PROJECT TITLE ATWO (2)-STOREY RESIDENCE W/ ROFDECK

LOCATION PORTO CIRCLE BRGY. BALON ANITO MARIVELES, BATAAN


OWNER MR. & MRS. JOSELITO DOMINGUEZ
SUBJECT PROJECT COST ESTIMATE

SCOPE OF WORKS DESCRIPTION

A. EARTHWORKS
EXCAVATION
GRAVEL BEDDING
SUB-TOTAL

B. STRUCTURAL WORKS
COLUMN FOOTING
PORTLAND CEMENT
WHITE SAND
CRUSHED GRAVEL
16 mm Dia.x 6.00m. DB
Ga.26 G.I. Tie wire
SUB-TOTAL

C. WALL FOOTING
PORTLAND CEMENT
WHITE SAND
CRUSHED GRAVEL
10 mm Dia.x 6.00m. DB
Ga.26 G.I. Tie wire
SUB-TOTAL

D. CONCRETE COLUMNS
PORTLAND CEMENT
WHITE SAND
CRUSHED GRAVEL
16 mm Dia.x 6.00m. DB
10 mm Dia.x 6.00m. DB
Ga.26 G.I. Tie wire
SUB-TOTAL

E. CONCRETE BEAMS
PORTLAND CEMENT
WHITE SAND
CRUSHED GRAVEL
16 mm Dia.x 6.00m. DB
10 mm Dia.x 6.00m. DB
Ga.26 G.I. Tie wire
SUB-TOTAL

F. SLAB ON GRADE
PORTLAND CEMENT
WHITE SAND
CRUSHED GRAVEL
10 mm Dia.x 6.00m. DB
Ga.26 G.I. Tie wire
SUB-TOTAL
G. SECOND FLOOR SLAB
PORTLAND CEMENT
WHITE SAND
CRUSHED GRAVEL
12 mm Dia.x 6.00m. DB
Ga.26 G.I. Tie wire
SUB-TOTAL

H. CONCRETE STAIRS
PORTLAND CEMENT
WHITE SAND
CRUSHED GRAVEL
16 mm Dia.x 6.00m. DB
12 mm Dia.x 6.00m. DB
10 mm Dia.x 6.00m. DB
Ga.26 G.I. Tie wire
SUB-TOTAL

J. CONC. LAVATORY COUNTERS AND KITCHEN COUNTERTOPS


PORTLAND CEMENT
WHITE SAND
CRUSHED GRAVEL
10 mm Dia.x 6.00m. DB
Ga.26 G.I. Tie wire
SUB-TOTAL

K. ROOFING & TRUSS

SUB-TOTAL

L. FORMWORKS
1/2" THICK PLYWOOD FORMS
2"x2" FRAME(Coco Lumber)
2"x3" SCAFFOLDINGS
SUB-TOTAL

M. MASONRY
150 MM THK. CHB

CEMENT
SAND

100 MM THK. CHB

CEMENT
SAND

MASONRY REBARS
10 mm Dia.x 6.00m. DB
Ga.26 G.I. Tie wire
SUB-TOTAL
SUB-TOTAL STRUCTURAL WORKS
ARCHITECTURAL WORKS
N. PLASTERING
PORTLAND CEMENT
SAND
SUB-TOTAL

O. LATEX PAINTING WORKS (EXTERIOR & INTERIOR)


WALL
CEILING AND SOFFIT
SUB-TOTAL

P. DOORS INCLUDING DOOR JAMB, LOCKSETS&HARDWARES (EXCLUDING GLA


D1
D2
D3
D4
SUB-TOTAL

Q. WINDOWS
W1
W2
W3
W4
W5
SUB-TOTAL

R. GLASS AND ALUMINUM WORKS


ALUMINUM SLIDING CLOSET DOOR WITH MIRROR
KITCHEN CABINET DOOR FROSTED GLASS INSETS ONLY
CABINET DOOR FROSTED GLASS INSETS ONLY
BATHROOM MIRRORS
12MM THK. TEMPERED CLEAR GLASS BALCONY RAILING
12MM THK. TEMPERED FROSTED GLASS SHOWER PARTITION
12MM THK. CLEAR GLASS SHELF
ACCESSORIES & CONSUMABLES
SUB-TOTAL

S. EXTERIOR ACCENT WALL TILING


SPANISH TILE WALL ACCENT
PORTLAND CEMENT
SAND
TILE GROUT
SUB-TOTAL
T. NATURAL GRANITE WORKS
MAIN KITCHEN COUNTER , SKIRT & BACKSPLASH
BAR COUNTER, LEG & SKIRT
LAVATORY COUNTER @MBR
CONCRETE LEDGE @ MBR
LAVATORY COUNTER @2F COMMON T&B
CONCRETE LEDGE @ MBR
PORTLAND CEMENT
SAND
TILE GROUT
SUB-TOTAL

U. TILE WORKS
GROUND FLOOR
(FOYER, LIVING, DINING, STAIRWAY, MAIN KIT)
600X600MM SYNTHETIC GRANITE TILES
PORTLAND CEMENT
SAND
TILE GROUT

(CARPORT, PORCH,LANAI)
400X400MM NON SKID CERAMIC FLR TILES
PORTLAND CEMENT
SAND
TILE GROUT

(SERVICE KITCHEN,LAUNDRY&DRYING)
400X400MM NON SKID CERAMIC FLR TILES
PORTLAND CEMENT
SAND
TILE GROUT

(SERVICE KITCHEN COUNTERTOP & BOT.CAB. FLR)


600X600MM SYNTHETIC GRANITE TILES
200X200MM GLAZED TILES
PORTLAND CEMENT
SAND
TILE GROUT

(MAIN KITCHEN BOTTOM CABINET FLR)


200X200MM GLAZED TILES
PORTLAND CEMENT
SAND
TILE GROUT

(BEDROOM 3 T&B)
400X400MM NON SKID CERAMIC FLR TILES
400X400MM GLAZED CERAMIC WALL TILES
PORTLAND CEMENT
SAND
TILE GROUT

(GF COMMON T&B)


400X400MM NON SKID CERAMIC FLR TILES
400X400MM GLAZED CERAMIC WALL TILES
400X400MM ACCENT WALL TILES
PORTLAND CEMENT
SAND
TILE GROUT
V. SECOND FLOOR
(FAMILY HALL, COMMON T&B LAVATORY AREA)
300X900MM NON SKID CERAMIC FLR TILES
PORTLAND CEMENT
SAND
TILE GROUT

(BEDROOMS 4,5&6)
300X900MM NON SKID CERAMIC FLR TILES
PORTLAND CEMENT
SAND
TILE GROUT

(MBR & WALK-IN CLOSET)


300X900MM NON SKID CERAMIC FLR TILES
PORTLAND CEMENT
SAND
TILE GROUT

(MBR T&B)
400X400MM NON SKID CERAMIC FLR TILES
400X400MM GLAZED CERAMIC WALL TILES
300X300MM ACCENT WALL TILES
PORTLAND CEMENT
SAND
TILE GROUT

(BEDRM.5 T&B)
400X400MM NON SKID CERAMIC FLR TILES
400X400MM GLAZED CERAMIC WALL TILES
300X300MM ACCENT WALL TILES
PORTLAND CEMENT
SAND
TILE GROUT

