You are on page 1of 33

By grace of god Cleared class 1 on 16/09/2016 with Mr David

Thanks to my frnds,well wishers,eton hall group nd coc61


1st attempt questions examiner : hussain
Slow steaming, why running slow steaming
PI controller,jw temp not maintaining actions
adv of valve positioner
eca procedures
d type boiler drawing nd explanation
exhaust economiser drawing nd explanation
ege water washing nd inspection
anchor not heaving up
mooring winch hydraulic circuit
forging,types of forging
crankshaft manufacturing....
2nd attempt examiner : david
Detailed Tanker midship construction. Use of fish plate,lightening holes.green sea effect ,camber
construction.
Load line survey for tanker
Sketch SDNR for bilge system.he dont need normal sdnr,valve disc for sdnr used in bilge system
is slightly different,if u google u vl get it.Also check valve disc construction of emg bilge
suction.
Detailed sketch of bilgesystem as per annex1.need to show normal bilge transfer,bilge overboard
pumping,bilge/ sludge shore transfer,for tankers transfer line to slop tk,bilge direct ovbd,emg
bilge suc.
Emg bilge suc testing procedure,regulation.
Sketch Tubular heat exchanger.sketch all types of expansion arrangements.materials used.factors
affecting perfomance.
Solas Regulation for fireman outfit,solas regulation for scba set,solas reg for life line,how to
inspect life line.
Spares required as per solas
While answering david he vl giv questions intialy nd tell u to write dwn.dnt try to complete
early.u r going to get more questions if u complete early...

With blessings of Shirdhe key Sai baba I have passed my class 1 oral exam at first attempt on 22
August 2016 Time 0830 1300 hrs
Examiner - David sir, Question asked
1 Bulk carrier load line survey complete writing and explanation.
2 Bulk carrier mid ship cross section.
3 Centrifugal pump sketch and factors affecting pump performance.
4 E/R Overhead crane circuit diagram and maintenance carried out.
5 Boiler high lift safety valve sketch and inspection of parts.
6 four ram steering gear sketch and single failure.
Thanks to Eton hall group Ashish Kumar Dey, Raj Sharma, Vijesh and Vimal Rawat for their
support.

I am glad to inform that I have cleared my class 1 coc orals today in 1st attempt by Mr.david sir.
Questions asked
1.Bedplate types construction faults that might occur and inspection detailed sketch..explanation.
2.MLC Complete writeup and explanation
3.Load line survey complete write up and explanation
4.all statutory certificates,supplements and additional documents writeup and explain.
Thanks for the group in assisting me for preparing my orals.and all the best for future
candidates.thanks to the admin of this group and please keep updating so our fellas can get
benefit.

I cleared my coc-1 ON 16 June 2016 by grace of God ...and thanks all my well wishers in east
lodge .... And my class mates ...
2nd attempt ..
Mr David
1,E/R overhead crane circuit diagram and general faults ....
2. Mid ship cross section of bulk Carrier. give as many details as possible...fish plate camber rat
holes scallops grade of steel used for different plates and thickness.
3.Load Line Survey of Bulk carriers..explain in detail of every aspect. He made the decision to
pass at this point ..
4.AIR compressor diagram effects of bumping clearance and how to adjust..
5 Boiler Safety valve and survey.
6 Steering gear 4 Ram and regulations ...problems associated with steering
He asked me to write every thing. Very less cross questions...
He was kind and taught me total certificate system and how as a chief engineer should verify...
My previous attempt
Mr Hussain
1.ME PERFORMANCE
2.Crank shaft types and manufacturing process
3.Tail shaft and stern tube survey
4. stern tube system.
5. Purifier safeties and checks
6.Liner drawing
7. Remote level gauges drawings .
8. Engine room crane circuit diagram and checks ...

By grace of almighty god & well wisher i cleared my class-1 oral on 18th July by David sir in
second attempt .
first attempt Q asked By Hussian sir,
1)Draw & explain maneuvering system ,causes engine not starting on air.
2)draw & explain T/C, function of shroud ring & overhauling procedure with k1&k2.
3)all types of boiler burner including ultrasonic burner with pizo electric effect.
4)slow steaming
2 nd attempt Q ask by David sir,
1)draw & explain centrifugal p/p all parts with material ,factors affecting p/p performance.
2)reverse power trip draw & write working principle effect what will
happen if reverse fail to operate.
3)earth fault both diagram lamp type & instrument type working principle & hazard associated
with it if not proper attention paid..
4)co2 flooding diagram ,solas regulation daily ,weekly ,monthly & yearly inspection &
maintenance.
5)Boiler gauge glass leaking action pls tell him u wil isolate from remote operation .

Questions asked by Mr. David


1. Bulk carrier cross section. What is significance of fish plate, lighting hole. Show rat hole and
scallops on the diagram.
2. Bulk carrier load line survey. Where water tight door and where weather tight door used.
3. Turbocharger diagram. What is k value, how to take k value, significance of k value.
4. Turbocharger surging cause and how to reduce. What is bad fuel, what is annex 6 regulation
14 and 18. In slow steaming how many times a day you grit wash, and soot blow. How to grit
wash (mention load up program ).
5. How to enter in an enclosed space ( tell details of entry permit checklists, oxygen analyser.)
6. Bedplate diagram . How many types of bedplate, how to inspect bedplate ( show crack prone
areas on the diagram ). How you carry out red dye penetrate test on bedplate.
7. Refrigerator cycle draw. Name of refrigerating gas. Problems associated with this system.
8. MLC in details
from Mr. Hossain sir. Question asked......
1. T/c drawing ; operation & drydock survey during O/H.
2.M/E running-in.
3. M/ E tie rod drw & tightening procedure.
4. Hydraulic jack drw & working principal.
5. Star delta starter.
6.IGS system drw & expansion.
7. Ows drw & operation.
8.Hi voltage system drw & working safety

Questions asked by Mr. David


1. Bedplate dwg & inspection
2. CPP dwg ,operation & problems
3. ER overhead crane circuit dwg & maintenance
4. ME TC dwg, k value, surging cause, action
5. CO2 dwg & maintenance
6. Framo cargo pp dwg......etc
Question ask..David
Piston (from.my last attempt)... x-section cointenar.. Cpp full topics.. air compressor all from
bumping to o/h.. bilge digram .. bilge valve digram. cic .. train jr..mlc and so many x questions..
Last attempt from hussain
Seemp, ramson slilde , one unit exh temp high, piston, rudder carrier, cpp and frequency
controller diagram and function.

Examiner: Mr David Tham


Questions:
1.Statutory certificates with their periods of validity . supplementary certificates to be included.
2.Crude oil tanker construction and midship section.
3.Maritime labour conventions and decleration of compliance for MLC.
4.Load Line Survey.
5.STP checks and port state control detentions.
It was a wonderful experience. The oral was mainly focused on management level.

By the grace of almighty Allah i have cleared my class 1 first attempt


Examinar Mr David
1.MLC DETAILS X QUESTION DMLC ii
2. OVER HEAD CRANE CKT PLUS MAINTAINANCE
3. CENTRIFUGAL PUMP SKETCH AND PERFORMANCE FALL
3. FFA MAINTAINANCE ON BOARD
4. BILGE VALVE DIAGRAM
Hi, Cleared my class 1 orals from Sir, Mr.David ..
Questions asked , nothing new.
Chemical tanker cross section.
Load line survey
Earth Fault finding
Reverse power trip
CIC.
MLC 2006
Turning Gear interlock

ALHAMDOLILLAH cleared class 1 exams today from Mr David.


