Professional Documents
Culture Documents
CE Contract No Type1 Type2 Code Material ID Name of Material Main Field Material Category Related to T-Spec Ref General Description Use Location of usage Sample Remarks
Submission Inspection
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Composition for use in sealing joints in concrete members
CE NNNA MS C 15 1 Joint Sealant Civil Sealant Substation 3 Seal Joints Internal joint (Horizontal & vertical) No Site
ever is applicable to respective project) and block works
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Fire resistant acrylic sealant .A fire rating of up to 2 hours to
CE NNNA MS C 15 5 Fire Resistant Sealant Civil Sealant Substation 3 Joint Sealant Internal perimeter pointing around door & window frames No Site
ever is applicable to respective project) be achieved.
Aluminum Channel Size 20x10 mm & Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 6 Civil ALuminum Substation 3 To define architectural elements Grooves and Louvers External Surface & Parapet Yes Site
Aluminum Box Section thic 50mm ever is applicable to respective project)
Steel Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Insulated Polyurethane sandwich aluminum panels with
CE NNNA MS C 15 10 Insulated Overhead Door Civil Substation 2 overhead door in GIS room 132kV GIS room Yes Site
(Sandwich Panel) ever is applicable to respective project) electrical/manual operation
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Suitable aluminum profile section of 10-12.4 cm width,
CE NNNA MS C 15 11 Aluminum Threshold Civil ALuminum Substation 3 Stop ingress of sand and dust Fixed to the bottom of aluminum door frame Yes Site
ever is applicable to respective project) powder coated to the same color of the door.
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Trench Cover
CE NNNA MS C 15 19 GI Gratings / GI Chequered Plate Civil Steel Substation 2 Hot dip galvanized Industrial type heavy section with non Transformer Bays, Basement & other openings. Yes Site
ever is applicable to respective project) Openings Cover
slippery tooth.
Polypropylene step Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 21 Civil Steel Substation 1 Galvanised (Hot Dipped) Iron steps with polypropylene coverFacilitate access for maintenance and inspection. Manholes, cable pits and IDT/ET/Reactor sump pits. No Site
reinforced with 16mm dia. steel. ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Internal wall surface of substation building
CE NNNA MS C 15 24 Internal Plaster Civil Plastering Substation 2 Retarded semihydrate gypsum-plaster. Background to recive internal paint No Site
ever is applicable to respective project) (block work & RCC)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Coating formulated and recommended for application to Concrete surface for vertical members (walls/columns) &
CE NNNA MS C 15 26 Curing Compound Civil Plastering Substation 1 Retard the evaporation of water No Site
ever is applicable to respective project) freshly placed concrete. RCC ceiling
Page 1 of 8
Issue-4, Rev-0
All structural steel works shall be hot Dip galvanized.
Painting system : 1x Primer Coat+1x Under Coat+2x Top
Coat
The painting system shall comprise of:
1-Two component inorganic zinc silicate prime -75 micron
DFT.
2-Two component polyamide cured epoxy with natural
micceous iron oxide - 100 micron DFT.
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which 3-Two component polyurethane finishing coat - 40micron
CE NNNA MS C 15 28 System for structural steel protection Civil Painting Substation 2 Protect Structural Steel works Handrail, Spiral staircase, cat Ladders, other steel metal No Site
ever is applicable to respective project) DFT
Protection for galvanized steel
Epoxy polyamide cured primer (solids by volume 50% to
60%)
Followed by epoxy polyamide cured high build (solids by
volume 50% to 60%) under coat
topped with a 2- component polyurethane isocyanite cured
paint with excellent color and gloss retention properties and
resistant to abrasion, impact, chemical attacks and corrosion.
