REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN

AND DN61 (MILCOVATU) THROUGH THE


MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 1 of 23

METHOD STATEMENT
XXXXXXXXXXXXXX
CODE [MS XX]

Ministry of Development, Public Works and Housing

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 2 of 23

Economic And Social Cohesion Programme - Phare 2004


Project No. RO 2004/016.772.04.01.01.01.07

Rehabilitation of the connection road between Videle Town


and DN 61 (Milcovatu) through the modernization of DJ 601D,
km 14+514 27+214 - Videle
and DJ 612, km 0+000 6+900, Milcovatu (Giurgiu County) - Mereni
DESCRIPTION:

Method Statement to be used on Contract for XXXXXXXXXXXX

Controlled Copy [ ] N [ . ] Received by

TABLE OF CONTENT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXxxxxxxxxxx

TABLES INDEX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXx

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 3 of 23

DOCUMENTATION POSITION

DOCUMENT LEVEL 1 QUALITY PLAN


DOCUMENT LEVEL 2 METHOD STATEMENTS
DOCUMENT LEVEL 3 FORMS / REPORTS

DISTRIBUTION LIST

POSITION NAME DATE SIGNATURE


PROJECT MANAGER Jorge Gonalves
TECH.RESP. EXECUTION Vasilie Pintilie
QUALITY RESPONSIBLE Artemiza Decis
ENGINEER Massaad E. Ghaoui
LAND SURVEYOR Catalin Roscka

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 4 of 23

GENERAL FOREMEN Manuel Moreira


LABORATORY Jose Carlos Gonalves

INDEX OF REVISIONS

N O. ED. REV. DATE PAGE / CHAPTER / PARAGRAPH REMARKS


0 2007-XX-XX XX - Not Applicable XX- Pending for Approval
1

SCOPE

This procedure has been elaborated for performing XXXXXXXXXXXXXXX Works


as required by Project, Technical Specifications, etc in order to know the stages
and the setting methods within the REHABILITATION OF THE CONNECTION
ROAD BETWEEN VIDELE TOWN AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ601D, KM 14+514 27+214 - VIDELE AND DJ612, KM
0+000 6+900, MILCOVATU (GIURGIU COUNTY) MERENI Works execution,
so that it complies with ISO 9001 :2001 Standard Quality Management
System requirements, JV QM Plan, H&S Plan, TMP, standards, data sheet, and
applicable norms, by resources provided the company. Is an ensemble of
activities that are planed inside the quality system for an adequate confidence in
the Works executing.

1 FIELD OF APPLICATION

The technical work procedure Method Statement is to be applied in performing


all the necessary XXXXXXXXXXXX. It contains the usual technical conditions to

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 5 of 23

be respected when assembling XXXXXXXXXXXX, the quality control and


acceptance conditions in order to comply with Clients expectations.

2 TERMS, DEFINITIONS, ABBREVIATIONS

2.1 TERMS, DEFINITIONS

This terms and definitions will be used in accordance with JV MONTEADRIANO &
SOARES DA COSTA Quality Plan ED.02 REV.00, with SR EN ISO 9000/2001,
Health and Safety Plan, Traffic Management Plan, Contract Documents and
relevant legislation; e.g.: XXXXXXXXXXXX and all the relevant legislation:

Method Statement/Procedure - documented mean of process execution


Document any information support including the included information
Rehabilitation complex arrangement of an existing road by improvement
of the geometric elements, by applying modern road pavement into a road
structure dimensioned in accordance with the in forced Norms and all annex
Works execution or adaptation (supporting walls, bridges) to the new
conditions;
Conformity accomplishment of a request;
Nonconformity unfulfilling of a request;
Corrective action an action to eliminate the causes of a detected
nonconformity or of unwanted situation;
Preventive action - an action to eliminate the causes of a potential
nonconformity or of unwanted situation;
Quality Plan a document that specify what procedures and resources
must be applied, by who and when, for a specific project, product, process or
contract;
Registration a document that declares the obtained results and/or
provides proves of the accomplished activities;
REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL
Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 6 of 23