Many thanks to all batchmates of may,2016 class specially Tariq Munir.
Questions asked were:
CPP.sketch and explain
Common problems associated with CPP system.
How to check the desired pitch is attained. What will happen if pitch is not zero and engine
running at port.
Type of shaft coupling(Muff coupling)
Air bottles regulations for non reversible engines.
HV distribution system 6.6KV to 220V
HV installation requirements,
What precautions to take when working on HV system.
Cross questioning on EPTW.
PPE related to HV.
Boiler high lift safety valve, items to check during survey.
Safety valve setting infront of surveyor
Why drains should be clear.
2 Stage Main Air compressor Working sketch.
Reasons and effects of bumping clearance more/Less
Valves getting excessively choked, reasons, how to rectify.
What type of oil used. Problems with mineral oil.
Explain MLC 2006 in detail.
1st attempt : Mr Hussain
Questions asked were.
Slow steaming precautions as Chief Engineer.
Draw and explain M/E Cylinder lubricator system.
Draw M/E cylinder Liner.
Draw CPP and explain.
Draw both fuel pumps and explain working.
Alhamdullillah cleared oral today
Mr david...ist attempt
High voltage sketch...
safeties only highvoltge...
eptw some questions about bow thruster function... genrtr power accordingly...
Crankcase explosion full mechanics of explosion ,safeties,sketch omd n function.,sketch relief
vlv regltn ...also prepare relief valve material...
mlc full dmlc...
what conditions for age of 16 year seafarer to work at night in engine room ...
high lift safety valve...sopep genral...cic implementation s...tarb book for trainees...
ALLHAMULLILAH !! Today i have Cleared my Class 1 Oral ,Finally Mission accomplished .I
am very thankful to all my friends who support me and guide me to achieve this mile stone
.Special Thanks to Muhammad Imran Rasheed for his moral and academic support. Thanks
Imran .
Examiner : MR. Hussain
Attempted : 2nd
1.What is planned maintenance system and how it followed on your board ship.Write in detail.
2.How to evalaute ME performance.
3.Draw ACB system and explain it .
4.What is HVS(high voltage system) draw its electrical system onboard and write the safety
precaution to be following before carrying a work on HVS . What are the person protective
equipment and tools used in the work,
5.Draw IGG system and tell me what checks you will carry out if your IGG system isn't
working .
6.Draw the Purifier Cross session , how you will evaluate your lub. oil purifier performance .
7.your Aux boiler isn't maintaining its pressure,what checks you will carry out to Solve this
problem.
8.Boiler Safety Valve setting procedure .
9.What do you know about TR 48:2015 and it Annexs .
Well once again thanks to every member of this group .

Examiner: Mr. DAVID


Questions asked:
-Load line survey complete.. items to check on
containership
-Boiler survey complete.. how to carry out.. starting
with all necessary precautions.. safety valve
setting
-Boiler High Lift safety valve sketch with part
names, to mark all necessary clearances, why D/4
-High voltage distribution & safety equipment to
carry on onboad high voltage ships
-Fixed CO2 FF system sketch.. must show the
spectacle flange on the discharge line with air
blow thru connection
-CO2 test/inspections and maitenance
Alot of cross questions.. ECA precautions, SOPEP content, sewage psc deficiencies, mlc/dmlc
part 1 & 2, psc inspections/CIC concentrated inspection campaign, cadet training and how to
educate them on their TARB book assignments, etc

Cleared my COC Class 1 by Mr. David


Generally lots and lots and lots of cross questions, some of them based on shipboard operations
and maitenances, so just keeps on refreshing onboard activities, he mostly not so interest in what
you have known, if you shown any aspects that not so familiar with, then will dig very deep.
1. EGE:
- Crew neglections which causing EGE faults, I explained mainly in two aspects, one is boiler
water treatment, the other is lack or improper maintenance of combustion equipments causing
soot accumulating, like FO quality control, injector, exhaust valve, TC, liner and piston ring
wear, cylinder LO timing and quantity, EGE water washing or soot blowing action etc.
- then whichever you mentioned, mostly there is a cross question, like FO injection pressure and
testing, TC performance, unit overhaul, i mentioned FO in bad quality, then ask about FO
sampling, how many samples u collect, and BDN.
- How to check and identify the EGE faults: enclosed space entry, permit to work, stop
circulating pump, then check
- How to repair the tube leak or if can not repair the leak, what is your action, leading to EGE dry
run procedures and precautions
2. Certificates carried onboard and their validity, any supplementary, windows period, then lead
to following
- SOPEP manual, stamped first page, contents, procedures, please mention SOPEP is for shore
people use, SOPEP locker content and checks, frequency and responsible person for this
- MLC and DMLC
- IOPP then OWS
- ISPP then sewage treatment plant
3. pay attention to types of your last ship, mostly the load line survey will as per your last ship
- scope and survey period
- certificate, ILLC, stability and incline test, 3 certificate in 1 form
-purpose of LL survey
-procedures, i mentioned about superstructure, deck, engine room and duct keel,
- before you answering any question, mention the safety measures first
- cross questions about: weather tight and water tight, hatch cover weather tight check, air vent
check, emergency bilge testing, sprinker testing, EEBD, fire fighting appliances, duct keel what
u check,
4. Thats all i can remember so far, not so many subjects, but for each one going very deep, from
0825 to 1245. try to answer all the questions as a CE, more assertive.
5. As he is more interest with my answers for normal questions, and also no more time, so no
drawing.( i guess because in the beginning, he asked about how long have you prepared for oral,
i said in the past two years, i studied whenever i got time, especially drawings).

By the grace of almighty god,i cleared my class 1 orals from Mr.Zulfiqur Husain.
Questions asked
1.Slow steaming precautions as C/E
2.D/G commisioning after major overhaul.
3.Frequency modulation and Rpm adjustment.
4.Fuel P/P diagram both Man & Sulzer
5.Co2 system diagram
6.Co2 flooding procedure.
7.Vessel grounding actions as C/e
8.E/R overhead crane checks and how to carry out load test.
COC 1 cleared on 1st attempt by Mr. Hussain.
Questions asked:
Draw Main Engine Charge Air Cooler and explain its Dry dock specs in details
Explain the working principle of Inverter
Draw Maneuvering Diagram
Draw 4 Ram steering gear
Draw Jacket 2 element control and integrated Sea water control
Explain boiler causes and actions for repeated flame failure
Draw Boiler safety valve and explain the lifting procedure
Draw main engine starting air valve
Draw High voltage distribution diagram and list the safety equipment to be onboard
Explain SEEMP
Explain NDT
Explain how to take MEP and report to company

By the grace of Allah I have cleared my class 1 oral on 25th May @1500 Hrs.(2nd attempt)
Exam was conducted by Mr. David Tham
1. Stern Tube L.O. system drawing,from where to draw L.O.sample & what are the L.O. tests to
be carried out on board & ashore.
2. 2-Stroke diesel engine bedplate types,drawing & checks to be carried out during
inspection.show places that may crack in the drawing.
3. Economizer tube heavily leaking at sea,action as C/E.How to find the leak & how to plug the
leaky tube.Causes of tube damage.
4. Boiler high lift safety valve drawing,name of all parts & materials,survey~ setting procedure&
items to check during setting & after setting. Pls mention about loose fitting key in the valve
spindle(easing gear) & loose fitting securing pin in the valve lid.show the easing gear pulley
higher than the handle position.Mention about valve to be sealed in front of surveyor after setting
to prevent tempering.
5. Sketch and explain centrifugal pump,name all parts & materials.Factors effecting efficiency of
the pump.
6. Steering gear (4 ram type) working hydraulic circuit,causes of sluggish rudder movement.
7. Sketch IG system & what are the maintenance to be carried out,checks during survey.
8. Contollable pitch propeller drawing & how it works.(for twin screw ship)
9. MLC 2006 titles,explanation & cross questions regarding safe manning document on board.
Thanks to everyone in Eton Hall & all who have given me courage.

First time attempted for class one oral...


Examiner: Mr. Hussain
Verdict: fail
Question:
1.4 stroke engine performance & report writing to company.
2.2-stroke engine performance monitoring & report to company.
3.both types fuel pumps.
4.NDT
5.crank shaft manufacture & inspection.
6. Purifier performance monitoring
Lots of cross question regarding these.
MAY ALLAH HELP YOU ALL...