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Sub base consisting of well graded natural sands, gravels or
CE NNNA MS C 15 32 Road Base Civil Soil Improvement Substation 1 Prepare formation for load bearing serface Below structural foundation and internal road No Site
ever is applicable to respective project) rock
Solvent free epoxy resin mortar screed comprise a three 11kV Switchgear room, Transformer plinth, capacitor bank,
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 33 Internal Epoxy Screed Civil Floor Finishing Substation 2 cpmponent system of epoxy resin, hardner and mineral Floor Finishing record, workshop, fire pump house, air lock room, Nitrogen Yes Site
ever is applicable to respective project)
aggregates. room, Stair case steps and loading corridor in first floor
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which 100mm High block in color polyvinyl chloride membrane Form a waterproof seal between the floor and the wall, and
CE NNNA MS C 15 35 PVC Skirting Civil Finishing Substation 3 Raised floor area Yes Site
ever is applicable to respective project) with coving provide a neat, attractive join between the wall and the floor.
Glazed in Wall:
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which A vitrified covering which is practically impermeable.
CE NNNA MS C 15 43 Ceramic Tile Civil Tiles Substation 3 Wall & Floor finishing Battery room, Kitchen, Pantry,Toilet, Bathroom Yes Site
ever is applicable to respective project) Non slipery in Floor:
A clay-based covering with a mat finish
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Polymer based used in mortar and concrete as an admixture
CE NNNA MS C 15 52 Integral Waterproofing Agent Civil Water Proofing Substation 2 Waterproofing additive for sand -cement plastering works External & Internal wall No Site
ever is applicable to respective project) and bonding agent to increase water resistivity and durability.
Reinforcement Steel of Dia: 8, 10,12, 14, 16, 18, 20, 22, 25, 28, 30 & 32 mm
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 57 BS : 460GR. Civil Reinforcement Substation 1 Mild steel and high yield steel bars (Hot rolled) Provide required strength to the structural concrete members All Structural members (substructur and superstructur) No Site
ever is applicable to respective project)
ASTM : 425 GR 60
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Portland cement (OPC), Sulphate-resisting Portland and
CE NNNA MS C 15 58 Cement Civil Cement Substation 1 RCC works, Block works, plaster and screed Substation Building No Site
ever is applicable to respective project) supersulphated
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Insulation Board with maximum Density of 24-26 kg/m^3 ,
CE NNNA MS C 15 60 Cavity Insulation Board Civil Insulation Board Substation 2 Reduce thermal conductivity of external wall External Walls Yes Site
ever is applicable to respective project) 50 mm thick with lapping cut out.
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Bitumen sheeting, laid under walls above floor level so as to
CE NNNA MS C 15 61 Damp Proof Course (DPC) of minimum thickness 3mm. Civil Water Proof Substation 2 Arrest capillary action Above first layer of soild blook work Yes Site
ever is applicable to respective project) exclude rising moisture.
Page 2 of 8
Issue-4, Rev-0
WaterStop Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Profile of impervious material placed in the middle of At joint of RC virtical and horizontal member Below ground
CE NNNA MS C 15 63 Civil Water Proof Substation 1 Prevent water penetration through the substructural member Yes Site
(PVC Water stop 250mm widh) ever is applicable to respective project) concrete member level
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Increse bonding strength of mortor for plastering and screed
CE NNNA MS C 15 64 Bonding Agent for plastrering and floor screed. Civil Admixture Substation 2 Polyvinyl acetate emulsion type Floor and wall Yes Site
ever is applicable to respective project) for flooring
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Fiber gypsum board with aluminum backing, and 9 mm thick
CE NNNA MS C 15 65 Gypsum Board Civil Bulk Head Substation 3 Hide A/C & vetilation ducts 11kV SWGR Room Yes Site
ever is applicable to respective project) for bulkhead
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 66 Polyethylene Flexible Board Civil Expansion Board Substation 2 Polyuthelene pased filler board 20mm thick Fill expansion joint Concrete & block work No Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which A substance applied to the inside surfaces and seams of a
CE NNNA MS C 15 70 Mould and Shutter Release Agent Civil Construction Substation 1 Mould release - oil Shutter release agent Formwork for concrete works No Site
ever is applicable to respective project) mold to prevent the casting from adhering to the mold
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Precast concrete blocks types: Hollow, Solid & Thermo
CE NNNA MS C 15 75 Blocks Civil Construction Substation 2 Block works Walls No Site
ever is applicable to respective project) blocks size 100mm, 150mm & 200mm
Roof top packaged units is having all its components Air conditioning of 132 kV GIS/ 11 kV Switchgear, In the factory of
CE NNNA MS M 16 77 Air Conditioning - Roof top packaged AC MEP HVAC Substation 1 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 assembled in a single box/compartment. Its major parts are Air Conditioning Equipment Capacitor room and Control rooms. No manufacturer. Saudi
compressor , evaporator , condensor , expansion device , Installed on Roof top. Arabia / Mexico.