Inspection conformity evaluation through observation and judgment,


completed, if is the case, by measurement, attempt or comparing with a
calibrated device;
Setting out materialization operation of the projects geometrical elements
by topographical methods;
Boundary marking planting operation of the milestones from which the
work is set out;
Pegs wooden (iron) posts by means of which the set out elements are
materialized;
Road territory strip of land occupied by the constructive elements of the
road within cross section, measured in horizontal projection.
Traffic lane longitudinal subdivision of the carriageway, materialized or
not by road markings, necessary for one row vehicle traffic.
Traffic lane longitudinal subdivision of the carriageway, materialized or
not by road markings, necessary for one row vehicle traffic.
Safety area strip of land situated on both sides of the road territory,
destined for road signalling, plantations, other purposes in road exploitation;
XXXXXXXXXXXX
XXXXXXXXXXXX
Report Document in witch registration are made, and present results of
tests and/or actions;
Works Acceptance Action of analysis and decision if the quality of a
certain work is in accordance with required specifications;

2.2 ABBREVIATIONS

QMS - Quality Management System;


QMS - Quality Management System;
QM - Quality Manual;
REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL
Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 7 of 23

SP System Procedures;
OP - Operational Procedures;
QP - Quality Plan;
QF- Quality Forms;
GN General Applications;
SO Setting Out;
LB Laboratory;
L Laboratory Responsible;
CP Check Points;
SP Stop Points;
CC Conformity Checking;
IA Internal Audits;
HS Health and Safety;
TM Traffic Management;
TS Technical Specifications;
D- Design;
SDR Shop Drawings;
SD Site Disposition;
DS Determinant Stages;
WP - Works Program
HSP Health & Safety Plan;
IPC Interim Payment Certificate;
TCB Technical Construction Book;
MDPH Ministry of Development, Public Works and Housing;
B Beneficiary;
PIU Phare Implementation Unit;
RDA Regional Development Agency;
JV Joint Venture;

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 8 of 23

C Contractor;
P - Designer;
PM Project Manager;
PMD Project Manager Deputy;
I State Inspectorate in Constructions;
QR Quality Responsible;
TRE Technical Responsible with Execution;
LS Land Surveyor;
TMR TM Responsible;
HSR HS Responsible;
SP Specific;
RWD Roadworks;
BRD Bridge;
GND General domain;
BLD Building;
IFD Infrastructure;
App. Approval;
Deliv. Delivered;
Est. estimated;
Foll. Followed;
N - Number;
** - Coding;
Reg. Regarding;
ID Identification.

2.3 REFERENCE DOCUMENTS

Contract Documents;
JV MONTEADRIANO & SOARES DA COSTA QP ED.02 R.00
REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL
Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 9 of 23

SR EN ISO 9001 : 2001 Standard Quality Management System.


Law 10/1995 regarding the Quality in Constructions and application
regulations of it;
Shop Drawings;
Standards in force applicable in constructions:
XXXXXXXXXXXX XXXXXXXXXXXX XXXXXXXXXXXX
Practice code for the execution of concrete, reinforced concrete and pre-
stressed concrete works, indicative NE 012-99.
Pedestrian, vehicle, and emergency access signalling is made according to
Traffic Management Plan.
Fire prevention labour security and environment protection actions are
according to Health and Security Plan.

2.4 APPLICABLE DOCUMENTS

QP;
Quality IA Report;
Nonconforming Report;
WP;
MS;
Other Relevant Documents:
TMP;
HSP.