(2F COMMON T&B)


400X400MM NON SKID CERAMIC FLR TILES
400X400MM GLAZED CERAMIC WALL TILES
300X300MM ACCENT WALL TILES
PORTLAND CEMENT
SAND
TILE GROUT

(COMMON BALCONY, MBR BALCONY)


400X400MM NON SKID CERAMIC FLR TILES
PORTLAND CEMENT
SAND
TILE GROUT
SUB-TOTAL
W. CARPENTRY WORKS
BASEBOARD
HARDIFLEX CEILING BOARD
CEILING HANGERS
50X300X1200MM TANGUILE TREAD
VENT SLATS
50X100MM SOLID WD. HANDRAILS @ STAIR
50X100MM SOLID WD. HANDRAILS @ FAM. HALL
CONSUMABLES
SUB-TOTAL
X. KITCHEN CABINET
SOLID WOOD CABINET DOORS
CABINET DOORS IN DUCO PAIN FINISH
3/4" MARINE PLYWOOD CARCASSES/SHELVES
CABINET CARCASSES/SHELVES IN DUCO PAIN FINISH
HARDIFLEX HANGING OVERBOARD
VENEER FINISHING FOR OVERBOARD
STAINLESS STEEL DOOR PULLS
DOOR HINGE/DOOR CLOSERS
CONSUMABLES
SUB-TOTAL

Y. WARDROBE CLOSETS
3/4"THK. ORD. PLYWOOD CABINET UPPER DOOR
3/4" ORD. PLYWD. VERT. PARTITION & CARCASS
3/4" ORDINARY PLYWD. INTERIOR SHELVES
STAINLESS STEEL DOOR PULLS FOR UPPER DOOR
DOOR HINGE/DOOR CLOSERS
CONSUMABLES
SUB-TOTAL

Z. SHOE CABINETS
@ STAIR
3/4"THK. ORD. PLYWOOD CABINET DOOR
3/4" ORD. PLYWD. VERT. PARTITION & CARCASS
3/4" ORDINARY PLYWD. INTERIOR SHELVES
STAINLESS STEEL DOOR PULLS
DOOR HINGE/DOOR CLOSERS
CONSUMABLES

@ BEDROOMS
3/4"THK. ORD. PLYWOOD CABINET DOOR
3/4" ORD. PLYWD. VERT. PARTITION & CARCASS
3/4" ORDINARY PLYWD. INTERIOR SHELVES
STAINLESS STEEL DOOR PULLS
DOOR HINGE/DOOR CLOSERS
CONSUMABLES
SUB-TOTAL

AA. IRONWORKS / METALWORKS


@ BALCONY, FAMILY HALL & KITCHEN
25MMX25MM HORIZONTAL STAIR RAILING
50X100MM DECORATIVE VERT.PARTITION @ KIT.
25X50MM VERTICAL BALUSTERS
CONSUMABLES
SUB-TOTAL

BB. VARNISHING / STAINING WORKS


BASEBOARD
DOOR JAMBS
DOORS
CABINETS / CLOSETS
CONSUMABLES
SUB-TOTAL
SUB-TOTAL ARCHITECTURAL WORKS
CC. PLUMBING WORKS
FIXTURES
MASTER WATER CLOSET
MASTER LAVATORY
MASTER FAUCET/ TAP MIXER
MASTER WHIRLPOOL/BATHTUB
MASTER SHOWER HEAD AND VALVES
WATER HEATER (MULTI-POINT)
WATER CLOSET
LAVATORY
SHOWER HEAD AND VALVES
BATHROOM FAUCET/TAP MIXER
FLOOR DRAIN/ SHOWER DRAIN
HOSE BIBB / FAUCET
KITCHEN SINK
KITCHEN TAP MIXER
WATER TANK
ROUGHING INS
SUB-TOTAL PLUMBING WORKS

DD. ELECTRICAL WORKS


ROUGHING INS
WIRES AND WIRING DEVICES
Wires and Cables
Convenience Outlet
Weather Proof Outlet
ACU Outlet
Electric Range
TV / Cable Outlet
Single Pole Switch
Two Pole Switch
Three Pole Switch
Three Way Switch

Special Design Spherical Drop Light 1.2,1.0 & 0.80 m. dia.


1-40w FF 0.30x1.20 Surface Mounted
with Prismatic Diffuser
Recessed Square Pinlight 3"
1x20w Ceiling Mounted Fluorescent Cove Lighting
1x20w Surface Mounted Fluorescent Cabinet Lighting
1x20w Fluorescent Strip Lighting for Mirror
Spot Light Par 38 Dual Type for Roof Eaves
Ceiling-Mounted CFL lighting
Exterior Wall Mounted Lighting
PANEL BOARD
PANEL BOARD (PP)
MAIN: 225AT, 225AF,2P 240V MCCB
Branches: 1-30AT 2PCB, BOLT ON
10-20AT 2PCB, BOLT ON
1-125AT 2PCB, BOLT ON
PANEL BOARD (LP)
MAIN: 125AT, 225 AF, 2P 250V MCCB
Branches: 17-20AT 2PCB, BOLT ON TYPE
1-30AT 2PCB, BOLT ON
SUB-TOTAL ELECTRICAL WORKS

GRAND TOTAL PROJECT COST

PRC Reg. No:


TIN:
PTR No:
Issued At;
Date
OFDECK
MARIVELES, BATAAN

UNIT UNIT COST AMOUNT

120.00 SQ.M. 350.00 42,000.00


15.00 CU.M. 700.00 10,500.00
52,500.00

150.00 BAG 220.00 33,000.00


15.00 CU.M. 550.00 8,250.00
30.00 CU.M. 700.00 21,000.00
172.00 PC 320.00 55,040.00
40.00 KG 60.00 2,400.00
119,690.00

84.00 BAG 220.00 18,480.00


12.00 CU.M. 550.00 6,600.00
24.00 CU.M. 700.00 16,800.00
98.00 PC 125.00 12,250.00
30.00 KG 60.00 1,800.00
55,930.00

250.00 BAG 220.00 55,000.00


24.00 CU.M. 550.00 13,200.00
48.00 CU.M. 700.00 33,600.00
510.00 PC 320.00 163,200.00
188.00 PC 125.00 23,500.00
50.00 KG 60.00 3,000.00
291,500.00

165.00 BAG 220.00 36,300.00


6.00 CU.M. 550.00 3,300.00
12.00 CU.M. 700.00 8,400.00
272.00 PC 320.00 87,040.00
210.00 PC 125.00 26,250.00
50.00 KG 60.00 3,000.00
164,290.00

228.00 BAG 220.00 50,160.00


13.00 CU.M. 550.00 7,150.00
26.00 CU.M. 700.00 18,200.00
150.00 PC 125.00 18,750.00
60.00 KG 60.00 3,600.00
97,860.00
150.00 BAG 220.00 33,000.00
15.00 CU.M. 550.00 8,250.00
30.00 CU.M. 700.00 21,000.00
350.00 PC 180.00 63,000.00
70.00 KG 60.00 4,200.00
129,450.00

30.00 BAG 220.00 6,600.00


2.00 CU.M. 550.00 1,100.00
4.00 CU.M. 700.00 2,800.00
32.00 PC 320.00 10,240.00
12.00 PC 180.00 2,160.00
20.00 PC 125.00 2,500.00
8.00 KG 60.00 480.00
25,880.00

