No Des

1 DISMENTLLING & REMOVALS

2 EARTH WORK (EXCAVATION & EM

3 CONCRETE

4 MASONARY WORK

5 FLORING WORK

Page 1 of 209
Sr.
No Des

6 SURFACE RENDERING

7 WOOD WORK

8 Paint Work

9 STEEL WORK

10 MESLINIOUS .

TOTAL CIV
Page 2 of 209
Sr.
No Des

11 INTERNAL WATER SUPPLY & SAN

12 EXTERNAL WATER SUPPLY & SEW

13 ELECTRICAL WORK

G. TO

NET TO
Page 3 of 209
Sr.
No Des

14 ADDITIONAL CIVIL (Extra/ Non B

15 ADDITIONAL ELECTRICAL (Extra

FINAL T

Less Alre

Page 4 of 209
Sr.
No Des

Net Tota

Page 5 of 209
CAPITAL BUILDERS ISL
Restoration of GPO
IPC -06
SUMMARY OF CO

Description

SMENTLLING & REMOVALS

RTH WORK (EXCAVATION & EMBANKMENT)

NCRETE

ASONARY WORK

ORING WORK

Page 6 of 209
Restoration of GPO
IPC -06
SUMMARY OF CO

Description

RFACE RENDERING

OOD WORK

aint Work

EEL WORK

ESLINIOUS .

TOTAL CIVIL WORK.


Page 7 of 209
Restoration of GPO
IPC -06
SUMMARY OF CO

Description

TERNAL WATER SUPPLY & SANITARY INSTALLATION

TERNAL WATER SUPPLY & SEWERAGE

ECTRICAL WORK

G. TOTAL

Less Rebate @ 3%

NET TOTAL
Page 8 of 209
Restoration of GPO
IPC -06
SUMMARY OF CO

Description

DDITIONAL CIVIL (Extra/ Non BOQ)

DDITIONAL ELECTRICAL (Extra/ Non BOQ)

FINAL TOTAL

Less Retention Money @ 5%

Update Summery

Less Already Verified upto 5th IPC

Page 9 of 209
Restoration of GPO
IPC -06
SUMMARY OF CO

Description

Net Total

Page 10 of 209
S ISLAMABAD
GPO Murree
06
OF COST
Privious Bill This Bill To date G. Total
Amount Amount Amount
(Rs) (Rs) (Rs)

683,711.16 0.00 683,711.16

158489.32 0.00 158489.32

1040061.00 89709.36 1129770.36

1916995.13 0.00 1916995.13

1647179.62 0.00 1647179.62

Page 11 of 209
GPO Murree
06
OF COST
Privious Bill This Bill To date G. Total
Amount Amount Amount
(Rs) (Rs) (Rs)

1314854.30 31240.68 1346094.98

4412591.60 71404.64 4483996.24

220766.85 155565.00 376331.85

90549.73 0.00 90549.00

12281172.81 1205831.40 13487004.21

23766418.17 1553751.08 25320121.87


Page 12 of 209
GPO Murree
06
OF COST
Privious Bill This Bill To date G. Total
Amount Amount Amount
(Rs) (Rs) (Rs)

344568.35 187559.00 532127.35

2236805.00 64081.00 2300886.00

1241900.00 1760249.00 3002149.00

27589691.52 3565640.08 31155284.22

827690.75 106969.20 934658.53

26762000.77 3458670.87 30220625.69


Page 13 of 209
GPO Murree
06
OF COST
Privious Bill This Bill To date G. Total
Amount Amount Amount
(Rs) (Rs) (Rs)

13237138.40 6467992.88 19705131.28

641400.00 6984002.00 7625402.00

40640539.17 16910665.76 57551158.98

2032026.96 845533.29 2877560.25

38608512.22 16065132.47 54673644.69

38608512.22

Page 14 of 209
GPO Murree
06
OF COST
Privious Bill This Bill To date G. Total
Amount Amount Amount
(Rs) (Rs) (Rs)

16065132.47

Page 15 of 209
Page 16 of 209
Page 17 of 209
Page 18 of 209
Page 19 of 209
Page 20 of 209
Page 21 of 209
Page 22 of 209
Page 23 of 209
Page 24 of 209
Page 25 of 209
CAPITA
Restor

Sr
Description Unit Rate
No

1 DISMENTLING & REMOVALS

1.01 Dismantling and removal of wooden Trusses, Purlins, CGI sheeting etc.
Sft 15

1.02 Dismantling of RCC Beams,columns,slabs etc.


Cft 60

1.03 Removal of Door and Windows


Sft 10

1.04 Dismentling of Floor.


Sft 15

Page 26 of 209
Restor

Sr
Description Unit Rate
No

1.05 Removal of front steps marble/Terrazo/Masonry etc.


Sft 10

1.06 Removal of first floor aluminum windows.


Sft 10

1.07 Removal of External Plaster.


Sft 12

1.08 Removal of Internal Plaster.


Sft 7

1.09 Dismantling of first floor walls.


Sft 10

1.10 Dismentling of Existing Plumbing.


Job 30000
Page 27 of 209
Restor

Sr
Description Unit Rate
No

1.11 Removal of existing False ceiling


Sft 5

Page 28 of 209
Restor

Sr
Description Unit Rate
No

EARTH WORK
2
(EXCAVATION & EMBANKMENT)

Excavation in foundation in all types of soil i/c Boulders Rock for wall,
2.01 columns and steps etc. i/c dagbelling, re-filling around structures with
excavated earth in 6" layers etc.
Cft 33

Providing & carrying out termite proofing using "FMC Bilflex "or
2.02 approved equivalent on all areas of soil in contact with the payment
structure & under floors after the earth filling etc.
Sft 14

3 CONCRETE

Page 29 of 209
Restor

Sr
Description Unit Rate
No

P/L Plant Mix Cement Concrete (1:4:8) using stone ballast 1-1/2"
3.01 maximum nominal size i/c compaction, curring etc. in foundation & under
floors.

(a)
4" thick under foundation. Cft 250

(b)
4" thick under floor. Cft 215

Providing & Laying 2" thick PCC 1:2:4 DPC i/c 2mm thick
3.02
bitumen coating etc. complete with all respect.
Sft 175
P/L RCC (1:2:4 ) with a minimum cube strength of 3000 psi at 28 days ,
3.03
etc.

Page 30 of 209
Restor

Sr
Description Unit Rate
No

(a )
Footing CFT 312

(b)
First Floor Beams +Lintels CFT 425

Page 31 of 209
Restor

Sr
Description Unit Rate
No

4 MASONARY WORK

Providing and laying First class brick masonery of approved quality shape
4.01 design and thickess in sub/ superstructure Laid in lime martor inculading
all sqare folding etc.complete in all respect.