With blessings of Waheguruji... Cleared class 1 orals


Questions: 1st attempt: Mr Hussain.
1: ECA change over process.
2: Seemp.
3: Boiler not firing causes n action.
4: ME one unit exhaust temp high cause n action.
5: LO management as CE.
6: Purifier running checks.
7: Heat Treatment types
8: Crank shaft manufacturing process.
9: Scavenge Fire actions and after checks.
2nd attempt: Mr. David
1: Load line survey.
2: Midship cross section n various parts explanation.
3: Framo pump diagram.
4: Co2 sketch explain with operation. Daily, weekly, monthly and yearly checks.
5: Certificates on board n validity period.
6: Stp diagram. Checks to avoid PSC detention.
7: Mlc regulations and certificates.
my class-1 engine oral with surveyor Mr.David in 1st attempt.
Question asked.......
1. 2-stage air comp sketch in operational condition.
2. Bumping clearance. Its factor in comp. performance.
3.Fire man outfit items & its all regulation including SCBA (SOLAS)
4.SOPEP manual content describe elaborately.
5.starting air line explosion cause & preventive measures.
6.PSC cheks on sewage treatment plant.
A lot more cross questions regarding Fireman outfit & SOPEP
Questions asked-David
1 skech draw sewage treatment plant
Marpol annex 4 , port state check s for s t p , pls show holding tank and 3 way valve for isolation
of plant expect all relevant cross questions .
2 tanker cross section should able to explain various parts free surface effect
3 load line survey.
4 flame proof light sketch and draw
5 battery room checks and regulations
6 inert gas. System and flamabity curve
7 b & w fuel pump sketch.
8 mlc and cross questions mainly cabin inspection and onboard complaint procedure want to hear
about dmlc
1.Boiler survey internal external with sketches drawing.
2. Sea water centrifugal pump sketch and factors affecting on pump efficiency.
3.mlc 2006 complete
4.enclosed space entry procedure
Alhumdullilah passed cls 1 COC today in 1st attempt..
Examiner : David Tham
Time : 0830 to 1250 Hrs
Questions asked :
1. Load line survey tankers..
( examiner more interested in Focstle area checks.. Be more specific abt items pertaining to crew
protection on deck..E/R skylight sealing he was more concerned abt CO2 release in E/R)
Hull checks: apart from prilsom mark ( remember drawing wid dimensions) wht all other marks
to look for??
2. Tanker midship cross section sketch n detail labels..dont forgt to draw fish plates on top even
in cross sections.. Luckily Examiner gave me hint abt the same..Further he advised me not to
blindly follow notes circulating around..
3. Sewage cross section drawing..Items to look for PSC .Actions if found air blower not
working?? Jus inform class n do modification to avoid PSC detention..
4. OWS cross section..wht all things PSC look for? How they will come to knw you are handling
OWS well??
5. Annex items regarding OWS n Sewage ..criteria for discharge..
6. Garbage management plan onboard.. How u n ER contributes to that..
7. Tie rod sketch.. Dont forget pinching screw and retaining ring in drawing.. Tightening
procedure and sequence of tightness ( draw)
Enclosed space checks..
8. International shore connection all 3 sizes with drawing..
9. MLC abt young seafarers.. Accommodation checks.. He is not interested in structural or
designable things rather asked me to explain wht CE n capt should check in accommodation
during thr weekly rounds..
24.03.16, 2pm
Class One Examination
Examiner: Mr Hussain
Questions asked:
1. Explain how your company adopt EEOI into practice.
2. Sketch both Main Engine fuel pumps.
3. Explain how you would carry out Main Engine unit survey as a Chief Engineer.
4. Explain how you would identify EGE tube leakage and actions.
5. Describe the ECA changeover procedure.
6. Sketch and describe High Voltage distribution system.
7. Sketch and describe the Vacuum Circuit Breaker.
8. Sketch and explain the Engine Room Overhead Crane.
9. Sketch and describe Jacket Water Controller and cooling system.
10. Explain how would you calculate the maximum lift-able bunker.
11. Explain actions you would take for a Thrust Bearing high temperature alarm.
12. Sketch the Stern Tube system and describe how you would carry out a Stern Tube survey.
13. Sketch and describe Oily Water Separator. Explain what it is meant by 15ppm.
Verdict: Failed.
"You're nearly there. Would have cleared you if you improve a little more. Don't give up. Study
hard, try again."
Examiner was Mr David sir.
MLC details
List of all FFA on board ship, their SOLAS requirements and their maintenance procedure.
SW centrifugal pump sketch, parts material and their functions, cause of drop of efficiency.
And many other cross questions...
Class-1 exam recently. Examiner was Mr David sir.
Requesting others kindly post exam qus of ur exam/collected from others...
Qus. asked....
> Maneuvering diagram.... explain in detail.... pilot on board engine running on slow ahead,
order given to stop then slow astern but not starting engine...Action as C/E?
> Centrifugal p/p- X section...materials of parts... efficiency factor...
> 2-stage air compressor skt.... safety, bumping clearance, volumetric efficiency... materials..
> Boiler survey in details....
> CO2 system drawing... operating procedure,SOLAS regulation, daily, weekly,monthly
maintenance....
As per discussion with musfiq sir, Mr. David sir went as deep as possible in every topics with
regulation and want answer like a C/E.....
All the best for the members of COC class 61 group. Coming for exam middle of March 2016.
Well apparently he deviated from his standard of rules and reg.(David).
1. TC
- drawing ,exp with materials. Function of components.
- surging- causes and effects , then he went into engine unbalancing, combustion chamber faults.
Fouling - causes, slowly went into EGE Fire..
K-value.. Standard qs..
2. Centrifugal pump
- sketch
- causes for drop in efficiency..
Explained all on paper so no as asked at all.
3. Bilge piping diag complete.
Drew as per ships line diag, ensure to highlight bulge sludge intercon, em bilge and direct bilge
sic, cargo bilge intercon, bilge and ballast pump..
Same here no xqs asked.
4. Screw down non return valve
Sketch and materials . No xqs..
5. Bulk carried midship x-sec
Explanations
LUQUIFACTION and then he went in to GM righting lever and moment
6. Load line survey wrt bulky
Doors on deck are weather right and not watertight.. So specific..
All the usual, but wrote 3 pages in Bullet points so asked to explain in detail.
Spoke about duct keel so he asked about enclosed space entry
7. Fire prevention training to juniors..
Start from cabin habits..
Don't overload electrical sockets, no smoking in cabins, dirty boiler suits lying around..
Then alleyways, laundry rooms, testing of call points n detects .. Use test spray with the full
device. Silicon cover n telescopic pipe.. No direct spray as it can damage ur eyes n breathing.
Reached fire station.. All items in fire station, in detail, QCV, fire dampers, iso valve ,em
stops,em fire pump, co2 operation cab .. So then had to reach co2 room.. General inspect n
checks
Qusetions asked as below.(David).
1.High voltage system drwng..safties incorporated with HV.
2.MSB safetiea..safeties on working on a elec ckt...
3.Earth fault sketch.operational details..
4.Economiser C/S..details of mountings..
5.Explosion proof light..What is EXi,EXe...battery room safeties..how to change light in battery
room.
6.Crankcase Relief door C/S..functional details of each components..regulation for crankcase
relief valve.
7.Oil mist detector dwng..operational details..how to check..How will u protect ur engine in case
of alarm?(action in case of alarm)
8.Crankcase inspection..details..draw the reference mark..shrink fit ref mark..just draw a crank
through & show the ref marks.
9.Scavenge fire..details..indication,cause,action,actions after fire,preventive measures.
10.NDT test in details..
11.Tie bolt sketch..tightening procedure..sequence of tightening draw.specially show the
intermediate ring.
12.Refrigeration cycle with indicating all components..charing procedure..name some of the
refrigerant..properties of refrigerant..problems associated with the system.
13.STP dwng..Aerobic one..Functional description..test with sewage..psc detention causes..what
are the maintenaces.
Question of Z.Hussain in 1st attempt...
Slow steaming
ME performance..all draw cards drwng..
Power calculation
Steering gear both drawing
Jacket water control
Stern tube sealing arrangement dwng
Forging..type of forging for C/shaft
C sahft drawing..fillet raddi exploded view...
Sewage drwng
Three types of burner dwng
Maxm buker lift...
HV system..
Thanks..all the best guys
I have cleared class 1 oral from David sir in 1st attempt.
Below are the questions asked.
Refrigeration Plant sketch/explain and Problem associated with it like short cycling.
T/C sketch/explain. How to measure Clearance k,k1,k2. Explain fouling of T/C.
Economizer sooth fire.
Boiler Safety Valve sketch/explain, material and survey.
Earth fault.
Msb safeties.