2.5 SPECIFIC REGISTRATIONS

METHOD
ID MS CODE FORMS CODE FORMS DESCRIPTION
STATEMENT
1. XXXXXXXXXX
DESCRIPTIONS RWD.QF.GN.01 TRAFFIC MANAGEMENT REPORT
XX RWD.QF.GN.03 SETTING OUT REPORT

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 10 of 23

METHOD
ID MS CODE FORMS CODE FORMS DESCRIPTION
STATEMENT
DESCRIPTIONS RWD.QF.GN.02 EQUIPMENT CHECKING REPORT
RWD.QF.GN.03 SITE DISPOSITION REPORT
[MS 1] RWD.QF.GN.04 MATERIAL ACCEPTANCE REPORT
XXXXXX RWD.QF.GN.05 WORKS ACCEPTANCE REPORT
XXX XXXXXX XXXXXXXXXX XXXXXXXXXX XXXXXXXXXXXX
TABLE 1 SPECIFIC REGISTRATIONS
XXX XXXXXX XX XX

CODE DESCRIPTION

ROADWORKS QUALITY FORM FOR GENERAL APPLICATION FOLL. BY


RWD.QF.GN.**
REPORT CODE
TABLE 2 CODE DESCRIPTION

2.6 GENERAL REGISTRATION

Nevertheless, the presented [QF.GN.--] Code Forms above mentioned for the
Specific Registration, are common to all the tasks, another codification of general
domain was established in our QMS in order to embrace other fields such as Health
and Safety Management, Traffic Management, Fire Prevention and Internal Audits.

CODE DESCRIPTION

CODE DESCRIPTION
GENERAL DOMAIN, QUALITY FORM FOLL. BY SPECIFIC CODIFICATION
GND.QF.**. **
AND REPORT CODE
GENERAL DOMAIN QUALITY FORM FOR CONFORMITY CHECKING REPORT
GND.QF.CC.**
FOLL. BY REPORT CODE
GENERAL DOMAIN QUALITY FORM FOR HEALTH AND FOLL. BY REPORT
GND.QF.HS.**
CODE
GENERAL DOMAIN QUALITY FORM FOR INTERNAL AUDITS FOLL. BY
GND.QF.IA.**
REPORT CODE
TABLE 3 CODE DESCRIPTION

Keeping under control these documents is the responsibility of the QR.

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 11 of 23

3 NORMATIVE REFERENCES

In order to elaborate the Method Statement for Precast Culverts, the following
International Standards and Internal Rules were used:

SR ISO 8402 1995 Quality management and quality assurance.


Vocabulary;
SR EN ISO 9000/2001 - Quality management systems. Fundamental
principles and vocabulary;
SR EN ISO 9001/2001 - Quality management systems. Requirements;
SR EN ISO 9004/2001 - Quality management systems. Guidelines to
enhance performances;
SR ISO 10.013/1996 - Guide for the elaboration of Quality Manuals;
Law no. 10/1995 regarding Quality in Constructions;
Rules regarding Quality in Constructions approved by RGO 766/1997;
Law 319/2006 regarding Health and Safety;
GD (HG) 1048 din 09/08/2006 regarding Health and Safety Protection
Equipment;
GD (HG) 300/02.03.2006 regarding Health and Safety minimal request for
Temporary and Mobile Sites;
Proclamation 328/1966 .. having as result the Methodological Norms
regarding Conditions of Traffic Closing and Obstructions for Works
Execution in Public Roads Territory and/or for Road Protection from
October 2000;
Contract Documents.
Standards in force applicable in constructions:
9824/3 -74 Terrestrial measurements. Setting out on the field of the public
roads (M SR 3/86);
4855 80 Terrestrial measurements. Basic survey plans;

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 12 of 23

9824/4 83 Terrestrial measurements. Setting out on the field of the over


ground artworks;
STAS 1243 -88 Foundation soil. Classification and identification of soils.
XXXXXXXXXXXX

4 PROCESS DESCRIPTION

4.1 WEATHER CONDITIONS

Average conditions are advisable;


Stormy and/or Rainy conditions are not advisable.

