Yes No N/A Initials
Gas Equipment Connection
Tempering Valve
Air Compressor
Compressor Air Outlet
Waste/Vent Riser
Water Riser
Gas Riser
Compressed Air Riser
--END OF CHECKLIST--
2/25
Yes No N/A Initials
Verify sprinkler head locations have been coordinated with
architectural ceiling plans.
--END OF CHECKLIST--
Verify the need for other types of systems, such as natural gas,
propane, compressed air, vacuum, distilled water, steam, fuel
oil, acid waste, deionized water, oxygen, nitrogen, nitrous
oxide, medical air, vehicle service oils, etc.
Verify scale is shown and is correct.
Verify sheet note symbols are coordinated on plans.
Verify all services are continued on civil plans and on the
building plumbing plans.
3/25
Yes No N/A Initials
Check all sheet references and follow references to the
indicated locations.
Verify the "Point of Connection" for all plumbing services.
Coordinate with civil plan for plumbing requirements and fire
protection requirements.
Check pipe size with plumbing first floor plan or plumbing
below grade piping plan.
Check underground plumbing equipment and verify adequate
details are provided.
Check for indications of future building or construction and
verify that underground plumbing pipes and equipment are
coordinated with proposed future installations.
Verify that water meters and gas meters are indicated.
Verify that invert elevations are adequate.
Verify that correct backflow prevention has been indicated.
Coordinate water supply with landscape plans.
Verify gas pipe sizes with Plumbing Code.
Verify that pipe material is indicated.
Coordinate site plumbing with architectural plans.
Coordinate site plumbing with underground mechanical
piping.
Read all general notes, sheet notes, keyed notes, etc., and
verify the note symbols are appropriate for the items
referenced on the plans.
Verify sheet title, plan title, scale, title block information, sheet
number, north arrow, stamp, dates, logos, etc. are consistent
with architectural drawings and other disciplines.
--END OF CHECKLIST--
4/25
Plumbing Demolition Plans Review
7 Plumbing Demolition Plans Yes No N/A Initials
Verify that demolition symbols are clear and complete.
Read all sheet notes and verify they are clear and appropriate.
5/25
Yes No N/A Initials
Verify sheet title, plan title, scale, title block information, sheet
number, north arrow, stamp, dates, logos, etc. are consistent
with architectural drawings and other disciplines.
Verify sheet note symbols are coordinated on plans.
8. Negative Responses (attach sheets as necessary)
Item Reason for negative response Resolution
--END OF CHECKLIST--
6/25
Yes No N/A Initials
Verify the floor plan and enlarged plan have the same
background and are current with the latest architectural plan.
Check that the fixture units in the partial plan correspond to
the floor plan.
Check waste pipe sizes shown on the plumbing floor plans and
enlarged plumbing partial plans with associated accumulated
fixture units.
Follow all roof drain and roof drain overflow drain pipe risers
up to the floors above. Check for coordinated locations from
floor to floor on each pipe riser.
Measure the horizontal projected roof area served by each roof
drain. Pencil in roof areas for all roof drains and associated
overflow drains. Verify roof drain pipe sizes.
Check subsoil drains or footing drains, if applicable. Verify
pipe size is minimum of 3" diameter.
7/25
Yes No N/A Initials
Verify that all pipes are routed to allow maximum headroom in
all parking areas and drive aisles, and are coordinated with
structural beams.
Check floor drains and floor sinks for provisions for proper
venting.
Verify that all vents from the underground plumbing plan are
continued up to the first floor plan, that the sizes are consistent
from underground to above ground, and that there are no vents
that are not enclosed in walls, chases, or other construction.
Check floor drains and floor sinks for provisions for trap
priming. Plan should show the below-slab portion of the water
piping from the trap primer to the floor drain or floor sink.
Check for underground portion of domestic cold water service
and fire protection service. Coordinate with civil site plan and
plumbing site plan.
Verify that gas piping is NOT run under the building.
Verify correct match lines and coordinate continuation of pipes
across match lines.
Verify that architectural backgrounds and column grid lines
are current and are correct.
Verify correct line weights on plumbing work.
Verify correct and coordinated key plan.
Read all general notes, sheet notes, keyed notes, etc. and verify
the note symbols are appropriate for the items referenced on
the plans.
Verify sheet title, plan title, scale, title block information, sheet
number, north arrow, stamp, dates, logos, etc. are consistent
with architectural drawings and other disciplines.
Verify sheet note symbols are coordinated on plans.
8/25
10. Negative Responses (attach sheets as necessary)
Item Reason for negative response Resolution
--END OF CHECKLIST--
Verify the floor plan and enlarged plan have the same
background and are current with the latest architectural plans.