I AM PLEASED TO INFORM THAT BY THE GRACE OF GOD I HAVE CLEARED MY


CLASS 1 ORALS FROM MR. DAVID ON 11jan 2016. Tks to my family and students staying
in ethon hall. Question asked. 1. EEDI last attempt question. 2. Co2 system drawing and
servicing maintainance of co2 system. In case major fire sequence of action to be followed
3. Centrifugal pump drawing and factor effect in efficiency. 4. Turbo charging surging and
Reason for surging. What action to take. Turbo charger washing procedure. Material use for
washing. 5. Boiler water testing in detail. Cross question. PH meaning 6. MLC in detail. And lot
of cross question regarding crew accodomation and master inspection of crew accommodation.
Health and safety. Lot of cross question pls mention safety meeting every month. And complaint
handling procedure in detail. If ur company 3rd or motor man have some problem what is
procedure followed for complaint. 7. How to replace wear ring in centrifugal pump . He is more
bothered about safety than technical aspects. 1st attempt. 1. EEDI in detail 2. ME performance.
3.AE performance. 4. Boiler safety valve drawing and procedure for setting pressure. 5.
Refrigeration system and charging refrigerant procedure. Hussain failed me and advice me to
study in group
I AM PLEASED TO INFORM THAT BY THE GRACE OF ALMIGHTY I HAVE CLEARED
MY CLASS 1 ORALS FROM MR. DAVID ON 28.12.15.
QUESTION ASKED
1. MLC 2006 IN DETAILS.
2. STP S/D, WHAT ALL THE CHECKS TO BE CARRIED OUT BEFORE ARRIVAL PORT.
3.ANNEX IV IN DETAILS. WHAT ARE THE DEFICIENCY, IS PORT STATE INSPECTOR
IS LOOKING WHEN INSPECTING STP.
4.WHAT ARE DIFFERENCE IN SEWAGE SHORE AND SLUDGE SHORE FLANGE
CONNECTION.
5. SKETCH OPERATIONAL DRW OF BULK CARRIER MID SHIP SECTION, SHOWING
THAT IN CASE OF OIL SPILL ON DECK HOW IT
PREVENT GOING OVERBOARD.
6.LOAD LINE SURVEY. DIFF BETWEEN WEATHER AND WATER TIGHT DOOR.
cleared class 1 Coc orals on 21st Dec 1st attempt examiner was Mr . David.
Question s asked
Economiser, sketch maintenance, problems associated.
2 stage main air compressor, sketch. working. Maintenance lub oil properties.
High voltage safety, maintenance, testing equipment, how to test.
Fire detection , prevention .
Hot work in engine room,
Co system in detail.
Some safety regulations assorted.
Questions Asked:
1. ECA Change Over Procedure
- i) what are the approved ECA Areas.
-ii) Precautions when switching to low sulphur fuel oil.
-iii)Procedures for switching to low sulphur fuel oil.
-iv) Log,Records & Technical File to be maintained.
2. M/E Unit Survey.
3. Your 2/E has taken set of cards,how will you evaluate M/E Performance with calculation.
4. Load Diagram/propeller Curve-S+D.
5. HV - Transformer & what safety procedures to be followed during working on Transformer.
6. Stern Frame- S+D
7. Stern Frame Survey during dry-docks.
And guys gauge what................ the sweet words," Keep learning."

Hello friends,
yesterday i passed my class 1 coc, examiner was Mr David.
following questions asked
1)earth fault detector diagram and explanation.
2) reverse power trip, diagram.
3) main switchboard safeties.
4)how to trouble shoot earth fault.
5)sewage treatment plant, its marpol regulations,and how to ensure your sewage treatment is
working fine and checks on sewage treatment plant, regulations of sewage holding tank.
6) crankshaft deflection
7) load line survey checks, reason for survey,duration of survey and certificate validity for how
long.
8)tanker midship section.
9)lifeboat checks, co2 room checks, emergency gen room checks.
oral went well.
David is focussed on safety, he asks questions mostly as per PSC inspector perspective.goes in
great detail and lots of cross questioning.Thanks everyone for their help.
Hi everybody, today was my class 1 oral first attempt with Mr David and passed, questions in
detail are
1, draw and explain 440 volt distribution system to busbar and then to motors
2, write down and explain loadline survey in detail,
3, write and explain MLC in detail, DMLC in detail. DMLC have two parts. Part 1 is prepared by
flag state according to code of ILO and part 2 is prepared by owner and owner hire a MLC
auditor approved by flag state will inspect ship and issue interim certificate valid for six months.
After six months inspection if found no deficiency will issue five year certificate.
4, draw and explain bulk carrier midship section, lightening hole purpose, fish plate
5, draw and explain sewage treatment plant, with annex 4 requirements, Specialy shore
connection for sewage dimensions.
6, draw and explain oily water separator operation.
He asked only six questions but went in detail on MLC and sewage plant. On ship we have three
shore connection go through all. Sludge and bilge water connection, sewage shore connection,
international shore connection for fire line. Pumping rate should be written on sewage plant as
well as holding tk, what port state check on sewage plant.
Thx to all for putting exam questions on this page