UNTERTOPS
5.00 BAG 220.00 1,100.00
0.50 CU.M. 550.00 275.00
1.00 CU.M. 700.00 700.00
10.00 PC 125.00 1,250.00
5.00 KG 60.00 300.00
3,625.00

1.00 lot 100,000.00 100,000.00


100,000.00

100.00 pc 600.00 60,000.00


850.00 BF 15.00 12,750.00
1,500.00 BF 15.00 22,500.00
95,250.00

2,000.00 pc 15.00 30,000.00


70.00 BAG 220.00 15,400.00
12.00 CU.M. 550.00 6,600.00

500.00 PC 12.00 6,000.00


38.00 BAG 220.00 8,360.00
4.00 CU.M. 550.00 2,200.00

75.00 PC 125.00 9,375.00


15.00 KG 60.00 900.00
78,835.00
1,214,810.00
120.00 BAG 220.00 26,400.00
15.00 CU.M. 550.00 8,250.00
34,650.00

220.00 SQ.M. 200.00 44,000.00


210.00 SQ.M. 250.00 52,500.00
96,500.00

ARDWARES (EXCLUDING GLASS)


1.00 SET 27,600.00 27,600.00
1.00 SET 43,500.00 43,500.00
2.00 SET 40,000.00 80,000.00
1.00 SET 20,400.00 20,400.00
171,500.00

1.00 SQ.M. 4,000.00 4,000.00


2.00 SQ.M. 4,000.00 8,000.00
2.00 SQ.M. 4,000.00 8,000.00
1.00 SQ.M. 4,000.00 4,000.00
1.00 SQ.M. 4,000.00 4,000.00
28,000.00

1.00 SQ.M. 3,500.00 3,500.00


0.72 SQ.M. 1,200.00 864.00
2.16 SQ.M. 1,200.00 2,592.00
0.50 SQ.M. 1,500.00 750.00
5.20 SQ.M. 8,000.00 41,600.00
3.60 SQ.M. 7,000.00 25,200.00
SQ.M. 900.00 -
1.00 LS 1,500.00 1,500.00
76,006.00

12.47 SQ.M. 1,350.00 16,834.50


BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -
16,834.50
SQ.M. 2,500.00 -
SQ.M. 2,500.00 -
SQ.M. 2,500.00 -
SQ.M. 2,500.00 -
SQ.M. 2,500.00 -
SQ.M. 2,500.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -
-

47.81 SQ.M. 800.00 38,248.00


BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

53.63 SQ.M. 600.00 32,178.00


BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

SQ.M. 600.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

SQ.M. 800.00 -
SQ.M. 375.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

SQ.M. 375.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

SQ.M. 600.00 -
SQ.M. 600.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

SQ.M. 600.00 -
SQ.M. 600.00 -
SQ.M. 600.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -
SQ.M. 600.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

SQ.M. 600.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

SQ.M. 600.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

SQ.M. 600.00 -
SQ.M. 600.00 -
SQ.M. 400.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

SQ.M. 600.00 -
SQ.M. 600.00 -
SQ.M. 600.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

SQ.M. 600.00 -
SQ.M. 600.00 -
SQ.M. 600.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -

SQ.M. 600.00 -
BAG 220.00 -
CU.M. 550.00 -
KG 60.00 -
70,426.00
L.M. 167.00 -
PCS 320.00 -
B.F. 37.50 -
PCS 1,200.00 -
PCS 500.00 -
L.M. 370.00 -
L.M. 370.00 -
LS 13,000.00 13,000.00
13,000.00
SQ.M. 500.00 -
SQ.M. 750.00 -
SQ.M. 360.00 -
SQ.M. 750.00 -
SQ.M. 113.00 -
SQ.M. 1,200.00 -
PCS 500.00 -
PCS 30.00 -
LS 4,700.00 -
-

SQ.M. 292.00 -
SQ.M. 292.00 -
SQ.M. 292.00 -
PCS 500.00 -
PCS 30.00 -
LS 3,500.00 -
-

SQ.M. 292.00 -
SQ.M. 292.00 -
SQ.M. 292.00 -
PCS 500.00 -
PCS 30.00 -
LS 1,000.00 -

SQ.M. 292.00 -
SQ.M. 292.00 -
SQ.M. 292.00 -
PCS 500.00 -
PCS 30.00 -
LS 1,300.00 -
-

L.M. 45.00 -
L.M. 380.00 -
L.M. 120.00 -
LS 1,300.00 -
-

L.M. 100.00 -
L.M. 100.00 -
SQ.M. 250.00 -
SQ.M. 250.00 -
LS 8,000.00 -
-
506,916.50
1 SET 15,000.00 15,000.00
1 SET 7,500.00 7,500.00
1 SET 5,000.00 5,000.00
SET 50,000.00 -
1 SET 8,000.00 8,000.00
SET 9,000.00 -
1 SET 8,000.00 8,000.00
1 SET 4,000.00 4,000.00
1 SET 5,000.00 5,000.00
1 SET 2,500.00 2,500.00
2 SET 350.00 700.00
SET 500.00 -
1 SET 5,000.00 5,000.00
1 SET 3,000.00 3,000.00
1 SET 20,000.00 20,000.00
1 LS 30,000.00 30,000.00
113,700.00

LS 1.00 30,000.00

1 LS 1.00 60,000.00
SET 280.00 -
SET 400.00 -
SET 500.00 -
SET 500.00 -
SET 260.00 -
SET 200.00 -
SET 280.00 -
SET 320.00 -
SET 260.00 -

SET 15,000.00 -

SET 1,200.00 -
SET 450.00 -
SET 350.00 -
SET 350.00 -
SET 350.00 -
SET 900.00 -
SET 200.00 -
SET 1,200.00 -
UNIT 4,000.00 5,000.00
PC 650.00 -
PC 500.00 -
PC 1,700.00 -

UNIT 6,000.00 -
PC 500.00 -
PC 650.00 -
95,000.00

TOTAL MATERIAL COST 1,930,426.50


40% LABOR COST 772,170.60
5% MATERIAL CONTINGENCY COST 96,521.33

2,799,118.43
PROJECT TITLE PROPOSED TWO-STOREY RESIDENCE
LOCATION LOT 21 & 22,LOUISIANA ST., METROVILLE EXECUTIVE VILLAGE, MAPUL
OWNER MS. MARILOU D. BARDON
SUBJECT PROJECT COST ESTIMATE

SCOPE OF WORKS DESCRIPTION QTY

EARTHWORKS

EXCAVATION 42.43
GRAVEL BEDDING 1.82
SUB-TOTAL

STRUCTURAL WORKS
COLUMN FOOTING 5.90
PORTLAND CEMENT 53.10
WHITE SAND 2.95
CRUSHED GRAVEL 5.90
16 mm Dia.x 6.00m. DB 48.00
Ga.26 G.I. Tie wire 6.23
SUB-TOTAL

WALL FOOTING 2.46


PORTLAND CEMENT 22.10
WHITE SAND 1.23
CRUSHED GRAVEL 4.91
12 mm Dia.x 6.00m. DB 33.00
10 mm Dia.x 6.00m. DB 8.00
Ga.26 G.I. Tie wire 1.75
SUB-TOTAL