(a) Ground Floor


Cft 335
(BRICK WORK) :-
P/L first class brick masonry of approved quality, shape, design and
4.02
thickess in sub/ superstructure laid in 1:3 csm morter i/c all scaffolding
etc.

Page 32 of 209
Restor

Sr
Description Unit Rate
No

(a)
Ground Floor Cft 350

(b)
First Floor Cft 360

(STONE MASONARY)
P/L hammer dressed coursed masonry in shapes and designs and thickness
4.03
as per original/existing in sub/superstructure laid in lime mortar i/c all
scaffolding etc.

(a)
Ground Floor Cft 220

(b)
First Floor Cft 210
Page 33 of 209
Restor

Sr
Description Unit Rate
No

4.04 Restoratiomn of the stone massonery wall to the original shapes after
necessary cleaning filling of voids and poitnting with lime surkhi khakka
mortar similar to the original and replacement of damaged stone complete
in all respect. Sft 75

5 Tile work

5.01 Providing & Laying 2" to 1.5" thick p.c.c 1:2:4 Under Floor Sft 55

Page 34 of 209
Restor

Sr
Description Unit Rate
No

5.02 Providing & fixing White marbble Tiles On floor Sft 330

5.03 Providing & Laying white Marble Tile Skirting . Sft 150

Providing and laying ceramic/porcelain tiles dadu 10mm thick R.A.K or


5.04 approved equivalent including base mortar, fixing, filling the joints with
neat mortar slurry of white color.

(a) Providing & laying ceramic Porcelain Tiles on bath room floors Sft 340

Page 35 of 209
Restor

Sr
Description Unit Rate
No

(b) Bath rooms and kitchen wall Sft 340

6 SURFACE RENDERING

Lime mortar pointing on the external surface of stone masonery walls after
6.02 rakaing of joint including all scafolding , formwork complete in all
respects.
Sft. 45

Page 36 of 209
Restor

Sr
Description Unit Rate
No

(INTERNAL PLASTER):-
P/L traditional lime, surkhi, khakka plaster 1" thick on average consisting
6.03
of 1.5part lime, 1 part surkhi and 1 part khakka (1.5:1:1) under coat mixed
Addm
with chopped jute @ 3.5 kg/100 sft of plaster with a top coat of lime slurry
etc.
Sft. 69

Page 37 of 209
Restor

Sr
Description Unit Rate
No

7 WOOD WORK

P/F Deodar wood double glazed windows (size & thickness as per
original) with 5mm thick glazed clear glass, i/c steel Grill wire netting i/c
7.01 all fittings, tower bolts,sliding bolt, hinges,door stoper etc. i/c three coats
of synthetic enamel paint etc. complete.

Sft. 2840

Providing and fixing deodar wood panel doors includings doors frames as
7.02
per originel desing or as shown on the drawing.
Sft. 2600

7.03 Deodar Wood Columns and Beams at Ver.


Sft 8000

Page 38 of 209
Restor

Sr
Description Unit Rate
No

7.04 Deodar Wood canopy (window).


Nos 55000

7.05 Deodar wood canopy(Front ent. Ver.)


Nos 65000

8 Painting

Providing & Applying of 3 coats of ICI, Berger ,Nippon, Ennamal paints


8.02
of approved shade. Sft 36

Page 39 of 209
Restor

Sr
Description Unit Rate
No

9 Providing and fixing of Deformed Steel

Providing laying and fixing of Deformed Reinforcing bars with minimum


9.1 yield strength of 60000 Psi including cutting bending placing and binding kg 127
in position as per drawings.

Page 40 of 209
Restor

Sr
Description Unit Rate
No

10 MISCELLANEOUS (New Wooden Truss i/c GI Sheeting)

Providing & Fixing Deodar wood trusses and purlins similar to the
existing trusses and purlins i/c 22 SWG GI corrugated sheet roofing with
10.01
overlap of atleast 1.5 corrugations sideways and 6"-9" longitudnally i/c all
nuts, bolts washers and all other fixing arrangments etc. complete.

a Replacement of damaged purlins/trusses Cft 5500

b Repair of damaged purlins/trusses Cft. 5500

Page 41 of 209
Restor

Sr
Description Unit Rate
No

d Doedar wood false ceiling . Sft 520


Providing & Laying rubble masonery hammer dressed in supper
structure in lime mortar pointing in the shape and thickness as
shown on the drawing including all formwork , scafollding etc.

10.02 Nos 35000

Providing and fixing Granite/white marble slab with a minimum thickness


of 3/4" on steps with base mortar, including filling joints with matching
10.04
color mortar, curing, polishing etc., complete in all respects as per
drawings and as directed by the Engineer.

Sft. 1200

Page 42 of 209
Restor

Sr
Description Unit Rate
No

(B) ?
Sft 600

10.05 Restoration of Stone Retaining Wall


Sft. 150
Restoration of the existing stone masonry buttress walls with the stones of
the same size and shape as that of the existing buttress walls, laid in lime
10.06
mortar as per exisiting, including all appurtenances, complete in all
respects Sft. 160

Providing & fixing in place 3"dia 30' long GI flag pole with brackets and
10.09
pulli at the top end.
Nos 27000

Page 43 of 209
Restor

Sr
Description Unit Rate
No

Provuding & Fixing sutface tyoe fire hydrant of aooroved quality along
with mild steel sheet fire cabnite size (24"x24"x9") with glass front ,
2.5"diea canvas hose 100' long with related fitting /fixture etc.
10.10

Nos 50000

10.11 Hammer dress Stone massonery ratianing Wall.


Cft 200

Providing heating radiators comprising of boiler piping & 12 radiators


10.13
with all fittings
Job 1950000

10.14 Installation of Insta Gas Geysers


Nos 10000

Page 44 of 209
Restor

Sr
Description Unit Rate
No

10.15 Providing & Laying Tuff Pavers


Sft 150

G. TOTAL CIVIL WORK.

Page 45 of 209
Restor

Sr
Description Unit Rate
No

11 INTERNAL WATER SUPPLY & SANITARY INSTALLATION

Providing & Fixing European A Quailty Water closct make porta or


11.01 Nos
approved equlvalant.
14000

Providing & Fixing Chaina Arissa Patter w.c A Quailty pakistan made
11.02 Nos
porta or apporved colour complete with 4 gallons low level flush tank .
9100

Providing & Fixing Chaina wash hand basin A Quailty made porta or
11.03 apporved equvalent vanity type of granite including C.I brackets 22"x16" Nos
size vanity
24000

Page 46 of 209
Restor

Sr
Description Unit Rate
No

P/F Soil/waste/vant uPVC pipe with plain socket and spigot ends
11.04
complete with accessories ,back filling complete with all respects.

