SECADOR DE ARIDOS 0 210.07
GRUPO ELECTROGENO 75 Kw. 1,500 17.07
GRUPO ELECTROGENO 0 150 Kw. 2,000 51.12

Archivo:352704299.xlsx
Hoja:EQUIPO
CAMION IMPRIMADOR 178 - 210 1,800 gl 16,475 118.24
VIBRADOR DE CONCRETO 4 1.25 plg 0 18.10
FAJA TRANSPORTADORA 18" x 5 0 150 T/H 4,000 16.79
TOEDOLITO 6.63
NIVEL 8.75
MIRA PLAGABLE 1.11
JALONES 0.66
MAQUINA PINTAR PAVIM. 22.87

Archivo:352704299.xlsx
Hoja:EQUIPO
#REF!
#REF!
#REF!
#REF!
#REF!

STO HORARIO DE EQUIPO MECANICO


1.02

3.525
COSTO TOTAL
DE UTILIZAC.
HORARIO
S/.

23.54
14.63
39.09
138.21
85.86
11.68
59.61
35.22
11.05
172.61
135.03
228.26
56.05
43.34
57.43
63.72
200.07
32.17
115.10
105.37
171.69
28.99
214.27
17.41
52.14

Archivo:352704299.xlsx
Hoja:EQUIPO
120.60
18.46
17.13
6.76
8.93
1.13
0.67
23.33

Archivo:352704299.xlsx
Hoja:EQUIPO
DISTANCIAS VIRTUALES

CENTROS DE ABASTECIMIENTO

LIMA: (OTROS MATERIALES)


PIURA: (ACERO)
TALARA: (ASFALTO, PETROLEO)

CUADRO DE DISTANCIAS VIRTUALES

RUTAS DISTANCIA VIRTUA


DE A (KM)
LIMA OBRA
TALARA OBRA
PIURA OBRA
Para el clculo de los fletes se empleo la ltima Actualizacion de Costos Minimos del Transporte de Carga
en Camion publicada en el D.S. N 049-2002-MTC con precios a Noviembre del 2002
Asimismo se han actualizado las distancias virtuales de acuerdo al Anexo I de este mismo D.S.

RUTAS DIST. FACTOR DISTANCIA VIRTUA


DE A REAL ( KM )
LIMA - OBRA:
Lima Sullana 1,010.84 1.00
Sullana Obra (c.g. Tramo) 138.00 1.00
TOTAL
TALARA - OBRA:
Talara Dv. Talara 9.00 1.00
Dv. Talara Obra (c.g. Tramo) 101.80 1.00

TOTAL
PIURA - OBRA:
Piura Sullana 37.55 1.00
Sullana Obra (c.g. Tramo) 138.00 1.00
TOTAL

352704299.xlsx / DIST_VIRTUAL
NCIAS VIRTUALES

OS DE ABASTECIMIENTO

(OTROS MATERIALES)
(ACERO)
(ASFALTO, PETROLEO)

DE DISTANCIAS VIRTUALES

DISTANCIA VIRTUAL
(KM)
1,148.84
110.80
175.55
tualizacion de Costos Minimos del Transporte de Carga

DISTANCIA VIRTUAL
( KM )

1,010.84
138.00
1,148.84

9.00
101.80

110.80

37.55
138.00
175.55

352704299.xlsx / DIST_VIRTUAL
COSTO DEL FLETE A OBRA

1) SOLIDOS: S/. x Ton

LIMA - OBRA: 1,148.84 > 500


0.15109 x 1,148.84 = 173.58

PIURA - OBRA: 175.55 < 500


24.8935 + 0.1043 x 175.55 = 43.20

2) LIQUIDOS: S/. x Ton

LIMA - OBRA: 1,148.84 > 500


0.211526 x 1,148.84 = 243.01

TALARA - OBRA: 110.80 < 500


34.851 + 0.1418194 x 110.80 = 50.56

ACTUALIZACION A SETIEMBRE 2006

Iu (32) SET 06* 383.87


K = --------------------- = ---------------------= 1.206
Iu (32) NOV. 2002 318.23

* Indice 32 proyectado a Setiembre 2006 con el promedio de los ultimos 12 meses

1) SOLIDOS:
LIMA - OBRA: S/. 0.21 / KG
PIURA - OBRA: S/. 0.05 / KG

352704299.xlsx / FLETE
2) LIQUIDOS:
LIMA - OBRA: S/. 0.29 / KG
TALARA - OBRA: S/. 0.06 / KG

352704299.xlsx / FLETE
DEL FLETE A OBRA

S/. x Kg

0.17358

0.04320

S/. x Kg

0.24301

0.05056

ACION A SETIEMBRE 2006

352704299.xlsx / FLETE
COSTO DE FLETE DE TUBERIAS LIMA-BARRANCA

PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE PRODUCCION DE AGUA POTABLE EN LAS ZONAS CENTRO Y NORTE DE LA CIUDAD DE BARRANCA-LIMA

DN CANTIDAD
160 16
200 23
315 152
350 308

I. ESTIMACION DE N DE VIAJES PARA TRASLADO DE TUBERIAS EN CAMION TRAILER

No de VEHICULOS CAPACIDAD Nro. de COSTO


VIAJES (CONTABILIZANDO EL TOTAL DE IDA + VUELTA) EFEC. MOV. EQ. HORAS/VIAJE ALQ/HOR SUB-TOTAL
9 CAMION TRAILER 12 TON 4.00 216.39 7,790.04 IDA
9 CAMION TRAILER 12 TON 4.00 216.39 7,790.04 VUELTA

Monto de Movilizacin 7,790.04


Monto de Desmovilizacin 7,790.04
Incrementos por Seguros, Viaticos, etc 10% 1,558.01

TOTAL S/. 17,138.09


CALCULO DE DISTANCIA MEDIA DE TRANSPORTE

AGUA

FUENTE INFLUENCIA LONG. LONGITUD


ACCESO VOLUMEN
DE AGUA
DESDE HASTA LONG. MEDIA TOTAL
88 + 150 0.000 10.500 10.500 5.25 77.85 83.10 0.002
ACCESO 20.100 27.000 6.900 3.45 61.35 64.80 0.001
0.20 27.000 30.600 3.600 1.80 57.75 59.55 0.001
56.400 59.100 2.700 1.35 29.25 30.60 0.001
59.100 62.100 3.000 1.50 26.25 27.75 0.068
62.100 69.000 6.900 3.45 19.35 22.80 0.003
69.000 74.100 5.100 2.55 14.25 16.80 0.006
74.100 84.900 10.800 5.40 3.45 8.85 427.680
84.900 88.150 3.250 1.63 0.20 1.83 128.300
88.150 89.400 1.250 0.63 0.20 0.83 49.900
90.900 100.800 9.900 4.95 2.95 7.90 392.040
100.800 105.300 4.500 2.25 12.85 15.10 178.200
105.300 111.900 6.600 3.30 17.35 20.65 261.360
111.900 114.900 3.000 1.50 23.95 25.45 0.012
140.100 144.900 4.800 2.40 52.15 54.55 0.324
144.900 158.000 13.100 6.55 56.95 63.50 0.206
TOTALES 1,438.10
DISTANCIA MEDIA DE TRANSPORTE

MEZCLA ASFALTICA

PLANTA DE INFLUENCIA LONG. LONGITUD


ACCESO VOLUMEN
ASFALTO
DESDE HASTA LONG. MEDIA TOTAL
1019 + 000 1,025.600 1,028.000 2.400 1.20 11.00 12.20 864.00
ACCESO 1,031.750 1,035.800 4.050 2.03 18.80 20.83 583.20
2.00 1,035.800 1,043.000 7.200 3.60 26.00 29.60 2,592.00
1,043.000 1,053.100 10.100 5.05 36.10 41.15 1,454.40
1,053.100 1,057.000 3.900 1.95 40.00 41.95 2,106.00
1,057.000 1,058.800 1.800 0.90 41.80 42.70 396.00
1,084.000 1,086.700 2.700 1.35 69.70 71.05 594.00
1182 + 840 1,105.000 1,107.100 2.100 1.05 77.24 78.29 462.00
ACCESO 1,151.500 1,153.000 1.500 0.75 31.34 32.09 256.00
1.50 1,155.100 1,157.200 2.100 1.05 27.14 28.19 462.00
1,170.700 1,172.000 1.300 0.65 12.34 12.99 286.00
CALCULO DE DISTANCIA MEDIA DE TRANSPORTE

