Authorities Requirements

q in Project
j Design
g

Date: 31 July 2009 (Friday)


Speaker: Mr. Benny Goh
Property Development Manager
B.Eng. (Civil Engineering) M.Sc. (Construction Management )

INTEGRATED DESIGN PROJECT 1


Authorities Requirements in Project Design

Project
j Planning
A
Approval
l

Engineering
Plan
Pl

Electrical & Water Building


Telekom Reticulation Plan
Authorities Requirements in Project Design

Planning Approval

Planning
Pl i gAApprovall mustt b
be ggranted
t d before
b f
any development project can commence
Authorities Requirements in Project Design

Relevant Authorities:

1. Land & Survey Department Planning Section


State Department
Role: To receive planning application, process
and recommend to SPA for approval

2. SPA State Planning Authority


Ministry of Planning & Resource Management
Role: To approve planning application
Authorities Requirements in Project Design

Types of Planning Approval:


1. Amalgamation
- Merging of 2 or more parcel of lands

2. AVTC: Application for Variation of Title Conditions


- Conversion: Agricultural to Residential, Commercial etc.

3. Subdivision
- Process to subdivide a parcel
p of land into individual lots

4. Reclassification
- Process to reclassify: native status to mixed zone
Authorities Requirements in Project Design

Procedures & Requirements:


1. Appoint Qualified License Surveyor
Boundary Verification & Topographical Survey

2. Appoint Town Planner


Propose & Draw Planning Layout based on:

Clients Requirements
Boundary & Topographical Survey
Planning Requirements
(Development
(D l t Control
C t l Standard
St d d Manual)
M l)
Authorities Requirements in Project Design
Planning Requirements:
a. Adequate Legal Access
Authorities Requirements in Project Design

Planning Requirements:

b. Hierarchy of Urban Road

Trunk Distribution
Arterial Distribution
L
Locall Di
Distribution
ib i
Access Road
Arterial
Distribution Road

Local
Distribution Road

Trunk
Distribution Road
Authorities Requirements in Project Design

Planning Requirements:
c. Road Reserve
Functions:
Road Carriageway
Pedestrian Footpath
Drain Reserve
Utility Service Lines & Street Lights
G
Green V Verge / LLandscape
d
Authorities Requirements in Project Design

Planning Requirements:
c. Road Reserve

Typical Widths:

Trunk & Arterial : 40m & above


Local Distribution : 25m
Access Road : 9m, 15m & 20m
Authorities Requirements in Project Design

Typical Road Section:


Road Cross-Section
Authorities Requirements in Project Design

Planning Requirements:
c. Road Reserve

S
Special
i lCCross S
Section
ti

- Covered drain with footpath on top


Authorities Requirements in Project Design

Special Road Section:


Covered Drain with
Footpath on top
Authorities Requirements in Project Design

Planning Requirements:
d. Secondary Access

A Row
R off Shophouses
Sh h
6m wide side lane & 7m wide back lane
Traffic Circulation & Sewer Lines Maintenance

Residential Terraced Houses


3m wide footpath / drain reserve at rear
General Drainage & Sewer Lines
Authorities Requirements in Project Design

Secondary Access:
Authorities Requirements in Project Design

Secondary Access:
Secondary Access
Authorities Requirements in Project Design

Planning Requirements:
e. Parking Space
Residential Landed
Min. 1 C/P per unit
Residential Apartments/ Condominium
1 C/P per unit + additional 10%
1 M/P per unit
Shophouses
1 C/P per 50 sq m floor area
1 M/P per 200 sq m flfloor area
Authorities Requirements in Project Design

Planning Requirements:
f. Building Setbacks

Definition:
Min. distance of a building external wall line
to the lot boundary
Main Purposes:
Creation of open space / landscape
Natural lighting & Ventilation
Privacy
Firebreak
Fi b k
Authorities Requirements in Project Design
Building Lines
Building Setbacks: Boundary Lines

Terraced

Semi-Detached
Authorities Requirements in Project Design

Planning Requirements:
g Permitted
g. P r itt d Building
B ildi g Extension
E t i &UUsage
g

Total walled
walled-up
up length of building < 14m

Front boundary 1.5m min clear distance

Side boundary 1.5m min clear distance

Rear boundary 6m min clear distance with


max 9 sq m walled-up
walled up area allowed
Authorities Requirements in Project Design

Permitted Building Extension & Usage:

Max 14m length


Authorities Requirements in Project Design

Planning Requirements:
h Open
h. O Space
S

Private Open Space


- Within house boundary
- Created by building setbacks

Public Open Space


-A ibl b
Accessible h generall public
by the bli
- Rule of thumb: 10% of total area
Open Space
SAMARIANG AMAN
4 ACRES OPEN SPACE
Authorities Requirements in Project Design