(a) 4" Internal dia Rft. 450

(b) 3" Internal dia Rft. 300

(c) 2" Internal dia Rft. 195

P/F Dadex, Beta, Popular or approed quality PPRC pipes i/c fitting and
11.05
spasials, copmlete with all respects.

Page 47 of 209
Restor

Sr
Description Unit Rate
No

(a) 1/2" Dia Rft. 85

(b) 3/4" Dia Rft. 104

(c) 1" Dia Rft. 165

11.06 Providing & Fixing C.P Towel Rail. Nos 1000

11.07 Providing & Fixing Looking glass first quality, Sft 275

Providing & Fixing of 4" dia C.I floor trap with C.P grating complete in
11.08 all respects. Nos 2500
Page 48 of 209
Restor

Sr
Description Unit Rate
No

11.10 Providing & Fixing of toillet Paper Holder . Nos 800

11.11 Providing & Fixing of double Bib Cock . Nos 1500

11.12 Providing & Fixing of Muslim Shower's. Nos 1200

11.15 Providing & fixing of electric Geysers. Nos 16000

G. TOTAL INTERNAL WATER SUPPLY WORK.

Page 49 of 209
Restor

Sr
Description Unit Rate
No

12 EXTERNAL WATER SUPPLY & SEWERAGE

P/L in trenches PVC-U soil waist vent pipes (Dadex , Beta or equivalent
12.01 class "c" i/c cutting jointing & laying in possition complete with all
respects.

(a) 6" Internal dia Rft. 700

(b) 9" Internal dia Rft. 1300

Page 50 of 209
Restor

Sr
Description Unit Rate
No

Providing manholes inside diamension as per approved design and


specifications complete with CI cover and frame 18" inside dia fixed in
12.02
RCCslab , (1:2:4) banching,1/2" thick cs plaster, i/c excavation,
backfilling, as per design & spacification complete.

(a) 2 'x 2' Nos 28000

(b) 3' x 3' Nos 39000

Page 51 of 209
Restor

Sr
Description Unit Rate
No

Providing & Fixing of G.I pipes (IIL+M or approved equvilant


including all necessery fittings and special such as
12.03 teels,sockets,elbow,bends,crosses,etc.

3/4" Dia
(a)
Rft. 95
1" Dia
(b)
Rft. 135
1-1/2" Dia
(c)
Rft. 200

Page 52 of 209
Restor

Sr
Description Unit Rate
No

Providing & constructing 3000 gallons capacity UGWT complete


12.05
with all respects as per designs, drawings and spacifications.
Job 495000

Providing & constructing 2000 gallons capacity OGWT complete


12.06
with all respects as per designs, drawings and spacifications.
Job 595000

G. TOTAL EXTERNAL WATER SUPPLY & SEWERAGE WORK.

Page 53 of 209
Restor

Sr
Description Unit Rate
No

13.00 Electrical Work

Distribution Board Supply and installation & commissioning of


13.01.0 recessed/surface wall mounting type DB Fabricated from 16 SWG
Sheet With electrostatic pain etc.

Supply; Installation & commissioning of recessed /Surface wall


mounting type DISTRIBUTION BOARD febricated from 16-
13.1.01 (i) SWG sheet steel with electrostatic paint of approved colour and Nos. 130000.00
with back box .
DB-G

Page 54 of 209
Restor

Sr
Description Unit Rate
No

Supply; Installation & commissioning of recessed /Surface wall


mounting type DISTRIBUTION BOARD febricated from 16-
(ii) SWG sheet steel with electrostatic paint of approved colour and Nos. 45000.00
with back box .
DB-F

Sub Total Section 1.

Supply and Wiring of light circuit from DB to switchboard with


13.2.01 3x2.5mm2 single core LSZH (low smoke zero halogen) insulated Nos. 3000.00
300/500 volt grade cables.

Page 55 of 209
Restor

Sr
Description Unit Rate
No

Supply and Wiring of first light/wall /exhaust fan point consisting


of one point controlled by one switch with 3x1.5mm2 single core
13.2.02 Nos. 2400.00
LSZH (low smoke zero halogen) insulated 300/500 volt grade
wire.

13.2.03 Same as item No.13.2.02 above but point to point wiring. Nos. 1350.00

Same as item No. 13.2.02 above but wiring of ceiling


13.2.06 fan/chandelier including fan hook, complete with one way switch Nos. 2600.00
and fan dimmer, complete in all respects.

Page 56 of 209
Restor

Sr
Description Unit Rate
No

Supply and Wiring of first 3 pin 5 Amps switch socket outlet point
from switch board with single core 3x1.5mm2 single core LSZH
13.2.10 Nos. 2500.00
(low smoke zero halogen) PVC insulated 300/500 volt grade
cable

Same as item No. 13.2.10 above but wiring of 3 pin 15A switch
socket outlet+1 No. 3 pin 5 Amp switch socket outlet wired with
13.2.11 Nos. 4500.00
3 Nos. 4mm2 single core LSZH (low smoke zero halogen) cables
from DB including

Supply & Installation of flexible connection ceiling to light fitting


13.2.13 Nos. 600.00
.

Page 57 of 209
Restor

Sr
Description Unit Rate
No

Sub Total Section 2.

13.4.02 i) Supply & Installation of ceiling recessed down lighter. Nos. 975.00

Sub Total Section .4

Page 58 of 209
Restor

Sr
Description Unit Rate
No

Supply & Laying of 1 dia PVC pipe to be laid under floor


13.5.01 including floor cutting as required as per drawings & Rft. 30.00
specifications for Computer, Tel & Power Supply System.

Supply & Installation of adjustable 12 SWG die cast aluminium


12"x12"x4" floor boxes having base box of 16 SWG G.I sheet
13.5.02 with 3 sets of 15 A PVC connectors including floor cutting as Nos. 9000.00
required as per drawing.
FLOOR BOXES

Page 59 of 209
Restor

Sr
Description Unit Rate
No

Wiring of 1 No. 5 Amp or 2 Nos. 13 Amps switch socket outlets


13.5.03 with 3 Nos. 2.5mm2 single core LSZH (low smoke zero halogen) Nos. 3200.00
cables L+N+E drawn in pre laid PVC pipes, from DB's to floor

13 Amp ,3 pin switch socket outlet make clipsal / Approved


13.5.04 (ii) Each 800.00
equinalent.

5 Amp ,3 pin switch socket outlet make clipsal/Approved


13.5.05 (i) Each 900.00
equivalent.

13 Amp ,3 pin switch socket outlet make clipsal / Approved


13.5.05 (ii) Each 900.00
equinalent.

