You are on page 1of 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

1
2
3 40cm
4 3cm
5 12cm
6
7
8
9
10

11
12
13
14

15


16

17
18
19

20

m
mm
cm


567568570574
2015.04.01
2016.04.01



27 28 29 30 31


5705745758 AA8-301-034
2015.04.01
CHECK LIST FOR SCAFFOLDINGS 2016.04.01
For the mont of : Works Location Checked by

Checking Table for Daily Inspection Note3


Description of check items Remark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 Any abnormal settlement of bottom base board or bottom timber block?

2 Any access way provided from scaffolding to construction building side?

3 Maintain more than 40cm width for working platform ?

4 Gap for each working platform panels maintain less than 3cm ?

5 Gap for working platform and vertical scaffolding post member maintain not more than 12cm ?

6 Any damages of scaffolding materials using ?

7 Working platform panels tighten propperly ?

8 Any staircase access provided accodingly ?

9 Any objects(materials,tools and equipments) should not put on scaffolding ?

Wall connection and bottom base horizontal connection provided accordingly ?


10
and should not have any unfasten parts?

11 Any unfasten of close tighten parts or connection parts or fixing parts?

12 Provided signboard indicated of maximum loading capacity for the scaffolding ?

13 Provided any preventive measure for falling down such as mid framebottom framebase boards?

14 Drive tigtly and without any loosen parts in case of using wedge style?

15 Provide base board properly for material receiving stage area for prevention of fallen materials?

"keep out" action taken during temporary removal of handrail or diagonal bracing?
16
and retrieve original condition immidiately ?

17

18

19

20

Reason for Inspection: bad weather after mid size of earthquake after installation
daily baseregular base
Corrective Action Status Note 2

Bad weather & Mid class Earthquake Level Strong


wind10m/second average during 10 minutes
Heavy rainmore than 50mm rainfall in one time
Heavy snowmore than 25cm snow fall in one time
Mid.class of Earthquake more than grade 4 seismic intensity

InspectorInspector :should be Leader(manager) in charge of scaffolding assembleing


and appointed person as in charge of safety and hygiene manager who carry full
knowledge and experiences for scaffolding works
Project General
Manager Contractor

Initial by Inspector
Legends: for "Good", X for "No Good"
Note2: incase of " No good",corrective actions to be recorded
Note3: Inspection date and reason for Inspection to be Initial by General
recoreded such as after bad weather or Earthquake Contractor