Yesterday I cleared my MEO Class 1 Oral from Mr. Hussain


Following Questions asked...
1. 4 RAM Steering gear diagram n explanation
2. Overhead crane inspection
3. Unit Survey
4. Piston & Liner diagram
5. Biler safety valve diagram
6. MAN B & W Fuel pump diagram
7. Max Bunker lift
8. How will you take the LO samples and waht are the LO tests onboard
1. Explosion proof light C/S, during explanation asked where & why it is provided? he wants to
listen about the battery types in battery room. what type of switch is used for light & where it is
provided?
2. S.W. p/p mech seal c/s, all parts' material, why it gets damage? causes...he wants to hear about
vibration due to loose foundation bolts, bend shaft etc. also asked about factors reducing
efficiency of centrifugal p/p. wants to hear about self priming device not working. asked me to
draw one. I drew air eductor type & explained.
3. midship c/s of bulk carrier & explain each part. during explanation asked what r the factors for
capsizing of bulk carrier? wants to hear abt free surface effect, cargo not properly lashed,
liquification phenomenon of cargo. asked me abt the cargo lashing equipment certificate &
manual.
asked me abt duct keel hatch cover checks during load line survey.
4. T/C c/s, all clearances, parts' material. What is T/C surging. causes and its effects on M/E.
5. 2S piston c/s with oil flow, piston ring groove section. he wants to see the fillets in the groove
and what is its significance ? all the clearances & piston inspection procedure.
6. C/C relief v/v c/s, explain all parts specially the flame screen. asked me abt C/C explosion
phenomenon. asked me to draw OMD. testing procedure of OMD. dont even mention abt
cigarrette smoke. wants to hear abt using smoke spray.
7. STP c/s and how will u convince PSC that your STP is working efficiently? he wants to hear
more about blower and air lift. if the blower is under repair you can make temporary
arrangements with control air but he wants to hear that u must inform class society & take class
exemption. he detained some ships due to this. Sewage holding tank must have copy of class
certificate pasted on bulkhead mentioning capacity & discharge rate.
that's all guys......
Questions during 1st attempt by Mr. Hussain:
1. Slow steaming procedure. what measures to take. LT & HT line diagram & explain how to
maintain jacket temp. for running FWG?
2. Jacket temp. controller.
3. stuffing box c/s.
4. LO purifier c/s and nomogram. how will you make sure that your purifier is working
efficiently?
5. alcap type water transducer circuit diagram.
6. max liftable bunker. dont even mention abt 90% capacity.
Thank you all once again.
- Anirban
Cleared class 1 orals today
Examiner Mr David Tham
Questions
1 bulk carrier midship section
2 Mlc 2006 full details
3 Enclosed space entry
4 Sopep
5 LSA FFA checks in detail
6 load line survey
Lot of cross questioning on above topics
Dear Friends! By the grace of God and prayers of my family I have cleared my class 1 orals
today from Sir Zulfiqar Hussein, after submitting assignment.
These Questions were asked during my oral examination .
1-Midship section of bulk carrier.
2-During cleaning of cargo hold crew found a crack at the connection between hopper thank and
DB tank, what actions you will take as chief engineer,
3-Auxilary boiler safety valve draw.
4-Sewage treatment plant draw and explain.
5-Four ram steering gear and rotary vane steering gear and explain both,
6-Emergency steering in rotary vane steering gear.
7 Detailed performances monitoring of main engine including load diagram explanation.
8-purifier crossection.
9-how to check purifier is working efficiently.
10-what is annealing.
11-how to carry out EGE water washing.
11-what is forging and its applications.
1. Draw tie bolts and explain tie rod tightening procedure.
2. Draw 440 earth fault, reverse power relay, write msbd safties. Explain motoring action.
3. Draw co2 system and explain CO2 checks weekly,monthly, 3 monthly, yearly.
4. Draw a Boiler safety v/v and explain working, ask all related questions about loose pin,
simmering, drain choke, why D/4,
Safety v/v survey, periodicity.
5. Draw a refer system and explain the working, properties of refer gas and Problems associated
with refer system, Refer long running causes, refer short cycling, frosting on evaporator causes.
6. Draw Mid ship section of bulk carrier and explain the strengtening members and their
function. Whatever u show in the diagram he may ask about anything.
Dear Friends, by the grace of God 2nd Sep-2015, i cleared my Class-1 Oral Exam from David
Sir. Questions asked by Mr. David are as follows:
1. MLC-2006 details
2. Draw 440 earth fault, how to find location of earth fault. reverse power relay, write msb
safties. Explain motoring action.
3. Draw co2 system and explain CO2 checks weekly.
4. Draw a Boiler safety v/v and explain working, ask all related questions why
D/4,regulation.Safety v/v survey.
5. Draw a refer system and explain it, gas charging, wt are the problem did you finds on board.
6. Draw Mid ship section of Tanker and some related question
7.S.W centrifugal p/p and why pump performance drop, draw mechanical seal.
1st attempt with Mr. Zulfiqur husain question
1.ECA change over.
2. Rotary vane steering drawing and high pressure and low pressure side sealing.
3. Erratic steering gear cause and action.
Cleared Class 1 orals fm Mr.David first attempt 11thaug2015 .....qs....
1.Drawings - Main Cooling Sea Water pump cross-section (to show a bit of clearance between
gland packing cover & pump casing i.e. gland cover positively presses against the gland packing
& can be further tightened if required )
Boiler safety valve (to show sufficient height of safety valve spring for lifting , asked how to
measure lip clearance by placing lead wire & pressing the valve with spindle on the valve seat
to get the clearance )
Oil tanker cross-sectn- purpose of fishplates , show lightening holes
Crank-case relief valve (with c/case explosion theory)
CO2 release bank (drawing & detailed procedure to release .Quick closing valves must be
manually shut & verified as part of procedure before release )
2. MSBD safeties & earth fault diagram . Purpose of preferential trip & how to avoid (simply
putting off the breakers of deck machinery whenever not required ) , Purpose of reverse power
trip (to avoid motoring phenomenon of generator)
3. Boiler safety valve survey ( same procedure as in notes i.e. spindle trueness check on lathe ,
spring free length > 0.9 natural length of new spring , not lapping the valve itself with seat but
fabricating a cast iron rod etc.)
4.Load Line Survey specific for tankers ( very particular about Catwalk to mention the
shelters provided , enclosed on three sides & open on one side facing accommodation for crew
protection against rough weather)
5.Grounding to write down relevant points about course of action as C/E (included SOPEP
action & Bedplate& Holding down bolts etc. checks & if ship staying at night crew to take a
long rod & wrapped with white cloth & regular immersing in water from ship side to check for
any oil spill in the dark).
thanks & best rgdrs .....Nishant A.Bole
Cleared my class I orals with Hussain today 2nd attempt
First attempt with David que asked
Enclosed space entry
Boiler internal and external inspection
MSB safeties
Drawing
Earth fault
Tie rod
Bulk carrier midship cross section
Today que asked by Hussain
Slow steaming
Me performance
Me power calculations
O2 analyser check
Rudder sluggish
Drawing
Recirculating type fuel valve
Hello guys cleared by Mr David in second attempt. Questions of both examiners are as follows
1. Slow steaming
2. Main engine performance
3. Safety valve, drg and explain
4. 4ram steering gear
5 10 deg port
6 How owners loose during slow steaming
7. Rudder carrier bearing
8. Forging all abt it with examples
9. NDT
10. Safety valve pressure setting and precautions for setting
11. 85% bunker lift at Singapore
12. Mlc
13. Sopep
14. Load line survey in depth
15. Seafearer employment aggrement in detail
16. Earth faults sketch
Thanks and all the best

by the GRACE OF ALLAH AND PRAYERS OF my fmly pass coc class 1 oral ...by
MR.ZULFAQAR. 5hrs 20 mints duration
1: anchr not heaving up..explain with hyd.diagram.
2:d/g commisioning back
3: forging and crank shaft construction
4 :lubricating points in crank case.
5: plate type and tube type heat exchanger advantages and disadvantges with sketch.
6: free surface effect explain;
7: two days b4 undocking.
8: max.bunker lift.
9:ege not building up steam pressure.
10:high voltage
11:b&w p/p
Following were the questions asked 1.M/E performance, powercalculation, and indicator
instrument verification
2. Rudder sluggish operation , actions
3. M/E unit survey and cms survey procedure and purpose
4. What are NDT tests. Explain different types of NDT tests
5. SS 600 procedure
6. E/R crane ckt diagram, explain and safties fitted on crane
7. What is forging , purpose and what components forging is done
8. Explain freesurface effect
9. L.o sampling taking procedure
10. Purifier performance
11. Boiler flame failure actions
12. Procedure to carry out emergency steering
13. Ege unable to maintain steam pressure during normal sea.passage- action
I have cleared my class 2 orals from Mr.David.
First attempt
Questions as follows :-
1) Tie rods sketch and all details
2) Centrifugal pump with all details
3) NDT
4) overhead crane circuit diagram and details
Some cross questions on materials and safety
1.Bed plate inspection with drawing
2.Crankshaft inspection with drawing..
3.Boiler burner /3 types drawing /explanation
4.Steering system drawing ,emergency steering including single failure concept ...
5.High voltage system with safety mantainance
BY THE GRACE OF ALMIGHTY ALLAH I HAVE CLEARED MY CLASS 2 ORAL FROM
MR HUSSAIN THROUGH ASSIGNMENTS IN ST ATTEMPT
QUESTION ASKED IN ORAL ARE
1.from FWE till cargo discharging complete operation
2 Dumping Valve Controller
3. boiler tanker servce mode or boiler control mode for cargo discharging
4.slow steaming
5.thrust bearing temp high reasons and action
6. purifier effiieciently running how u will come to know
7. how to train ship crew for co2 flooding drill
8.how u train jr engr for emergency drill for steering gear
9. STP and OWS Sketch and working
10.Rotary vane sketch and Working
11.foundation bolt sketch
Verdict : Assignments

Alhamdulliah cleared coc class 2 oral today at first attempt .


Examinner david sir
Qiestion......
1.sketch bilge system showing all condition
2.sketch emergency bilge sustion system and regulation
3.sketch SDNR vulve
4.sketch gauge glass and blowdown procedure and action if water not in gauge glass
5.purifier cross section with full automation and nomogram.
6.stern tube arrangement
7.how to collect stern tube sample and what are the test and how to test
Thanks to all.I also get information from coc 61.so everybody please post here after exam
ALHAMDULILAH by the grace of ALLAH almighty i have cleared my coc class 2 engineering
side:) at first attempt from Mr David sir .Questions asked are as under
1.He asked me about my company and type of ships done.As i have done oil/chem tanker so he
told me to draw chemical tanker sketch.
2.Load line survey complete especially with respect to oil/chem tankers.(Purpose of camber on
tanker drawing)
3.2 stage Air compressor drawing.What is bumping clearance,its significance,how to check and
how to adjust it.
4.Boiler high lift safety valve sketch and then he passed me ALHAMDULILAH:)
By the grace of almighty I have cleared my Class-2 oral from Zulfiqur Hussain sir at 1st attempt.
Question asked:-
C/C inspection, how to trained junior.
T/C sketch and asked the purpose of the different parts
Recirculating type fuel v/v
One unit exhaust temp high cause and action in details
How u confirm your purifier performance is good.