1,172.000 1,178.500 6.500 3.25 5.84 9.09 936.00


1,179.300 1,181.400 2.100 1.05 2.94 3.99 1,134.00
1,181.400 1,182.400 1.000 0.50 1.94 2.44 216.00
1,213.900 1,218.000 4.100 2.05 32.56 34.61 902.00
1,233.400 1,234.000 0.600 0.30 52.06 52.36 132.00
TOTALES 13,375.60
DISTANCIA MEDIA DE TRANSPORTE
CALCULO DE DISTANCIA MEDIA DE TRANSPORTE

CALCULO DE DISTANCIA MEDIA DE TRANSPORTE DE MEZCLA A OBRA


(Parchado Superficial y Profundo)

INFLUENCIA LONG. LONGITUD


UBICACIN ACCESO VOLUMEN
DESDE HASTA LONG. MEDIA TOTAL
18 + 900 0.000 10.500 10.500 5.25 1,010.50 1,015.75 0.09
ACCESO 0.000 10.500 10.500 5.25 1,010.50 1,015.75 0.02
0.25 10.500 15.000 4.500 2.25 1,006.00 1,008.25 0.01
18.000 18.900 0.900 0.45 1,002.10 1,002.55 39.76
18.900 20.100 1.200 0.60 -998.10 -997.50 52.70
20.100 27.000 6.900 3.45 -996.90 -993.45 220.16
20.100 27.000 6.900 3.45 -996.90 -993.45 0.01
27.000 30.600 3.600 1.80 -990.00 -988.20 128.59
27.000 30.600 3.600 1.80 -990.00 -988.20 0.01
36.900 40.200 3.300 1.65 -980.10 -978.45 271.50
40.200 45.000 4.800 2.40 -976.80 -974.40 278.10
45.000 56.400 11.400 5.70 -972.00 -966.30 7.00
56.400 59.100 2.700 1.35 -960.60 -959.25 193.20
56.400 59.100 2.700 1.35 -960.60 -959.25 0.01
59.100 62.100 3.000 1.50 -957.90 -956.40 68.59
59.100 62.100 3.000 1.50 -957.90 -956.40 0.68
62.100 69.000 6.900 3.45 -954.90 -951.45 7.20
62.100 69.000 6.900 3.45 -954.90 -951.45 0.03
69.000 74.100 5.100 2.55 -948.00 -945.45 16.04
69.000 74.100 5.100 2.55 -948.00 -945.45 0.06
89.400 90.900 1.500 0.75 -927.60 -926.85 12.38
111.900 114.900 3.000 1.50 -905.10 -903.60 419.06
111.900 114.900 3.000 1.50 -905.10 -903.60 0.12
114.900 117.000 2.100 1.05 -902.10 -901.05 95.00
117.000 129.600 12.600 6.30 -900.00 -893.70 1,134.19
129.600 135.900 6.300 3.15 -887.40 -884.25 1,361.63
135.900 140.100 4.200 2.10 -881.10 -879.00 124.50
140.100 144.900 4.800 2.40 -876.90 -874.50 250.01
140.100 144.900 4.800 2.40 -876.90 -874.50 3.24
144.900 156.000 11.100 5.55 -872.10 -866.55 280.33
144.900 156.000 11.100 5.55 -872.10 -866.55 2.06
TOTALES 4,966.28
DISTANCIA MEDIA DE TRANSPORTE
CALCULO DE DISTANCIA MEDIA DE TRANSPORTE

CALCULO DE DISTANCIA MEDIA DE TRANSPORTE DE MATERIAL DE CANTERA A OBRA


(Base granular, Slurry Seal, Tratamiento Superficial, Tratamiento de Fisuras)

INFLUENCIA LONG. LONGITUD


UBICACIN ACCESO VOLUMEN
DESDE HASTA LONG. MEDIA TOTAL
172 + 000 0.000 10.500 10.500 5.25 161.50 166.75 1.00
ACCESO 10.500 15.000 4.500 2.25 157.00 159.25 1.00
15.000 18.000 3.000 1.50 154.00 155.50 1.00
20.100 27.000 6.900 3.45 145.00 148.45 1.00
27.000 30.600 3.600 1.80 141.40 143.20 1.00
30.600 36.900 6.300 3.15 135.10 138.25 1.00
40.200 45.000 4.800 2.40 127.00 129.40 1.00
45.000 56.400 11.400 5.70 115.60 121.30 1.00
59.100 62.100 3.000 1.50 109.90 111.40 1.00
62.100 69.000 6.900 3.45 103.00 106.45 2.00
69.000 74.100 5.100 2.55 97.90 100.45 1.00
74.100 84.900 10.800 5.40 87.10 92.50 2.00
84.900 89.400 4.500 2.25 82.60 84.85 2.00
89.400 90.900 1.500 0.75 81.10 81.85 1.00
90.900 100.800 9.900 4.95 71.20 76.15 2.00
100.800 105.300 4.500 2.25 66.70 68.95 2.00
105.300 111.900 6.600 3.30 60.10 63.40 2.00
111.900 114.900 3.000 1.50 57.10 58.60 2.00
114.900 117.000 2.100 1.05 55.00 56.05 2.00
117.000 129.600 12.600 6.30 42.40 48.70 1.00
129.600 135.900 6.300 3.15 36.10 39.25 1.00
135.900 140.100 4.200 2.10 31.90 34.00 1.00
140.100 144.900 4.800 2.40 27.10 29.50 2.00
144.900 156.000 11.100 5.55 16.00 21.55 1.00
TOTALES 22.00
DISTANCIA MEDIA DE TRANSPORTE
CALCULO DE DISTANCIA MEDIA DE TRANSPORTE

CALCULO DE DISTANCIA MEDIA DE TRANSPORTE DE ELIMINACION DE MATERIAL A BOTADEROS


(Parchado Superficial, Profundo y Remocin de Carpeta)

INFLUENCIA LONG. LONGITUD


UBICACIN ACCESO VOLUMEN
DESDE HASTA LONG. MEDIA TOTAL
61 + 450 0.000 10.500 10.500 5.25 50.95 56.20 0.09
ACCESO 0.000 10.500 10.500 5.25 50.95 56.20 0.02
0.000 10.500 10.500 5.25 50.95 56.20 0.36
10.500 15.000 4.500 2.25 46.45 48.70 0.01
18.000 18.900 0.900 0.45 42.55 43.00 39.76
18.900 20.100 1.200 0.60 41.35 41.95 52.70
20.100 27.000 6.900 3.45 34.45 37.90 220.16
20.100 27.000 6.900 3.45 34.45 37.90 0.01
20.100 27.000 6.900 3.45 34.45 37.90 0.20
27.000 30.600 3.600 1.80 30.85 32.65 128.59
27.000 30.600 3.600 1.80 30.85 32.65 0.01
27.000 30.600 3.600 1.80 30.85 32.65 0.24
36.900 40.200 3.300 1.65 21.25 22.90 271.50
40.200 45.000 4.800 2.40 16.45 18.85 278.10
45.000 56.400 11.400 5.70 5.05 10.75 7.00
56.400 59.100 2.700 1.35 2.35 3.70 193.20
56.400 59.100 2.700 1.35 2.35 3.70 0.01
56.400 59.100 2.700 1.35 2.35 3.70 0.22
59.100 61.450 2.350 1.18 0.00 1.18 53.50
59.100 61.450 2.350 1.18 0.00 1.18 0.53
59.100 61.450 2.350 1.18 0.00 1.18 10.56
61.450 62.100 0.650 0.33 0.00 0.33 15.09
61.450 62.100 0.650 0.33 0.00 0.33 0.15
61.450 62.100 0.650 0.33 0.00 0.33 2.98
62.100 69.000 6.900 3.45 0.65 4.10 7.20
62.100 69.000 6.900 3.45 0.65 4.10 0.03
62.100 69.000 6.900 3.45 0.65 4.10 0.64
69.000 74.100 5.100 2.55 7.55 10.10 16.04
69.000 74.100 5.100 2.55 7.55 10.10 0.06
69.000 74.100 5.100 2.55 7.55 10.10 1.24
74.100 84.900 10.800 5.40 12.65 18.05 4,860.00
84.900 89.400 4.500 2.25 23.45 25.70 2,025.00
89.400 90.900 1.500 0.75 27.95 28.70 12.38
90.900 100.800 9.900 4.95 29.45 34.40 4,455.00
100.800 105.300 4.500 2.25 39.35 41.60 2,025.00
105.300 111.900 6.600 3.30 43.85 47.15 2,970.00
111.900 114.900 3.000 1.50 50.45 51.95 419.06
111.900 114.900 3.000 1.50 50.45 51.95 0.12
111.900 114.900 3.000 1.50 50.45 51.95 0.38
CALCULO DE DISTANCIA MEDIA DE TRANSPORTE

