You are on page 1of 4

Petrel* 2014 Well Headers in a Well Section

In this installment of our series of brief TIPS&TRICKS articles featuring selected changes or options
available to the Petrel 2014 user, we take a closer look at Well Headers in a Well Section.

Additions to Well Section Headers


1. Normal Well Header
2. Open the Settings dialog for the Cross sections folder (in the input pane)
3. Go to the Header tab

1
2

Petrel is a mark of Schlumberger

4801 Woodway Drive, Suite 150W Houston, TX 77056 www.scminc.com info@scminc.com 2015 SCM E&P Solutions, Inc.

1
4. You may change the default header
5. Add Sub-header(s)
6. Modify Parameters
7. Add an Automatic Value (Values may be changed in the Well Manager)
8. Modified Header

4801 Woodway Drive, Suite 150W Houston, TX 77056 www.scminc.com info@scminc.com 2015 SCM E&P Solutions, Inc.

2
9. Multiple Sub-headers
10. Pull-down to see entire header
11. Pull-down further to see Color Tables

10

11

12. Header values apply to all Well Sections (regardless of Template)

4801 Woodway Drive, Suite 150W Houston, TX 77056 www.scminc.com info@scminc.com 2015 SCM E&P Solutions, Inc.

3
(Note: This may be overridden for just one X-section by clicking on that X-section instead of the
folder.)

12

4801 Woodway Drive, Suite 150W Houston, TX 77056 www.scminc.com info@scminc.com 2015 SCM E&P Solutions, Inc.

You might also like