CONCRETE COLUMNS 8.42


PORTLAND CEMENT 75.74
WHITE SAND 4.21
CRUSHED GRAVEL 8.42
16 mm Dia.x 6.00m. DB 351.00
10 mm Dia.x 6.00m. DB 301.00
Ga.26 G.I. Tie wire 20.55
SUB-TOTAL

CONCRETE BEAMS 18.22


PORTLAND CEMENT 164.02
WHITE SAND 9.11
CRUSHED GRAVEL 18.22
16 mm Dia.x 6.00m. DB 435.00
10 mm Dia.x 6.00m. DB 360.00
Ga.26 G.I. Tie wire 82.49
SUB-TOTAL

SLAB ON GRADE 8.02


PORTLAND CEMENT 72.15
WHITE SAND 4.01
CRUSHED GRAVEL 8.02
10 mm Dia.x 6.00m. DB 137.74
Ga.26 G.I. Tie wire 5.67
SUB-TOTAL

SECOND FLOOR SLAB 8.73


PORTLAND CEMENT 78.55
WHITE SAND 4.36
CRUSHED GRAVEL 8.73
10 mm Dia.x 6.00m. DB 454.00
Ga.26 G.I. Tie wire 37.25
SUB-TOTAL

CONCRETE STAIRS 0.74


PORTLAND CEMENT 6.66
WHITE SAND 0.37
CRUSHED GRAVEL 0.74
16 mm Dia.x 6.00m. DB 18.00
10 mm Dia.x 6.00m. DB 19.00
Ga.26 G.I. Tie wire 1.15
SUB-TOTAL

CANTILEVERED SLAB OVER WINDOWS 0.92


PORTLAND CEMENT 8.24
WHITE SAND 0.46
CRUSHED GRAVEL 0.92
16 mm Dia.x 6.00m. DB 11.00
10 mm Dia.x 6.00m. DB 8.00
Ga.26 G.I. Tie wire 4.00
SUB-TOTAL

CONC. LAVATORY COUNTERS AND KITCHEN COUNTERTOPS


PORTLAND CEMENT 1.50
WHITE SAND 0.08
CRUSHED GRAVEL 0.16
10 mm Dia.x 6.00m. DB 5.50
Ga.26 G.I. Tie wire 0.60
SUB-TOTAL

ROOFING & TRUSS


STEEL TRUSS 84.00
GA # 24 PREPAINTED LONGSPAN G.I. SHEET 84.00
10MM. DOUBLE SIDE THERMAL INSULATION 84.00
GA #24 PRE-PAINTED GUTTER 28.50
25X300MM SOLID WOOD FASCIA BOARD 28.50
SUB-TOTAL

FORMWORKS
1/2" THICK PLYWOOD FORMS 30.00
2"x2" FRAME(Coco Lumber) 600.00
2"x3" SCAFFOLDINGS 400.00
SUB-TOTAL

MASONRY
150 MM THK. CHB 103.64
1,295.44
104.98
8.75

100 MM THK. CHB 80.40


1,005.00
84.42
7.04

MASONRY REBARS
10 mm Dia.x 6.00m. DB 230.00
Ga.26 G.I. Tie wire 6.90
SUB-TOTAL
SUB-TOTAL STRUCTURAL WORKS

ARCHITECTURAL WORKS

PLASTERING 431.03
PORTLAND CEMENT 103.45
SAND 8.62
SUB-TOTAL

LATEX PAINTING WORKS (EXTERIOR & INTERIOR)


WALL 460.00
CEILING AND SOFFIT 234.00
SUB-TOTAL

DOORS INCLUDING DOOR JAMB, LOCKSETS&HARDWARES (EXCLUDING GLAS


D1 1.00
D2 1.00
D3 1.00
D4 1.00
D5 1.00
D6 1.00
D7 5.00
D8 2.00
D9 3.00
D10 4.00
D11 1.00
SUB-TOTAL
WINDOWS
W1 1.92
W2 1.20
W3 0.96
W4 0.90
W5 2.56
W6 2.56
W7 1.44
W8 1.44
W9 1.92
W10 0.80
W11 0.60
W12 0.36
W13 0.24
W14 8.64
W15 1.82
W16 3.36
W17 16.10
SUB-TOTAL

GLASS AND ALUMINUM WORKS


ALUMINUM SLIDING CLOSET DOOR WITH MIRROR 23.22
KITCHEN CABINET DOOR FROSTED GLASS INSETS ONLY 2.79
CABINET DOOR FROSTED GLASS INSETS ONLY 3.60
BATHROOM MIRRORS 2.04
12MM THK. TEMPERED CLEAR GLASS BALCONY RAILING 18.72
12MM THK. TEMPERED FROSTED GLASS SHOWER PARTITION 2.70
12MM THK. CLEAR GLASS SHELF 0.36
ACCESSORIES & CONSUMABLES 1.00
SUB-TOTAL

EXTERIOR ACCENT WALL TILING


SPANISH TILE WALL ACCENT 5.70
PORTLAND CEMENT 1.71
SAND 0.14
TILE GROUT 2.85
SUB-TOTAL

NATURAL GRANITE WORKS


MAIN KITCHEN COUNTER , SKIRT & BACKSPLASH 3.20
BAR COUNTER, LEG & SKIRT 1.78
LAVATORY COUNTER @MBR 1.24
CONCRETE LEDGE @ MBR 0.32
LAVATORY COUNTER @2F COMMON T&B 1.42
CONCRETE LEDGE @ MBR 0.39
PORTLAND CEMENT 2.50
SAND 0.20
TILE GROUT 3.98
SUB-TOTAL
TILE WORKS
GROUND FLOOR
(FOYER, LIVING, DINING, STAIRWAY, MAIN KIT)
600X600MM SYNTHETIC GRANITE TILES 30.74
PORTLAND CEMENT 9.22
SAND 0.77
TILE GROUT 15.37

(CARPORT, PORCH,LANAI)
400X400MM NON SKID CERAMIC FLR TILES 21.88
PORTLAND CEMENT 6.56
SAND 0.55
TILE GROUT 10.94

(SERVICE KITCHEN,LAUNDRY&DRYING)
400X400MM NON SKID CERAMIC FLR TILES 9.88
PORTLAND CEMENT 2.96
SAND 0.25
TILE GROUT 4.94

(SERVICE KITCHEN COUNTERTOP & BOT.CAB. FLR)


600X600MM SYNTHETIC GRANITE TILES 0.81
200X200MM GLAZED TILES 1.62
PORTLAND CEMENT 0.73
SAND 0.06
TILE GROUT 1.22

(MAIN KITCHEN BOTTOM CABINET FLR)


200X200MM GLAZED TILES 2.34
PORTLAND CEMENT 0.70
SAND 0.06
TILE GROUT 1.17

(BEDROOM 3 T&B)
400X400MM NON SKID CERAMIC FLR TILES 1.04
400X400MM GLAZED CERAMIC WALL TILES 7.36
PORTLAND CEMENT 2.52
SAND 0.21
TILE GROUT 4.20

(GF COMMON T&B)