114.900 117.000 2.100 1.05 53.45 54.50 95.00


117.000 129.600 12.600 6.30 55.55 61.85 1,134.19
129.600 135.900 6.300 3.15 68.15 71.30 1,361.63
135.900 140.100 4.200 2.10 74.45 76.55 124.50
140.100 144.900 4.800 2.40 78.65 81.05 250.01
140.100 144.900 4.800 2.40 78.65 81.05 3.24
140.100 144.900 4.800 2.40 78.65 81.05 21.60
144.900 156.000 11.100 5.55 83.45 89.00 280.33
144.900 156.000 11.100 5.55 83.45 89.00 2.06
144.900 156.000 11.100 5.55 83.45 89.00 13.71
TOTALES 21,353.41
DISTANCIA MEDIA DE TRANSPORTE
NCIA MEDIA DE TRANSPORTE

LONGITUD

PONDERADA
0.17
0.06
0.06
0.03
1.88
0.07
0.10
3,784.97
234.79
41.42
3,097.12
2,690.82
5,397.08
0.31
17.67
13.06
15,279.61
10.62

LONGITUD
PONDERADA
10,540.80
12,148.06
76,723.20
59,848.56
88,346.70
16,909.20
42,203.70
36,169.98
8,215.04
13,023.78
3,715.14
NCIA MEDIA DE TRANSPORTE

8,508.24
4,524.66
527.04
31,218.22
6,911.52
419,533.84
31.37
NCIA MEDIA DE TRANSPORTE

LONGITUD
PONDERADA
91.42
18.28
10.08
39,859.18
-52,570.44
-218,717.95
-9.93
-127,072.64
-11.86
-265,649.18
-270,980.64
-6,764.10
-185,327.10
-10.55
-65,599.48
-647.48
-6,850.44
-30.45
-15,165.02
-58.62
-11,474.40
-378,662.62
-108.43
-85,599.75
-1,013,625.60
-1,204,021.33
-109,435.50
-218,633.75
-2,833.38
-242,919.96
-1,782.49
-4,444,584.13
-894.95
NCIA MEDIA DE TRANSPORTE

LONGITUD
PONDERADA
166.75
159.25
155.50
148.45
143.20
138.25
129.40
121.30
111.40
212.90
100.45
185.00
169.70
81.85
152.30
137.90
126.80
117.20
112.10
48.70
39.25
34.00
59.00
21.55
1,385.80
62.99
NCIA MEDIA DE TRANSPORTE

E DE ELIMINACION DE MATERIAL A BOTADEROS

LONGITUD
PONDERADA
5.06
1.01
20.23
0.49
1,709.59
2,210.86
8,344.06
0.38
7.58
4,198.46
0.39
7.84
6,217.35
5,242.19
75.25
714.84
0.04
0.81
63.13
0.62
12.46
4.98
0.05
0.98
29.52
0.13
2.62
162.00
0.63
12.52
87,723.00
52,042.50
355.31
153,252.00
84,240.00
140,035.50
21,770.17
6.23
19.95
NCIA MEDIA DE TRANSPORTE

5,177.50
70,149.65
97,084.22
9,530.48
20,263.31
262.60
1,750.68
24,949.37
183.07
1,220.19
799,061.80
37.42
PROYECTO: ESTUDIO DEFINITIVO PARA EL MANTENIMIENTO PERIODICO DE LA RED VIAL NACIONAL
TRAMO: CARRETERA TRANSVERSAL PATIVILCA-CONOCOCHA-CHOQUECHACA. KM 0+000 - KM 275+000
CLIENTE: PROVIAS
LUGAR: HUARAZ

RENDIMIENTO DE LAS PARTIDAS DE TRANSPORTE

MAT GRAN Y EXCED MAT GRAN Y EXCED MATER. ASFALTICO


BASES DE CALCULO UND HASTA 1 KM DESPUES DE 1KM HASTA 1KM
( 1 KM ) ( 1 KM ) ( 1 KM )

DISTANCIA MEDIA Km. 1 1 1


VELOCIDAD CARGADO. Km/Hr. 25 30 25
VELOCIDAD DESCARGADO. Km/Hr. 35 40 35
TIEMPO CARGA Y DESCARGA. Min. 4.61 0 18.77
TIEMPO RECORRIDO CARGADO Form. 60 d / 25 60 d / 30 60 d / 25
TIEMPO RECORRIDO DESCARGADO Form. 60 d / 35 60 d / 40 60 d / 35
TIEMPO RECORRIDO Min. 4.11 3.5 4.11
CICLO Form. 4.61 + 4.11d 0.00 + 3.50d 18.77 + 4.11d
CICLO Min. 8.72 3.50 22.88
TIEMPO TRABAJADO POR DIA Min. 480 480 480
EFICIENCIA % 90.00% 90.00% 75.00%
TIEMPO UTIL TRABAJADO Min. 432 432 360
VOLUMEN DEL VOLQUETE M3. 15 15 15
NUMERO DE VIAJES AL DIA Un. 50 123 16
VOLUMEN TRANSPORTADO POR DIA M3. 750.00 1845.00 240.00
ESPONJAMIENTO 1.20 1.20 1.20
RENDIMIENTO m3xkm 625 1,538 200
ENTO DE LAS PARTIDAS DE TRANSPORTE

MATER. ASFALTICO
DESPUES DE 1KM
( 1 KM )

1
30
40
0
60 d / 30
60 d / 40
3.5
0.00 + 3.50d
3.50
480
75.00%
360
15
103
1545.00
1.20
1,288
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
1.00 OBRAS PRELIMINARES

1.01 MOVILIZ. Y DESMOVILIZACION GLB 1.00 440,602.00


1.02 ROCE Y LIMPIEZA M2 150,000.00 0.69

2.00 MOVIMIENTO DE TIERRAS

2.01 CORTE EN MATERIAL NO CLASIFICADO M3 785,115.00 12.06


2.02 REEMPLAZO DE MATERIAL INADECUADO M3 2,500.00 21.32
2.03 PERFILADO Y COMPACTACION M2 170,000.00 0.93
2.04 CONFORMACION DE TERRAPLENES M3 290,000.00 7.09
2.05 TERRAPLENES CON MAT.DE CANTERA M3 50,750.00 13.51
2.06 REMOCION DE DERRUMBES M3 20,000.00 4.91

3.00 PAVIMENTO

3.01 SUB BASE GRANULAR M3 85,900.00 28.77


3.02 BASE GRANULAR e = 0.20m M3 123,200.00 37.83
3.03 IMPRIMACION M2 589,300.00 1.94
3.04 TRATAMIENTO SUPERFICIAL BICAPA M2 503,300.00 9.06

4.00 TRANSPORTE

4.01 TRANSPORTE HASTA 1KM M3-KM 680,000.00 7.62


4.02 TRANSPORTE MATERIAL DESPUES DE 1 KM M3-KM 2,650,000.00 1.33

5.00 DRENAJE

5.01 LIMPIEZA DE ALCANTARILLAS M3 2,000.00 14.38


5.02 LIMPIEZA DE CAUCES M3 2,000.00 9.14
5.03 ELIMINACION DE ALCANT. METALICAS M 300.00 6.83
5.04 DEMOLICION DE CONCRETO M3 500.00 65.09
5.05 EXCAVACION PARA ESTRUCTURAS M3 15,000.00 26.34
5.06 RELLENO PARA ESTRUCTURAS M3 10,000.00 46.31
5.07.01 ALCANTARILLA TMC D = 36" M 1,000.00 321.42
5.07.02 ALCANTARILLA TMC D = 48" M 500.00 487.36
5.07.03 ALCANTARILLA TMC D = 60" M 100.00 739.98
5.07.04 ALCANTARILLA TMC D = 72" M 100.00 931.88
5.07.05 ALCANTARILLA TMC D = 96" M 25.00 1,437.29