By the grace of almighty ALLAH i have cleared my class 2 oral from Mr.David...........,
Questions asked.....
1. Sketch IG system ...alarms and trips ....maintenance....survey
2. Sketch and explain centrifugal pump...parts detail ..material..factors of pump efficiency drop
3.sketch and explain MAN B&W fuel pump
4. Sketch explain sulzer fuel pump
5. Sketch and explain boiler high lift safety valve ...clearances and complete survey
6. MLC complete and a lot of cross questions
7. How port state can detain a ship while survey ....
8. LSA
9. FFA
10. Enclosed space entry permit ...a lot of cross section on oxy meter
All the best guys.......
Cleared class 2 orals from Mr.David
Followin are the qns
1.Stern tube seal x section and l.
o system
Explain with materials,how to ensure it is efficiently working,how to change seal without
drydocking
2.2 stage compressor
Bunning clearance,how to adjust ,safeties
3.x section of bulk carrier
Explain all parts.
4.loadline survey all checks.
5.crankcase explosion -everything from a to z ...drawings of omd and relief valve.
6.mlc
That's it. ..
Thanx to all instructors and friends....Thanx again

By the help of the almighty Allah, I cleared my class 2 oral from Mr. David sir. Thanks to all of
my classmates of October 15 batch for their help & support.
Questions asked:
01. Solas reg for emcy generator
02. Solas reg for fire fighter outfit
03. Lsa items & inspection
04. Ffa items & inspection
05. Boiler high lift safety valve sketch & explain. Clearance & why D/4.
06. Boiler safety valve survey duration, inspection during survey.
07. Main switch board safety, why they r provided? Explain.
08. Earth lamp sketch & explain. How often check in ur ship
09. Turbo charger sketch, explain. Parts materials.
10. Turbo charger surging, indication, causes, prevention

Alhamdulillah passed my coc class 1&2 Exams.


Examiner: sir David
Questions asked :
1- high voltage system and safeties for working on hv system. Please mention arc suite and live
line tester.
2- crankcase relief door with materials and relevant details.
3- oil mist detectors. Both. Working details. Testing.
4- Crankcase inpection with all precautions and every small detail. Mention ndt dye penetrant
test to check crankcase weld/ cracks. Also pay special attention to enclosed space entry checks
list. After completion of inspection, check list to be put in chief engineer record file. Mention it.
5- boiler safety v/v. Sketch. Frequency of safety v/v survey. Routine checks. Items to b checked
during safety v/v overhaul.
6- sewage treatment plant. Checks before reaching port to avoid portstate detention. Checks on
sewage switchboard.
Cross questions from all topics and mention every small details. He want to listen complete
details.
Question asked by Mr. Hussain earlier attempt.
1- Train the junior for crankcase inspection.
2- oil charging procedure for accommodation a/c compressor.
3- thrust bearing sketch , high temperature alarm , causes , action.
4- four days after sailing you experience one unit exhaust temperature high. Reasons, ur action.
Draw card and explain the problems u have written that are causing high temperature from card.
5- draw injector cross section.
6- pilot onboard and engine not starting. Causes. action. Starting diagram.
6- sealing arrangements. Draw and explain.
7- boiler water controller.
8- how would you know that your exhasut valve working efficiently? How to find out that the
exhaust valve is eratic ?
Alhamdulillah....Yeaterday cleared class 1 exam From Mr. Zulfiqar hussain sir at 1st attempt
special thanks to royal marine engineers of Eton hall for their supports..
Qusetions asked:
1. New chemical is going to carry to your ship as a C/E what safety measures & precaution u will
take...
2. Cyl liner X-section(S+D).After M/E unit overhaul, from o/h report superintend advise you to
discard cyl. liner, as CE ur action.
3.Both type fuel p/p.(S+D), Timing concept elaborately with graph.
4. Purifier X-section(S+D), desludge procedure, nomogram, back pressure effect on efficiency.
5. S/T LO system(S+D), at sketch must show elaborate wiew of fwd & aft sealing arrangement.
6. tail-shaft & propeller survey
7.Alarm pick-up point for:-
-Cyl. L.O non-flow alarm
-Bilge well high level alarm
- L/O purifier abnormal alarm.
8.NDT.

questions from Mr. hussain...


1.ECA change over procedures
2.manoeuvreing diagram
3.4 Ram steering,explain 10degree stbd
4.main engine x-head drawing n survey procedure....
Verdict: pass
Mr.David questions
1.both fuel pumps drawings and timing check and inspection of all parts during above job.
2. D-type boiler drawing and survey.
3.fixed fighting system drawing(co2),safety precautions before releasing co2..how to release..
4.deck foam system drawing
Hari OM...!! With Gods grace passed oral for class 2 with Mr. David ....Thnx to all east lodge
gang...Sachin Karunan Shaun Dsouza Antony Kishore Indraneel Datta Joseph Ini Vanu
Sudalaiyandi & Puneet Sinha To all frnds since start to end off the course....
Questions asked
1. Crankcase relief door... Material and all details... How you inspect crankcase door.. What are
maintenance carried out what are tool used .. Draw
2. OMD - draw and explain what you have on your ship then later draw both... Working .. What
are limits .. How it is related to PSC INSPECTION....how you try out ?
3. Safety valve: draw with detail and explain in detail about clearances how you measure , why
D/4 ,what if drain is chocked at bottom, what are the checks carried out on safety valve , how
you check the trueness, where does steam go .. I said via escape to funnel to atmosphere..he
wants to listen "SAFE PLACE"..why d/4 is important..
4.PSC.. Full detail in writing accommodation and deck for explaining .. How to check flame
trap.. How many places we have flame traps. Purpose of flame traps
5.Loadline survey..writting..accomodation and deck... Explain on container vessel...
6. Places where dail gauges are used . .. What is the importance...
Finally ok i pass you ...
Questions asked by Mr Hussain in Class 2 oral:
1) Main engine one unit high exhaust temperature, causes and actions.
2) Draw both fuel pumps and fuel metering.
3) As I sail on a ship with diesel electric propulsion system, engine unit strip down for survey.
Steps and actions, I also included items such as areas of high concern like connecting rod bolts
and reasons for concern (load reversal on exhaust stroke etc), survey done by surveyor of Chief
engineer (if CMS etc)
4) 4 Ram steering gear.
5) Fuel oil purifier, Checks to ensure correct running. Automatic desludge cycle.
6) Lub oil sample taking.
7) Main engine power calculation, usage of planimeter, as I sail on 4 stroke engines, power
calculation for engines over 600RPM.
8) HV switchboard - I explained the switchboard that incorporates frequency converters, I think
the one for the Dennis Hall Practical Electrics for marine engineers.
9) Safeties whilst working on the HV switchboard, I chose to isolate a transformer so went
through the various steps and paperwork for this.
If anyone has any questions about any of the above questions I am happy to answer any. Hope
the above is of help and maybe see you all when sea time for Chiefs is up.
All the best Lee
Time was about 3 hours 45 minutes.
Examinar: David Tham
1. boiler safety v/v dia.
setting procedure, survey, during sea passages what r the problem u may get & action
2. scavange fire, causes,indication,action,inspection.
3.m/e manu.diagram & explain, in emergency how u will operate the system.
4.co2 system draw.prior to realeses safety.
5. t/c sketch.
1) MLC- cross qns on rest hours, Onboard complaint procedure.. how to complaint?
In manning level he asked me what are the checks you will carry out to ensure minimum safe
manning crew are onboard.
2) Statutory certificates with validity, survey periods.
3) Sewage treatment sketch, psc inspection on sewage plant&standared shore connection specs.
4)Crankshaft deflection
5) Tie bolt tightening procedure.
6) Enclosed space entry.

