The Asst. Engineer The Assistant Divisional Engineer
Mechanical Indoor/Stage2 Mechanical Subdivision
M.H.E.(J)Scheme M.H.E.(J)Scheme
Onukudelli Onukudelli.
Sir,
Yours faithfully
Assistant Engineer
Mechanical Indoor Section/Stage2
M.H.E.(J)Scheme
Onukudelli.
Copy submitted to the Account Officer, O&M, Onukudelli for favour of information
please.
CHARGE HANDING OVER REPORT OF ASSISTANT ENGINEER,
MECHANICAL/STAGE2, ONUKUDELLI.M.H.E.(J) SCHEME FROM
Er.K.SEETARAM to Er.S.RAGHURAM
Material Status.
1) 01 No 2nd stage UGB, 01 No 2nd stage LGB and 1 No. 2 nd stage thrust pad(Sent
for sample) are given to M/S.Venkateswara Agricultural works on 24-03
-2015, Vide T.Note No-526, Gate pass No.6530 for repair / recondition as there
are no spares.
2) Dismantled damaged materials of 2nd stage is kept in power house for
devolution to be sent o&m stores.s
.
The O&M Staff available in the section carries out the day by day maintenance
works of Power House. Major maintenance and over-hauling works carried out by out
sourcing.
Major works completed:
1) Unit.No.4,5 and 6 complete Turbine overhauling work was done.
2) 2nd stage units damaged bearings replaced and align the TG shaft.
3) Unit 4 and 6 MIV over haul work was done
4) Governor heat exchanger pipelines & valves for Unit-4&6 are replaced with new
ones
5) Lube oil cooler gate valves for units-4,5,6 are replaced with new ones.
6) 6 T-joint pipelines of upstream & downstream pipelines for Units- 4, 6 were
replaced with new ones.
From To
The Asst. Engineer The Assistant Divisional Engineer
Mechanical Indoor/Stage2 Mechanical Subdivision
M.H.E.(J)Scheme M.H.E.(J)Scheme
Onukudelli Onukudelli.
Sir,
Yours faithfully
Assistant Engineer
Mechanical Indoor Section/Stage2
M.H.E.(J)Scheme
Onukudelli.
Copy submitted to the Account Officer, O&M, Onukudelli for favour of information
please.
Material Status.
01)01 No 2nd stage UGB, 01 No 2nd stage LGB and 1 No. 2nd stage thrust pad(Sent
for sample) are given to M/S.Venkateswara Agricultural works on 24-03 -2015,
Vide T.Note No-526, Gate pass No.6530 for repair / recondition as there are no
spares.
02)Dismantled damaged materials of 2nd stage is kept in power house for
devolution to be sent o&m stores.
.
The O&M Staff available in the section carries out the day by day maintenance
works of Power House. Major maintenance and over-hauling works carried out by out
sourcing.
Major works completed:
01) Unit.No.4, 5 and 6 complete Turbine overhauling work was done.
02)2nd stage units damaged bearings replaced and align the TG shaft.
03) Unit 4 and 6 MIV over haul work was done
04) Governor heat exchanger pipelines & valves for Unit-4&6 are replaced with new
ones
05) Lube oil cooler gate valves for units-4, 5, 6 are replaced with new ones.
06)6 T-joint pipelines of upstream & downstream pipelines for Units- 4, 6 were
replaced with new ones.