:\OLLANTA\352704299.xlsx\PPTO
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
5.07.06 ALCANTARILLA TMC D =130" M 25.00 1,946.68
5.08.01 CONC. CICLOPEO F'C=140 KG/CM2 + 30%P.G. M3 800.00 232.52
5.08.02 CONCRETO SIMPLE F'C=175 K/CM2 M3 800.00 308.25
5.08.03 CONCRETO SIMPLE F'C=210 K/CM2 M3 800.00 335.93
5.09 ENCOFRADO Y DESENCOFRADO M2 5,000.00 31.09
5.10 ACERO DE REFUERZO KG 10,000.00 2.50
5.11 CANAL ALIVIADERO EN ALCANTARILLAS M 200.00 27.56
5.12 PROTECCION DE CAUCES M3 500.00 136.54
5.13 JUNTA PARA BADENES M 100.00 53.01
5.14.01 CANAL PROVISIONAL DURANTE CONSTRUCCION M 500.00 63.37
5.14.02 REPOSICION DE CANALES DE RIEGO M 500.00 112.61

:\OLLANTA\352704299.xlsx\PPTO
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
5.15 SUBDREN LATERAL M 2,000.00 286.34
5.16 TUBERIA DE DESCARGA EN SUBDREN M 200.00 158.78
5.17 CUNETAS REVESTIDAS TRIANGULARES M 55,000.00 75.43
5.18.01 CUNETAS RECTANGULARES TIPO 1 M 2,500.00 218.65
5.18.02 CUNETAS RECTANGULARES TIPO 2 M 2,500.00 260.47
5.19 ZANJAS DE CORONACION SIN REV. M 2,000.00 23.92
5.20 ZANJA DE CORONACION REVESTIDA M 500.00 112.35
5.21 CANAL ALIVIADERO EN TALUD SUPERIOR M 50.00 98.56
5.22 ZANJA DE DRENAJE M 300.00 34.60
5.23 GAVION TIPO CAJA M3 2,000.00 138.23
5.24 GAVION TIPO COLCHON M3 200.00 255.94
5.25 GEOTEXTIL SEPARADOR M2 200.00 4.78
5.26 ENROCADO DE PROTECCION M3 2,000.00 56.46

6.00 OBRAS DE ARTE

6.01 MURO DE CONCRETO CICLOPEO M3 10,000.00 384.32


6.02 EXCAVACION PARA ESTRUCTURAS M3 20,000.00 26.34
6.03 RELLENO PARA ESTRUCTURAS M3 10,000.00 46.31
6.04 ENCOFRADO Y DESENCOFRADO M2 20,000.00 31.09
6.05 CONC. CICLOPEO F'C=140 KG/CM2 + 30%P.G. M3 3,000.00 232.52
6.06 CONCRETO SIMPLE F'C=210 K/CM2 M3 3,000.00 335.93

7.00 SEALIZACION Y SEGURIDAD VIAL

7.01 MARCAS SOBRE EL PAVIMENTO M2 20,000.00 19.95


7.02 SEALES PREVENTIVAS UND 152.00 467.01
7.03 SEALES REGLAMENTARIAS UND 42.00 424.12
7.04.01 SEALES INFORMATIVAS M2 16.00 457.47
7.04.02 CIMENTACION DE SEALES INFORMATIVAS M3 20.00 496.29
7.04.03 TUBO D = 3" M 150.00 101.35
7.05 POSTES KILOMETRICOS UND 16.00 156.14
7.06 POSTES DELINEADORES UND 2,200.00 129.13
7.07 GUARDAVIAS NUEV0S (INCLUYE TERMINAL) M 1,680.00 132.39
7.08 PINTADO PARAPETOS MUROS/ALCANT. M2 240.00 8.00

8.00 IMPACTO AMBIENTAL

8.01 REHAB. AREA AFECTADA POR CONST.CAMPAMENT GLB 1.00 39,791.20

:\OLLANTA\352704299.xlsx\PPTO
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
8.02 REHAB. PATIO DE MAQUINARIAS Y EQUIPOS GLB 1.00 22,941.23
8.03 REHAB. CANTERAS (INC.CHANC/ZARAN) UND 6.00 29,117.94
8.04 REHAB. DE BOTADEROS UND 15.00 21,617.94
8.05 CONFORM.DE MATERIAL EN BOTADEROS M3 522,500.00 2.72
8.06 DESACTIVACION DE POZAS DE ASFALTO GLB 1.00 2,679.92
8.07 REHAB. ZONAS DESTINADAS COMO DESVIOS GLB 1.00 4,988.23
8.08 SEALIZACION AMBIENTAL GLB 1.00 25,799.26
8.09 EDUCACION AMBIENTAL GLB 1.00 1,346.60
8.10 EXPROPIACION DE ZONAS RURALES M2 500.00 125.47
8.11 EXPROPIACION DE ZONAS AGRICOLAS M2 1,000.00 0.81

:\OLLANTA\352704299.xlsx\PPTO
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
9.00 VARIOS

9.01 REUBIC.DE VIVIENDAS AFECTADAS M2 200.00 866.33


9.02 REUBIC.DE POSTES DE LUZ UND 20.00 885.84
9.03 REUBIC.DE POSTES CON TRANSFORMADOR UND 20.00 915.60
9.04 PROFUNDIZ. TUBERIA AGUA POTABLE M 100.00 44.00
9.05 REFORZ. TUBERIA DESAGUE M 100.00 26.12
9.06 ELEVACION DE BUZONES UND 20.00 130.12
9.07 MANTENIMIENTO DE TRANSITO DIA 240.00 664.85

COSTO DIRECTO

GASTOS GENERALES 7.459896%

UTILIDAD 10.00%

SUB_TOTAL

I.G.V. 18.00%

TOTAL INC. I.G.V.

:\OLLANTA\352704299.xlsx\PPTO
RA
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
544,102.00

440,602.00
103,500.00

12,519,819.40

9,468,486.90
53,300.00
158,100.00
2,056,100.00
685,632.50
98,200.00

12,835,139.00

2,471,343.00
4,660,656.00
1,143,242.00
4,559,898.00

8,706,100.00

5,181,600.00
3,524,500.00

9,317,335.25

28,760.00
18,280.00
2,049.00
32,545.00
395,100.00
463,100.00
321,420.00
243,680.00
73,998.00
93,188.00
35,932.25

:\OLLANTA\352704299.xlsx\PPTO
RA
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
48,667.00
186,016.00
246,600.00
268,744.00
155,450.00
25,000.00
5,512.00
68,270.00
5,301.00
31,685.00
56,305.00

:\OLLANTA\352704299.xlsx\PPTO
RA
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
572,680.00
31,756.00
4,148,650.00
546,625.00
651,175.00
47,840.00
56,175.00
4,928.00
10,380.00
276,460.00
51,188.00
956.00
112,920.00

7,160,250.00

3,843,200.00
526,800.00
463,100.00
621,800.00
697,560.00
1,007,790.00

1,031,165.82

399,000.00
70,985.52
17,813.04
7,319.52
9,925.80
15,202.50
2,498.24
284,086.00
222,415.20
1,920.00

2,081,268.18

39,791.20

:\OLLANTA\352704299.xlsx\PPTO
RA
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
22,941.23
174,707.64
324,269.10
1,421,200.00
2,679.92
4,988.23
25,799.26
1,346.60
62,735.00
810.00

:\OLLANTA\352704299.xlsx\PPTO
RA
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
378,473.20

173,266.00
17,716.80
18,312.00
4,400.00
2,612.00
2,602.40
159,564.00

54,573,652.85

4,071,138.00

5,457,365.29

64,102,156.14

11,538,388.11

75,640,544.25

:\OLLANTA\352704299.xlsx\PPTO
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA ( ALTERNATIVA 02 )