400X400MM NON SKID CERAMIC FLR TILES 4.77
400X400MM GLAZED CERAMIC WALL TILES 7.36
400X400MM ACCENT WALL TILES 1.26
PORTLAND CEMENT 4.02
SAND 0.33
TILE GROUT 6.70

SECOND FLOOR
(FAMILY HALL, COMMON T&B LAVATORY AREA)
400X400MM NON SKID CERAMIC FLR TILES 12.87
PORTLAND CEMENT 3.86
SAND 0.32
TILE GROUT 6.44

(BEDROOMS 4,5&6)
400X400MM NON SKID CERAMIC FLR TILES 18.48
PORTLAND CEMENT 5.54
SAND 0.46
TILE GROUT 9.24

(MBR & WALK-IN CLOSET)


400X400MM NON SKID CERAMIC FLR TILES 11.95
PORTLAND CEMENT 3.59
SAND 0.30
TILE GROUT 5.98

(MBR T&B)
400X400MM NON SKID CERAMIC FLR TILES 2.00
400X400MM GLAZED CERAMIC WALL TILES 0.13
300X300MM ACCENT WALL TILES 0.48
PORTLAND CEMENT 0.78
SAND 0.07
TILE GROUT 1.30

(BEDRM.5 T&B)
400X400MM NON SKID CERAMIC FLR TILES 1.63
400X400MM GLAZED CERAMIC WALL TILES 2.16
300X300MM ACCENT WALL TILES 0.07
PORTLAND CEMENT 1.16
SAND 0.10
TILE GROUT 1.93

(2F COMMON T&B)


400X400MM NON SKID CERAMIC FLR TILES 1.82
400X400MM GLAZED CERAMIC WALL TILES 7.23
300X300MM ACCENT WALL TILES 0.66
PORTLAND CEMENT 2.91
SAND 0.24
TILE GROUT 4.86

(COMMON BALCONY, MBR BALCONY)


400X400MM NON SKID CERAMIC FLR TILES 24.03
PORTLAND CEMENT 7.21
SAND 0.60
TILE GROUT 12.01
SUB-TOTAL

CARPENTRY WORKS
BASEBOARD 78.53
HARDIFLEX CEILING BOARD 48.00
CEILING HANGERS 566.50
50X300X1200MM TANGUILE TREAD 8.50
VENT SLATS 10.00
50X100MM SOLID WD. HANDRAILS @ STAIR 3.50
50X100MM SOLID WD. HANDRAILS @ FAM. HALL 1.86
CONSUMABLES 1.00
SUB-TOTAL

KITCHEN CABINET
SOLID WOOD CABINET DOORS 2.92
CABINET DOORS IN DUCO PAIN FINISH 2.92
3/4" MARINE PLYWOOD CARCASSES/SHELVES 13.03
CABINET CARCASSES/SHELVES IN DUCO PAIN FINISH 13.03
HARDIFLEX HANGING OVERBOARD 1.58
VENEER FINISHING FOR OVERBOARD 1.58
STAINLESS STEEL DOOR PULLS 8.00
DOOR HINGE/DOOR CLOSERS 17.00
CONSUMABLES 1.00
SUB-TOTAL

WARDROBE CLOSETS
3/4"THK. ORD. PLYWOOD CABINET UPPER DOOR 4.03
3/4" ORD. PLYWD. VERT. PARTITION & CARCASS 18.00
3/4" ORDINARY PLYWD. INTERIOR SHELVES 17.94
STAINLESS STEEL DOOR PULLS FOR UPPER DOOR 13.50
DOOR HINGE/DOOR CLOSERS 13.50
CONSUMABLES 1.00
SUB-TOTAL

SHOE CABINETS
@ STAIR
3/4"THK. ORD. PLYWOOD CABINET DOOR 2.93
3/4" ORD. PLYWD. VERT. PARTITION & CARCASS 1.40
3/4" ORDINARY PLYWD. INTERIOR SHELVES 2.95
STAINLESS STEEL DOOR PULLS 6.00
DOOR HINGE/DOOR CLOSERS 11.00
CONSUMABLES 1.00

@ BEDROOMS
3/4"THK. ORD. PLYWOOD CABINET DOOR 1.40
3/4" ORD. PLYWD. VERT. PARTITION & CARCASS 2.25
3/4" ORDINARY PLYWD. INTERIOR SHELVES 6.72
STAINLESS STEEL DOOR PULLS 5.00
DOOR HINGE/DOOR CLOSERS 40.00
CONSUMABLES 1.00
SUB-TOTAL

IRONWORKS / METALWORKS
@ BALCONY, FAMILY HALL & KITCHEN
25MMX25MM HORIZONTAL STAIR RAILING 56.65
50X100MM DECORATIVE VERT.PARTITION @ KIT. 8.40
25X50MM VERTICAL BALUSTERS 8.25
CONSUMABLES 1.00
SUB-TOTAL

VARNISHING / STAINING WORKS


BASEBOARD 78.53
DOOR JAMBS 53.65
DOORS 20.63
CABINETS / CLOSETS 44.76
CONSUMABLES 1
SUB-TOTAL
SUB-TOTAL ARCHITECTURAL WORKS

PLUMBING WORKS
FIXTURES
MASTER WATER CLOSET 1
MASTER LAVATORY 1
MASTER FAUCET/ TAP MIXER 2
MASTER WHIRLPOOL/BATHTUB 1
MASTER SHOWER HEAD AND VALVES 1
WATER HEATER (MULTI-POINT) 3
WATER CLOSET 4
LAVATORY 4
SHOWER HEAD AND VALVES 4
BATHROOM FAUCET/TAP MIXER 4
FLOOR DRAIN/ SHOWER DRAIN 9
HOSE BIBB / FAUCET 4
KITCHEN SINK 2
KITCHEN TAP MIXER 2
WATER TANK 1
ROUGHING INS 1
SUB-TOTAL PLUMBING WORKS

ELECTRICAL WORKS
ROUGHING INS 1
WIRES AND WIRING DEVICES
Wires and Cables 1
Convenience Outlet 35
Weather Proof Outlet 5
ACU Outlet 6
Electric Range 1
TV / Cable Outlet 4
Single Pole Switch 8
Two Pole Switch 15
Three Pole Switch 12
Three Way Switch 2
Special Design Spherical Drop Light 1.2,1.0 & 0.80 m. dia. 1
1-40w FF 0.30x1.20 Surface Mounted
with Prismatic Diffuser 34
Recessed Square Pinlight 3" 60
1x20w Ceiling Mounted Fluorescent Cove Lighting 38
1x20w Surface Mounted Fluorescent Cabinet Lighting 2
1x20w Fluorescent Strip Lighting for Mirror 4
Spot Light Par 38 Dual Type for Roof Eaves 7
Ceiling-Mounted CFL lighting 2
Exterior Wall Mounted Lighting 3

PANEL BOARD
PANEL BOARD (PP)
MAIN: 225AT, 225AF,2P 240V MCCB 1
Branches: 1-30AT 2PCB, BOLT ON 1
10-20AT 2PCB, BOLT ON 10
1-125AT 2PCB, BOLT ON 1
PANEL BOARD (LP)
MAIN: 125AT, 225 AF, 2P 250V MCCB 1
Branches: 17-20AT 2PCB, BOLT ON TYPE 17
1-30AT 2PCB, BOLT ON 1
SUB-TOTAL ELECTRICAL WORKS