Planning Requirements:
i. Density

8 units per acre for residential

10 units per acre for shops

Conversion: 1 acre = 4,046.85 sq m


Authorities Requirements in Project Design

Planning Requirements:
j. Substation Requirements
- Syarikat SESCO Berhad

k. Environmental Impact Accessment


- NREB
- Project Developments > 10 ha
Typical Planning
Submission Layout
y
Authorities Requirements in Project Design

Procedures & Requirements:


3. Planning Approval granted
- Valid for 2 years / option to extend upon expiry

4. Draft Subdivision Plan by Town Planner


A plan that shows plot no, permitted usage, no of
storey, minimum building setbacks and area for
eachh particular
i l subdivided
bdi id d llot
DRAFT PLAN
Authorities Requirements in Project Design
Procedures & Requirements:

5. Survey Plan by Qualified License Surveyor

A plan that shows approved survey lot and area


size for each particular subdivided lot

The survey lot and area size for every lot is used for
registration with Land & Survey Department for title
issuance
Authorities Requirements in Project Design

Planning Principles:

Creation of a sustainable and functionable


development planning layout
Authorities Requirements in Project Design

Engineering Plan Approval


Authorities Requirements in Project Design

Engineering Plan:
Shows:

1.
1 Road
R d Width & Pavement
P t Thickness
Thi k
2. Drainage Sizes & Sewer Lines Details
3
3. Road Culverts & Entrance Crossover
4. Traffic Junction Details
5. Retainingg Structures
6. Road Marking & Signage
7. Landscape Details
Authorities Requirements in Project Design

Who is Responsible?
C & S Engineer is appointed as Submitting Person

C & S Engineer has to be a Professional Engineer


to sign & endorse Engineering Plan

C & S Engineer shall design & submit Engineering


Plan with calculation to authorities for approval

C & S Engineer shall be responsible for the design


off the
th Engineering
E i i Plan
Pl
Authorities Requirements in Project Design

Design Requirements

Planning Approval Layout & Road Reserve

Design Standards to JKR Arahan Teknik R6/U6 to


R1/U1 (R Rural & U Urban)

Design for Drains & Culverts to DID Standards &


MASMA Manual Saliran Mesra Alam Malaysia
Engineering Plan

Drainage Flow

Road System

Road Platform
Authorities Requirements in Project Design

Relevant Authorities
1. Land & Survey Samarahan Planning Section

2. Local Council Majlis Daerah Samarahan

3 JKR Samarahan
3.

4. DID Samarahan
Engineering Plan Submission Flowchart

Re-submission Submitting Person

Land & Survey

Council JKR DID

Compile Comments by
Land & Survey

No Yes
Comply ? Approval
Authorities Requirements in Project Design

Land & Survey Planning Section


Roles & Responsibilities:
Coordinate Engineering Plan submission with all
other authorities
Ensure full
E f ll compliance
li to
t Planning
Pl i Layout
L t
Approval & Draft Deposited Plan
Convey Engineering Plan approval
Authorities Requirements in Project Design

Local Council Majlis Daerah Samarahan

Roles & Responsibilities:

Check adequacy of Road, Drainage, Sewer,


Landscape design etc
Issuance of Road Completion Certificate
F
Future
t re Maintenance
Authorities Requirements in Project Design

JKR Samarahan
Roles & Responsibilities:

Adequacy of design for Road Pavements & Traffic


Junction
Authorities Requirements in Project Design

DID Samarahan
Roles & Responsibilities:

Adequacy of design for Drainage Flow & Sewer


Lines
Authorities Requirements in Project Design

Submission Requirements:

a. Engineering Plan x 6 sets


Endorsed by C & S Engineer & signed by Owner

b. Submission Fees
N i l submission
Nominal b i i ffees off RM100 payable
bl

g Calculations
c. Design
Drain Sizes, Drainage Flow Pattern, Structural
Design, Road Pavement Design etc.
Authorities Requirements in Project Design

Submission Requirements:

d. Documents from Owner


- Authorization letter
- Ownership of land: land title, IC or company
registration

e. Other Relevant Documents


- Approved Planning Layout
- Draft Subdivision Plan
Authorities Requirements in Project Design

Application for Road Completion Certificate

a. Submission of following documents to Council


- Standard Council Forms
- As-built Plans (if any variation)

b. Joint site inspection by all authorities

c. Issuance of Road Completion Certificate if


compliance
Authorities Requirements in Project Design

Building Plan Approval


Authorities Requirements in Project Design

Building Plan:

An Architectural Plan that shows design layouts,


elevations, cross-sections and details of a
proposed building

Building
B ildi Pl
Plan must comply
l with
i h the
h BBuilding
ildi B By-
laws contained in the Fourth Schedule, Building
Ordinance 1994
Authorities Requirements in Project Design

Architect:

An Architect is appointed to design, prepare and


endorse Building Plan for submission to authorities
for approval

An Architect is also known as the Submitting


Person and is responsible for the design work
Authorities Requirements in Project Design

Relevant Authorities:

1. Local Council Majlis Daerah Samarahan

2. Land & Survey Samarahan Planning Section

3. BOMBA (not applicable for landed residential)


Authorities Requirements in Project Design

Local Council Majlis Daerah Samarahan

Roles & Responsibilities:

Register
R i t & record d Building
B ildi Plan
Pl submission
b i i
Coordinate checking of Building Plan by L & S
and BOMBA
Check for compliance to Building By-laws by
Buildingg Section,, Engineering
g g Section & Health
Section
Issuance of Occupation Permit
Authorities Requirements in Project Design

Technical Requirements:

a. Natural lighting & ventilation


- window openings > 10% of floor area

b. Minimum room size


- all habitable room > 6.5
6 5 sq m
- room width (any direction) at least 2m

c. Height clearance
- living, dining & bedrooms: at least 2.8m
- kitchen
ki h & w/c: / at least
l 2.5m
25
Authorities Requirements in Project Design

Technical Requirements:
d. Party wall
- at least 200mm thick & of solid masonry
- extend at least 230mm beyond building lines
e. Perimeter fencing
- 1.8m ht for solid fences & 2.75m for non-solid
f. Staircase
- riser < 180mm & width >260mm
- max 16 riser between any 2 landings
- landing
l di g depth
d th / width
idth min
i 900mm
900
Authorities Requirements in Project Design

Technical Requirements:
g. Built-in / conceal timber
- treated & coated with wood preservative
h. Roof pitch & surface drainage runoff
- pitch at least 18 for concrete/clay roof tiles
- pitch at least 2 for metal roof decking
- gutter & rain water down pipes
i. Damp proof courses
- all walls at ground floor and all bathroom
walls
ll
Authorities Requirements in Project Design

Technical Requirements:
j. Water-storage
- 150 gallons to water board requirement
k. R.C. lintel beams
- install over doors, windows and openings
l. Wall / floor finishes
- kitchen / bathroom wall: min 1.5m ht tiles
- bathroom floor must be non-slip tile finishes
- min cement screed finishes for all other areas
Authorities Requirements in Project Design

Technical Requirements:
m. Septic tank
- size / capacity depends on building size
- ventilation pipe required
- discharge of effluent pipes to road side drains
n. Building surface runoff
- perimeter drain to discharge surface runoff to
roadside drain
o. Materials & specifications
- to be clearly spelt out in the building plan
Solid Fencingg max 1.8m high
g
Lintel Beam
Storage 150 Gallons (680 L)
Party Wall 200mm thk min & 230mm above building
Authorities Requirements in Project Design

Local Council Majlis Daerah Samarahan


Pl S
Plan Submission
b i i R Requirements:
i t
a. Building Plan x 5 sets
- endorsed by Architect & signed by Client / Owner

b. Submission Fees
- RM1 per sq m for wall-up area; 50% off for cover area
- 2nd & above similar building: 50% off
- minimum fee RM100 payable

c. Application Forms
- Building Plan Application Forms & Form A
Authorities Requirements in Project Design

Local Council Majlis Daerah Samarahan


Pl S
Plan Submission
b i i R Requirements:
i t
d. Building Plan Checklists
- Checklists for Building, Engineering & Health
- Endorsement & certification by Architect

e. Documents from Client / Owner


- Authorization letter
- Ownership of land: land title,
title IC or company
registration
Authorities Requirements in Project Design

Local Council Majlis Daerah Samarahan

Plan Submission Requirements:


f. Other Relevant Documents
- Approved Planning Layout
- Draft Subdivision Plan
- Survey Plan
- Approved Engineering Plan
Authorities Requirements in Project Design

Local Council Majlis Daerah Samarahan


Upon Approval of Building Plan:
a. Submission of Structural Plan
- by
b C & S Engineer
E i
- complete with structural calculation
- Forms A & B

b. Work Commencement & Completion of Setting Out


- byy Architect
- Forms C & D
Authorities Requirements in Project Design

Land & Survey Samarahan Planning Section

Roles & Responsibilities:

Check
Ch k for
f compliance
li to
t Planning
Pl i LLayoutt Approval,
A l
Draft Deposited Plan & Survey Plan
Authorities Requirements in Project Design