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
1.00 OBRAS PRELIMINARES

1.01 MOVILIZ. Y DESMOVILIZACION GLB 1.00 440,602.00


1.02 ROCE Y LIMPIEZA M2 150,000.00 0.69

2.00 MOVIMIENTO DE TIERRAS

2.01 CORTE EN MATERIAL NO CLASIFICADO M3 785,115.00 12.06


2.02 REEMPLAZO DE MATERIAL INADECUADO M3 2,500.00 21.32
2.03 PERFILADO Y COMPACTACION M2 170,000.00 0.93
2.04 CONFORMACION DE TERRAPLENES M3 290,000.00 7.09
2.05 TERRAPLENES CON MAT.DE CANTERA M3 50,750.00 13.51
2.06 REMOCION DE DERRUMBES M3 20,000.00 4.91

3.00 PAVIMENTO

3.01 SUB BASE GRANULAR M3 85,900.00 28.77


3.02 BASE GRANULAR e = 0.20m M3 123,200.00 37.83

4.00 TRANSPORTE

4.01 TRANSPORTE HASTA 1KM M3-KM 670,000.00 7.62


4.02 TRANSPORTE MATERIAL DESPUES DE 1 KM M3-KM 2,500,000.00 1.33

5.00 DRENAJE

5.01 LIMPIEZA DE ALCANTARILLAS M3 2,000.00 14.38


5.02 LIMPIEZA DE CAUCES M3 2,000.00 9.14
5.03 ELIMINACION DE ALCANT. METALICAS M 300.00 6.83
5.04 DEMOLICION DE CONCRETO M3 500.00 65.09
5.05 EXCAVACION PARA ESTRUCTURAS M3 15,000.00 26.34
5.06 RELLENO PARA ESTRUCTURAS M3 10,000.00 46.31
5.07.01 ALCANTARILLA TMC D = 36" M 1,000.00 321.42
5.07.02 ALCANTARILLA TMC D = 48" M 500.00 487.36
5.07.03 ALCANTARILLA TMC D = 60" M 100.00 739.98
5.07.04 ALCANTARILLA TMC D = 72" M 100.00 931.88
5.07.05 ALCANTARILLA TMC D = 96" M 25.00 1,437.29
5.07.06 ALCANTARILLA TMC D =130" M 25.00 1,946.68
5.08.01 CONC. CICLOPEO F'C=140 KG/CM2 + 30%P.G. M3 800.00 232.52

:\OLLANTA\352704299.xlsx\PPTO_ALT2
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA ( ALTERNATIVA 02 )


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
5.08.02 CONCRETO SIMPLE F'C=175 K/CM2 M3 800.00 308.25
5.08.03 CONCRETO SIMPLE F'C=210 K/CM2 M3 800.00 335.93
5.09 ENCOFRADO Y DESENCOFRADO M2 5,000.00 31.09
5.10 ACERO DE REFUERZO KG 10,000.00 2.50
5.11 CANAL ALIVIADERO EN ALCANTARILLAS M 200.00 27.56
5.12 PROTECCION DE CAUCES M3 500.00 136.54
5.13 JUNTA PARA BADENES M 100.00 53.01
5.14.01 CANAL PROVISIONAL DURANTE CONSTRUCCION M 500.00 63.37
5.14.02 REPOSICION DE CANALES DE RIEGO M 500.00 112.61
5.15 SUBDREN LATERAL M 2,000.00 286.34
5.16 TUBERIA DE DESCARGA EN SUBDREN M 200.00 158.78

:\OLLANTA\352704299.xlsx\PPTO_ALT2
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA ( ALTERNATIVA 02 )


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
5.17 CUNETAS REVESTIDAS TRIANGULARES M 55,000.00 75.43
5.18.01 CUNETAS RECTANGULARES TIPO 1 M 2,500.00 218.65
5.18.02 CUNETAS RECTANGULARES TIPO 2 M 2,500.00 260.47
5.19 ZANJAS DE CORONACION SIN REV. M 2,000.00 23.92
5.20 ZANJA DE CORONACION REVESTIDA M 500.00 112.35
5.21 CANAL ALIVIADERO EN TALUD SUPERIOR M 50.00 98.56
5.22 ZANJA DE DRENAJE M 300.00 34.60
5.23 GAVION TIPO CAJA M3 2,000.00 138.23
5.24 GAVION TIPO COLCHON M3 200.00 255.94
5.25 GEOTEXTIL SEPARADOR M2 200.00 4.78
5.26 ENROCADO DE PROTECCION M3 2,000.00 56.46

6.00 OBRAS DE ARTE

6.01 MURO DE CONCRETO CICLOPEO M3 10,000.00 384.32


6.02 EXCAVACION PARA ESTRUCTURAS M3 20,000.00 26.34
6.03 RELLENO PARA ESTRUCTURAS M3 10,000.00 46.31
6.04 ENCOFRADO Y DESENCOFRADO M2 20,000.00 31.09
6.05 CONC. CICLOPEO F'C=140 KG/CM2 + 30%P.G. M3 3,000.00 232.52
6.06 CONCRETO SIMPLE F'C=210 K/CM2 M3 3,000.00 335.93

7.00 SEALIZACION Y SEGURIDAD VIAL

7.01 MARCAS SOBRE EL PAVIMENTO M2 20,000.00 19.95


7.02 SEALES PREVENTIVAS UND 152.00 467.01
7.03 SEALES REGLAMENTARIAS UND 42.00 424.12
7.04.01 SEALES INFORMATIVAS M2 16.00 457.47
7.04.02 CIMENTACION DE SEALES INFORMATIVAS M3 20.00 496.29
7.04.03 TUBO D = 3" M 150.00 101.35
7.05 POSTES KILOMETRICOS UND 16.00 156.14
7.06 POSTES DELINEADORES UND 2,200.00 129.13
7.07 GUARDAVIAS NUEV0S (INCLUYE TERMINAL) M 1,680.00 132.39
7.08 PINTADO PARAPETOS MUROS/ALCANT. M2 240.00 8.00

8.00 IMPACTO AMBIENTAL

8.01 REHAB. AREA AFECTADA POR CONST.CAMPAMENT GLB 1.00 39,791.20


8.02 REHAB. PATIO DE MAQUINARIAS Y EQUIPOS GLB 1.00 22,941.23
8.03 REHAB. CANTERAS (INC.CHANC/ZARAN) UND 6.00 29,117.94

:\OLLANTA\352704299.xlsx\PPTO_ALT2
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA ( ALTERNATIVA 02 )


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
8.04 REHAB. DE BOTADEROS UND 15.00 21,617.94
8.05 CONFORM.DE MATERIAL EN BOTADEROS M3 522,500.00 2.72
8.06 DESACTIVACION DE POZAS DE ASFALTO GLB 1.00 2,679.92
8.07 REHAB. ZONAS DESTINADAS COMO DESVIOS GLB 1.00 4,988.23
8.08 SEALIZACION AMBIENTAL GLB 1.00 25,799.26
8.09 EDUCACION AMBIENTAL GLB 1.00 1,346.60
8.10 EXPROPIACION DE ZONAS RURALES M2 500.00 125.47
8.11 EXPROPIACION DE ZONAS AGRICOLAS M2 1,000.00 0.81

9.00 VARIOS

:\OLLANTA\352704299.xlsx\PPTO_ALT2
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA ( ALTERNATIVA 02 )


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
9.01 REUBIC.DE VIVIENDAS AFECTADAS M2 200.00 866.33
9.02 REUBIC.DE POSTES DE LUZ UND 20.00 885.84
9.03 REUBIC.DE POSTES CON TRANSFORMADOR UND 20.00 915.60
9.04 PROFUNDIZ. TUBERIA AGUA POTABLE M 100.00 44.00
9.05 REFORZ. TUBERIA DESAGUE M 100.00 26.12
9.06 ELEVACION DE BUZONES UND 20.00 130.12
9.07 MANTENIMIENTO DE TRANSITO DIA 240.00 664.85

COSTO DIRECTO

GASTOS GENERALES 8.377721%

UTILIDAD 10.00%

SUB_TOTAL

I.G.V. 18.00%

TOTAL INC. I.G.V.