Page 60 of 209
Restor

Sr
Description Unit Rate
No

Installation & Connecting up of Telephone cable 0.6mm solid


13.5.06 Rft. 85.00
condutor (10pair cable)

Supply ,Installation & Connecting up of Computer outlet type RJ-


13.5.07 Nos. 1500.00
45,CAT-6 to be instlled in floor box.,

Supply & Installation of RJ-456,CAT-6, Telephone outlet in floor


13.5.08 Nos. 1400.00
box.

13.5.09 Supply & Installation of RJ-45, CAT-6,Telephone outlet on walls. Nos. 1400.00

Page 61 of 209
Restor

Sr
Description Unit Rate
No

Supply & Installation of RJ-45, CAT-6, computer outlet insatlled


13.5.10 Nos. 1320.00
in walls .

Supply ,Installation & Connecting up of 16 SWG sheet steel


13.5.13 Each 4900.00
Telephone Junction Box.

Installation of self supported aerial armond PVC/PVC telephone


13.5.14 Rft. 170.00
cable 10 pair.

Supply ,Installation & Connecting up of CAT=6 Patch panel


13.5.15 Each 21500.00
installed in Data cabnite.

Page 62 of 209
Restor

Sr
Description Unit Rate
No

Supply, Installation of Data Cabnite size 9 U ,wall mounted


13.5.16 Nos. 24000.00
cabinet with lockable glass door including fan & shelf.

Supply & Installation of Giga speed CAT-6 computer switches. I)


13.5.17 Each 22350.00
24 ports.

Supply Installation & Connecting up of Category-6, 4-pair UTP


cord with 4-pair moduler plugs as follows.
13.5.18

(i) 1.0m(patch cord) Each 600.00

(ii) 3.0m(drop cord) Each 885.00


Page 63 of 209
Restor

Sr
Description Unit Rate
No

13.5.19 Testing & Commisioning of data and voice system . Job 30000.00

Sub Total Section 5.

Supply & Installation, Connecting RG-6 coaxial cable


13.6.01 Rft. 28
for CCTV system.

Supply & Wiring of CCTV cameras with 3no's 2.5mm


13.6.02 Nos. 6500
single core cable .

13.6.03 Supply & Installation of CCTV Colour cameras. Nos. 28600

Page 64 of 209
Restor

Sr
Description Unit Rate
No

Supply & Installation of CCTV colour cameras out


13.6.04 Nos. 36400
door .

13.6.05 Supply & Installation of DVR 9 chanel. Each 136500

13.6.06 Supply & Installation of Colour LCD 21" size. Each 25000

13.6.07 Testing & Commisioning of CCTV system. Job 30000

Sub Total Section 6.

Page 65 of 209
Restor

Sr
Description Unit Rate
No

Supply & wiring of smoke/heat detector and manual


13.7.01 Rft. 70
call point LSZH cable.

Supply & Installation of fire alarm control panel2


zone having indication control & supervision of each
13.7.03 Nos. 90000
detector & sounder circuit key swicth for general
alarn complete with NICAD battries .

Supply & Installation of photo electric smoke


13.7.04 Nos. 5000
detector with neon indicator and mounting base.

Page 66 of 209
Restor

Sr
Description Unit Rate
No

Supply & Installation of fixed temprature heat


13.7.05 Nos. 5000
detector with neon indicator mounting base.

Supp;y & Installation of Manual call point for


13.7.06 Nos. 9000
recessed /surface mounting as required .

13.7.07 Supply & Installation of fire alarm sounder. Nos. 9000

13.7.08 Testing & Commissioning of Fire alarm system. Job 25000

Sub Total Section 7.

Page 67 of 209
Restor

Sr
Description Unit Rate
No

Supply Installation & Connecting up of TV out let


13.8.01 Nos. 0
with 2way splitter.

Sub Total Section 8.

Providing and Installation of lightening arrestor and earthing


system comprising of 1 dia & 10 ft long steel rod with 1mm
13.9.01 copper conductor sleve of 99.97% imported copper as earth Nos. 75000.00
electrode 100ft below ground level including cost of boring and
lowering the rod 100ft down, complete.

Page 68 of 209
Restor

Sr
Description Unit Rate
No

13.9.02 Supply & Installation of Copper conductor cable Rft. 320.00

Sub Total Section 9.

Page 69 of 209
Restor

Sr
Description Unit Rate
No

ATS PANEL
Supply & Installation of sheet metal clad totally enciosed
free standing front excess ATS PANEL ,fabricated from 12-
SWG M.S sheet steel & doors from 14-SWG M.S sheet
steel with electrostatic paint of approved colour 415 volts ,
13.10.03 3 phase ,50 Hz complete with all respects . Each 260000.00
As per revised Rate .

Page 70 of 209
Restor

Sr
Description Unit Rate
No

Providing &Instalation Earthing System comprising of 1 dia &


10 ft long steel rod with 1mm copper conductor sleve of 99.97%
13.10.06 imported copper as earth electrode 100ft below ground level Nos. 75000.00
including cost of boring and lowering the rod 100ft down,
complete.

Sub Total Section 10.

Page 71 of 209
Restor

Sr
Description Unit Rate
No

i) DB-EX
INCOMING 1-
30ATP MCCB (ICS 10 KA) 1-
Digital voltmeter+volt selector switch 3-phase
indicuter light+control fuses OUTGOING
3-15/20 ASP MCB
13.11.01 Nos. 62000.00
(6KA) 1-30 ATP Air contactor
couple to and having following components.
1-Sun light switch .
1-timer . 1-
15 ATP MCB (ICS 10KA) 3-20 ASP
MCB (6KA).

Page 72 of 209
Restor

Sr
Description Unit Rate
No

Supply Installation & Connecting up of 4core 6mm copper


13.11.02 conductor cable from DB-G to DB-EX to be drawn in
Rft. 155.00
ii PVC condute under floor/ground complete with all respects
.

Supply & Laying of 1.50 dia PVC pipe to be laid under floor
13.11.03 including floor cutting as required as per drawings & Rft. 50.00
specifications for external lighting system.

Sub Total Section 11.