Verify that all vents from each floor are continued up to the
next floor above an to the roof, and that there are no vents that
are not enclosed.
9/25
Check for hose bibbs in all machinery rooms, kitchens,
incinerator rooms, trash chute rooms, rooms with floor drains,
and exterior building walls.
Verify hose bibbs include vacuum breaker or backflow
preventer.
Verify protection against freezing.
Verify piping is run parallel to or at right angles to building
walls and partitions.
Verify cold water and chilled water lines are insulated where
condensation could present a problem.
10/25
Yes No N/A Initials
Coordinate with structural plans for any equipment that
requires special structural supports or framing.
Coordinate with architectural and structural plans for any
special construction that may affect pipe and equipment
locations.
Verify that all equipment has the correct symbols, and is listed
in equipment schedules.
Verify that the architectural backgrounds and column grid are
current.
Verify correct line weights for plumbing work.
11/25
Yes No N/A Initials
Verify pipe identification symbols match the plumbing legend
and symbols.
Read all general notes, sheet notes, keyed notes and verify the
note symbols are appropriate for the items referenced on the
plans.
Verify sheet title, plan title, scale, title block information, sheet
number, north arrow, stamp, dates, logos, room names and/or
room numbers are consistent with architectural drawings and
other disciplines.
Verify sheet note symbols are coordinated on plans.
--END OF CHECKLIST--
12/25
Plumbing Roof Plans Review
13 Plumbing Roof Plans Yes No N/A Initials
Check roof drain pipe sizes shown on the roof plan with
associated accumulated square footage values. Check sizes
with the plumbing code.
Verify adequate clearance from all sanitary vents or other
plumbing vent son the roof and roof air handling unit outside
air intakes - minimum 10 feet horizontal or minimum of 3 feet
above.
Verify that all vents are sized. Coordinate with the plan below
the roof.
Check details for pipe supports on roof.
13/25
Yes No N/A Initials
Verify correct line weights for plumbing work.
Verify correct and coordinate key plans.
Verify correct identification, sizing and coordination of all
pipes going up and down between roof and floor below.
--END OF CHECKLIST--
14/25
Yes No N/A Initials
15/25
Yes No N/A Initials
Verify cleaning, degreasing, and nitrogen purge of piping and
fittings.
Verify requirements for system certification, pressure testing,
and time table.
Verify adequate sectionalizing, servicing, and zone valves, and
adequate access to valves.
Verify bulk storage provisions for medical gas supply cylinders
conforms to NFPA requirements.
Verify totally oil-free medical gas air compressor and
associated air dryer.
Check medical gas piping diagrams against floor plans for
consistency and completeness.
Verify proper gas manifolds on cylinder systems.
Verify locations for alarm panels.
Verify medical gas systems are on emergency generator system
or other emergency service.
Verify sizing of medical gas piping systems (medical air,
medical vacuum, oxygen, nitrous oxide, nitrogen, etc.)
conforms to code requirements.
Verify back-up reserve cylinders for medical gas systems.
--END OF CHECKLIST--
16/25
Central Plant Plumbing Plans Review
17A Central Plant Plumbing Plans Yes No N/A Initials
Coordinate with plumbing floor plans for correct continuity
and pipe sizing.
Transfer waste, vent, cold water, hot water, hot water
circulating, gas, industrial water, medical gases, roof drainage,
and overflow drainage flow rates from plumbing plans to
central plant plan.
17/25
Yes No N/A Initials
Verify locations for expansion tanks, and make-up water
supply. Verify provision for backflow prevention on make-up
water.
Verify provisions for water treatment on domestic hot water
and cold water systems.
Verify adequate isolation valves for servicing plumbing
equipment and sections of piping.
Verify adequate clearance at heat exchangers for tube and shell
servicing.
Verify all unit designations with equipment schedules. Verify
all equipment is shown and scheduled.
Coordinate equipment bases and concrete pads with
architectural and structural drawings.
17B Chillers and Cooling Towers
Verify provisions for cooling tower drainage piping are
complete.
Verify provisions for cooling tower basin filters and
appropriate drains.
Verify provisions for reduced pressure backflow preventer on
cold water make-up service.
Verify all make-up points to mechanical equipment are
downstream from backflow prevention devices.
Check for adequate floor drains and floor sinks around
equipment. Cooling tower blowdown approx.
10gpm/1000tons.
17C Heating Water Boilers
Check gas service piping and size to heating boilers.
Verify boiler gas train location and type.
Check for adequate floor drains and floor sinks around
equipment.
Check make-up water provisions. Verify backflow prevention
is provided.
Coordinate with mechanical drawings.
17D Domestic Hot Water Boilers
Check gas service piping and size to heating boilers.
Verify boiler gas train location and type.
Check for adequate floor drains and floor sinks around
equipment.
