Professional Documents
Culture Documents
No. Date
3 21.04.17
10
11
12
13
14
15
16
17
18
19
22
23
24
25
26
27
28
29
30
31
34
37
38
42
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
TO DO LIST
Naresh
Remarks/Results/
Documents
Item Opening
No. Date
2
21.04.17
3
10
11
12
13
14
15
16
17
18
19
22
23
24
25
26
27
28
29
30
31
34
37
38
42
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
TO DO LIST
Festo Every shipment to be track till it reach Festo & send me to customer
Sasikala
Remarks/Results/
Documents
Item Opening
No. Date
5 21.04.17
10
11
12
13
14
15
16
17
18
19
22
23
24
25
26
27
28
29
30
31
34
37
38
42
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
TO DO LIST
Daily machine production & loss details required through mail ( die castings loss format use
the same )
Peter
Remarks/Results/
Documents
Item Opening
No. Date
7 21.04.17
10
11
12
13
14
15
16
17
18
19
22
23
24
25
26
27
28
29
30
31
34
37
38
42
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
TO DO LIST
Auto ladle damage cup to be send to TGV
JCB base gauge order pl provide the date when it reach euro cast
Air gauge for JCB base date required when it reach euro cast
Planned Date Actual Date
Responsible for Completion
Status
of Completion
Manickaraj
Remarks/Results/
Documents
Item Opening
No. Date
3
21.04.17
4
10
11
12
13
14
15
16
17
18
19
22
23
24
25
26
27
28
29
30
31
34
37
38
42
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
TO DO LIST
Ask the die casting person to fettle & give fork castings instruction by md
Fan housing 5000 nos schedule given to cmw what is the status
Mohan
Remarks/Results/
Documents
Item Opening
No. Date
2
21.04.17
3
10
11
12
13
14
15
16
17
18
19
22
23
24
25
26
27
28
29
30
31
34
37
38
42
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
TO DO LIST
Pl send the reply mail to customer regarding leak test fixture status
Customer complaint tracking sheet plan to send daily with open or closed status
Cap cam bearing small machine feed back of solidification time reduce from 5 to 3 sec
Prasad
Remarks/Results/
Documents
4 21.04.17
10
11
12
13
14
15
16
17
18
19
22
23
24
25
26
27
28
29
30
31
34
37
38
42
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
TO DO LIST
Magesh
Remarks/Results/
Documents
concrete breaking work is progress, once fix the channel. After only we start shutter work
send it to indofen
r only we start shutter work
Item Opening
No. Date
2
21.04.17
3
10
11
12
13
14
15
16
17
18
19
22
23
24
25
26
27
28
29
30
31
34
37
38
42
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
TO DO LIST
Daily send the production & loss details of all the machine with man power
10
11
12
13
14
15
16
17
18
19
22
13.04.17
23
24
25
26
27
28
29
30
31
34
37
38
42
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
TO DO LIST
JCB Base 500 nos to be machined send to customer
Piston trial status update to Varma & correct the tool immediately
Daimler base each cavity 3 nos required by customer plan to send today after removing heat check mark
though emery sheet
SNCB 32 die will ready today pl plan trial with Mohan production
Control housing rejection to be collect from supplier 1700 nos send they started machining
Cam thrust cap new die trial machining feed back required
Planned Date Actual Date
Responsible Status
for Completion of Completion
Raja
Remarks/Results/
Documents
Item Opening
No. Date
10
11
12
13
14
15
16
17
18
19
22
13.04.17
23
24
25
26
27
28
29
30
31
34
37
38
42
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
TO DO LIST
Trimming tool status cf 23 1& 2
SEU - 1/2
SEU - 1/2 B
SEU - 3/8 B
Cam thrust cap new die trial pending after over flow provided in defect location
Leak test trial - suction inlet filter min 200 nos to be check & give the feed back
Leak test trial - Meter manifold with flange min 200 nos to be check & give the feed back
Leak test trial - Junction box housing small min 200 nos to be check & give the feed back
Leak test trial - Junction box housing big min 200 nos to be check & give the feed back
Leak test trial - Inlet filter box housing min 200 nos to be check & give the feed back
Leak test trial - Inlet filter box cover min 200 nos to be check & give the feed back
Balu
Remarks/Results/
Documents
Item Opening
No. Date
10
11
12
13
14
15
16
17
18
19
22
13.04.17
23
24
25
26
27
28
29
30
31
34
37
38
42
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
TO DO LIST
Enclosure size -1 machining status daily update
Daily stock status to be update & avoid last minute press from customer
Ramesh
Remarks/Results/
Documents
38627