A Ventillation fans to extract the design volume of air from Ventillation of Basement , Fire pump room , Battery
CE NNNA MS M 16 78 Fans (Ventillation and Smoke Extract) MEP HVAC Substation 1 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 enclosed area such as toilet , pantry , battery room & Ventilation and smoke extraction room,Nitrogen room & Toilet / Pantry.Smoke extraction of No Not required
basements and Smoke extract fans for removal of smoke in Cable basement.
Located in LVAC room. It is a panel indicating all the Controlling & monitoring of HVAC system including
CE NNNA MS M 16 79 HVAC control panel, Field devices and Instruments MEP HVAC Substation 2 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 functions/status of Airconditioning & Ventilation system in a managing fail recovery & duty sharing of equipments for best LVAC Room No Dubai
substation. System 1 for First floor control rooms have 3 performance & energy management and reporting
CE NNNA MS M 16 80 Electric Duct Heaters MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Heater located in duct for control of humidity. Humidity Control in LVAC/ Control / Charger rooms Roof No Not required
CE NNNA MS M 16 81 Air Terminals.(Diffuser, Grille, Sand trap louvers). MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Used for supply/return/extract air for AC system. Supply/Return/Extract Air Basement , Ground Floor , First Floor YES Not required
CE NNNA MS M 16 82 Refrigerant copper piping MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Used for connecting the indoor & outdoor unit of split units. To connect Indoor and Outdoor unit Fire pump room , Security room No Not required
Duct Finishes and Accessories.(Vapour barrier,adhesive, sealant, Al cladding,Access Adhesive, Vapour barrier, Sealant,Al Cladding and Access
CE NNNA MS M 16 84 MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Used for applying and protection of duct insulation. Ground Floor , First Floor & Roof YES Not required
doors). doors.
Submersible Pump Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Pump completely immersed in water for pumping out deluge /
CE NNNA MS C 15 95 MEP Drainage Substation 3 Basements & External area External Drainage System No Not required
Capacity: 25 cu.m/hr at 8 m head ever is applicable to respective project) oil water to respective areas.
Sanitary Wares ( wash basin , water closet , shower tray, wall mounted mirror, paper Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Includes all bath room / toilet fittings used in
CE NNNA MS C 15 99 Civil Plumbing Substation 3 Pantry / Toilet Plumbing No Site
holder, towel rail, nobe hook, hot air drier etc Acessories ever is applicable to respective project) plumbing/drainage.
Page 3 of 8
Issue-4, Rev-0
Sensors have time and light level adjustment and it works on Automatic switching on/off of lights by closing and opening Basements, 11 KV rooms, 132 KV GIS room , LVAC room,
CE NNNA MS M 16 106 Passive infrared movement sensor (PIR) MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 No Not required
infrared principle. of circuits by detecting movement of personnel. Control room , Corridors
Wiring devices include normal and weatherproof type switch, On/off control of lights by switching, convenient socket outlet
CE NNNA MS M 16 108 Wiring devices (Switches and Sockets) MEP Small Power & Lighting Substation 3 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 All areas (Indoor & outdoor) No Not required
sockets, ceiling rose etc and wiring ancillaries
Low voltage DBs contain one incomer isolator and outgoing Distributing power supply to various lighting and small LVAC Room , 132 KV GIS Room , 11KV rooms & Security
CE NNNA MS M 16 109 LV Distribution Boards for small power & lighting MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 No Not required
circuit breakers. It also includes timer, contactor as required. power circuits. Room.