Yes No N/A Initials
18/25
Check capacity of domestic water storage tanks.
Check capacity of domestic hot water circulating pumps.
Verify there is adequate capacity in GPM and head to provide
circulating flow in all hot water circulating loops.
17E Steam Boilers
Check gas service piping and size to steam boilers.
Verify boiler gas train location and type.
Check for adequate floor drains and floor sinks around
equipment.
Check make-up water provisions. Verify backflow prevention
is provided.
Check blowdown separators.
Verify vents to atmosphere from condensate receiver,
feedwater tank, deaerator tank, blowdown separator, and boiler
steam relief valves.
17F Heat Exchangers
Shell and tube type should be used where approach exceeds
approximately 15 degrees F.
Shell and tube, maximum water velocity in tubes = 6ft/sec.
Shell and tube, if steam/water, steam valve capacity exceeding
2" control valve size should have two valves sized at 1/3 and
2/3 capacity.
Verify adequate tube pull clearance on shell and tube, equal to
length of exchanger.
Verify piping connections arranged for head and piping
removal for cleaning tubes.
17G Domestic Hot Water Circulating Pumps
Pump suction pipe should be straight for a length of 5 to 10
pipe diameters or should provide suction diffusers.
Verify that pump connection details or plan view includes
flexible connection, check valve, balancing valve, and shut-off
valve on pump discharge, and shut-off valve, flexible
connection, and suction diffuser on pump suction.
19/25
Yes No N/A Initials
Check pump curve for appropriate selection and operating
point.
Check for adequate floor drains or floor sinks adjacent to
pumps.
Check pump controls to verify operating sequence.
Coordinate electrical service with electrical design.
17H General Central Plant Plumbing Plan
Read all general notes, sheet notes, keyed notes, etc. and verify
the note symbols are appropriate for the items reference on the
plans.
Verify sheet title, plan title, scale, title block information, sheet
number, north arrow, stamp, dates, logos, etc are consistent
with architectural drawings and other disciplines.
Verify sheet note symbols are coordinated on plans.
Coordinate with electrical drawings to verify all plumbing
equipment ahs been provided with the correct electrical
service.
Coordinate with mechanical drawings for condensate drains,
equipment drains, gas connections, make-up water piping,
floor drains, and floor sinks.
Verify that all equipment has the correct symbols, and is listed
in equipment schedules.
Verify that the architectural backgrounds and column grid lines
are current.
Verify correct line weights for plumbing work.
Verify correct and coordinated key plans.
Verify correct identification, sizing and coordination of all
pipes going through walls to adjacent spaces.
20/25
18. Negative Responses (attach sheets as necessary)
Item Reason for negative response Resolution
--END OF CHECKLIST--
21/25
Verify drawings linetypes are consistent with industry
standards (lines with single-dash for cold water piping, lines
with double-dash for hot water piping, lines with tripe-dash for
hot water circulating piping)
Verify references to fixture details are correct.
22/25
20. Negative Responses (attach sheets as necessary)
Item Reason for negative response Resolution
--END OF CHECKLIST--
Verify sheet title, plan title, scale, title block information, sheet
number, north arrow, stamp, dates, logos, etc are consistent
with architectural drawings and other disciplines.
Verify all details are related to the project.
Verify all details are edited for the project.
Read all notes on all details and verify the notes are correct for
the application.
Verify all equipment details have anchorage details.
Verify constructability of installation details.
Verify plumbing details conform to local and state code
requirements.
Coordinate with electrical drawings to v verify all plumbing
equipment has been provided with the correct electrical
service.
Coordinate with mechanical drawings for condensate drains,
equipment drains, gas connections, make-up water piping,
floor drains, and floor sinks.
Verify that all equipment details have the correct symbols.
Verify correct references to diagrams or other details.
Check plumbing details that apply to the project
Air Compressor
Air Gap Fittings
Compressed Air
Yes No N/A Initials
23/25
Condensate Traps
Deionized Water
Emergency Eyewash
Emergency Shower
Fire Protection
Flexible Piping
Fuel Piping
Gas Piping
Gas Service
Grease Interceptor
Indirect Waste
Medical Equipment
Medical Fixtures
Medical Gas
Pipe and Equipment Supports
Pipe Penetrations
Pumps
Reduced Pressure Backflow Preventers
Sand and Oil Traps
Septic Tanks
Sewage Ejectors
Sump Pumps
Thermostatic Mixing Valves
Thrust Blocks
Trap Primers
Underground Pipe
Waste Storage Tanks
Water Hammer Arresters
Water Heaters
Water Softeners
24/25
22. Negative Responses (attach sheets as necessary)
Item Reason for negative response Resolution
--END OF CHECKLIST--