00-HS-ZAA-OBY-0425

Prepared: Checked: Approved: Std. Checked:


SAMSUNG
Revision: Resp. Sector.: Reference: Language: Page No.: Total Pages:
2 PMT En 1 4
n

JOB HAZARD ANALYSIS


Subject of JHA Discipline

LIFTING BUILDING
JOB HAZARD ANALYSIS (JHA) MATERIAL USING Civil Arch Elec Mech
CRANE Other __Building_________

SECL Discipline P/C SECL Site HSE Manager SECL Construction Manager

Reviewed by Sign. Analyzed by Sign. Approved by Sign.

Date Date Date

IBS Construction Manager IBS HSE Manager IBS Site Manager

Agreed by Sign. Approved by Sign. Approved by Sign.

Date Date Date

Responsib Rem
No Activity Potential Hazards Preventative Measures
ilities ark

1 Pre job planning Necessary tools & Ensure that appropriate permit to work is in place Site
and preparation equipment available in and work site thoroughly inspected, get familiar with Engineer &
bad condition or not other obstruction. Supervisor
functioning. Conduct tool box meeting and explain expected
Heat stress if work hazards and necessary precautions.
carried out during All necessary tools & equipment available must be in
summer. good condition and proper functioning.
Simultaneous/conflictin Maintain a comfortable distance from different work

1
P0-QA20-F-NNN
CRANE LIFTING
g operation, condition activities, be more attentive make aware of your work
such loading/unloading, to other crew.
rig working nearby Maintain minimum distance of 4 meters from
Grinding/Welding/Liftin overhead power line.
g/Cutting at work site. Check surrounding area, ground condition, wind
Collision with workers condition, overhead power lines.
and vehicles in Check lifting capacity of Crane and radius of
boundaries. operation.
Poor arrangement and Ensure Crane is placed on hard, level ground,
housekeeping in outriggers fully extended, placed under timber mats
surroundings and must be in good condition.
Collapse due to Ensure the Crane is having spark arrester when
damaged sill of working in restricted area
outriggers

2 Setting Hand Injury to the Keep hands out of pinch point while rigging, Use Site
Crane for rigger. hand gloves. Engineer &
the load to Failure of slings or D- Ensure that the slings and shackles are inspected Supervisor
be lifted shackles. and in good conditions.
Collision of workers Know the weight to be lifted and its configuration,
working close to range Check Weather condition ,
Falling objects hazard Wind speed(low, high)
due to lifting different Emphasis more to STOP WORK if they see anything
types of materials unsafe.
Due to lifting heavy Do not use damaged pallets and do not overload the
materials such as pallets
blocks, bricks or bags it Ensure the lifting of same size of materials to avoid
can break the pallet falling objects
and may fall on ground Restrict the workers not to work near the boom range

2
P0-QA20-F-NNN
CRANE LIFTING
3 Lifting the Lifted material falling. Barricade the area of Crane operation place warning. Site
load Hitting people or Check rigging before lifting. Engineer &
existing facility. Ensure lifted load is properly balanced. Supervisor
Crane losing balance. Stop lifting if wind is getting strong and poor visibility.
While lifting any Refer to load chart and radius of operation.
material it can be Assign one man to give signal to crane operator.
collide or cut the wire Use tagline to control suspended load.
rope and crane can be
Use safety glasses, gloves. Keep other people clear
collapse due to that
of immediate area.
reasons
Provide safe guards for sharp edges to avoid sling
cut.
.
4 Unloading Assign one man to signal and this man controls
the load Rolling/tilting of movement of Crane -Know the weight to be lifted. Site
material. Ensure to place Wooden packing between load Engineer &
Damaging other Use proper slinging method to carry Site office at Supervisor
existing facility. work location
Hand injury to rigger. Position body out of line of loading and unloading.
Injury to personnel by Keep hands well away from (Load) site office ends.
falling of material Know the weight to be lifted.
Due to unload on Use tagline to control suspended load.
unstable condition of Position yourself to safer position for emergency exit
ground or any place it at workplace.
can collapse and hit
Ensure the site is thoroughly inspected for possible
workers.
obstruction in route and location of unloading.
Due to pile of materials
Ensure their enough clearance for Crane movement
more than 1.5m, it can
back and forth.
be collapse and hit
Use proper slinging method to (Load) Site office at
work location.
Do not over stack the materials.
Stack the material properly on firm ground.

3
P0-QA20-F-NNN
CRANE LIFTING

5 Clean work Incorrect placing Correct missing item. Site


site, Work Remove all surplus supports, pipes, trashes. Engineer &
Completed, Supervisor
final
thorough
check up,
hand over