Mr David.
Question asked.
1. Turbocharger: sketch, k values, surging, fouling.
2 crankcase relief door sketch, regulation, maintenance.
3 ODM SKETCH , working explanation, action in case of alarm.
4. 44OV earth lamp sketch, and explanation.
MSB SAFETIES AND CUTIUTS.
5. D-TYPE BOILER SKETCH, MOUNTINGS, SURVEY , GAUGE GLASS BLOW DOWN,
LOW WATER LEVEL ALARM___ ACTION CAUSE.
6. CENTRIFUGAL PUMP SKETCH, EFFICIENCY DROP.
7. SEWAGE TREATMENT SKETCH AND WORK. PSC INSPECTION
By God's grace cleared class 2 oral first attempt from mr. David..
questions asked
1. mlc 2006 .(detailed)
2.loadline survey for tankers(detailed)
3. tanker cross section
4. psc inspection and lot of cross question about inspetion and regulations.
5.co2 checks and testing
6. sewage treatment plant operation, regulations,
7. questions about boiler mountings .scenario based cross questions
8. how to prepare for psc inspetion.and how to train juniors and lot of suggestions given from
David sir.
I cleared my MEO class 2 Oral by Mr. Husain. The questions he asked are as follow:

1. Air Compressor ; Complete Sketch, The Reasons slow topping up, Major Overhaul.
2. One unit exhaust temperature high, action and cause of it.
3. Fuel injector overhaul and Changing procedure.
4. Exhaust valve renew procedure.
5. Purifier Sketch and performance monitoring.
6. Scavenging Space Fire ; causes, indication and action.
7. ECA Change Over Procedure.
8. Batch Purification.
9. L.O Sampling ; Purpose, How to.
10. OWS ; How to train Junior.
11. Boiler Fail to Fire (Not flame failure); Actions and Causes
On my First Attempt With Mr. David ...
1. Fire detection, prevention and extinction
2. Air Compressor Drawing + Operation
3. Starting air line explosion.
4. Waster mist firefighting system Diagram and explain.
5. Turbocharger; Drawing,Operation, Fouling causes, Effect, Prevention, Clearances, Washing.
6. Marpol
7.Bed Plate and Tie Rod
Some Short Questions;
international shore connection Different between Sewage and Sludge, What booklet are in the
smoking room by SOLAS, Etc
Examiner: Mr. Hossain
Result: Passed :)
1. How to take performance? (Write down how to take draw card, power card & light spring
diagram, draw all card with various fault)
2. How bow thruster work, explain with drawing?
3. How to do safety valve settings after survey?
4. How cpp work with drawing?
5. Draw 4 ram steering & explain? (Must show rudder angle feedback to bridge)
6. Explain single failure of 4 ram?
7. Which smoke detector is more sensitive?
8. What type of fire detector used above M/E cylinder head platform? What should you do
during taking the performance?
9. How you train your junior to pump out bilge?
10. What is free surface effect explain?
Today i passed meo class 2
Examiner mr hossain
Ques ask
1.slow streaming
2. Tc sketch
3. Tc o/h
4.tc emergency operation
5 hv
6.emr(engine room resource management)
7.ref oil change and gas recharge
OM Murugan Thunai . I cleared my class 2 orals with Mr.Hussain (first attempt ) on 15 th Dec
Here the questions are :
Me performance -expanl briefly
Thrust bearing high temp what actions& cause.
Purifier performance
Eca change over procedures only telling
STP sketch and explain
CPP ,ER crane sketch
Boiler flame failure action
enclosed space entry permit
" k , I consider u as PASS "
Hi all ,I cleared my class 2 orals with Mr.Hussain (first attempt also with mr.hussain) on the
second attempt yesterday.
Here the questions:
hydraulic jack draw and explain
eca change over procedure(He want to hear the word lsmgo)
boiler burners draw and explain
enclosed space entry permit
batch purification
how to measure oxygen level in tanks.
generator decarb.(what all measures as 2nd engr)
stuffing box
main engine alarms,interlock,shut down.
sketch of turning gear interlock valve.
blr flame failure
By the grace of Almighty Allah yesterday I cleared class 2 oral from Mr.David...
Questions asked to me
1: Fire prevention ,Detection And extinguishing system with sketches.
2: 2 Stage air compressor sketch& starting air line explosion
3: Boiler safety v/v sketch and detailed explanation with requirements, boiler gauge glass blow
through procedure, boiler blow back.
4: OWS sketch and explanation.
5: Cyliner air statring v/v sketch.
By the grace of Almighty Allah today I cleared class 2 oral from Mr.David...
Questions asked to me
1:Centrifugal pump c/s.pump efficiency drop reason??
2:CPP SKETCH and opertaion.
3:Fire prevention ,Detection And extinguishing system complete and lot of cross question.
4:SEWAGE SKETCH
5: 2 Stage air compressor sketch& starting air line explosion
6: IG system
7: MSB safeties
8:Earth lamp
9:RP protection sketch
10:Boiler internal external survey
Qtns asked..(David)
X-sec of bulk carrier; Load line convension, survey, inspection , assignment full details, 3types
Boiler burners including description & maintenance, fire prevention, fire detection, fire
extinction.
Lots of cross questions from all topics...

By the grace of Almighty Allah yesterday I cleared class 2 oral from Mr.David...
Thnx to Mahmudul Hasan Kallal Mohammad Ahmed Riyad Md Tawhidul Islam for ur helpful
co-operation.
Questions asked to me
1.C/S of centrifugal p/p, effect of efficiency drop
2.fluroscent lamp, strobocopic effect
3.bulk carrier midship section
4 . sewage treatment plant, regulations, psc inspection
5.oily water separator, regulations
6.crankcase relief door, operation
7.oil mist detector, crankcase explosion
8.fire detection, fire extinction, fire fighting description
9.MLC
10.load line survey
11.heat treatment
12.propeller damage & repair
13.Boiler safety valve drawing.....
A lot of cross questions from all the topics......
Thnx s lot........
Hi guys .Yesterday I cleared my coc class 2 oral exam ..examiner : David in first attempt.
The following questions asked by him.
: Bulk carrier X section
Load line survey for bulk carrier..
Both fuel pump
Boiler safety valve
Refrigeration system
Screw down non return valve section and principle.
Sewage diagram with psc inspection
: Centifugal pump with materia
Yesterday passed coc class 2 oral by Mr.David in 1st attempt...Question asked by him are as
follows...
1. Purifier cross section
2. 2 stage air compressor sketch and working,
3.Type of lub oil used in air compressor and why synthetic oil is used??
4.starting Air line explosion, complete phenomenon,safeties and how to avoid..
5.flouricent light circut
6.Catastofic effect of flouricent light
7.Reverse power relay,sketch and explanation.
8.Earth lamp sketch and explanation.
9.Sewaage treatment plant Sketch,working ,regulations, including sewage international
connection specifications.
10.Bilge international discharge connection specifications.
11.MSB safeties
12.Boiler burners types, all 3 types burner sketches and explanation.
Alot of cross questions on every sketch.....
Hi friends
passed my orals
Questions asked xsec T/C,bulk carrier , ows,mechanical seal , centrifugal pp and crankshaft
deflection , mlc 2006 .
Hi everyone. I have passed Class 2 MEO aural exam under Mr.Husain on 22nd of October 2015.
Following are the questions he has asked me, in as much detail as I can remember:
1. Troubleshooting - write down the steps you will follow as 2/E if M/E RPM is not rising.
2. ECA entry procedure write down and explain.
3. Plunger controlled and valve controlled fuel pump draw and explain the working. For plunger
controlled, he asked me to mark with red pen the position of the top of the plunger at its highest
position and the again its position at its lowest position.
4. Hull loading diagram (indicative of hull fouling etc draw and explain)
5. Overhead Crane circuit diagram draw and explain.
6. ACB, and Reverse power, Overcurrent and Undervoltage protection draw and explain
7. Boiler safety valve draw and explain procedure for boiler safety valve setting.
8. Viscotherm double element control, draw and explain.
9. Remote sensors for - Pressure (this one I was unsure of, didn't see the diagram anywhere),
level, temperature and flow. Explain each.
10. GOOGLY QUESTION: Tell me what electrical items you will prepare as a C/E, for drydock?
I tried to explain drydocking procedure and preparation but he was not interested and asked me
only about Electrical Items. He also wants to hear about some electrical 5 yearly survey items
that you will put in drydock, and I think he wants to hear about High Voltage items.
11. Draw High Voltage distribution system and explain
12. 4 ram and rotary vane steering gear system draw and explain.
13. rudder carrier bearing draw.
14. What are the checks you will do on a LO Purifier to ensure that it is running efficiently
15.What are your actions as a 2/E in a blackout?
Thats about all I can remember right now. Will amend this post if I remember extra questions
that he asked me. Thank you.