5% MATERIAL CON

GRAND TOTAL PROJECT COST

Prepared By:

Arch. GENATO T.QUEV


PRC Reg. No:
TIN:
PTR No:
Issued At;
Date

EXCLUDED WORKS IN PROJECT COST ESTIMATE:


- Steel Gates and CHB Fence
- Other Interior Design works not included in the project cost such as:
- customized built-in furniture aside from wardrobe closets and shoe cabinets
VILLAGE, MAPULANG LUPA, VALENZUELA CITY

UNIT UNIT COST AMOUNT

SQ.M. 350.00 14,848.75


CU.M. 700.00 1,274.00
16,122.75

BAG 220.00 11,682.00


CU.M. 550.00 1,622.50
CU.M. 700.00 4,130.00
PC 320.00 15,360.00
KG 60.00 373.80
33,168.30

BAG 220.00 4,862.88


CU.M. 550.00 675.40
CU.M. 700.00 3,438.40
PC 180.00 5,940.00
PC 125.00 1,000.00
KG 60.00 105.00
16,021.68

BAG 220.00 16,661.70


CU.M. 550.00 2,314.13
CU.M. 700.00 5,890.50
PC 320.00 112,320.00
PC 125.00 37,625.00
KG 60.00 1,233.00
176,044.33

BAG 220.00 36,084.51


CU.M. 550.00 5,011.74
CU.M. 700.00 12,757.15
PC 320.00 139,200.00
PC 125.00 45,000.00
KG 60.00 4,949.40
243,002.80

BAG 220.00 15,872.67


CU.M. 550.00 2,204.54
CU.M. 700.00 5,611.55
PC 125.00 17,217.50
KG 60.00 340.20
41,246.46

BAG 220.00 17,280.45


CU.M. 550.00 2,400.06
CU.M. 700.00 6,109.25
PC 125.00 56,750.00
KG 60.00 2,235.00
84,774.76

BAG 220.00 1,465.20


CU.M. 550.00 203.50
CU.M. 700.00 518.00
PC 320.00 5,760.00
PC 125.00 2,375.00
KG 60.00 69.00
10,390.70

BAG 220.00 1,811.70


CU.M. 550.00 251.63
CU.M. 700.00 640.50
PC 320.00 3,520.00
PC 125.00 1,000.00
KG 60.00 240.00
7,463.83

BAG 220.00 330.00


CU.M. 550.00 44.55
CU.M. 700.00 113.40
PC 125.00 687.50
KG 60.00 36.00
1,211.45

SQ.M. 1,200.00 100,800.00


SQ.M. 350.00 29,400.00
SQ.M. 90.00 7,560.00
L.M. 120.00 3,420.00
L.M. 300.00 8,550.00
149,730.00

pc 600.00 18,000.00
BF 15.00 9,000.00
BF 15.00 6,000.00
33,000.00

pc 15.00 19,431.56
BAG 220.00 23,096.10
CU.M. 550.00 4,810.74

PC 12.00 12,060.00
BAG 220.00 18,572.40
CU.M. 550.00 3,872.00

PC 125.00 28,750.00
KG 60.00 413.70
111,006.50
923,183.54

BAG 220.00 22,757.90


CU.M. 550.00 4,741.00
27,498.90

SQ.M. 200.00 92,000.00


SQ.M. 250.00 58,500.00
150,500.00

(EXCLUDING GLASS)
SET 13,800.00 13,800.00
SET 21,750.00 21,750.00
SET 20,000.00 20,000.00
SET 10,200.00 10,200.00
SET 10,200.00 10,200.00
SET 8,500.00 8,500.00
SET 7,700.00 38,500.00
SET 7,700.00 15,400.00
SET 8,700.00 26,100.00
SET 3,700.00 14,800.00
SET 1,950.00 1,950.00
181,200.00
SQ.M. 2,000.00 3,840.00
SQ.M. 2,000.00 2,400.00
SQ.M. 2,000.00 1,920.00
SQ.M. 2,000.00 1,800.00
SQ.M. 2,000.00 5,120.00
SQ.M. 2,000.00 5,120.00
SQ.M. 2,000.00 2,880.00
SQ.M. 2,000.00 2,880.00
SQ.M. 2,000.00 3,840.00
SQ.M. 2,000.00 1,600.00
SQ.M. 2,000.00 1,200.00
SQ.M. 2,000.00 720.00
SQ.M. 2,000.00 480.00
SQ.M. 2,000.00 17,280.00
SQ.M. 2,000.00 3,640.00
SQ.M. 2,000.00 6,720.00
SQ.M. 2,000.00 32,200.00
93,640.00

SQ.M. 1,750.00 40,635.00


SQ.M. 600.00 1,671.00
SQ.M. 600.00 2,160.00
SQ.M. 750.00 1,530.00
SQ.M. 4,000.00 74,880.00
SQ.M. 3,500.00 9,450.00
SQ.M. 450.00 162.00
LS 750.00 750.00
131,238.00

SQ.M. 1,350.00 7,695.00


BAG 220.00 376.20
CU.M. 550.00 78.38
KG 60.00 171.00
8,320.58

SQ.M. 1,250.00 4,000.00


SQ.M. 1,250.00 2,225.00
SQ.M. 1,250.00 1,550.00
SQ.M. 1,250.00 400.00
SQ.M. 1,250.00 1,771.88
SQ.M. 1,250.00 487.50
BAG 220.00 550.94
CU.M. 550.00 109.42
KG 60.00 238.73
11,333.45
SQ.M. 700.00 21,518.00
BAG 220.00 2,028.84
CU.M. 550.00 422.68
KG 60.00 922.20

SQ.M. 400.00 8,750.00


BAG 220.00 1,443.75
CU.M. 550.00 300.78
KG 60.00 656.25

SQ.M. 400.00 3,950.00


BAG 220.00 651.75
CU.M. 550.00 135.78
KG 60.00 296.25

SQ.M. 700.00 567.00


SQ.M. 375.00 607.50
BAG 220.00 160.38
CU.M. 550.00 33.41
KG 60.00 72.90

SQ.M. 375.00 877.50


BAG 220.00 154.44
CU.M. 550.00 32.18
KG 60.00 70.20

SQ.M. 400.00 416.00


SQ.M. 400.00 2,944.00
BAG 220.00 554.40
CU.M. 550.00 115.50
KG 60.00 252.00

SQ.M. 400.00 1,908.00


SQ.M. 400.00 2,944.00
SQ.M. 400.00 504.00
BAG 220.00 883.74
CU.M. 550.00 184.11
KG 60.00 401.70
SQ.M. 400.00 5,149.00
BAG 220.00 849.59
CU.M. 550.00 177.00
KG 60.00 386.18