Wiring for lighting & small power circuits and cabling for LV
CE NNNA MS M 16 110 Wires & cables MEP Small Power & Lighting Substation 3 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 450/750 V grade wires and 1000 V grade cables All areas No Not required
power distribution
CE NNNA MS M 16 111 GI Conduit & accessories MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 Heavy duty galvanized conduits, fittings, boxes & accessories Surface containment for lighting & small power wiring All areas No Not required
Nitrogen gas flooding system for capacitor banks including Used as clean agant system in capacitor banks and as per
Capacitor rooms, as per DCD requrirement for Control room, At manufacturer
CE NNNA MS M 18 153 Nitrogen Flooded System FFP Nitrogen Flooded System Substation 1 Volume III, 1.5.1.9.0.08, Rev 9, Clause 4.2 nitrogen cylinders, nozzles, releasing panel, detectors, manual DCD requirement for control room, telecom room, LVAC No
Telecom room, LVAC room and Charger room factory
release, selector switch & isolation switch. room and charger room
Fire resistant cable can sustain fire for a certain period and Fire resistant cable used for wiring of emergency lights and
CE NNNA MS M 16 176 Fire resistant and Heat resistant cable MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 heat resistant cable can sustain designated high emperature in heat resistant cable used for final connection to light fitting All areas (not succeptible to mechanical damage) No Not required
normal environment. Cables are of 300/500 V grade from fixed wiring installation.
Galvanized light pole with arm to hold road light or area flood
CE NNNA MS M 16 177 Street lighting pole & Cut-out box MEP Small Power & Lighting Substation 2 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 Illuminating the outdoor areas External areas No Not required
light
CE NNNA MS M 16 178 Filters(Aluminum and Synthetic). MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Filters for Fresh air intake. Filtering Fresh Air intake to S/s Roof and Basement. YES Not required
Heavy duty metal clad TPN+E power socket with matching Power socket for supplying power to HV equipment testing
CE NNNA MS M 16 181 Heavy duty socket outlet with plug MEP Small Power & Lighting Substation 1 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 GIS room, IDT rooms and ET room No Not required
plug rated 200 A & 300 A machines
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Undergorund structural member other than basement and oil
WaterProofing Self Adhesive membrane Civil Water Proofing Substation 1 1.5mm thick self adhesive waterproofing membrane Protection membrane to substructural member Yes Site
ever is applicable to respective project) water tank
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Enhances adhesion of bituminous waterproofing membranes
Water Proofing Primer Civil Water Proofing Substation 1 A solvent-based bituminous penetrating primer Basement/Undergorund No Site
ever is applicable to respective project) to substrates
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Enhances adhesion of bituminous waterproofing membranes
Water Proofing Primer Civil Water Proofing Substation 2 A solvent-based bituminous penetrating primer Basement/Undergorund No Site
ever is applicable to respective project) to substrates
Issue-4, Rev-0
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
Roofing Insulation Board Civil Water Proofing Substation 2 Extruded polystyrene of minimum density 35 kg/m^3 Roofing Insulation Board Roof Terrace Yes Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
Roofing Separation layer Civil Water Proofing Substation 2 A 100 gm/sq.m. geotextile separation layer Roofing Separation Layer Roof Terrace Yes Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
Roof Concrete Tile Civil Tiles Substation 2 Precast Tile with chamfer at top edge Roof Finishing Roof Terrace Yes Site
ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
Aluminum Flashing Civil Metalic Substation 2 Aluminum Roof Flashing To protect Termination of WP membrane Roof Terrace Yes Site
ever is applicable to respective project)
At manufacturer
Jockey Pump Set FPS Fire Pump Set Substation 1 Volume III, 1.5.1.9.0.08, Rev.10. Clause 5.1.4 Multi stage vertical pump with 3/50/400 V electric motor Use to maintain a constant system pressure Fire Pump room No
factory of pumps