:\OLLANTA\352704299.xlsx\PPTO_ALT2
RNATIVA 02 )
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
544,102.00

440,602.00
103,500.00

12,519,819.40

9,468,486.90
53,300.00
158,100.00
2,056,100.00
685,632.50
98,200.00

7,131,999.00

2,471,343.00
4,660,656.00

8,430,400.00

5,105,400.00
3,325,000.00

9,317,335.25

28,760.00
18,280.00
2,049.00
32,545.00
395,100.00
463,100.00
321,420.00
243,680.00
73,998.00
93,188.00
35,932.25
48,667.00
186,016.00

:\OLLANTA\352704299.xlsx\PPTO_ALT2
RNATIVA 02 )
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
246,600.00
268,744.00
155,450.00
25,000.00
5,512.00
68,270.00
5,301.00
31,685.00
56,305.00
572,680.00
31,756.00

:\OLLANTA\352704299.xlsx\PPTO_ALT2
RNATIVA 02 )
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
4,148,650.00
546,625.00
651,175.00
47,840.00
56,175.00
4,928.00
10,380.00
276,460.00
51,188.00
956.00
112,920.00

7,160,250.00

3,843,200.00
526,800.00
463,100.00
621,800.00
697,560.00
1,007,790.00

1,031,165.82

399,000.00
70,985.52
17,813.04
7,319.52
9,925.80
15,202.50
2,498.24
284,086.00
222,415.20
1,920.00

2,081,268.18

39,791.20
22,941.23
174,707.64

:\OLLANTA\352704299.xlsx\PPTO_ALT2
RNATIVA 02 )
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
324,269.10
1,421,200.00
2,679.92
4,988.23
25,799.26
1,346.60
62,735.00
810.00

378,473.20

:\OLLANTA\352704299.xlsx\PPTO_ALT2
RNATIVA 02 )
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
173,266.00
17,716.80
18,312.00
4,400.00
2,612.00
2,602.40
159,564.00

48,594,812.85

4,071,138.00

4,859,481.29

57,525,432.14

10,354,577.79

67,880,009.93

:\OLLANTA\352704299.xlsx\PPTO_ALT2
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
1.00 OBRAS PRELIMINARES

1.01 MOVILIZ. Y DESMOVILIZACION GLB 1.00 #REF!


1.02 ROCE Y LIMPIEZA M2 170,000.00 0.29

2.00 MOVIMIENTO DE TIERRAS

2.01 CORTE EN MATERIAL NO CLASIFICADO M3 1,009,645.00 11.05


2.02 REEMPLAZO DE MATERIAL INADECUADO M3 2,500.00 20.40
2.03 PERFILADO Y COMPACTACION M2 170,000.00 0.93
2.04 CONFORMACION DE TERRAPLENES M3 256,348.00 8.05
2.05 REMOCION DE DERRUMBES M3 20,000.00 4.53
2.06 CONFORM.DE MATERIAL EN BOTADEROS M3 828,500.00 2.22

3.00 PAVIMENTO

3.01 SUB BASE GRANULAR M3 82,005.00 23.62


3.02 BASE GRANULAR e = 0.20m M3 117,170.00 31.16
3.03 IMPRIMACION M2 542,030.00 1.67
3.04 TRATAMIENTO SUPERFICIAL BICAPA M2 497,295.00 8.29

4.00 TRANSPORTE

4.01 TRANSPORTE HASTA 1KM M3-KM 938,555.00 4.55


4.02 TRANSPORTE MATERIAL DESPUES DE 1 KM M3-KM 3,169,290.00 1.13

5.00 DRENAJE

5.01 LIMPIEZA DE ALCANTARILLAS M3 2,000.00 12.32


5.02 LIMPIEZA DE CAUCES M3 2,000.00 7.59
5.03 ELIMINACION DE ALCANT. METALICAS M 300.00 6.77
5.04 DEMOLICION DE CONCRETO M3 500.00 24.18
5.05 EXCAVACION PARA ESTRUCTURAS M3 15,000.00 26.28
5.06 RELLENO PARA ESTRUCTURAS M3 10,000.00 27.97
5.07.01 ALCANTARILLA TMC D = 36" M 1,000.00 314.94
5.07.02 ALCANTARILLA TMC D = 48" M 500.00 478.43
5.07.03 ALCANTARILLA TMC D = 60" M 100.00 728.29
5.07.04 ALCANTARILLA TMC D = 72" M 100.00 917.71
5.07.05 ALCANTARILLA TMC D =130" M 25.00 1,920.81

:\OLLANTA\352704299.xlsx\PPTO (2)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
5.08.01 CONC. CICLOPEO F'C=175 KG/CM2 + 30%P.M. M3 800.00 176.21
5.08.02 CONCRETO SIMPLE F'C=210 K/CM2 M3 800.00 261.82
5.09 ENCOFRADO Y DESENCOFRADO M2 5,000.00 30.96
5.10 ACERO DE REFUERZO KG 10,000.00 2.47
5.11 ALIVIADERO EN ALCANTARILLAS M2 200.00 73.96
5.12 PROTECCION DE CAUCES EN BADENES M3 500.00 47.24
5.13 JUNTA PARA BADENES M 100.00 14.16
5.14.01 CANAL PROVISIONAL DURANTE CONSTRUCCION M 500.00 51.18
5.14.02 REPOSICION DE CANALES DE RIEGO M 500.00 96.54
5.15 SUBDREN LATERAL M 2,000.00 157.08
5.16 TUBERIA DE DESCARGA EN SUBDREN M 200.00 122.18

:\OLLANTA\352704299.xlsx\PPTO (2)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
5.17 CUNETAS REVESTIDAS TRIANGULARES M 55,000.00 60.75
5.18.01 CUNETAS RECTANGULARES TIPO 1 M 2,500.00 117.75
5.18.02 CUNETAS RECTANGULARES TIPO 2 M 2,500.00 127.54
5.19 ZANJAS DE CORONACION SIN REVESTIR M 2,000.00 14.73
5.20 ZANJA DE CORONACION REVESTIDA M 500.00 53.51
5.21 REVESTIMIENTO CON PIEDRA EMBOQUILLADA M2 50.00 40.70
5.22 ZANJA DE DRENAJE M 300.00 37.92
5.23 GAVION TIPO CAJA M3 2,000.00 123.37
5.24 GAVION TIPO COLCHON M3 200.00 240.82
5.25 GEOTEXTIL SEPARADOR M2 200.00 4.78
5.26 ENROCADO DE PROTECCION M3 2,000.00 37.59

6.00 OBRAS DE ARTE

6.01 MURO DE CONCRETO CICLOPEO M3 22,000.00 334.21


6.02 EXCAVACION PARA ESTRUCTURAS M3 40,000.00 26.28
6.03 RELLENO PARA ESTRUCTURAS M3 20,000.00 27.97
6.04 ENCOFRADO Y DESENCOFRADO M2 40,000.00 30.96
6.05 CONC. CICLOPEO F'C=140 KG/CM2 + 30%P.G. M3 3,000.00 169.21
6.06 CONCRETO SIMPLE F'C=210 K/CM2 M3 3,000.00 261.82

7.00 SEALIZACION Y SEGURIDAD VIAL

7.01 MARCAS SOBRE EL PAVIMENTO M2 20,000.00 19.89


7.02 SEALES PREVENTIVAS UND 152.00 322.83
7.03 SEALES REGLAMENTARIAS UND 42.00 299.81
7.04.01 SEALES INFORMATIVAS M2 16.00 364.83
7.04.02 CIMENTACION DE SEALES INFORMATIVAS M3 20.00 299.87
7.04.03 TUBO D = 3" M 150.00 119.24
7.05 POSTES KILOMETRICOS UND 16.00 100.43
7.06 POSTES DELINEADORES UND 2,200.00 68.12
7.07 GUARDAVIAS NUEV0S (INCLUYE TERMINAL) M 1,680.00 127.20
7.08 PINTADO PARAPETOS MUROS/ALCANT. M2 240.00 8.00

8.00 IMPACTO AMBIENTAL

8.01 REHAB. AREA AFECTADA POR CONST.CAMPAMENT GLB 1.00 21,242.90


8.02 REHAB. PATIO DE MAQUINARIAS Y EQUIPOS GLB 1.00 24,431.13
8.03 REHAB. CANTERAS (INC.CHANC/ZARAN) UND 6.00 32,376.28

:\OLLANTA\352704299.xlsx\PPTO (2)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
8.04 REHAB. DE BOTADEROS UND 15.00 24,876.28
8.06 DESACTIVACION DE POZAS DE ASFALTO GLB 1.00 2,507.10
8.07 REHAB. ZONAS DESTINADAS COMO DESVIOS GLB 1.00 4,803.68
8.08 SEALIZACION AMBIENTAL GLB 1.00 24,115.04
8.09 EDUCACION AMBIENTAL GLB 1.00 1,346.60
8.10 EXPROPIACION DE ZONAS RURALES M2 500.00 123.76
8.11 EXPROPIACION DE ZONAS AGRICOLAS M2 1,000.00 #REF!

