You are on page 1of 20

PT PERTA ARUN GAS

DEVELOPING INDONESIAS LNG INFRASTRUCTURE &


MAINTAINING LNG BUSINESS COMPETENCY

INDONESIAS FIRST IN-LAND LNG RECEIVING


AND REGASIFICATION TERMINAL

29 OCTOBER 2015

PERTAMINA
PERTA ARUN GAS
CONFIDENTIAL AND PROPRIETARY
Any use of this material without specific permission of PT PERTAMINA (Persero) is strictly prohibited
AGENDA

HISTORICAL AND REVITALIZE OF ARUN ASSETS

LAST LNG CARGO

THE PROJECT OF LNG RECEIVING AND REGASIFICATION TERMINAL

COMMISIONING AND OPERATION

NEXT STEP OF PERTA ARUN GAS


HISTORICAL ARUN LNG PLANT
DATA ASSETS :
1ST build : Location: Blang Lancang, Lhokseumawe, Aceh
Train 1, 2, 3 - 1974 6 LNG Plant, total capacity 12.5 MTPA with 5 LNG Storage
1982 : Train 4 & 5 Tank, total capacity 636,000 m3 and 2 LNG Jetty @80,000
Capacity Expansion Project DWT
LPG Extraction Facility, capacity 1.4 MTPA with 4 LPG
Storage Tank, total capacity 302,000 m3 and 1 LPG Jetty
65,000 DWT
Train 6 : Capacity Expansion Condensate Treating, max. capacity 120,000 barrel/day with
Project 1986 Since 2012
Single
4 Condensate Storage Tank, total capacity 2.12 mill. Barrel
1990 : Capacity Expansion Train Ops. and SBM-MBM for Condensate Lifting
Project into 12,5 MTPA 11 Power Plant, total output capacity 220 MW
(Ownership Of The Asset is Gov. of Indonesia)
ARUN LNG PLANT ENDED on OCT.14 (Last Cargo)
Expiry of LNG Sales Contract in 2014
LNG PLANT STOP
Declining of Gas Deliverability From Upstream Gas Field
OPERATION :
No New Prospected Gas Reserve OCT 2014

Year : 1977 2012


(Number of CARGOES )
LNG : 4251
Condensate : 1880
LPG Propane : 355
LPG Butane : 359
Sulphur : 211
ASSETS OF ARUN LNG PLANT
6 LNG Plant, total capacity 12.5 MTPA with 5 LNG Storage Tank, total capacity
636,000 m3 and 2 LNG Jetty @80,000 DWT

LPG Extraction Facility, capacity 1.4 MTPA with 4 LPG Storage Tank, total
capacity 302,000 m3 and 1 LPG Jetty 65,000 DWT

Condensate Treating, max. capacity 120,000 barrel/day with 4 Condensate


Storage Tank, total capacity 2.12 mill. Barrel and SBM-MBM for Condensate
Lifting

11 Power Plant, total output capacity 220 MW

2 LNG jetty, @80,000 DWT


1 65,000 DWT LPG jetty
AGENDA

HISTORICAL AND REVITALIZE OF ARUN ASSETS

LAST LNG CARGO

THE PROJECT OF LNG RECEIVING AND REGASIFICATION TERMINAL

COMMISIONING AND OPERATION

NEXT STEP OF PERTA ARUN GAS


LAST LNG CARGO

LNG PLANT
STOP
OPERATION
IN 2014
AGENDA

HISTORICAL AND REVITALIZE OF ARUN ASSETS

LAST LNG CARGO

THE PROJECT OF LNG RECEIVING AND REGASIFICATION TERMINAL

COMMISIONING AND OPERATION

NEXT STEP OF PERTA ARUN GAS


THE PROJECTS & CONVERTED TERMINAL
Export Terminal
Export/Import Terminal
LNG & LPG Facilities
Regasification Plant
Liquefaction Plant Fac.
DATA ASSETS : LNG & LPG Trading
Location: Blang Lancang, Lhokseumawe, Aceh
6 LNG Plant, total capacity 12.5 MTPA with 5 LNG
Storage Tank, total capacity 636,000 m3 and 2 LNG
Jetty @80,000 DWT
LPG Extraction Facility, capacity 1.4 MTPA with 4
LPG Storage Tank, total capacity 302,000 m3 and 1
LPG Jetty 65,000 DWT
Condensate Treating, max. capacity 120,000
barrel/day with 4 Condensate Storage Tank, total
capacity 2.12 mill. Barrel and SBM-MBM for
Condensate Lifting
11 Power Plant, total output capacity 220 MW
(Ownership Of The Asset is Gov. of Indonesia)