Horizontal split case Diesel Fire Pump Set, UL/FM Used as standby source of flow demand for fire fighting At manufacturer
Disel Pump Set FPS Fire Pump Set Substation 1 Volume III, 1.5.1.9.0.08, Rev.10. Clause 5.1.4 Fire Pump room No
Approved, UL/FM Approved Diesel engine system factory of pumps
Flow Meter, 8" dia for the flow range of maximum demand of To measure the flow demand of pump during pump testing & At manufacturer
Flow Meter & accessories FPS Fire Pump Set Substation 1 Volume III, 1.5.1.9.0.08, Rev.10. Clause 5.1.4 Fire Pump room No
pump, wafer type maintanance. factory of pumps
CE NNNA MS E 18 186 Fire Alarm System FPS Fire Alarm System Substation Volume III, 1.5.1.9.0.08, Rev 10 Addressable fire alarm system To detect the fire in terms of heat and smoke In whole substation building No As mentioned below
Smoke Detector FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Addressable Optical Smoke Detector, c/w standard base. To detect the smoke caused by fire in early stage In whole substation building No At site
Duct detector FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Addressable Duct Smoke Detector, c/w Housing and tube. To detect the smoke in HVAC Duct HVAC Return Air Duct No At site
Fire Alarm printer desk to print the sequence to operation To get the printed out put information of all the event from
Fire Alarm Printer FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Control room No At site
from fire alarm control panel main fire alarm control panel
Addressable recessed/surface mounted Manual Break In cas eof emergency the break galss unit can be used to alert
Manual Call Point FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 In whole substation building No At site
glass/Manual pull station, Red colour. the peoples by sounder/strobe
Recessed type Remote indicator with Red colour LED flashes Used as indication of sensing device which is invisible for the
Remote Indicator FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 In control Building No At site
in case of detector activated. user.
Battery FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Fire Alarm contro Panel Batteries Fire Alarm System Control room No At site
Enclosures for fire alarm equipments FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Weatherproof enclosure for fire alarm modules, IP65 Fire Alarm System In whole substation building No At site
Isolator Module FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Loop isolator module Fire Alarm System In whole substation building No At site
Fire Resistance Cabl;e - 2hr FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 MICC cable, orange colour, 2coreX1.5 Sqrmm. Fire Detection & Alarm System In whole substation building No At site
Flame Detector UV/IR2 or UV/IR3 or IR3 FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 UV/IR2 or UV/IR3 or IR3 Fire Detection & Alarm System Transformer area No At site
Manual Release Pull Station, Agent Release wording, Dual action, Yellow Color FPS Fire Alarm System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Agent Release wording, Dual action, Yellow Color Fire Extinguishing System Near door of Nitrogen Fire Suppression protected room No At site
Page 5 of 8
Issue-4, Rev-0
CE NNNA MS E 18 187 Fire Fighting System FPS Fire Fighting System Substation Volume III, 1.5.1.9.0.08, Rev 10, Clause 5,6
Water mist system FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5 Selector valve c/w wet pilot Trim Used in Water Mist System for IDTs,Ets and Reactors No At site
Wet Pilot Sprinkler FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.18 Wet Pilot for Sprinkler Deluge / Mist system IDTs,Ets and Reactors, cable basement No At site
High velocity solid cone water spray nozzle, 3/4",1/2' NPT, Used to spray the water to cover all the hazard area like
Spray Nozzles FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.18 132kV Basements/IDT/ET/Reactor No At site
Brass body IDT/ET/Reactor, Basements as per design.
Test & Drain valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 7.1.1 Test & Drain valve, 25mm dia, threaded end, brass body. Used to drain the water in the pipe of wet pilot system IDT/ET/Basement/Pump room/First Floor No At site
Deluge alarm pressure switch, 1/2" NPT connection, dual Used to transfer the signals that the water is flow in the
Pressure Switch FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.10 Deluge valve & Fire Pump set No At site
SPDT type with weatherproof cover. system with high pressure.
