You are on page 1of 44

APPLICATIONS

of the
ENGINEERING
in the
AERONAUTICS

PRESENTED BY: Jos Juan Jareo Diz-Lois

Airbus ESDZ - Jos J. Jareo Diz-Lois


The Consortium

Date of foundation:July 10, 2000


Foundation companies: Aerospatiale Matra SA
CASA (Construcciones Aeronaticas SA)
DaimlerChrysler Aerospace AG

Gerhard Jos Mara Lionel


Schrder Aznar Jospin

The heads of government in 2000 confirm the extension of


EADS to integrate the three bounding partners

EADS today is the second-largest group in the global aerospace and


defence industry, with a unique range of products and services
Airbus ESDZ - Jos J. Jareo Diz-Lois Page 2
Competitive Position
Based on 2003 average exchange rates /$: 1.128 /: 0.691

Revenues Order Book


bn bn

Boeing 44.8 EADS 179.3

EADS 30.1 Boeing** 92.9

Lockheed Martin 28.2 BAE Systems 69.3

Northrop-Grumman 23.2 Lockheed Martin 68.2

BAE Systems 18.2 Northrop-Grumman 51.6

Raytheon 16.1 General Dynamics 36.4

General Dynamics 14.7 Raytheon 24.4

Thales 10.6 Thales 18.7

Finmeccanica* 6.3 Finmeccanica* 16.6

* Aerospace and defence activities


** Commercial aviation based on catalogue prices for EADS, contractual prices for Boeing

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 3


A Global Leader

AIRBUS Commercial Aircraft


No.1

Helicopters
No.1
Commercial Launch Vehicles
No.1

Missile Systems
No.2

Satellites
No.3
Mil.Transport Aircraft

No.3
Military Aircraft
No.4
Page 4
EADS Structure
Military EADS
Airbus Aeronautics Defence
Transport SPACE

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 5


EADS-Employees by Divisions as 2005

Total Spain 8700 Employees


Airbus ESDZ - Jos J. Jareo Diz-Lois Page 6
Global Presence

a world of cultural diversity

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 7


Welcome
to the world of Airbus

Airbus ESDZ - Jos J. Jareo Diz-Lois


Airbus 2005 Current Programmes

Seats A380

600
FRANCE

500
GREAT BRITAIN
AIRBUS
SPAIN
AIRBUS
GERMANY INTEGRATED
A340-600 COMPANY

400 EADS
A340
A340-500
BAE
SYSTEMS
A330

300 A330-200
A300
A310
A321
200 A320
A319

ILFC
A318

100
89

97
69 70 71
72 73 74 75 76 77 78
79 80 81 82 83 84
85 86 8787
88
88 90 91 92 93
94 95
96 98 01

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 9


DEVELOP NEW AIRCRAFT PROCESS MILESTONES PLANIFICATION

M3
M3 M5
M5 M7
M7 M13

FEASABILITY CONCEPT DEFINITION DEVELOPMENT SERIES

Concept Definition Development Phase


Phase Phase

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 10


AIRCRAFT DEVELOPMENT

I. STRUCTURE
II. SYSTEMS
III. CABIN CONFIGURATION
IV. ENGINES

In the development of an aircraft the following points have a high importance for
the design:
Materials selection (metallic and non metallic)
Manufacturing
Standard parts (mechanics, systems, electrics)
Corrosion prevention
Requirements and specifications, weight, costs,
Testing
Resources (work sharing)
Airbus ESDZ - Jos J. Jareo Diz-Lois Page 11
STRUCTURE

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 12


AERODYNAMIC SURFACES

Aerodynamic shape of the A/C for getting flight and performances requirements
(lift, drag, noise, speed, etc.)
A380 Belly Fairing A380 Section 19 A380 Section 19.1

A380 HTP A380 Rudder A380 Wing

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 13


PRESSURES DISTRIBUTION

Analytical studies aimed to estimate the pressure coefficient on each part of the
aircraft surfaces in a wide range of flight conditions and configuration cases

Euler algorithm Panels method

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 14


PRESSURES DISTRIBUTION

RANS (Reynolds Averaged Navier-Stokes) Method

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 15


STRUCTURAL ARRANGEMENT
Geometrical references of aircraft external and internal shapes, and the major co-
ordinate systems and datum lines A380 Section 19
A380 Belly Fairing

A380 Wing
A380 HTP

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 16


DESIGN STUDIES AND ALTERNATIVES
Different possibilities of a technical solution to be evaluated by the involved
departments that meet one or several requirements which aim at defining the
optimised solution at the lower cost in the shortest time.
WITH CENTER BOX WITH CENTER JOINT (NO CENTER BOX)

CENTER BOX
CENTER JOINT

LATERAL
BOX

LATERAL BOX

EXAMPLE A330/340 EXAMPLE A340/600


Airbus ESDZ - Jos J. Jareo Diz-Lois Page 17
SPACE ALLOCATION MOCK-UP

Simplified envelope volumes for structure and system parts (including


installation) allowing to allocate space between structures and systems and to
validate structure and systems architectures

