You are on page 1of 4

DEPARTMENT OF CIVIL ENGINEERING

WATER SUPPLY AND SANITARY FITTING

June-2017
at Kanpur

Submitted to the
The partial fulfillment of the requirement for diploma

Conducted by:
Board of Technical Education Uttar Pradesh Lucknow

Motivated by:
Dr. R.K. Singh
Principal
TOTAL ESTIMATING COST RS. 67949.00
Under the Guidance of:
Under the Guidance of Under the Guidance
Er. S.L. Rajput Er. A.K. Pandey
(H.O.D.) Drawing Inst. in Civil
Engineering
Civil Engineering Er. C.P. Awasthi
Drawing Inst. in Civil
Engineering

Prepared by:
SHIVALI TRIPATHI
SPN NO. M0120414150
Batch-2014, Second Shift
Branch- Civil Engineering

GOVERNMENT POLYTECHNIC KANPUR


DEPARTMENT OF CIVIL ENGINEERING
CERTIFICATE

This is to certify that Project entitled Water supply & Sanitary Fittings which is
submitted by Shivali Tripathi (M0120414150) in partial fulfillment of the requirement
for the award of diploma in Civil Engineering, Govt. Polytechnic Kanpur is a record of
the candidate own work carried out by him under my/our supervision. The matter
embodied in this Project is original and has not been submitted for the award of any other
diploma.

Dr. R.K. Singh Er. S.L. Rajput


Principal H.O.D.
Government Polytechnic, (Civil Engg. Department
Kanpur Government Polytechnic,
Kanpur

Index
S.N Particular Page No.
o. Start Finis
h
1. Project Problem
2. Need of Project
3. Specification
4. Analysis of Cost
5. Detailed Estimate & Abstract of Cost
6. Total Cost
7. Reference
8. Drawings

Department of Civil Engineering

Project Problem
Prepare a detailed project report for the maintenance of Civil Engg. Block situated
in Polytechnic Campus.

The Project Report should include the following civil work-


1. Patch Repairing of walls and floor
2. Replacement Glass, Panel in door and window
3. White washing of room, corridor entrance hall etc.
4. Cement, Paints of each outer faces or Building
5. Replacement of unserviceable water supply and sanitary fitting.
6. Painting are door and window terrace repairing of roof.
7. Project Report should also include details specification of plaster work, cement
concrete, painting and sanitary fitting.
8. Line plan of building of each story with room corridor, entrance hall etc.
9. Front and side elevation of Building
10. Drawing of terrace plan also prepare the abstract of cost of the project on the
bases or prevelling S.O.R.
11. If any item not covered is S.O.R. calculate the rate at that item by analysis of rate.

You might also like