9.00 VARIOS

9.01 REUBIC.DE VIVIENDAS AFECTADAS M2 200.00 342.33

:\OLLANTA\352704299.xlsx\PPTO (2)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO PRECIO
UNITARIO
( SOLES )
9.02 REUBIC.DE POSTES DE LUZ UND 20.00 885.84
9.03 REUBIC.DE POSTES CON TRANSFORMADOR UND 20.00 915.60
9.04 PROFUNDIZ. TUBERIA AGUA POTABLE M 100.00 43.45
9.05 REFORZ. TUBERIA DESAGUE M 100.00 25.66
9.06 ELEVACION DE BUZONES UND 20.00 114.41
9.07 MANTENIMIENTO DE TRANSITO DIA 240.00 649.91

COSTO DIRECTO

GASTOS GENERALES #REF!

UTILIDAD 10.00%

SUB_TOTAL

I.G.V. 18.00%

TOTAL INC. I.G.V.

:\OLLANTA\352704299.xlsx\PPTO (2)
RA
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
#REF!

#REF!
49,300.00

15,359,148.65

11,156,577.25
51,000.00
158,100.00
2,063,601.40
90,600.00
1,839,270.00

10,615,740.95

1,936,958.10
3,651,017.20
905,190.10
4,122,575.55

7,851,722.95

4,270,425.25
3,581,297.70

6,871,965.25

24,640.00
15,180.00
2,031.00
12,090.00
394,200.00
279,700.00
314,940.00
239,215.00
72,829.00
91,771.00
48,020.25

:\OLLANTA\352704299.xlsx\PPTO (2)
RA
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
140,968.00
209,456.00
154,800.00
24,700.00
14,792.00
23,620.00
1,416.00
25,590.00
48,270.00
314,160.00
24,436.00

:\OLLANTA\352704299.xlsx\PPTO (2)
RA
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
3,341,250.00
294,375.00
318,850.00
29,460.00
26,755.00
2,035.00
11,376.00
246,740.00
48,164.00
956.00
75,180.00

11,494,710.00

7,352,620.00
1,051,200.00
559,400.00
1,238,400.00
507,630.00
785,460.00

856,269.74

397,800.00
49,070.16
12,592.02
5,837.28
5,997.40
17,886.00
1,606.88
149,864.00
213,696.00
1,920.00

#REF!

21,242.90
24,431.13
194,257.68

:\OLLANTA\352704299.xlsx\PPTO (2)
RA
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
373,144.20
2,507.10
4,803.68
24,115.04
1,346.60
61,880.00
#REF!

269,672.40

68,466.00

:\OLLANTA\352704299.xlsx\PPTO (2)
RA
T.C. S/. 3.493 = 1 US$
SUB_TOTAL TOTAL

( SOLES ) ( SOLES )
17,716.80
18,312.00
4,345.00
2,566.00
2,288.20
155,978.40

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

:\OLLANTA\352704299.xlsx\PPTO (2)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO

100.00 OBRAS PRELIMINARES

101.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00


102.00 TRAZO Y REPLANTEO KM 84.47
103.00 MANTENIMIENTO DE TRANSITO GLB 1.00

200.00 MOVIMIENTO DE TIERRAS

202.00 LIMPIEZA GENERAL Y ROCE HA 17.00


205.00 EXCAVACION NO CLASIFICADA PARA EXPLANACIONES M3 1,009,645.00
206.00 REMOCION DE DERRUMBES M3 20,000.00
210.00 CONFORMACION DE TERRAPLENES M3 256,348.00
220.00 EXCAVACION PARA MEJORAMIENTO DE SUB-RASANTE M3 2,500.00
220.02 PERFILADO Y COMPACTADO EN ZONA DE CORTE M2 170,000.00

300.00 SUB-BASE Y BASE

303.00 SUB BASE GRANULAR M3 82,005.00


305.00 BASE GRANULAR M3 117,170.00

400.00 PAVIMENTO ASFALTICO

401.00 IMPRIMACION ASFALTICA M2 542,030.00


405.00 TRATAMIENTO SUPERFICIAL BICAPA M2 497,295.00
421.00 ASFALTO LIQUIDO GLN 552,785.00

600.00 OBRAS DE ARTE Y DRENAJE

600.01 LIMPIEZA DE ALCANTARILLAS M3 2,000.00


600.02 LIMPIEZA DE CAUCES O ENCAUZAMIENTO M3 2,000.00
600.03 DEMOLICION DE ESTRUCTURAS M3 500.00
600.04 ELIMINACION DE ALCANTARILLAS METALICAS M 300.00
601.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 35,000.00
605.00 RELLENO PARA ESTRUCTURAS M3 30,000.00
605.01 MATERIAL FILTRANTE M3 5,500.00
610.01 CONCRETO CICLOPEO F'C=140 KG/CM2 M3 3,000.00
610.02 CONCRETO CICLOPEO F'C=175 KG/CM2 M3 22,800.00
610.05 CONCRETO SIMPLE F'C=210 K/CM2 M3 3,800.00
610.10 ENCOFRADO Y DESENCOFRADO DE CIMENTACION M2 6,750.00

:\OLLANTA\352704299.xlsx\PPTO (3)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO

610.11 ENCOFRADO Y DESENCOFRADO DE MURO EXPUESTO M2 38,000.00


610.12 ENCOFRADO Y DESENCOFRADO DE LOSA M2 250.00
610.20 ACERO DE REFUERZO FY = 4200 KG/CM2 KG 10,000.00
610.30 JUNTA DE DILATACION Y CONSTRUCCION LOSA/BADEN M 100.00
622.01 ALCANTARILLA T.M.C. D = 36" M 1,000.00
622.02 ALCANTARILLA T.M.C. D = 48" M 500.00
622.03 ALCANTARILLA T.M.C. D = 60" M 100.00
622.04 ALCANTARILLA T.M.C. D = 72" M 100.00
622.10 ALCANTARILLA ARMCO T.M.C. L<4.80m ( D = 130" ) M 25.00
625.01 SUBDREN LATERAL PROFUNDO M 2,000.00
625.10 TUBERIA DE DESCARGA EN SUBDREN M 200.00
635.01 CUNETAS REVESTIDAS TRIANGULARES M 55,000.00
635.02 CUNETAS RECTANGULARES TIPO 1 M 2,500.00
635.03 CUNETAS RECTANGULARES TIPO 2 M 2,500.00
635.20 REVESTIMIENTO CON PIEDRA EMBOQUILLADA M2 50.00
635.30 ENROCADO DE PROTECCION M3 2,000.00
650.01 GEOTEXTIL SEPARADOR M2 200.00
670.01 GAVION TIPO CAJON M3 2,000.00
670.10 GAVION TIPO COLCHON M3 200.00
670.15 ALIVIADERO EN ALCANTARILLAS M2 200.00
670.20 ZANJA DE CORONACION REVESTIDA M 500.00
670.30 ZANJA DE CORONACION NO REVESTIDA M 2,000.00
670.51 ZANJA DE DRENAJE M 300.00
670.52 PROTECCION DE CAUCES EN BADENES M3 500.00
670.53 CANAL PROVISIONAL DURANTE CONSTRUCCION M 500.00
670.54 REPOSICION DE CANALES DE RIEGO M 500.00