A380 Belly Fairing A380 Section 19.1

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 18


SPACE ALLOCATION MOCK-UP

A380 HTP A380 Section 19

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 19


DESIGN - STRESS Design loop (Metallic or CFRP parts)

DESIGN STRESS

Definitive part

Design concept FEM with loads

Stress results

Without
Official part drawing Hole Without
New dimensioning Hole

Two new Flanges:


thickness = 3.5 mm
New proposal

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 20


FEM AND STRESS ANALISYS
GENERAL AIRCRAFT BALANCE
AIRCRAFT LIFT LOAD
AIRCRAFT C.G. APPLICATION POINT (EXCEPT
HORIZONTAL TAILPLANE)

HORIZONTAL TAILPLANE
FORCE APPLICATION
POINT

TOTAL FUSELAGE WEIGHT FWD OF


TOTAL FUSELAGE WEIGHT AFT OF

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 21


FEM AND STRESS ANALISYS

Model of one A/C component simulating its geometry, materials


properties, types of attachment, constraints, etc

TYPICAL HTP
PRELIMINARY FEM

HTP STRESS ANALISYS

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 22


FEM AND STRESS ANALISYS
SECTION 19 AND 19.1. FINITE ELEMENT MODEL (FEM)

PRELIMINARY RESERVE FACTOR ANALYSIS (IMPACT OF A NEW LOAD LOOP)


Airbus ESDZ - Jos J. Jareo Diz-Lois Page 23
FEM AND STRESS ANALISYS

HTP AND SECTION 19. FINITE ELEMENT MODEL (FEM)

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 24


PRELIMINARY SIZING (A380 Example)
Section 19 Lateral Upper panel thickness distribution
Baseline providing minimum data (basic dimensions and thickness) to start
production of 3D models

SK239

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 25


PRELIMINARY SIZING (A380 Example)

Section 19 composite frame


Linner

Actual frame
section
Mouse hole
section
Skin panel
Hweb
L
d

Lst

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 26


PRELIMINARY SIZING (A380 Example)

Section 19 metallic frames joint

3 rivets at
each side of
the joint A

A
2 columns of rivets at
each side of the joint

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 27


DESIGN PRINCIPLES

Technical solutions to the A/C that meets the applicable requirements.


It presents detailed information in order to demonstrate that the design fulfil all the
requirements (stress, production, economy, reparability, supportability,) and to
enable the validation of the design by all the stake holders through a maturity process

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 28


DESIGN PRINCIPLES (Maturity levels A, B, C)

Maturities provide information about the progress status (real and planned) of a
definition, and consequently about the level of confidence in the proposed solution.

M3 M5 M7
Concept Definition Definition

Design
Design Review
Review Design
Design Review
Review

Maturity Maturity Maturity


Level A Level B Level C
Many solutions One solution is
are studied and selected and
discussed validated

Ennhha
ann meenntt
cceem
F I
IDDEEN
N CE
C E E DP
CO
C N
ON F Realise Feasibility
Sum up good ideas studies Completed
Airbus ESDZ - Jos J. Jareo Diz-Lois Page 29
SYSTEMS

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 30


SYSTEMS and EQUIPMENT LAY-OUT DEFINITION

Location of systems components on the structure, like fuel, water, hydraulic


pipes, mechanical commands (rods, cables, etc.), electrical harnesses, etc.
The attachment of those components to structure (brackets) is also part of
Systems Lay-out.

ATA 21. AIR CONDITIONING/VENTILATION


ATA 25. SUPPLEMENTAL COOLING
ATA 27. FLIGHT CONTROLS
ATA 28. FUEL
ATA 29. HYDRAULICS
ATA 32. LANDING GEARS
ATA 33. LIGHTS
ATA 36. BLEED
ATA 38. WATER & WASTE
ATA 25 & 38. DRAINAGE
ATA 92. ELECTRICS
Location of equipments on the structure, like landing gears, electronic bays,
electric/hydraulic/pneumatic equipments, actuators, etc. The linking elements
between them are part of the Systems Installation

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 31


BLEED AIR

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 32


FLIGHT CONTROLS

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 33


LANDING GEAR

Body landing gear

Nose landing gear

Wing landing gear

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 34


CABIN CONFIGURATION

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 35


CABIN CONFIGURATION

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 36


HTP A380

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 37


S19 A380

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 38


COCKPIT A380

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 39


WING BOX BODY A380

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 40


S18 A380

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 41


A380

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 42


A380

Airbus ESDZ - Jos J. Jareo Diz-Lois Page 43


Thank you
for your attention

Please visit www.airbus.com for more information


Airbus ESDZ - Jos J. Jareo Diz-Lois Page 44