CHECK LIST FOR SCAFFOLDINGS 2016.04.01
For the mont of : Works Location Checked by
4 Gap for each working platform panels maintain less than 3cm ?
5 Gap for working platform and vertical scaffolding post member maintain not more than 12cm ?
13 Provided any preventive measure for falling down such as mid framebottom framebase boards?
14 Drive tigtly and without any loosen parts in case of using wedge style?
15 Provide base board properly for material receiving stage area for prevention of fallen materials?
"keep out" action taken during temporary removal of handrail or diagonal bracing?
16
and retrieve original condition immidiately ?
17
18
19
20
Reason for Inspection: bad weather after mid size of earthquake after installation
daily baseregular base
Corrective Action Status Note 2
Initial by Inspector
Legends: for "Good", X for "No Good"
Note2: incase of " No good",corrective actions to be recorded
Note3: Inspection date and reason for Inspection to be Initial by General
recoreded such as after bad weather or Earthquake Contractor