Page 73 of 209
Restor

Sr
Description Unit Rate
No

Page 74 of 209
Restor

Sr
Description Unit Rate
No

Extra Non BOQ

1 Stone chisling of stone . Sft 228

2 Dismentling of wooden wall panneling . Sft 20

3 Dismentling of pcc work . Sft 21

4 Leveling and Dressing of floor . Sft 10

5 Dismentling of teller counter . Rft. 592

Page 75 of 209
Restor

Sr
Description Unit Rate
No

6 Disposal of Debaries . Cft 80

7 Dismentling of MS Grill . Sft 59

8 Dismentling of MS fence . Sft 38

9 Dismentling of Stone Wall . Cft 30

10 Dismentling of Ward robs, kitchen cabnit etc. Cft 20

11 Dismentling of wooden wall partition . Sft 22

Page 76 of 209
Restor

Sr
Description Unit Rate
No

12 Providing & fixing I - section Girder . Kg 190

13 Stone slab on Butterus Wall (External) No 1670

14 Prepration of Arches . No 12746

15 Providing & Fixing Steel Fance . Sft 466

16 Deodar wooden Planks 1" Thick . Cft 5500

17 Providing & Fixing Steel cuppling Under verandha columes(4"x4") . Sft 1633

Page 77 of 209
Restor

Sr
Description Unit Rate
No

Providing & Fixing Steel cuppling Under Entress Conopy columes(6"x6")


18 . Sft 1904

21 Providing & Fixing Sanwitch Panels on roof . Sft 794

22.0 Providing & Fixing Wooden Floor. Sft 1190

23.0 Providing & Fixing of 3" dia G.I pipe . Rft 658

24.0 Providing & Fixing of Chaqured Plate on Grating. Sft 353

25.0 Providing & Fixing of Submercible Pump. No. 59135

Page 78 of 209
Restor

Sr
Description Unit Rate
No

26.0 Providing & Fixing of wooden beading on Door & Windows. Rft 123

27.0 Ground Floor ceiling with Girder. Sft 346

28.0 Providing 'Laying & Fixing Deodar wood Stair. No 141735

29.0 Providing & Fixing of Grating. Sft 995

30.0 Providing & Fixing of Roof Gutter. Rft 423

31.0 Providing & Laying wooden skirting . Rft 148

Page 79 of 209
Restor

Sr
Description Unit Rate
No

32.0 Deodar wooden Patti on wall top. Rft 173

33.0 Providing & Fixing of Plants. Job 86640

34.0 Providing & Fixing of Gipsum Board Ceiling . Sft 185

35.0 Providing & Fixing of Bridge stair.(Planks) Sft 930

36.0 Providing & Fixing of security grill. Sft 635

37.0 Providing & Fixing of GPO Logo. Job 85800

Page 80 of 209
Restor

Sr
Description Unit Rate
No

38.0 Providing & Fixing of Teller Counter. Rft 9534

39.0 Providing & laying Lacure Polish. Sft 118

40.0 Providing & Fixing Deodar wooden Jali. Rft 1007

41.0 Internal Painting on wall with lime surkhi .


Sft 13

57.0 Providing & Fixing of M.S sheet angle .


Rft 130

NON BOQ ITEMS CIVIL WORKS


Page 81 of 209
Restor

Sr
Description Unit Rate
No

19 Providing & Fixing of Electrical cable Trucking (2.5"x 1.5". Rft 356

20 Providing & Fixing of Electrical cable Trucking (1.5"x 1"). Rft 238

42.0 Supply & Installation of 3core 4mm cable for external lights. Rft 292

43.0 Supply & Installation of Diesel Generator with sound proof canopy. No 1914000

44.0 Supply & Installation of Ceiling Fan. No 9900

45.0 Supply ,Installation & Connecting up of PAK light. No 2139

Page 82 of 209
Restor

Sr
Description Unit Rate
No

46.0 Supply ,Installation & Connecting up of Chandlier. No 26796

47.0 Supply & Fixing of Pole light's. No 61182

48.0 Supply & Installation of Flood light's. No 14652

49.0 Supply & Installation of Wall light's. No 17688

50.0 Supply , Installation & Connecting up of Hanging lantern light's. No 17688

51.0 Supply & Installation of Main switch. No 14105

Page 83 of 209
Restor

Sr
Description Unit Rate
No

52.0 Supply ,Installation & Connecting up of Lightining Arrestor. No 442167

53.0 Providing & Installation of Mirror lights. (4').


No 2000

54.0 Providing & Installation of Mirror lights. (2').


No 1700

55.0 Providing & Installation of 4core 16mm Cable .


Mtr 1356

56.0 Providing & Installation of Earhting Testing Box .


No 13860

58.0 Providing & Fixing of Caffee D.B with 3 phase Meter. No 84110

Page 84 of 209
Restor

Sr
Description Unit Rate
No

ATS Panel Balance amount

NON BOQ ELECTRICAL WORKS

Page 85 of 209
APITAL BUILDERS ISLAMABAD
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

8355 125325.00 8554.00 128310.00 0.00 0.00

1374 82440.00 2879.80 172788.00 0.00 0.00

723 7230.00 626.00 6260.00 0.00 0.00

5854 87810.00 7546.77 113201.55 0.00 0.00

Page 86 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1898 18980.00 1746.11 17461.10 0.00 0.00

633 6330.00 1201.00 12009.95 0.00 0.00

8536 102432.00 4647.81 55773.72 0.00 0.00

18356 128492.00 11262.12 78834.83 0.00 0.00

2174 21740.00 3782.85 37828.50 0.00 0.00

1 30000.00 1.00 30000.00 0.00 0.00


Page 87 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

5000 25000.00 6248.70 31243.51 0.00 0.00

Total 635779.00 Total 683711.16 Total 0.00

Page 88 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

19228 634524.00 2478.94 81805.02 0.00 0.00

6250 87500.00 5477.45 76684.30 0.00 0.00

Total 722024.00 Total 158489.32 Total 0.00

Page 89 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

44 11000.00 71.61 17902.50 0.00 0.00

1815 390225.00 2096.65 450779.75 0.00 0.00

132 23100.00 657.52 115066.00 0.00 0.00

Page 90 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

327 102024.00 1059.97 330710.64 287.53 89709.36

416 176800.00 294.54 125179.50 0.00 0.00

Total 703149.00 Total 1039638.39 Total 89709.36

Page 91 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

10249.00 3433415.00 62.49 20934.15 0.00 0.00

Page 92 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

85 29750.00 446.15 156152.50 0.00 0.00

100 36000.00 27.17 9780.88 0.00 0.00

150 33000.00 3153.14 630628.00 0.00 0.00

120 25200.00 5366.65 1019663.50 0.00 0.00


Page 93 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

4500 337500.00 1064.50 79837.50 0.00 0.00

Total 3894865.00 Total 1916996.53 Total 0.00

5854 321970 3822.68 210247.4 0.00 0.00

Page 94 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

5500 1815000 2838.38 936665.4 0.00 0.00

507 76050 108 16200 0.00 0.00

354 120360 284.21 96631.4 0.00 0.00

Page 95 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1477 502180 1139.52 387436.8 0.00 0.00