4.2 RESOURCES

4.2.1 MANPOWER

Land Surveyors;
Laboratory Technicians;
Foremen;
Road Workers;
Equipment Operators;
XXXXXXXXXXXX

MATERIALS

Iron pegs;
Wooden pegs;
Paint for pegs;
REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL
Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 13 of 23

XXXXXXXXXXXX

EQUIPMENTS

Total station and/or G.P.S. Device;


Communications devices;
Computers;
Printers;
Levels;
Poles;
Levelling rods;
Transport Vehicles;
XXXXXXXXXXXX

MANDATORY EQUIPMENT CHECKING

Checking the direct involved equipment. [QF.GN.01] Equipment Checking Report.

4.3 PRELIMINARY WORKS

Identification of the XXXXXXXXXXXXXXXX;


Setting out the XXXXXXXXXXXXXXXX;
Securing the area;
Signalizing the area.

4.4 PRECEDING CONDITIONS

The XXXXXXXXXXXXXXXX were previously analysed and approved by the Engineer.

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 14 of 23

The XXXXXXXXXXXXXXXX are properly stocked and in sufficient number to finalize


their assembly in one stage.

HANDING/TAKING OVER

Not applicable.

4.5 WORKING AREA SIGNALLING

The XXXXXXXXXXXXXXXX assembling works will begin when the area is


properly signalized.
Nevertheless the XXXXXXXXXXXXXXXX area is inside of an restricted area, as
in accordance with the Traffic Management Plan, independent signalization
will be placed on the XXXXXXXXXXXXXXXX area perimeter.

4.6 XXXXXXXXXXXXXXXX PROCEDURE

XXXXXXXXXXXXXXXX

Other Safety Measures are described on item 9.

CONTROL WITHIN THE PROCESS

EXECUTED DOCUMENT TO BE QUALITY


ID TECHNOLOGICAL OPERATION
BY COMPLETED STAGES
1. Setting Out the Precast Culvert LS Setting Out Report S
See Item
2. XXXXXXXXXXXXXXXX C
5.2
Works Acceptance
3. Checking Out QR S
Report
TABLE 4 - PROCESS CONTROL

C = CHECK POINT S = STOP POINT

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 15 of 23

The setting works will be executed respecting the admitted and imposed tolerances
according to Technical Specifications, Drawings or Site Dispositions.

5 DATA INTERPRETATION / MANAGEMENT ANALYSIS

The data interpretation will be executed by the Contractor. In accordance with each
situation, he will take the necessary measures to comply with what is stated in the
Design, and if necessary, clarifications will be requested to the Engineer.

6 SPECIFIC ASSIGNMENTS FOR QUALITY OF MAIN PERSONNEL, INVOLVED IN


WORK ACCOMPLISHMENT

6.1 PROJECT MANAGER

Planning and Coordinates the entire production activity (execution,


supplying, respecting the quality requirements, training the productive,
technical staff);
Provides skilled and authorized personnel;
Checks the acquirement of the technical knowledge and their applicability
within the execution process;
Checks all the elaborated documents attesting the execution of works;
Operatively coordinates the entire staff activity;
Provides materials and installations for each stage of execution to the
working places.

6.2 DEPUTY PROJECT MANAGER

DPM is completing all the above-mentioned responsibilities of the PM, assisting him
along the Works execution.
REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL
Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 16 of 23

6.3 QUALITY RESPONSIBLE

Provides the technical documents of execution (Designs, Technical


Specifications, Technical Standards and Normative in force);
Checks the elaborated Organizes and assures the elaboration and
administration of all documents attesting the execution of works;
Immediately informs the Project Manager when the technical prescriptions
are not achieved;
Performs supervision inspections for observing the quality of the execution in
the Check Points and Stop Points and validates the qualitative certifying
documents specific and or general to the work;
QC responsible supervises the precise application of the execution project,
the present procedure and the correct elaboration of quality records;
Attends to working front taking over based on taking over minute, and also
to accepting of finished works, in order for their commissioning;
Checks the acknowledgment and respecting of execution details, data sheets,
execution technical procedures, work instructions, etc;
Official report for acceptance of works.