CO2 Fire Extinguisher FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 8 CO2 Fire Extinguisher, 10 LBS capacity UL/FM Approved. Used to fight small fire manually In whole substation building No At site
CO2/DCP Trolley Fire Extinguisher FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 8 Dry Chemical Powder Fire Extinguisher, 50 LBS capacity Used to fight small fire manually Outside Transformers No At site
Trolley Foam Fire Extinguisher FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 8 Trolley Foam Fire Extinguisher, 135 Lts capacity Used to fight small fire manually Fire Pump Room Yes At site
Swing check valve, Flanged ends, bronze disc & seat with
Swing Check Valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Used in Pump delivery pipe Pump room No At site
removable cover .
Butterfly Valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10 Supervised Butterfly valve Used in fire pump room sprinkler system Pump room No At site
Pipe Hangers & Clips FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 7.2.3 G.I. Pipe hanger, adjustable type Used to support the pipes IDT/ET/Basement/Pump room No At site
Stainless Pipe SS 316 FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.13 SS 316 Fire pump sensing line Pump Room No At site
Used in fire pump room, deluge manifold & fire main ring
OS & Gate Valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.13 OS & Y gate valve, Flanged ends. Deluge Manifold, Fire Main Pipe & Fire Pump room No At site
pipe to isolate the system
Strainer FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.5 "Y" strainer, Flanged end, c/w ss strainer Used to filter the water in the discharge pipe Fire Pump Room No At site
Sprinkler Guard FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Hard wire cage designed to encase sprinkler To protect sprinkler from damage Fire Pump Room, IDT/Basement No At site
Substation and Cable Fire Sealant & Fire Proof coating of cables used to avoid the
Fire Sealant & Cable Coating FPS Fire fighting system 3 Volume III, 1.5.1.9.0.08, Rev 10, Clause 10.7 To ensure fire containment Substation Building No At site
projects penetration of fire from one compartment to another.
132kV GIS, 11kV Switchgear room, control room and
Breathing Appparatus FPS Others Substation 3 Volume III, 1.5.1.9.0.08, Rev 10, Clause 9 Breathing apparatus of 45 mins duration Safty of personnel No At site
security room
Globe Valve FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5 Globe valve, flanged end, Cast iron body. For Fire Pump Performance Test Fire Pump Room Yes At site
Galvanised Threaded Fittings FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.13 Factory Galvanized Fittings as per BS 143, PN25. Fire Fighting System In whole substation building Yes At site
Black Flanges FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.1.13 Black steel welded type, slip on flange, Class 150, ANSI. Fire Fighting System In whole substation building No At site
Fire Hose FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.4.3 Fire Hose Fire Fighting System Out side yard area No At site
Branch Pipe Nozzle FPS Fire fighting system Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.4. Branch pipe Nozzle Fire Fighting System Out side yard area Yes At site
Breathing Appparatus Cabinet FPS Others Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 9 Breathing Appparatus Cabinet Fire Fighting System In whole substation building Yes At site
Recessed Breeching Inlet Cabinet FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.4. Breeching inlet Cabinet Fire Fighting System Out side yard area No At site
Fire Hose Reel FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 10, Clause 5.3 25mmX30 metre long Autimatic Fire Hose Reel Fire Fighting System Staircase landing area Yes At site
Page 6 of 8
Issue-4, Rev-0
5T EOT is provided with three movements in 132 KV room.
Long travel , Cross travel & Hoist , ie it can travel in all three
directions X , Y , Z. Each movement is operated by an
CE NNNA MS M 16 189 5 MT EOT CRANE MEP Crane & Monorail Substation 3 Volume III, 1.5.3.1.0.01, Rev.9, Clause 24 independent motor and all controls are operated from a Lifting of equipment in GIS room GIS No Dubai
hanging pendent moving along with the crane. All have both
high & low speeds and are equipped with brakes & limit
switches.
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Consists of an heating element inside a shell with thermal
Electric Water Heater. 50 Ltr capacity. MEP Plumbing Substation 3 Pantry Water heater No Not required
ever is applicable to respective project) protection to provide cut off at set temp.