700.00 TRANSPORTE

701.01 TRANSPORTE MAT. PROVENIENTE DE CANTERA HASTA 1KM M3-KM 206,775.00


701.02 TRANSPORTE MAT. PROV. EXCAV. DE EXPLAN. HASTA 1KM M3-KM 711,780.00
701.03 TRANSPORTE MAT. PROV.DERRUMBES HASTA 1KM M3-KM 20,000.00
702.01 TRANSPORTE MAT. PROVENIENTE DE CANTERA MAYOR 1KM M3-KM 2,755,040.00
702.02 TRANSPORTE MAT. PROV. EXCAV. DE EXPLAN. MAYOR 1KM M3-KM 404,250.00
702.03 TRANSPORTE MAT. PROV.DERRUMBES MAYOR 1KM M3-KM 10,000.00

800.00 SEALIZACION Y SEGURIDAD VIAL

801.00 SEALES PREVENTIVAS UND 152.00

:\OLLANTA\352704299.xlsx\PPTO (3)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO

802.00 SEALES REGLAMENTARIAS UND 42.00


803.00 SEALES INFORMATIVAS M2 16.00
804.00 POSTE DE FIJACION DE SEALES INFORMATIVAS D = 3" M 150.00
804.10 CIMENTACION DE SEALES INFORMATIVAS M3 20.00
805.00 POSTES DELINEADORES UND 2,200.00
810.00 MARCAS SOBRE EL PAVIMENTO M2 20,000.00
820.00 GUARDAVIAS INCLUYE TERMINAL M 1,680.00
830.00 HITOS DE KILOMETRAJE UND 16.00
840.00 PINTADO PARAPETOS MUROS/ALCANT. M2 240.00

900.00 IMPACTO AMBIENTAL

902.01 REHAB. DE BOTADEROS UND 15.00


902.03 REHAB. CANTERAS (INC.CHANC/ZARAN) UND 6.00
906.00 ACONDICIONAMIENTO DE MATERIAL EN BOTADERO M3 828,500.00
907.00 REHAB. AREA AFECTADA POR CONST.CAMPAMENTOS GLB 1.00
908.00 REHAB. PATIO DE MAQUINARIAS Y EQUIPOS GLB 1.00
909.00 DESACTIVACION DE POZAS DE ASFALTO GLB 1.00
909.01 SEALIZACION AMBIENTAL GLB 1.00
909.02 EDUCACION AMBIENTAL GLB 1.00
910.00 REHAB. ZONAS DESTINADAS COMO DESVIOS GLB 1.00

9100.00 VARIOS

9103.00 EXPROPIACION DE ZONAS RURALES M2 500.00


9104.00 EXPROPIACION DE ZONAS AGRICOLAS M2 1,000.00
9105.01 REUBIC.DE POSTES DE LUZ UND 20.00
9105.02 REUBIC.DE POSTES CON TRANSFORMADOR UND 20.00
9106.00 ELEVACION DE BUZONES UND 20.00
9151.00 REUBIC.DE VIVIENDAS AFECTADAS M2 200.00
9152.00 PROFUNDIZ. TUBERIA AGUA POTABLE M 100.00
9153.00 REFORZ. TUBERIA DESAGUE M 100.00

COSTO DIRECTO

GASTOS GENERALES #REF!

UTILIDAD 10.00%

SUB_TOTAL

:\OLLANTA\352704299.xlsx\PPTO (3)
#REF!
#REF!
#REF!
#REF!

PRESUPUESTO REFERENCIAL DE OBRA


PRECIOS AL 31.10.99
TEM DESCRIPCION UND METRADO

I.G.V. 18.00%

TOTAL INC. I.G.V.

:\OLLANTA\352704299.xlsx\PPTO (3)
DE OBRA
T.C. S/. 3.493 = 1 US$
PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
#REF!

#REF! #REF!
1,051.69 88,836.25
155,932.74 155,932.74

13,570,046.16

2,951.03 50,167.51
11.05 11,156,577.25
4.53 90,600.00
8.05 2,063,601.40
20.40 51,000.00
0.93 158,100.00

5,587,975.30

23.62 1,936,958.10
31.16 3,651,017.20

4,644,095.85

0.63 341,478.90
3.85 1,914,585.75
4.32 2,388,031.20

14,841,112.75

12.32 24,640.00
7.59 15,180.00
24.18 12,090.00
6.77 2,031.00
26.28 919,800.00
27.97 839,100.00
46.18 253,990.00
169.21 507,630.00
176.21 4,017,588.00
261.82 994,916.00
30.96 208,980.00

:\OLLANTA\352704299.xlsx\PPTO (3)
DE OBRA
T.C. S/. 3.493 = 1 US$
PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
36.75 1,396,500.00
36.75 9,187.50
2.47 24,700.00
14.16 1,416.00
314.94 314,940.00
478.43 239,215.00
728.29 72,829.00
917.71 91,771.00
1,920.81 48,020.25
157.37 314,740.00
122.18 24,436.00
60.75 3,341,250.00
117.75 294,375.00
127.54 318,850.00
40.70 2,035.00
37.59 75,180.00
4.78 956.00
123.37 246,740.00
240.82 48,164.00
73.96 14,792.00
53.51 26,755.00
14.73 29,460.00
37.92 11,376.00
47.24 23,620.00
51.18 25,590.00
96.54 48,270.00

7,851,722.95

4.55 940,826.25
4.55 3,238,599.00
4.55 91,000.00
1.13 3,113,195.20
1.13 456,802.50
1.13 11,300.00

856,269.74

322.83 49,070.16

:\OLLANTA\352704299.xlsx\PPTO (3)
DE OBRA
T.C. S/. 3.493 = 1 US$
PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )
299.81 12,592.02
364.83 5,837.28
119.24 17,886.00
299.87 5,997.40
68.12 149,864.00
19.89 397,800.00
127.20 213,696.00
100.43 1,606.88
8.00 1,920.00

2,485,118.33

24,876.28 373,144.20
32,376.28 194,257.68
2.22 1,839,270.00
21,242.90 21,242.90
24,431.13 24,431.13
2,507.10 2,507.10
24,115.04 24,115.04
1,346.60 1,346.60
4,803.68 4,803.68

#REF!

123.76 61,880.00
#REF! #REF!
885.84 17,716.80
915.60 18,312.00
114.41 2,288.20
342.33 68,466.00
43.45 4,345.00
25.66 2,566.00

#REF!

#REF!

#REF!

#REF!

:\OLLANTA\352704299.xlsx\PPTO (3)
DE OBRA
T.C. S/. 3.493 = 1 US$
PRECIO SUB_TOTAL TOTAL
UNITARIO
( SOLES ) ( SOLES ) ( SOLES )

#REF!

#REF!

:\OLLANTA\352704299.xlsx\PPTO (3)
#REF!
#REF!
#REF!

CRONOGRAMA DE DESEMBOLSOS
PRECIOS AL 31.07.01
TEM DESCRIPCION TOTAL MES 1 MES 2 MES3

1.00 OBRAS PRELIMINARES 43,076.92 17,230.77 12,923.08 12,923.07

2.00 MOVIMIENTO DE TIERRAS 121,439.69 42,503.89 78,935.80 0.00

3.00 PAVIMENTO 4,198,187.83 839,637.57 2,099,093.92 1,259,456.34

4.00 OBRAS DE ARTE Y DRENAJE 1,867,191.14 746,876.46 933,595.57 186,719.11

5.00 SEALIZACION Y SEGURIDAD VIAL 261,622.35 0.00 91,567.82 170,054.53

6.00 MITIGACION IMPACTOS AMBIENT 199,657.98 29,948.70 99,828.99 69,880.29

7.00 VARIOS 306,070.20 107,124.57 107,124.57 91,821.06

COSTO DIRECTO 6,997,246.11 1,783,321.96 3,423,069.75 1,790,854.40

:\OLLANTA\352704299.xlsx\CRON
#REF!
#REF!
#REF!

CRONOGRAMA DE DESEMBOLSOS
PRECIOS AL 31.07.01
TEM DESCRIPCION TOTAL MES 1 MES 2 MES3

GASTOS GENERALES 1,310,507.00 333,996.53 641,103.20 335,407.27

UTILIDAD 699,724.61 178,332.20 342,306.98 179,085.43

SUB_TOTAL 9,007,477.72 2,295,650.69 4,406,479.93 2,305,347.10

I.G.V. 1,621,345.99 413,217.12 793,166.39 414,962.48

TOTAL INC. I.G.V. 10,628,823.71 2,708,867.81 5,199,646.32 2,720,309.58