6.4 TECHNICAL RESPONSIBLE FOR EXECUTION

Assures that the works execution are developing according with the Design
and Quality Plan provisions, providing in this way the correct implementation
of the Quality System;
Informs the Quality Responsible about any mistakes in the implementations
of the Quality Procedures, stopping the works and takes the proper measures
to solve the non conformities;
Analyse and approves the Method Statements for each work;
Keeps track of all the Quality System Reports and assures the right
coordination of the Determinant Stages with the Inspections Entities.

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 17 of 23

6.5 HEALTH AND SAFETY RESPONSIBLE

Assure that all the Contractors personnel and all other persons that have
access on Site are informed regarding all the HSP provisions;
Instructing all the personnel regarding the HS procedures;
Preparing all the required Reports regarding HS and HSP;
Check the quality and the distribution of all the Protection Equipment;

6.6 TRAFFIC MANAGEMENT RESPONSIBLE

Assure that all the Contractors personnel and all the other persons that have
access on Site are informed regarding all the TMP provisions;
Instructing all the personnel regarding the TM procedures;
Check the quality and the distribution of all the Signals mentioned in the
TMP;

6.7 FOREMEN

Directly and permanently supervises the execution process respecting all


technical prescriptions, norms and normative in force;
Operatively coordinates the entire workers activity;
Operatively coordinates the entire equipments activity;
Coordinates the mounting/assembling of all the materials;
Checks the supplying of work devices and tools for workers subordinated.

6.8 LAND SURVEYOR

Provides the execution of topographical and geodesic measurements in order


to execute the works;

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 18 of 23

Takes over from the Investor and Designer the topographical benches for the
works to be executed, assisted by the General Manager;
Draws up the general and detailed setting schemes of the works and
completes the specific forms.

6.9 LABORATORY

Laboratory personnel will be responsible for;


Performing laboratory tests for establishing the nature of the materials;
Performing laboratory tests for establishing the nature of the materials;
Testing each source of material where the testing frequency is also stated;
Performing laboratory testing to the imposed frequencies stated in TS;
Checking the materials used for the execution of works.

7 TEMPORARY WORKS DETAILS

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXX

8 SAFETY MEASURES

Regarding the safety measures for XXXXXXXXXXXXXXXX the following items should
be complied:

Use of the all the Safety Equipment that is stated on Health and Safety Plan:
Reflective Vests;
Protective Helmets;
Protective Boots;

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 19 of 23

Protective Gloves;
First Aid Kit on the transport vehicle.
The XXXXXXXXXXXXXXXX assembling team will act according to the
instruction given on the Health and Safety Plan scope;
The XXXXXXXXXXXXXXXX assembling team will be perfectly equipped with
communications means to (if necessary) contact the proper Entities in case
of emergency;
The XXXXXXXXXXXXXXXX assembling team will be previously instructed of
the final objective and eventual risks and right procedures to take in order to
ensure the integrity of workers;
The Foremen will instruct his team not to allow unauthorised persons to stay
in the proximity of the working area;
Mobile Equipment Safety Measures:
The operators will signalize for attention and will not start any
manoeuvre until all the personal have cleared equipment action area;
The operators will not start loads on trucks unless they checked that
all the workers have cleared the danger area;
The loading in the trucks will not be executed unless the equipment
has reached a complete stop;
The load operations will be executed only by the load equipment
operators;
It is prohibit fixation or hand adjustment or with other tools of the load
by other persons;
At stock loading it will be checked its stability in the bucket;
During loading and unloading, it is prohibit to workers stand on
equipment range of action;
At materials loading and transporting manoeuvres, the equipment will
have a small speed, during the bucket loading and unloading as well
during the transportation;