SQ.M. 400.00 7,392.00


BAG 220.00 1,219.68
CU.M. 550.00 254.10
KG 60.00 554.40

SQ.M. 400.00 4,780.00


BAG 220.00 788.70
CU.M. 550.00 164.31
KG 60.00 358.50

SQ.M. 400.00 800.00


SQ.M. 400.00 50.93
SQ.M. 400.00 192.00
BAG 220.00 172.08
CU.M. 550.00 35.85
KG 60.00 78.22

SQ.M. 400.00 650.00


SQ.M. 400.00 864.00
SQ.M. 400.00 28.80
BAG 220.00 254.56
CU.M. 550.00 53.03
KG 60.00 115.71

SQ.M. 400.00 729.00


SQ.M. 400.00 2,892.00
SQ.M. 400.00 264.00
BAG 220.00 641.03
CU.M. 550.00 133.55
KG 60.00 291.38

SQ.M. 400.00 9,610.00


BAG 220.00 1,585.65
CU.M. 550.00 330.34
KG 60.00 720.75
97,325.56

L.M. 167.00 13,114.51


PCS 320.00 15,360.00
B.F. 37.50 21,243.75
PCS 1,200.00 10,200.00
PCS 500.00 5,000.00
L.M. 370.00 1,295.00
L.M. 370.00 688.20
LS 6,500.00 6,500.00
73,401.46

SQ.M. 500.00 1,460.99


SQ.M. 750.00 2,191.49
SQ.M. 360.00 4,690.80
SQ.M. 750.00 9,772.50
SQ.M. 113.00 178.54
SQ.M. 1,200.00 1,896.00
PCS 500.00 4,000.00
PCS 30.00 510.00
LS 4,700.00 4,700.00
29,400.32

SQ.M. 292.00 1,175.30


SQ.M. 292.00 5,256.00
SQ.M. 292.00 5,238.48
PCS 500.00 6,750.00
PCS 30.00 405.00
LS 3,500.00 3,500.00
22,324.78

SQ.M. 292.00 854.10


SQ.M. 292.00 407.34
SQ.M. 292.00 861.98
PCS 500.00 3,000.00
PCS 30.00 330.00
LS 1,000.00 1,000.00

SQ.M. 292.00 408.80


SQ.M. 292.00 657.00
SQ.M. 292.00 1,962.24
PCS 500.00 2,500.00
PCS 30.00 1,200.00
LS 1,300.00 1,300.00
14,481.46
L.M. 45.00 2,549.25
L.M. 380.00 3,192.00
L.M. 120.00 990.00
LS 1,300.00 1,300.00
8,031.25

L.M. 100.00 7,853.00


L.M. 100.00 5,365.00
SQ.M. 250.00 5,158.13
SQ.M. 250.00 11,188.87
LS 8,000.00 8,000.00
37,565.00
886,260.76

SET 7,500.00 7,500.00


SET 3,750.00 3,750.00
SET 2,500.00 5,000.00
SET 25,000.00 25,000.00
SET 4,000.00 4,000.00
SET 4,500.00 13,500.00
SET 4,000.00 16,000.00
SET 2,000.00 8,000.00
SET 2,500.00 10,000.00
SET 1,250.00 5,000.00
SET 175.00 1,575.00
SET 250.00 1,000.00
SET 2,500.00 5,000.00
SET 1,500.00 3,000.00
SET 10,000.00 10,000.00
LS 15,000.00 15,000.00
133,325.00

LS 1.00 1.00

LS 1.00 1.00
SET 280.00 9,800.00
SET 400.00 2,000.00
SET 500.00 3,000.00
SET 500.00 500.00
SET 260.00 1,040.00
SET 200.00 1,600.00
SET 280.00 4,200.00
SET 320.00 3,840.00
SET 260.00 520.00
SET 15,000.00 15,000.00

SET 1,200.00 40,800.00


SET 450.00 27,000.00
SET 350.00 13,300.00
SET 350.00 700.00
SET 350.00 1,400.00
SET 900.00 6,300.00
SET 200.00 400.00
SET 1,200.00 3,600.00

UNIT 4,000.00 4,000.00


PC 650.00 650.00
PC 500.00 5,000.00
PC 1,700.00 1,700.00

UNIT 6,000.00 6,000.00


PC 500.00 8,500.00
PC 650.00 650.00
161,502.00

TOTAL MATERIAL COST 2,104,271.31


40% LABOR COST 841,708.52
5% MATERIAL CONTINGENCY COST 105,213.57

3,051,193.39

pared By:

ch. GENATO T.QUEVEDO


12008
111-072-960
8132509
Quezon City
26-Mar-13

hoe cabinets
F1 6.015625 4.333333
F2 3.8115 47.66667
F3 1.75
F4 0.224 30
11.80113 0.566038
6.226415

c1 11 4.785
10 3.48
4 2.784
11.049 5.52

16.569
1.111111 166.6667

810

0.075 100
13.33333 1333.333
0.36
2.777778
694.4444

0.16
6.25
406.25

0.04
25
375
3.048 166.6667
235

366.6667

357.6389

111.1111
120
43.3333333333
4.1874
4.634 4.8657
211.286
5282.15

4.704
PROJECT TITLE PROPOSEDTWO-STOREY RESIDENCE
LOCATION LOT 21 & 22,LOUISIANA ST., METROVILLE EXECUTIVE VILLAG
MAPULANG LUPA, VALENZUELA CITY
OWNER MS. MARILOU D. BARDON

SUBJECT PROJECT COST ESTIMATE

SCOPE OF WORKS DESCRIPTION QTY

EARTHWORKS

EXCAVATION 84.85
GRAVEL BEDDING 3.64
SUB-TOTAL

STRUCTURAL WORKS
COLUMN FOOTING 11.80
PORTLAND CEMENT 106.20
WHITE SAND 5.90
CRUSHED GRAVEL 11.80
16 mm Dia.x 6.00m. DB 48.00
Ga.26 G.I. Tie wire 6.23
SUB-TOTAL

WALL FOOTING 4.91


PORTLAND CEMENT 44.21
WHITE SAND 2.46
CRUSHED GRAVEL 4.91
12 mm Dia.x 6.00m. DB 33.00
10 mm Dia.x 6.00m. DB 8.00
Ga.26 G.I. Tie wire 1.75
SUB-TOTAL

CONCRETE COLUMNS 16.83


PORTLAND CEMENT 151.47
WHITE SAND 8.42
CRUSHED GRAVEL 16.83
16 mm Dia.x 6.00m. DB 351.00
10 mm Dia.x 6.00m. DB 301.00
Ga.26 G.I. Tie wire 20.55
SUB-TOTAL

CONCRETE BEAMS 22.43


PORTLAND CEMENT 201.84
WHITE SAND 11.21
CRUSHED GRAVEL 22.43
16 mm Dia.x 6.00m. DB 435.00
10 mm Dia.x 6.00m. DB 360.00
Ga.26 G.I. Tie wire 82.49
SUB-TOTAL
SLAB ON GRADE 16.03
PORTLAND CEMENT 144.30
WHITE SAND 8.02
CRUSHED GRAVEL 16.03
10 mm Dia.x 6.00m. DB 137.74
Ga.26 G.I. Tie wire 5.67
SUB-TOTAL
SECOND FLOOR SLAB 17.46
PORTLAND CEMENT 157.10
WHITE SAND 8.73
CRUSHED GRAVEL 17.46
10 mm Dia.x 6.00m. DB 454.00
Ga.26 G.I. Tie wire 37.25
SUB-TOTAL

CONCRETE STAIRS 1.48


PORTLAND CEMENT 13.32
WHITE SAND 0.74
CRUSHED GRAVEL 1.48
16 mm Dia.x 6.00m. DB 18.00
10 mm Dia.x 6.00m. DB 19.00
Ga.26 G.I. Tie wire 1.15
SUB-TOTAL