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Storage of domestic water.
Domestic water storage tank MEP Plumbing Substation 3 Roof & External area Water storage No Not required
ever is applicable to respective project) Capacity: 600 Gallons & 1000 Gallons
Submersible Pump Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Pump completely immersed in water for pumping out deluge /
MEP Drainage Substation 2 Basements & External area External Drainage System No Not required
Capacity: 25 cu.m/hr at 8 m head ever is applicable to respective project) oil water to respective areas.
Floor trap 75 mm diameter with stainless steel grating & Polypropylene road gully 568 Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Floor drains & floor cleanout covers (Stainless steel)
MEP Drainage Substation 3 Pantry/Toilet Plumbing No Not required
mm x 920 mm ever is applicable to respective project) Part of drainage system.
Glass for vission panel (2 hrs fire rated) Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 195 Civil Glass Substation 2 Mark of origin/make to be embossed on the Glass. To see other side of door without openning the door. In the steel doors of Intranal Rooms Yes Site
(25mmx30mm) ever is applicable to respective project)
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Colours: In line with Civil Defense regulation. To see the route easily in dark to escape during fire or if there
CE NNNA MS C 15 197 Fluorescent paint (for fire escape route) Civil Painting Substation 3 On the floor along the fire escape route. No Site
ever is applicable to respective project) is no light.
Top Coats: Minimum two coats of Fuorescent Paint and
Clear Coat over the same for protection.
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Oil water tank and
CE NNNA MS C 15 200 40mm wide GRP Ladder for oil water tank and basement sump pits Civil Others Substation 3 To access during mentainance. To access during mentainance. Yes Site
ever is applicable to respective project) Sump Pits at basement
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which To stop entering to the DEWA premises over the boundary
CE NNNA MS C 15 201 Galvanized steel spikes Civil Metalic Substation 3 To stop intrusion. At the boundary wall top. Yes Site
ever is applicable to respective project) wall by the intruder.
CE NNNA MS E 18 229 Alarm Check Valve FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev.9, Clause 7.7 Flanged ends, Rubber seat disc For Sprinkler System Ground Floor No At site
Upright/Pendent- Brass; Concealed type-White Chrome Water fire suppression system for Pump Room, Contorl
CE NNNA MS E 18 230 Sprinklers (Upright/Pendent/Concelead) FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev.9, Clause 7.18 IDT/ET/Basement/Pump room/First Floor No At site
plated: 1/2", Temp-68, 79, 93 building Corridors, Workshop, Record Room.
CE NNNA MS E 18 232 CO2 Trolley Fire Extinguisher FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 9, Clause 3 CO2 Fire Extinguisher, 50 LBS capacity Used to fight small fire manually 132/11kV Switchgear room No At site
CE NNNA MS E 18 233 Gate Valve NRS FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 9, Clause 7.4 Threaded ends.Bronze construction. Below 2".Isolation purpose. Deluge Manifold & Fire Pump room No At site
CE NNNA MS E 18 234 Tamper (Supervisory) Switch FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 9, Clause 4.1.2 Double Switch - Two sets of SPDT Monitoring Isolation Valves (open/close). OS&Y Valves No At site
CE NNNA MS E 18 235 Carbon Steel Butweld Fittings FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 9, Clause 7.10 ASME B16.9 Fire Fighting System In whole substation building No At site
CE NNNA MS E 18 236 Forged Threaded Fittings FPS Fire Fighting System Substation 2 Volume III, 1.5.1.9.0.08, Rev 9, Clause 4.4.1 ASME B16.11, Class 3000 Forged Steel Fittings Nitrogen Fire Suppression System Nitrogen Fire Suppression System Piping No At site
CE NNNA MS E 18 237 Fire Water Tank FPS Fire Fighting Substation 1 Volume III, 1.5.1.9.0.08, Rev 9 Aluminum construction Fire Fighting System Near Fire Pump Room No At site
Page 7 of 8
Issue-4, Rev-0
Cable route marker tapes for use during installation shall be
HDPE PIPE: (Dia-160mm/Thick-9.5mm & Dia-110mm/Thick 6.6mm) Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which continuously installed 300 mm
CE NNNA MS C 15 242 Civil Sleeve/Pipes Cable Laying 1 ever is applicable to respective project) directly above the cable or cable covers.