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 20 of 23

It is not allowed for the operator to leave the equipment with the load
lifted;
The abandonment of equipment will be don only after the engine is
stopped, the break blockage, bathing hut closed, or the bucket lained
on the soil;
Cranes and/or excavators with appropriate cables for the weight of the
Precast Element will develop the assembling of Precast Culverts in
place.
Proper distances will be taken from the excavation pit edge;
Stairs will be used for works access the assembly area.
XXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXX

9 MATERIALS STORING

Regarding the Storing XXXXXXXXXXXXXXXX we can consider two situations:

Stock in the Construction Yard for posterior transport to assembling area, as


ever as XXXXXXXXXXXXXXXX are needed;
Stock in the proximity of the assembling area, if an appropriate place is
available and assure the proper safety conditions for this purpose.

10 DOCUMENTS CONTROL

10.1 PREPARING, CHECKING, APPROVAL

The Quality Responsible will prepare the present Method Statement, in


collaboration with TRE.
The Method Statement is then checked and approved by the Project Manager.
This document will then be submitted for the Engineers approval. In
REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL
Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 21 of 23

accordance with our internal procedures, all this documents will be


registered.

10.2 RELEASING, MODIFICATION, WITHDRAW

The present procedure it is released to all the relevant parties in accordance


with the Distribution List.
In case of modification, the present procedure it will be modified by the QR
as instructed by the Project Manager or the Engineer, and will follow the
same circuit of approval as the previous edition.
The withdrawal of the document it is executed at the instructions of the QR,
which will also ensure the annulled edition archiving.

11 NON-CONFORMITIES

At the detection of any non-conformance by the Contractors personnel or by the


Engineer, a QF.CC.** will be issued, and after the rectification of the Non-
Conformity the same form is filled with the close-up.

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 22 of 23

ANNEX 1

METHOD STATEMENTS LIST

The following Work Method Statements will be issued and implemented for the
execution of the main categories of Works:

MS EST. DEL. APP.


ID MS PURPOSE REV DEL. DATE
CODE DATE DATE
1. Setting out [MS 1] 00 09.05.07 09.05.07
2. Demolitions for Roadworks [MS 2] 00 09.05.07 09.05.07
3. Excavations [MS 3]
4. Soil Embankments [MS 4]
5. Gutters, Ditches and Manholes [MS 5]
6. Gabions Execution [MS 6]
7. Road Infrastructure [MS 7]
8. Roads Superstructure [MS 8]
9. Asphalt Mixtures [MS 9]
10. Trial Sectors [MS 10]
11. Demolitions for Bridge Works [MS 11]
12. Ground Improvement [MS 12]

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX
REHABILITATION OF THE CONECTION ROAD BETWEEN VIDELE TOWN
AND DN61 (MILCOVATU) THROUGH THE
MODERNIZATION OF DJ 601D AND DJ 612

METHOD STATEMENT XXXXXXXXXX / CODE [MSXXX] - PAGE 23 of 23

13. Precast Culverts [MS 13] 00 09.05.07 09.05.07


14. Railway Crossing [MS 14]
15. Guardrails and Handrails [MS 15]
16. Precast transition slabs [MS 16]
17. Expansion Joints [MS 17]
18. Elevations [MS 18]
19. Assembly of Precast Beams [MS 19]
20. Steel Reinforcements [MS 20]
21. Anti-cracking preventing elements [MS 21]
22. Concrete preparation and placing [MS 22]
23. Bridges and culverts waterproofing [MS 23]
24. Footways [MS 24]
25. Road Marking and Signalization [MS 25]
26. Bearing Devices [MS 26]
TABLE 5 METHOD STATEMENT LIST

The above Table will be up-dated whenever we submit a new or revised Method
Statement for Engineers approval.

REV DATE PREPARED BY CHECKED BY INTERNAL APPROVAL


Artemiza Decis Jorge Gonalves Jorge Gonalves
XXX 2007-XX-XX