Questions i was asked by Mr. David Thumb are as follows:


1. Bulk carrier midship section cross section and explain different parts.
2. Bedplate drawing and explain .
3. Turbocharger drawing.
-wht r the daily checks carried out in a turbocharger?
-procedure to overhaul a turbocharger?
4. MLC 2006 and details.
5. Load line survey and from midship section wht items are checked?
6. Earth fault fig n explain.
7. MSB safeties .
Cleared class2 orals in Gods Gift Examiner David sir
1.Bulk carrier X section explain all parts.
2.M.S.B safties + Drawing explain all parts
3.Boiler safety v/v drawing & regulations.
4.M.L.C.(SEA more details)
5.SOPEP(Manuals more details)
6.Enclosed space.
Questions
ECA CHANGE OVER PROCEDURE
FUEL PUMP B&W
THRUST BLOCK DIAGRAM & HIGH TEMP ALARM CAUSE & ACTION
BOILER FLAME FAILURE ACTION
BOILER SURVEY
ME UNIT SURVEY
4 RAM STEERING SKETCH & EXPLAIN EMERGENCY STEERING PROCEDURE
BATCH PURIFICATION
AIR COMP LONG RUN
CO2 ROOM SATURDAY ROUTINES CHECK
STAR DELTA STARTER
Class 2 ques
1. X section of chemical tanker
2. X section of centrifugal p/p
3. X section of boiler water tube
4. IG system sketch
5. Earth lamp sketch
7. Tie bolt sketch
8, mlc 2006
9. Boiler survey
10. Blr blow down procedure
11. Statutory certificate outboard
12. Tie bolt loose, pretention
13. Main switch board safety
14. Fire, how to combat, class of fire, how to extinguish.
15. Hyper mist system described
Dear friends, by the grace of almighty I have passed my class 2 oral at first attempt. examiner
was Mr. Zulfiquar sir. My questions were. ...
1. M/E ONE UNIT EXH TEMP HIGH. causes and action.
2. Draw EXH valve and describe.
3. How will you replace the EXH valve.
4. How will you overhaul the exh valve.
5. Sewage treatment plant, drawing, description and regulations.
6. Sewage tests.
7. What is the bore cooling in exh valve seat.
8. What documents you need to ready for boiler survey.
9. Ready the boiler for survey.
10. Why pitting corrosion occurs.
11. Jacket water control draw.
12. Purifier performance monitoring.
13. Motor IR test.
14. Thermal overload relay drawing and explanation.
Thanks everybody.
Today I have passed Class-2 exam (engine) at first attempt from Mr. Julfikar Hussain.
Question was:-1) M/E performance monitoring- explain + written 2) M/E under piston space
inspection. 3,4,5,6) Draw B&W fuel p/p, sulzer fuel p/p, 4-Ram steering gear, Oxygen analyzer
-explain working principle, operation, asked about all important parts. 7) bilge pumping out
procedures. 8) gas charging in the refrigeration system.

Alhamdulillah today I have passed class 2 in second attempt. My questions was 1) Boiler
repeated flame failure. 2) one unit exhaust temperature low. 3) batch purification 4) Air
compressor long run causes and action 5) scavenge space inspection 6) Engine room overhead
crane diagram and safeties 7) co2 diagram and flooding system.
I have Passed COC 1 & 2 oral in First attempt
below question asked by mr. david...
1. PSC in Singapore detain your vessel due to problem in port side life boat engine and
emergency generator. DPA aske u for this casualties. Write a c/e report to DPA With causes and
your action.
2. Cross section of chemical tanker.. and describe.
3. Briefly describe sopep plan and sopep locker.
4. Sketch and operation of nitrogen generator.
5. Gas free procedure of cargo tank during loading discharging and tank cleaning.
6. Panel board safety and draw reverse power relay and earth lamp system.
7. Domestic fridge line diagram sketch and describeshort cycling describe by TEV.
8. Both fuel pump draw and describe every component and operation by vitsulzer pump
timing..man & w cam lead..
9. Life boat engine entry procedure.
10. Hot air fan why use and how and when use.

By the grace of almighty i have cleared my class-2 oral in first attempt with assignment on 20th
january 15.
Special thanks to ripan, mehedi, jitender kumar and all who helped me a lot.
Examiner - zulfiqur hussain.
Question asked-
Crosshead bearing sketch and survey.
Both fuel pump.
Boiler safety v/v and 4 ram steering.
Centrl cooling system draw and explain with control.
Jacket cooling water system with sw and control system
By the grace of almighty yesterday i have cleared my class-2 Oral in first attempt. Questions
were asked
4-ram sketch, 10 port, sluggish operation
Safety v/v sketch, D/4 explanation, vent/drain purpose,speciality of safety v/v.
Man b&w fuel p/p, operation, timing check, purpose of erosion plug,shock absorber, vit, how it
works
New 4/e on board, as 2/e how u explain him about purifier starting procedure, monitoring
procedure & how to get the effective purification,
Purifier auto desludging mechanism,nomogram,solenoid v/v function check
IR, how to check motor ir.
Black smoke
Annex-IV
Scav. fire causes, indication & action
Scav. Inspection.
Thanks to all my well wisher.............
1ST ATTEMPT MR HUSSAIN
1. AS A SECOND ENGINEER HOW DO U MAINTAIN THE BITUMEN CARGO?
2. DRAW BITUMEN TANKER CROSS SECTION.
3. CARGO SCREW PUMP DRAWING
4. ANNEALING, HARDNESS
5. PURIFIER NOMOGRAM CHART
6. MAIN ENGINE SAFETY CYLINDER OIL NON FLOW ALARM TEST
7.THERMAL OIL SYSTEM INCLUDING CARGO HEATING
8.SERVICE TANK DRAIN LINE CHOCKED
2ND ATTEMPT MADAM FEI FEI
1. CPP MAINTENANCE, ADVANTAGES
2. ANEALING DETAILS
3. SERVICE TANK DRAIN LINE HOW CAN BE CHOCK?
4. PURIFEIR NOMOGRAM IS MATCHING WITH THE GRAVITY DISC
5. SCAVENGE SPACE INSPECTION
6. MLC
7. WHATS NEW IN ANNEX 6
8. BOILER REMOTE LEVEL GAUGE SHOWING HIGH CAUSES REMEDY
THANKS TO ALL OF MY FRIENDS SPECIALY NUR HOSEN BHI, RAFIQUE BHI,
SHAHED BHI, ASIF BHI, MEHEDI BHI, NAVEED BHI AND MY BROTHER
By the grace of almighty Allah subhanallahuthala i have passed class 2 oral in 1st attempt. The
questions asked by Madam Fei Fei..........
Drawing: 1. Sewage treatment plant 2. Fuel injector 3. Rotary van steering gear
Explain operatin of all the above drawing & sewage regulation, chlorinator function, fuel v/v
overall inspection, pressure testing procedure, sluggish operaion of steering gear, single phasing ,
how u check the single phasing,
Black smoke writting , scavenge fire action, after scavenge fire inspection, Scavenge manifold
door opening is push type or pull type & why?
During cargo operation 3rd eng report boiler gauge glass leaking , action
Systems and components for windlass and mooring winch
Pump and motor systems are used for powering deck machinery such as winches and windlasses.
Pump and actuating cylinders are normally employed for hatch covers. One or more pumps will
be used to supply the volume of fluid at the pressure required to operate one or more motors.
Pumps may be classified into two groups:
1 those with a fixed delivery when running at a given speed;
2 those with a variable delivery at a given speed.
Fixed delivery pumps can have their constant output bypassed via control valves until required or
output can be matched to requirements by incorporating a relief/accumulator, then stopping and
starting, varying speed, or connecting a variable delivery pump in parallel. Variable delivery
pump output can be controlled to give full flow in either direction, and volume output can be
varied from maximum down to zero.
Fixed delivery pumps
Constant output pumps of the gear or lobe type (see Chapter 5) are precision made to provide
high pressure with minimum back leakage. The former operate on the principle that as gears
revolve, fluid is carried around the outside
t. For general hydraulic systems where the pump delivers a constant volume of oil, speed control
of the hydraulic motor can be obtained by delivering the required amount of oil to the motor
through a control valve and diverting the remainder through a bypass to the pump suction.
. The pump discharge pressure is determined by the load. Speed and direction of rotation are
controlled by a lever operated balanced spool valve