To use as a sleeve near waterline crossing On the route of cable route profile Yes Site
Route Markers (Pole type for link box,unmade&grass area.Surface route marker in
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which For the route of the cable profile a wooden small posts are
CE NNNA MS C 15 245 tiles) Civil Pole/Post Cable Laying 2 ever is applicable to respective project) installed to identify the cable route profile
Identification of cable route profile Above cable route. Site
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Pile caps, sealing around cutouts of pipe encasement, casting
CE NNNA MS C 15 248 Swellable water bar Civil Piling / RCC structures Substation 1 ever is applicable to respective project)
Integral sealing for construction joints in concrete cast in situ.
around old concrete.
Piling,OWMH, FMH & SMH manholes No Site
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which High performance pile top fairing grout and cementitious void
CE NNNA MS C 15 249 Pile Grout Civil Piling Substation 1 ever is applicable to respective project) filler
Pile cap reprofiling Substructure No Site
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Elastomeric cementitious coating with inherent crack-
CE NNNA MS C 15 250 Elastomeric waterproof coating Civil Piling Substation 1 ever is applicable to respective project) bridging ability
Pile head treatment Substructure No Site
extenders.
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Reinforcing the water retaining capability and resistant to
CE NNNA MS C 15 252 GRE lining Civil Waterproofing Substation 3 ever is applicable to respective project) high temperature.
Oil and chemical tanks/manholes U/G Oil water tank, holding tank and other deep structures. No Site
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which External SMH, FMH, OWMH, Sump pits, GT and other
CE NNNA MS C 15 253 Painting system for manhole covers Civil Painting Substation 3 ever is applicable to respective project)
Epoxy coated painting system Protection against rust and corrosion.
manholes.
No Site
Sealing of cable ducts ( basement sleeves with waterproof system Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which Basement sleeves with waterproof system from external and sealing of all spare sleeves, earthing cable sleeves and all
CE NNNA MS C 15 254 Civil Waterproof / fire proof Substation 3 ever is applicable to respective project) fire proof system from internal. basement sleeves from inside
Main building basement RCC walls and transformer rooms Yes Site
from external and fire proof system from internal)
A two part acrylic modified cementitious coating dries to a
Volume III, 1.5.3.1.0.01, Rev. 9 to Rev-14, Clause Civil Works ( which
CE NNNA MS C 15 255 Liquid waterproof Civil Waterproof coating Substation 3 ever is applicable to respective project)
tough flexible layer of modified cement with an excellent Prevent passage of water Battery room, Pantry and toilet No Site
waterproofing properties
CE NNNA MS M 16 279 Isolator MEP Small Power & Lighting Substation 3 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 TPN, TP, DP or SP Metal clad or moulded case isolator To use as isolator or safety isolator in the power circuit All areas No Not required
CE NNNA MS M 16 280 Cable gland, lugs & accessories MEP Small Power & Lighting Substation 3 Volume III, 1.5.3.1.0.01, Rev.12, & Volume III 1.5.3.1.0.02, Rev-0 Brass cable gland set and tinned cooper lugs. End termination and connection of cables. All areas No Not required
CE NNNA MS M 16 282 Batteries for Uninterruptible power supply (UPS) MEP Small Power & Lighting Substation Vol III, 1.5.3.1.0.01, Rev 10 Power supply for CCTV Power supply for CCTV Telecom Room Not required
CE NNNA MS M 16 283 HVAC Miscellaneous items. MEP HVAC Substation 3 Volume III, 1.5.3.1.0.04, Rev. 6 to 8 Miscellaneous Items. Miscellaneous Items. Miscellaneous Items. No Not required
Page 8 of 8
Issue-4, Rev-0