SCHEDULE
Flow Diagrams
Process Flow Diagram-PFD
Piping & Instrumentation Diagram- P&ID
Utility Flow Diagram
DAY 27 Line Numbering
P&ID Requirements
Flow Diagram Exercises
Symbols & Abbreviations, etc
DAY 41
DAY 42
DAY 43
DAY 44
DAY 45
DAY 46
DAY 47
DAY 48
DAY 49
DAY 50
DAY 51
DAY 52
DAY 53
DAY 54
DAY 55
DAY 56
DAY 57
DAY 58
DAY 59
DAY 60
DAY 61
DAY 62
DAY 63
DAY 64
DAY 65
DAY 66
DAY 67
DAY 68
DAY 69
DAY 70
DAY 71
DAY 72
DAY 73
DAY 74
DAY 75
DAY 76
DAY 77
DAY 78
DAY 79
DAY 80
PDMS Pipe Modeling
QA/QC &HSE/QHSE
Quality Control and Quality Assurance
Health Safety and Quality Environment Training
PDMS Structure Modeling
Pipe Supports
Types and Functions of Support
Anchors
Pipe Guides
Limit Stops
Pipe Shoe
Dummy Leg/Trunion
Field Support/ Base Support
Rigid Hangers
Pipe Rack and Yard Piping Design
Flexible or Resilient Supports- Variable & Constant Load
CAESAR II Introduction
CAESAR II Modeling
CAESAR II Modeling
CAESAR II Modeling
CAESAR II Modeling
CAESAR II Modeling
CAESAR II Modeling
CAESAR II Modeling
Welding & NDT
Types of Welding and Welding Terminology
Welding Joints
Methods of Welding
Welding Geometry
Welding Symbols
NDT Methods
CAESAR II Analysis
CAESAR II Analysis
CAESAR II Analysis
CAESAR II Analysis
CAESAR II Analysis
CAESAR II Theory
CAESAR II Theory
CAESAR II Analysis
CAESAR II Analysis
Protection Of Pipe And Insulations
Abrasion
Freezing and Corrosion and its Classification
Lining
Coating
Wrapping
Insulation
Tracing
Jacketing
Electric Heating
Protection against Corrosion
Hot Insulation
Cold Insulation
Acoustic Insulation
Insulation Materials
Insulation Types for Oil &Gas Piping as per ASME
Internal Exam and Lab exam-4
DAY 81 PRIMAVERA Introduction
DAY 82 PRIMAVERA
DAY 83 PRIMAVERA
DAY 84 PRIMAVERA
DAY 85 PRIMAVERA
DAY 86 Project Management Theory
DAY 87 PRIMAVERA
DAY 88 PRIMAVERA
DAY 89 PRIMAVERA