PILING DRIVING RECORD

PROJECT NAME :____________________________________________________________________________


DATE : ____________________________ PILE LOCATION : __________________________
PILE SIZE : __________________________ TYPE OF PILE : ____________________________
LENGTH OF PILE : ____________________ NO. OF JOINT : ____________________________
HAMMER TYPE : _____________________ WEIGHT OF HAMMER : ____________________
GROUND LEVEL : ____________________ CUT OFF LEVEL : _________________________

HAMMER
PENETRATION (M) NO. OF BLOW PENETRATION (M)
DROP (M)
0.30 9.30
0.60 9.60
0.90 9.90
1.20 10.20
1.50 10.50
1.80 10.80
2.10 11.10
2.40 11.40
2.70 11.70
3.00 12.00
3.30 12.30
3.60 12.60
3.90 12.90
4.20 13.20
4.50 13.50
4.80 13.80
5.10 14.10
5.40 14.40
5.70 14.70
6.00 15.00
6.30 15.30
6.60 15.60
6.90 15.90
7.20 16.20
7.50 16.50
7.80 16.80
8.10 17.10
8.40 17.40
8.70 17.70
9.00 18.00

COMMENTS:
______________
_______________________
_______________________
______________________
: _____________________
_______________________

HAMMER
NO. OF BLOW
DROP (M)