Total 2835560 Total 1647181 Total 0.00

5500.00 247500.00 9786.99 440414.55 210.75 9483.70

Page 96 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

16877 1164513.00 12673.04 874439.76 315.32 21756.98

Total 1412013.00 Total 1314854.31 Total 31240.68

Page 97 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

238 675920.00 808.94 2297389.60 3.00 8520.00

804 2090400.00 443.50 1153100.00 24.19 62884.64

85 680000.00 83.39 667120.00 0.00 0.00

Page 98 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

3 165000.00 3.00 165000.00 0.00 0.00

2 130000.00 2.00 130000.00 0.00 0.00

Total 3741320.00 Total 4412609.60 Total 71404.64

8470.00 304920.00 6132.41 220766.76 4321.26 155565.00

Page 99 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

Total 220766.76 Total 155565.00

2696 342392 712.99 90549.73 0.00 0.00

Total 342392 Total 90549.73 Total 0.00

Page 100 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

521 2865500.00 995.50 5475250.00 0.00 0.00

200 1100000.00 114.51 629805.00 0.00 0.00

Page 101 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

4000 2080000.00 0.00 0.00 60.69 31557.50

2 70000.00 3.00 105000.00 0.00 0.00

2625 3150000.00 2399.02 2878824.00 74.88 89856.00

Page 102 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0.00 1503.73 902238.00 208.28 124968.00

2625 393750.00 1891.73 283759.50 475.34 71300.25

886 141760.00 235.76 37721.60 0.00 0.00

1 27000.00 2.00 48600.00 0.00 5400.00

Page 103 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1 50000.00 2.00 0.00 2.00 100000.00

2000 400000.00 503.70 100740.00 77.04 15408.00

1 1950000.00 1.00 1560000.00 0.00 390000.00

3 30000.00 0.00 0.00 2.00 20000.00

Page 104 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

400 60000.00 1728.19 259228.50 2382.28 357341.66

Total 12318010.00 Total 12281166.60 Total 1205831.40

26910032.00 23765963.40 1553751.08

Page 105 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

5 70000.00 4 56000 0.00 0.00

2 18200.00 4 36400 0.00 0.00

1 24000.00 4 96000 0.00 0.00

Page 106 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

200 90000.00 170.13 76572.00 231.50 104175.00

150 45000.00 124.07 37221.00 0.00 0.00

100 19500.00 2.25 438.75 0.00 0.00

Page 107 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

200 17000.00 218.66 18586.10 52.00 4420.00

150 15600.00 0.00 0.00 67.00 6968.00

100 16500.00 0.00 0.00 0.00 0.00

6 6000.00 0.00 0.00 4.00 4000.00

100 27500.00 0.00 0.00 40.72 11196.63

12 30000.00 10.00 25000.00 0.00 0.00


Page 108 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

5 4000.00 0.00 0.00 4.00 3200.00

8 12000.00 0.00 0.00 8.00 12000.00

5 6000.00 0.00 0.00 8.00 9600.00

4 64000.00 0.00 0.00 2.00 32000.00

Total 465300.00 Total 344568.35 Total 187559.00

465300.00 344568.35 187559.00

Page 109 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

500 350000.00 12.00 8400.00 10.83 7581.00

250 325000.00 413.50 537550.00 0.00 0.00

Page 110 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

13 364000.00 19.00 532000.00 0.00 0.00

2 78000.00 1.00 39000.00 1.00 39000.00

Page 111 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

50 4750.00 0.00 0.00 0.00 0.00

50 6750.00 73.00 9855.00 0.00 0.00

200 40000.00 100.00 20000.00 87.50 17500.00

Page 112 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1 495000.00 1.00 495000.00 0.00 0.00

1 595000.00 1.00 595000.00 0.00 0.00

Total 2258500.00 Total 2236805.00 Total 64081.00

2258500.00 2236805.00 64081.00

Page 113 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1.00 130000.00 1.00 100000.00 0.00 30000.00

Page 114 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1.00 45000.00 1.00 36000.00 0.00 9000.00

136000.00 39000.00

17.00 51000.00 9.00 27000.00 6.00 18000.00

Page 115 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

86.00 206400.00 27.00 48600.00 36.00 102600.00

62.00 83700.00 22.00 22275.00 17.00 30375.00

9.00 23400.00 9.00 17550.00 13.00 39650.00

Page 116 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

28.00 70000.00 4.00 5000.00 0.00 5000.00

9.00 40500.00 9.00 30375.00 0.00 10125.00

115.00 69000.00 0.00 0.00 100.00 60000.00

Page 117 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

150800.00 265750.00

68.00 66300.00 0.00 0.00 15.00 14625.00

0.00 14625.00

Page 118 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1250.00 37500.00 955.00 28650.00 0.00 0.00

5.00 45000.00 17.00 107100.00 0.00 45900.00

Page 119 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

12.00 38400.00 0.00 0.00 42.00 134400.00

5.00 4000.00 0.00 0.00 34.00 27200.00

7.00 6300.00 0.00 0.00 29.00 26100.00

7.00 6300.00 0.00 0.00 40.00 36000.00

Page 120 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

100.00 8500.00 0.00 0.00 100.00 8500.00

5.00 7500.00 0.00 0.00 26.00 39000.00

5.00 7000.00 0.00 0.00 17.00 25500.00

12.00 16800.00 0.00 0.00 24.00 33600.00

Page 121 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

7.00 9240.00 0.00 0.00 24.00 31680.00

1.00 4900.00 0.00 0.00 1.00 4900.00

150.00 25500.00 0.00 0.00 150.00 25500.00

1.00 21500.00 0.00 0.00 1.00 21500.00

Page 122 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1.00 24000.00 0.00 0.00 1.00 24000.00

1.00 22350.00 0.00 0.00 1.00 22350.00

12.00 7200.00 0.00 0.00 17.00 10200.00

12.00 10620.00 0.00 0.00 17.00 15045.00


Page 123 of 209
Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1.00 30000.00 0.00 0.00 1.00 30000.00

135750.00 546175.00

400 11200 0.00 0.00 1358.00 38024.00

5 32500 0.00 0.00 8.00 52000.00

3 85800 0.00 0.00 6.00 171600.00

Page 124 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

2 72800 0.00 0.00 2.00 72800.00

1 136500 0.00 0.00 1.00 136500.00

1 25000 0.00 0.00 1.00 25000.00

1 30000 0.00 0.00 1.00 30000.00

0.00 525924.00

Page 125 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1100 77000 0.00 0.00 1080.00 75600.00

1 90000 0.00 0.00 1.00 90000.00

21 105000 0.00 0.00 15.00 75000.00

Page 126 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

2 10000 0.00 0.00 0.00 0.00

4 36000 0.00 0.00 4.00 36000.00

4 36000 0.00 0.00 4.00 36000.00

1 25000 0.00 0.00 1.00 25000.00

0.00 327100.00

Page 127 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0 0.00 0.00 0.00 0.00

0.00 0.00

2.00 150000.00 2.00 150000.00 0.00 0.00

Page 128 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

150.00 48000.00 0.00 0.00 60.00 19200.00

150000.00 19200.00

Page 129 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1.00 260000.00 2.00 360000.00 0.00 0.00