THE PROJECTS
RECEIVING & REGASIFICATION - HUB TERMINAL AND
ARUN BELAWAN GAS TRANSMISSION PIPELINE
MILESTONEs ARUN LNG RECEIVING, HUB & REGASIFICATION TERMINAL
Juli.2012: Conceptual 21.01.13 : Persetujuan 02.08.2013 : Novasi EPC Contract :
Study, FEED,PreAmdal etc HOA PTM & PLN PERTAMINA Persero to PT. Perta Arun Gas

2011 2012 2013 2014 2015

26.07.11 Asset Utilization Plan 23.02.2013 : FID 04.04.2013 : Endorsement PT Perta 27.01.2015 : Mechanical
Workshop Arun LNG Arun Gas by Ministry of Law Completion
06.03.2013 : EPC Contract 19.02.2015 : 1st Cargo LNG
Arun Regas From Tangguh
(PNA Persero & REKIND)
09.03.2015 : The inauguration of the
operation of PAG by the President

14.03.2015 : 1st Gas


Production
14.03.2015 : 1st Gas
Receiving PLN Belawan

Pre Project Phase EPC Phase Production Phase

PERTAMINA
PERTA ARUN GAS
AGENDA

HISTORICAL AND REVITALIZE OF ARUN ASSETS

LAST LNG CARGO

THE PROJECT OF LNG RECEIVING AND REGASIFICATION TERMINAL

COMMISIONING AND OPERATION

NEXT STEP OF PERTA ARUN GAS


REGASIFICATION BUSINESS SCHEME
LNG SPA : BP Regas Agreement REGAS PLANT
(PSC TANGGUH) & LNG CARRIER (PLN & PAG) (DESIGN. 400 MMSCFD)
PT. PLN

LNG Cargo 2015 to Regas Plant POWER PLANT


PLN Arun Aceh
(ADP) Utara
No ETA Arun LNG Source Gas Alocation
1 19Feb Tangguh PLN Belawan
2 16March Tangguh PLN Belawan GAS PIPELINE ARUN
3 22April Tangguh PLN Belawan GAS DELIVERY TO BELAWAN ( 24 x 350 KM )
4 18May Tangguh PLN Belawan PLN, 40 MMSCFD >>>Invested & Operated by :
5 19Juni Tangguh PLN Belawan PT. Pertamina Gas
6 22Jul Tangguh PLN Belawan
OTHERS :
INDUSTRIAL ACEH &
7 24Aug Tangguh PLN Belawan
NORTH SUMATRA COMMITED VOL (CONTRACT
8 20Sept Tangguh PLN Belawan W/ PLN) : 95 MMSCFD
9 19Oct Tangguh PLN Belawan
POWER PLANT
10 6 Nov Tangguh PLN Belawan
PLN Belawan
11 3Dec Tangguh PLN Belawan
12 15 Dec Tangguh Industri Medan
REGASIFICATION PLANT LOCATION
GAS PIPELINE ARUN BELAWAN
PAG BEGAN PRODUCTION AND SUPPLY OF GAS IN ACEH AND MEDAN
BEGAN TO BE FULFILLED
NEWS :
AGENDA

HISTORICAL AND REVITALIZE OF ARUN ASSETS

LAST LNG CARGO

THE PROJECT OF LNG RECEIVING AND REGASIFICATION TERMINAL

COMMISIONING AND OPERATION

NEXT STEP OF PERTA ARUN GAS


17

TANK HUB FACILITIES


PAG Provides A Hub Facility With The
Tank Capacity Of 2 X 127500 M3

2 Unit LNG Tank


LNG TRUCKING
LNG TRUCKING
WOULD COMPLEMENT THE
BUSINESS OF PT PAG