You are on page 1of 3

PROJECT

TITLE:

FIELD DENSITY TEST (SAND REPLACEMENT METHOD)


RFI No.: CALIBRATION :
2
CHAINAGE: Mean mass of sand in cone (of cylinder) (m ) (g)
3
LOCATION: Volume of calibration container,V (V) (m )
DESCRIPTION OF SOIL: Mass of sand(+cylinder) before pouring (ml) (g)
3
DATE: Mass of sand (+cylinder) after pouring (m ) (g)
Mass of sand to fill calibration container
LAYER/SAMPLE NO.:
(ma=m1m3m2) (g)
3
Bulk Density of sand, Psd = ma/V (Mg/m )

SAMPLE NO. :
Mass of wet soil from hole, mw
Mass of sand (+cylinder) before pouring, ml (g)
Mass of sand (+cylinder) after pouring, m4 (g)
Mass of sand in hole (mb=mlm4m2) (g)
Ratio mw/mb (g)
Bulk Density, Psl=(mw/mb)*Psd
Dry Density
Pd=100Pw/(100+average moisture content) (Mg/m3)
MIXTURE CONTENT
Container No.
Weight of container + wet soil, a (g)
Weight of container + dry soil, b (g)
Weight of water, Ww (c=ab) (g)
Weight of container, d (g)
Weight of dry soil, Ws (e=bd) (g)
Moisture content, Mc=c/e*100 (%)
Comparative dry density (%)
REMARKS : M.D.D :
O.M.C :
PREPARED & TESTED BY CHECKED BY : WITNESS BY : APPROVED BY :
(R.E/A.R.E)

Name: Name: Name: Name:


Date: Date: Date: Date:
PROJECT TITLE:

BORED PILING RECORD FORM

PILE DETAILS DRILLING DATA


PILE REFERENCE: DEPTH (m) TIME (HRS) SOIL DESCRIPTIONS
LOCATION OF PILE (PILECAP) : 0
DIAMETER OF PILE: mm
WORKING LOAD PILE: kN
PLANT/EQUIPMENT DATA
BASE CRANE:
SERVICE CRANE:
BORING UNIT:
VIBROHAMMER:

MANPOWER DATA
OPERATOR (BORING UNIT):
OPERATOR (SERVICE CRANE):

REDUCED LEVELS CHECK


EXISTING WORKING PLATFORM
m
LEVEL:
CUTOFF LEVEL OF PILE: m
TOE LEVEL OF PILE: m
GROUND WATER LEVEL: m BGL

BORE HOLE DATA CHECK CONCRETING DATA CHECK


DIAMETER OF BOREHOLE: mm DATE CONCRETED :

DEPTH OF BOREHOLE FROM WORKING


VOLUME DELIVERED (A):
PLATFORM: m
DIAMETER OF CASING USED: mm THEORETICAL VOLUME (B):

LENGTH OF PERMENANT CASING: m WASTAGE (AB)/BX100:

REINFORCEMENT DATA CHECK CONCRETE(PAY) LENGTH:


MAIN REBAR DIAMETER: CONCRETE SLUMP:
NUMBER OF REBAR: CONCRETE GRADE:
BINDERS DIAMETER/PITCH:
DISCHARGE METHOD: TREMIE/DIRECT
LENGTH OF REINFORCEMENT:

No. Arrival Time D.O No. Start Time Finish Time


1
2
3
4

REMARKS:

Name: Name: Name:


Date: Date: Date:
PROJECT TITLE:

Quality Verification Checklist


Common Fill
Subcontrator:
Date: Chainage,CH.: To CH.:

L.H.S.: R.H.S.:
Height in Fill: m Layer#No: of Total Layers:

Site status: Ready Not Ready

If NOT, reinspection on: (Date)

Soil Condition prior to Compaction: WET: DRY:

Source of Material to be used:

1.Material 1. How is the quality of material to be used Suitable for use


Unsuitable for use
2.Has sample taken prior palcement of fill Yes No
material.(For testing if required)

Remark:
(if any)

2.Compaction 1.If Compaction thickness 300mm per layer Yes No


2.FDT has been carried out as per Specification Yes No
Requirements?
Remark:
(if any)

3.Material Laying 1. Laying of Filter Cloth Yes No


2. Sufficient lapping
of Filter Cloth N/A Yes No

Remark:
(if any)

Remark&Observations(if any) INSPECTION STATUS:

Prepared By: Checked By: Inspected By: Approved By:

COW (R.E./A.R.E)