Page 130 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

2.00 150000.00 3.00 225000.00 0.00 0.00

585000.00 0.00

Page 131 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1.00 62000.00 1.00 49600.00 0.00 12400.00

Page 132 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

1200.00 186000.00 0.00 0.00 65.00 10075.00

1100.00 55000.00 695.00 34750.00 0.00 0.00

84350.00 22475.00

Page 133 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

Total 2801710.00 Total 1241900.00 Total 1760249.00

Page 134 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0.00 4782.25 1090353.00 0.00 0.00

0 0.00 1664.98 33299.55 0.00 0.00

0 0.00 3689.67 77483.07 0.00 0.00

0 0.00 5386.69 53866.85 0.00 0.00

0 0.00 40.00 23680.00 0.00 0.00

Page 135 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0.00 956.25 76500.00 0.00 0.00

0 0.00 712.21 42020.39 0.00 0.00

0 0.00 1324.68 50337.84 0.00 0.00

0 0.00 5965.00 178950.00 0.00 0.00

0 0.00 744.91 14898.20 0.00 0.00

0 0.00 988.85 21754.70 0.00 0.00

Page 136 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0.00 1350.00 256500.00 184.50 35055.00

0 0.00 65.00 108550.00 0.00 0.00

0 0.00 41.00 522586.00 0.00 0.00

0 0.00 1653.18 770381.88 221.07 103018.62

0 0.00 628.15 3454825.00 0.00 0.00

0 0.00 16.00 26128.00 1.00 1633.00

Page 137 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0.00 8.00 15232.00 0.00 0.00

0 0.00 7858.68 6239791.92 0.00 0.00

0 0.00 0.00 0.00 1868.42 2223419.00

0 0.00 300.00 180000.00 60.00 56880.00

0 0.00 0.00 0.00 117.66 41533.13

0 0.00 0.00 0.00 1.00 59135.00

Page 138 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0.00 0.00 0.00 988.49 121584.27

0 0.00 0.00 0.00 300.00 103800.00

0 0.00 0.00 0.00 1.00 141735.00

0 0.00 0.00 0.00 148.20 147459.00

0 0.00 0.00 0.00 342.91 145050.93

0 0.00 0.00 0.00 252.00 37296.00

Page 139 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0.00 0.00 0.00 383.00 66259.00

0 0.00 0.00 0.00 1.00 86640.00

0 0.00 0.00 0.00 1650.53 305342.00

0 0.00 0.00 0.00 153.16 142438.80

0 0.00 0.00 0.00 456.75 290036.25

0 0.00 0.00 0.00 1.00 85800.00

Page 140 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0.00 0.00 0.00 25.50 243117.00

0 0.00 0.00 0.00 12527.00 1478186.00

0 0.00 0.00 0.00 372.84 375449.88

0.00 0.00 0.00 0.00 12395.00 161135.00

0.00 0.00 0.00 0.00 123.00 15990.00

Total 13237138.40 Total 6467992.88

Page 141 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0.00 2000.00 427200.00 0.00 284800.00

0 0.00 1500.00 214200.00 0.00 142800.00

0 0.00 0.00 0.00 276.00 80592.00

0 0.00 0.00 0.00 2.00 3828000.00

0 0.00 0.00 0.00 14.00 138600.00

0 0.00 0.00 0.00 59.00 126201.00

Page 142 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0.00 0.00 0.00 8.00 214368.00

0 0.00 0.00 0.00 12.00 734184.00

0 0.00 0.00 0.00 4.00 58608.00

0 0.00 0.00 0.00 15.00 265320.00

0 0.00 0.00 0.00 19.00 336072.00

0 0.00 0.00 0.00 2.00 28210.00

Page 143 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

0 0.00 0.00 0.00 1.00 442167.00

0.00 0.00 0.00 0.00 2.00 4000.00

0.00 0.00 0.00 0.00 2.00 3400.00

0.00 0.00 0.00 0.00 143.00 193908.00

0.00 0.00 0.00 0.00 1.00 13860.00

0.00 0.00 0.00 0.00 1.00 84110.00

Page 144 of 209


Restoration of GPO Murree
IPC -06
ABSTRACT OF COST
As per BOQ Total in Previous Total in this bill

Qty Amount (Rs) Qty Amount (Rs) Qty Amount (Rs)

4802.00

Total 0.00 Total 641400.00 Total 6984002.00

Page 145 of 209


To date G. Total

Qty Amount (Rs)

8554.00 128310.00

2879.80 172788.00

626.00 6260.00

7546.77 113201.55

Page 146 of 209


To date G. Total

Qty Amount (Rs)

1746.11 17461.10

1201.00 12009.95

4647.81 55773.72

11262.12 78834.83

3782.85 37828.50

1.00 30000.00
Page 147 of 209
To date G. Total

Qty Amount (Rs)

6248.70 31243.51

Total 683711.16

Page 148 of 209


To date G. Total

Qty Amount (Rs)

2478.94 81805.02

5477.45 76684.30

Total 158489.32

Page 149 of 209


To date G. Total

Qty Amount (Rs)

71.61 17902.50

2096.65 450779.75

657.52 115066.00

Page 150 of 209


To date G. Total

Qty Amount (Rs)

1347.50 420420.00

294.54 125179.50

Total 1129347.75

Page 151 of 209


To date G. Total

Qty Amount (Rs)

62.49 20934.15

Page 152 of 209


To date G. Total

Qty Amount (Rs)

446.15 156152.50

27.17 9780.88

3153.14 630628.00

5366.65 1019663.00
Page 153 of 209
To date G. Total

Qty Amount (Rs)

1064.50 79837.50

Total 1916996.03

3822.68 210247.4

Page 154 of 209


To date G. Total

Qty Amount (Rs)

2838.38 936665.4

108.00 16200

284.21 96631.4

Page 155 of 209


To date G. Total

Qty Amount (Rs)

1,139.52 387436.8

Total 1647181

9997.74 449898.2505

Page 156 of 209


To date G. Total

Qty Amount (Rs)

12988.36 896196.7365

Total 1346094.99

Page 157 of 209


To date G. Total

Qty Amount (Rs)

811.94 2305909.60

467.69 1215984.64

83.39 667120.00

Page 158 of 209


To date G. Total

Qty Amount (Rs)

3.00 165000.00

2.00 130000.00

Total 4484014.24

10453.67 376332.12

Page 159 of 209


To date G. Total

Qty Amount (Rs)

Total 376332.12

712.99 90549.73

Total 90549.73

Page 160 of 209


To date G. Total

Qty Amount (Rs)

995.50 5475250.00

114.51 629805.00

Page 161 of 209


To date G. Total

Qty Amount (Rs)

60.69 31557.50

3.00 105000.00

2473.90 2968680.00

Page 162 of 209


To date G. Total

Qty Amount (Rs)