Land & Survey Samarahan Planning Section

Technical Requirements:

a. Building
B ildi usage & no off storey
t

b Setback Lines
b.

c. Buildingg Length
g

d. Overall plot areas


Authorities Requirements in Project Design

Land & Survey Samarahan Planning Section

Plan Submission Requirements:

a B
a. Building
ilding Plan
- Received from Local Council

b. Documents from Architect


- Building Plan Submission Form
- Plotted Plans
PLOTTED PLAN
Rear Setback

Front Setback
Authorities Requirements in Project Design

Land & Survey Samarahan Planning Section

Plan Submission Requirements:

c. Other Relevant Documents


- Approved Planning Layout
- Draft
D ft Subdivision
S bdi i i PlPlan
- Survey Plan
- Letter of approval for Engineering Plan
Authorities Requirements in Project Design

Application for Occupation Permit

a. Submission of following documents to Council


- Form F by Architect and C & S Engineer
- As-built Building Plans (if any variation)
- Septic Tank Warranty

b. Site inspection by Council

c. Issuance of O.P. if all comply to Building Plan


Authorities Requirements in Project Design

Water Reticulation Approval


Authorities Requirements in Project Design

Water Reticulation:

Main function is to supply clean, potable water at


consistent pressure to all households

Water Reticulation Plan is designed and prepared


f submission
for b i i b by a professional
f i l C & S Engineer
E i
Authorities Requirements in Project Design

Design Requirements

Planning Approval Layout & Road Reserve

Design Standards to MWA Malaysia Water


Associations
Authorities Requirements in Project Design

Relevant Authorities

1. Kuching Water Board KWB

2. BOMBA
Water Reticulation Submission Flowchart

Re-submission Submitting Person

KWB

BOMBA

Compile Comments by
KWB

No Yes
Comply ? Approval
Authorities Requirements in Project Design

Kuching Water Board - KWB

Roles & Responsibilities:


Coordinate Water Reticulation Plan submission
with all other authorities
Design checks for water reticulation submitted
Convey approval
Future maintenance of water distribution network
Authorities Requirements in Project Design

BOMBA

Roles & Responsibilities:


Checks on pillar hydrants
utu e maintenance
Future a te a ce of
o pillar
p a hydrants
yd a ts
Authorities Requirements in Project Design

Submission Requirements:

a. Water Reticulation Plan x 4 sets


Endorsed by C & S Engineer & signed by Owner

b. Design Calculations
T
Types off Pipes,
Pi Pipe
Pi SiSizes, W
Water
t S Supply
l Fl
Flow
Pattern etc.
PRESSURE
CHART

- For design
g
of water
distribution
network
Authorities Requirements in Project Design

Submission Requirements:

c. Documents from Owner


- Authorization letter
- Ownership of land: land title, IC or company
registration

d. Other Relevant Documents


- Approved Planning Layout
Authorities Requirements in Project Design

Application for Commencement of Water Supply

a. Submission of following documents to KWB


- Standard KWB Forms
- As-built Plans
- BOMBA approval on pillar hydrant inspection

b. Testing: Flushing, Pressure & Chlorination

c. Joint site inspection by all authorities


Authorities Requirements in Project Design

Application for Commencement of Water Supply

d. Payment of flushing & pressure test water


consumption
co su pt o bills
b s

e. Issuance of Water Supply Commencement


Letter upon compliance
200mm DI Pipe

Existing 300mm
DI Pipe

150mm DI Pipe

Pillar Hydrant
Authorities Requirements in Project Design

Electricity Supply & Telekom Lines


Authorities Requirements in Project Design

Electricity Supply & Telekom Lines:

An M & E Engineer is appointed to design and


submit Electricity Supply Scheme & Telekom Lines

Electricity Supply Syarikat SESCO Berhad

Telekom Lines Syarikat TELEKOM


Substation

Mini Pillar

SESCO Cable
Marking
M ki g
O h d HT Lines
Overhead Li
Overhead Supply
pp y
Underground
g Supply
pp y
Authorities Requirements in Project Design

Submission Requirements:

a. Electrical Plan x 4 sets


Endorsed by M & E Engineer & signed by
Owner

b LLoading
b. di g Calculations
C l l ti
Substation, Mini Pillar, HT & LT Cables & Supply
Source etc
etc.
Authorities Requirements in Project Design

Submission Requirements:

c. Documents from Owner


- Authorization letter
- Ownership of land: land title, IC or company
registration

d. Other Relevant Documents


- Approved Planning Layout
Authorities Requirements in Project Design

Energizing of Electricity Supply

a. Application to SESCO upon work completion

b. Joint site inspection with SESCO

c. Energize Electricity Supply


Authorities Requirements in Project Design

THANK YOU