Professional Documents
Culture Documents
6. Create the Period Mapping. I have created the Application mapping for
it to take precedence.
7. Create the Category Mapping, I have created the application mapping
here as well.
8. Create the Data Load mapping, in this case I have ensured a like
mapping on all the Dimensions in the Import Format. Eg:-
9. Create the Data Load Rule and select the .DAT file, Execute,