Inspection Test Plan Number QA - -ITP- Rev. No. Sign Sign Sign Sign
Inspection Test Plan Name Date Date Date Date
SECTION 1 - REFERENCES
Procedures / Method Statements Drawings and Specifications Design Changes
SECONDARY CONTROL
PRIMARY CONTROL
InspectionDetails
Inspection Control Document and Acceptance Criteria
Operation Description Verifying Document ASGC SEC
Number Clause
Check Item Frequency Parameter Code Inspector Code Inspector
Contractor's Supervisor Signed SEC Engineer Signed SEC Engineer Signed QUALITY MANAGER Signed
Date Date Date Date
Sign
Date
REFERENCES
RY CONTROL
InspectionDetails
Client
PRIMARY CONTROL
PRIOR TO MOCK_UP
MATERIAL SUBMITTAL APPROVAL APPROVED MATERIAL SUBMITTA
INSTALLATION OF
Name: Date:
QA/QC Department site representative
Page 6 of 6 QAQC/AD110
ITY OF WONDERS
oject name
ST PLAN OF DB ENCLOSURES
Prepared by Checked by Approved By
(QA/QC Dept) (QA/QC Dept) (Project Manager)
SECONDARY CONTROL
Inspection Details
Checksheet/Verifying Document CONTRACTOR Consultant Client
Code Code
Page 7 of 7 QAQC/AD110
APPROVED METHOD STATEMENT HOLD HOLD N/A
N 3 - CLOSE OUT
TP and all associated reference documents. Completed checksheets etc are available.