1712.01 1027207.50

2367.07 355059.75

235.76 37721.60

2.00 54000.00

Page 163 of 209


To date G. Total

Qty Amount (Rs)

2.00 100000.00

580.74 116148.00

1.00 1950000.00

2.00 20000.00

Page 164 of 209


To date G. Total

Qty Amount (Rs)

4110.47 616570.16

Total 13486998.00

25319714.34

Page 165 of 209


To date G. Total

Qty Amount (Rs)

4.00 56000.00

4.00 36400.00

4.00 96000.00

Page 166 of 209


To date G. Total

Qty Amount (Rs)

401.63 180733.50

124.07 37221.00

2.25 438.75

Page 167 of 209


To date G. Total

Qty Amount (Rs)

270.66 23006.10

67.00 6968.00

0.00 0.00

4.00 4000.00

40.72 11196.63

10.00 25000.00
Page 168 of 209
To date G. Total

Qty Amount (Rs)

4.00 3200.00

8.00 12000.00

8.00 9600.00

2.00 32000.00

Total 533763.98

533763.98

Page 169 of 209


To date G. Total

Qty Amount (Rs)

22.83 15981.00

413.50 537550.00

Page 170 of 209


To date G. Total

Qty Amount (Rs)

19.00 532000.00

2.00 78000.00

Page 171 of 209


To date G. Total

Qty Amount (Rs)

0.00 0.00

73.00 9855.00

187.50 37500.00

Page 172 of 209


To date G. Total

Qty Amount (Rs)

1.00 495000.00

1.00 595000.00

Total 2300886.00

2300886.00

Page 173 of 209


To date G. Total

Qty Amount (Rs)

1.00 130000.00

Page 174 of 209


To date G. Total

Qty Amount (Rs)

1.00 45000.00

175000.00

15.00 45000.00

Page 175 of 209


To date G. Total

Qty Amount (Rs)

63.00 151200.00

39.00 52650.00

22.00 57200.00

Page 176 of 209


To date G. Total

Qty Amount (Rs)

4.00 10000.00

9.00 40500.00

100.00 60000.00

Page 177 of 209


To date G. Total

Qty Amount (Rs)

416550.00

15.00 14625.00

14625.00

Page 178 of 209


To date G. Total

Qty Amount (Rs)

955.00 28650.00

17.00 153000.00

Page 179 of 209


To date G. Total

Qty Amount (Rs)

42.00 134400.00

34.00 27200.00

29.00 26100.00

40.00 36000.00

Page 180 of 209


To date G. Total

Qty Amount (Rs)

100.00 8500.00

26.00 39000.00

17.00 25500.00

24.00 33600.00

Page 181 of 209


To date G. Total

Qty Amount (Rs)

24.00 31680.00

1.00 4900.00

150.00 25500.00

1.00 21500.00

Page 182 of 209


To date G. Total

Qty Amount (Rs)

1.00 24000.00

1.00 22350.00

17.00 10200.00

17.00 15045.00
Page 183 of 209
To date G. Total

Qty Amount (Rs)

1.00 30000.00

681925.00

1358.00 38024.00

8.00 52000.00

6.00 171600.00

Page 184 of 209


To date G. Total

Qty Amount (Rs)

2.00 72800.00

1.00 136500.00

1.00 25000.00

1.00 30000.00

525924.00

Page 185 of 209


To date G. Total

Qty Amount (Rs)

1080.00 75600.00

1.00 90000.00

15.00 75000.00

Page 186 of 209


To date G. Total

Qty Amount (Rs)

0.00 0.00

4.00 36000.00

4.00 36000.00

1.00 25000.00

327100.00

Page 187 of 209


To date G. Total

Qty Amount (Rs)

0.00 0.00

750.00

2.00 150000.00

Page 188 of 209


To date G. Total

Qty Amount (Rs)

60.00 19200.00

169200.00

Page 189 of 209


To date G. Total

Qty Amount (Rs)

0.00 360000.00

Page 190 of 209


To date G. Total

Qty Amount (Rs)

3.00 225000.00

585000.00

Page 191 of 209


To date G. Total

Qty Amount (Rs)

1.00 62000.00

Page 192 of 209


To date G. Total

Qty Amount (Rs)

65.00 10075.00

695.00 34750.00

106825.00

Page 193 of 209


To date G. Total

Qty Amount (Rs)

Total 3002899.00

Page 194 of 209


To date G. Total

Qty Amount (Rs)

4782.25 1090353.00

1664.98 33299.55

3689.67 77483.07

5386.69 53866.85

40.00 23680.00

Page 195 of 209


To date G. Total

Qty Amount (Rs)

956.25 76500.00

712.21 42020.39

1324.68 50337.84

5965.00 178950.00

744.91 14898.20

988.85 21754.70

Page 196 of 209


To date G. Total

Qty Amount (Rs)

1534.50 291555.00

65.00 108550.00

41.00 522586.00

1874.25 873400.50

628.15 3454825.00

17.00 27761.00

Page 197 of 209


To date G. Total

Qty Amount (Rs)

8.00 15232.00

7858.68 6239791.92

1868.42 2223419.00

360.00 236880.00

117.66 41533.13

1.00 59135.00

Page 198 of 209


To date G. Total

Qty Amount (Rs)

988.49 121584.27

300.00 103800.00

1.00 141735.00

148.20 147459.00

342.91 145050.93

252.00 37296.00

Page 199 of 209


To date G. Total

Qty Amount (Rs)

383.00 66259.00

1.00 86640.00

1650.53 305342.00

153.16 142438.80

456.75 290036.25

1.00 85800.00

Page 200 of 209


To date G. Total

Qty Amount (Rs)

25.50 243117.00

12527.00 1478186.00

372.84 375449.88

12395.00 161135.00

123.00 15990.00

Total 19705131.28

Page 201 of 209


To date G. Total

Qty Amount (Rs)

2000.00 712000.00

1500.00 357000.00

276.00 80592.00

2.00 3828000.00

14.00 138600.00

59.00 126201.00

Page 202 of 209


To date G. Total

Qty Amount (Rs)

8.00 214368.00

12.00 734184.00

4.00 58608.00

15.00 265320.00

19.00 336072.00

2.00 28210.00

Page 203 of 209


To date G. Total

Qty Amount (Rs)

1.00 442167.00

2.00 4000.00

2.00 3400.00

143.00 193908.00

1.00 13860.00

1.00 84110.00

Page 204 of 209


To date G. Total

Qty Amount (Rs)

2.00 4802.00

Total 7625402.00

Page 205 of 209


RESTORATIONOFGPOMURREE

06&FINALIPC

CAPITALBUILDER
ISLAMABAD
URREE

DERS

You might also like