COMPETENCE 11 ENGINE

On a tanker vessel,
what is the required
combined capacity of
the inert gas generating
C11 system as compared to 1.25
the total capacity of all
the cargo pumps which
can be operated
simultaneously?
What percent of oxygen
content by volume,
must each inert gas
C11 system be designed to 5% or less
supply the cargo tanks
with a gas, or mixture
of gases?

What is the required


C11 gas supply capacity of 125% of cargo pump capacity
an inert gas system?

Each vessel designed


to carry more than 49
C11 A collision bulkhead
passengers must have
_____.

The difference between


the initial trim of a
vessel and the trim
C11 change of trim
after anew load
condition is known as
____________.

Static water pressure of


C11 a hull of a ship is Keel
greatest at the _____.

When securing the


operation of an inert
C11 Secure the salt water supply to the scrubber
gas system the final
step should be _____.

RICOSE of Symbianize: Page 1 of 9


COMPETENCE 11 ENGINE

When the inert gas


system is temporarily
unable to maintain a
positive pressure or an
C11 Be shut down immediately
oxygen content less
than 8% cargo
operations should
_____.
An inert gas system
incorporating a
separately fired inert
gas generator shall be
provided with visual
C11 and audible alarms to Insufficient fuel supply
indicate failure of the
power supply to the
generator, the
automatic control
system and _____.
How does an inert gas
system on a tanker Inert gas dilutes the flammable vapor and air
C11 function to prevent concentrations to keep them below the lower
explosion in cargo explosive limit
tanks?

An inert gas system is


designed to reduce the Reducing the oxygen concentration below levels
C11
possibility of tank necessary for combustion
explosion by _____.

Which of the following


methods is used to
C11 supply inert gas from a High capacity fan
flue gas system to the
cargo tanks?
The component in an
inert gas system use
for cleaning the gas of
solid and sulfur
C11 Scrubber
combustion products,
while simultaneously
cooling the inert gas, is
called the _____.

RICOSE of Symbianize: Page 2 of 9


COMPETENCE 11 ENGINE

If a vessel loses its


reserve buoyancy, it
C11 most likely sink
will
________________.

What will happen when a


C11 vessel loses its reserve Most likely sink
buoyancy?

The purpose of the


deck seal in an inner Flow reversal of tank vapors into the machinery
C11
gas system is to space
prevent _____.

A vessel which is
C11 subjected to hogging Has its main deck plating under tensile stress.
_____.

Excessive recirculation Undesirable and it may lead to high oxygen


C11
of inert gas is _____. content of the inert gas

Aboard tankers, the


term Category A
machinery Space, as
defined by regulations
means any space
including trunks and
ducts to that space
containing _____. I,
C11 Internal combustion I, II & III
machinery used for
main propulsion II. One
or more oil fired boilers
or oil fuel units III.
Internal combustion
machinery used for
purposes other than
propulsion where the

RICOSE of Symbianize: Page 3 of 9


COMPETENCE 11 ENGINE

total collective power is


at least 500 brake
horsepower

Corrosion resistant
material and non-
corrodible material will
C11 include which of the I, II & III
following _____. I.
Plastics II. Silver III.
Copper nickel
Which of the following
methods of finished
applications is/are
considered to be
satisfactory for resisting
C11 I, II & III
corrosion? I.
Electroplating with
cadmium II
Sherardizing III.
Galvanizing
Corrosion resistant
material and non-
corrodible material will
include which of the I, II & III
following _____. I.
Brass II. Copper nickel
III. Plastics
The blowers of an inert
gas generation system
aboard a tanker, will be
automatically secured if
C11 _____. I. Normal water I, II & III
supply at the water seal
is lost II. The
temperature of the inert
gas being delivered to

RICOSE of Symbianize: Page 4 of 9


COMPETENCE 11 ENGINE

the cargo tanks is more


than 150oF III. The
cooling water supply to
the scrubbers is lost

The function of the


scrubber in an inert gas
system is to _____. I.
Cool the gases II.
C11 I, II & III
Remove solids from the
gases III. Remove
sulfur compounds from
the gases

Control of fire should


C11 be addressed Continue loading as this is normal procedure
__________.

Where are self-closing


C11 doors required on a in each stair tower
vessel?

WHAT HAPPENS
WHEN YOU ADD
reduce reserve buoyancy
WEIGHT TO A
C11 VESSEL
what will be the result
of counter flooding into
empty tanks, if the
decrease list or trim
couse of severe list, or
trim is due to off-center
C11 ballast
Flooding of any ships
compartment, resulting
in a serious loss of
c11 decrease ship stability
reserve buoyancy, will
always
________________.

RICOSE of Symbianize: Page 5 of 9


COMPETENCE 11 ENGINE

Stability is determined
principally by the
location of two points in
center of gravity
a vessel: The center of
buoyancy and the
________________.

The difference between


the forward and the aft
Trim
drafts of a vessel would
be the ________.

Yawing is the angular


motion of the vessel Vertical
about what axis?

The value of the


maximum righting arm
is dependent upon the
position of the center of gravity
position of the center of
buoyancy and the
_____________.
Which of the listed
functions is the purpose
of a gas scrubber in an Cools the inert gas
inert gas generation
system?

The purpose of swash


Reduce liquid movement and surging within a tank
bulkheads is to _____.

When a vessel is
inclined, the tendency
for it to return to its movement of the center of buoyancy toward the
original position is low side of the vessel
caused by the
_______________.

RICOSE of Symbianize: Page 6 of 9


COMPETENCE 11 ENGINE

The collision bulkhead As the first watertight bulkhead aft of the bow in
is located _____. the ship

Penetrations and
openings in watertight
bulkheads in a vessel Be kept as high and as far inboard as practicable.
of less than 100 gross
tons must _____.

Which of the following


conditions will result in
High temperature gas discharge from inert gas
an automatic
blowers
shutdownof the flue
gas inert gas system?

Vertical support
members used to
Stiffeners
strengthen bulkheads
are called _____.

The result of a blow


delivered by a heavy
sea causing rapid
vibrations of the elastic Pounding
portions of the ships
hull is identified as
_____.

The double bottom in a


Compartments between the inner and outer
vessel is a space
bottoms
comprised of _____.

An inert gas system on


Dilute tank atmospheres to keep gas
a tanker should be
concentrations below the lower explosive limits
used to _____.

RICOSE of Symbianize: Page 7 of 9


COMPETENCE 11 ENGINE

The primary function of


Supply conditioned gas with reduced oxygen
a flue gas type inert
content
gas system is to _____.

Which of the following


describes the purpose Provides landing surface for the sounding bob of a
of a striker or doubler tank sounding
plate?

Free surface effect


occurring in partially
filled cargo or fuel
storage tanks on board maintain vessel stability
a vessel should be
avoided to
_______________.

When flooding occurs


in a damaged vessel,
Decrease
reserve buoyancy
_____________.

When the height of the


metacenter is the same
as the height of the
c11 center of gravity, the Neutral
upright equilibrium
position is
____________.
What standard
mathematical formula is
commonly used to
c11 Simpson Rule
calculate a vessels
waterplane area for
stability purposes?

Angular motion about


the vertical axis of a
c11 Yaw
vessel is known as
_____________.

RICOSE of Symbianize: Page 8 of 9


COMPETENCE 11 ENGINE

The reserve buoyancy


the part of the enclosed and watertight portion of a
c11 of a ship consists of
vessel above the waterline
________________.