CANTILEVERED SLAB OVER WINDOWS 1.83


PORTLAND CEMENT 16.47
WHITE SAND 0.92
CRUSHED GRAVEL 1.83
16 mm Dia.x 6.00m. DB 11.00
10 mm Dia.x 6.00m. DB 8.00
Ga.26 G.I. Tie wire 4.00
SUB-TOTAL

CONC. LAVATORY COUNTERS AND KITCHEN COUNTERTOPS


PORTLAND CEMENT 3.00
WHITE SAND 0.16
CRUSHED GRAVEL 0.32
10 mm Dia.x 6.00m. DB 11.00
Ga.26 G.I. Tie wire 1.20
SUB-TOTAL

ROOFING & TRUSS


STEEL TRUSS 168.00
GA # 24 PREPAINTED LONGSPAN G.I. SHEET 168.00
10MM. DOUBLE SIDE THERMAL INSULATION 168.00
GA #24 PRE-PAINTED GUTTER 57.00
25X300MM SOLID WOOD FASCIA BOARD 57.00
SUB-TOTAL

FORMWORKS
1/2" THICK PLYWOOD FORMS 60.00
2"x2" FRAME(Coco Lumber) 1,200.00
2"x3" SCAFFOLDINGS 800.00
SUB-TOTAL

MASONRY
150 MM THK. CHB 207.27
2,590.88
209.96
17.49

100 MM THK. CHB 160.80


2,010.00
84.42
7.04

MASONRY REBARS
10 mm Dia.x 6.00m. DB 307.00
Ga.26 G.I. Tie wire 13.79
SUB-TOTAL
SUB-TOTAL STRUCTURAL WORKS
ARCHITECTURAL WORKS

PLASTERING 862.05
PORTLAND CEMENT 206.89
SAND 17.24
SUB-TOTAL

LATEX PAINTING WORKS (EXTERIOR & INTERIOR)


WALL 920.00
CEILING AND SOFFIT 318.00
SUB-TOTAL

DOORS INCLUDING DOOR JAMB, LOCKSETS&HARDWARES (EXCLUDING GLAS


D1 1.00
D2 1.00
D3 1.00
D4 1.00
D5 1.00
D6 1.00
D7 5.00
D8 2.00
D9 3.00
D10 4.00
D11 1.00
SUB-TOTAL

WINDOWS
W1 1.92
W2 1.20
W3 0.96
W4 0.90
W5 2.56
W6 2.56
W7 1.44
W8 1.44
W9 1.92
W10 0.80
W11 0.60
W12 0.36
W13 0.24
W14 8.64
W15 1.82
W16 3.36
W17 16.10
SUB-TOTAL

TILE WORKS
GROUND FLOOR
(FOYER, LIVING, DINING, STAIRWAY, MAIN KIT)
600X600MM SYNTHETIC GRANITE TILES 61.48
PORTLAND CEMENT 18.44
SAND 1.54
TILE GROUT 30.74

(CARPORT, PORCH,LANAI)
400X400MM NON SKID CERAMIC FLR TILES 43.75
PORTLAND CEMENT 13.13
SAND 1.09
TILE GROUT 21.88
(SERVICE KITCHEN,LAUNDRY&DRYING)
400X400MM NON SKID CERAMIC FLR TILES 19.75
PORTLAND CEMENT 5.93
SAND 0.49
TILE GROUT 9.88

(SERVICE KITCHEN COUNTERTOP & BOT.CAB. FLR)


600X600MM SYNTHETIC GRANITE TILES 1.62
200X200MM GLAZED TILES 1.62
PORTLAND CEMENT 0.97
SAND 0.08
TILE GROUT 1.62

(MAIN KITCHEN BOTTOM CABINET FLR)


200X200MM GLAZED TILES 2.34
PORTLAND CEMENT 0.70
SAND 0.06
TILE GROUT 1.17

(BEDROOM 3 T&B)
400X400MM NON SKID CERAMIC FLR TILES 2.08
400X400MM GLAZED CERAMIC WALL TILES 7.36
PORTLAND CEMENT 2.83
SAND 0.24
TILE GROUT 4.72

(GF COMMON T&B)


400X400MM NON SKID CERAMIC FLR TILES 9.54
400X400MM GLAZED CERAMIC WALL TILES 7.36
400X400MM ACCENT WALL TILES 1.26
PORTLAND CEMENT 5.45
SAND 0.45
TILE GROUT 9.08

SECOND FLOOR
(FAMILY HALL, COMMON T&B LAVATORY AREA)
400X400MM NON SKID CERAMIC FLR TILES 25.75
PORTLAND CEMENT 7.72
SAND 0.64
TILE GROUT 12.87

(BEDROOMS 4,5&6)
400X400MM NON SKID CERAMIC FLR TILES 36.96
PORTLAND CEMENT 11.09
SAND 0.92
TILE GROUT 18.48

(MBR & WALK-IN CLOSET)


400X400MM NON SKID CERAMIC FLR TILES 23.90
PORTLAND CEMENT 7.17
SAND 0.60
TILE GROUT 11.95

(MBR T&B)
400X400MM NON SKID CERAMIC FLR TILES 4.00
400X400MM GLAZED CERAMIC WALL TILES 10.44
300X300MM ACCENT WALL TILES 0.96
PORTLAND CEMENT 4.62
SAND 0.39
TILE GROUT 7.70
(BEDRM.5 T&B)
400X400MM NON SKID CERAMIC FLR TILES 3.25
400X400MM GLAZED CERAMIC WALL TILES 4.32
300X300MM ACCENT WALL TILES 0.14
PORTLAND CEMENT 2.31
SAND 0.19
TILE GROUT 3.86

(2F COMMON T&B)


400X400MM NON SKID CERAMIC FLR TILES 3.65
400X400MM GLAZED CERAMIC WALL TILES 14.46
300X300MM ACCENT WALL TILES 1.32
PORTLAND CEMENT 5.83
SAND 0.49
TILE GROUT 9.71

(COMMON BALCONY, MBR BALCONY)


400X400MM NON SKID CERAMIC FLR TILES 48.05
PORTLAND CEMENT 14.42
SAND 1.20
TILE GROUT 24.03
SUB-TOTAL

CARPENTRY WORKS
BASEBOARD 157.06
HARDIFLEX CEILING BOARD 96.00
CEILING HANGERS 1133.00
50X300X1200MM TANGUILE TREAD 17.00
VENT SLATS 20.00
50X100MM SOLID WD. HANDRAILS @ STAIR 7.00
50X100MM SOLID WD. HANDRAILS @ FAM. HALL 3.72
CONSUMABLES 1.00
SUB-TOTAL

IRONWORKS / METALWORKS
@ BALCONY, FAMILY HALL & KITCHEN
25MMX25MM HORIZONTAL STAIR RAILING 113.30
50X100MM DECORATIVE VERT.PARTITION @ KIT. 16.80
25X50MM VERTICAL BALUSTERS 16.50
CONSUMABLES 1.00
SUB-TOTAL

VARNISHING / STAINING WORKS


BASEBOARD 157.06
DOOR JAMBS 107.30
DOORS 41.27
CONSUMABLES 1
SUB-TOTAL
SUB-TOTAL ARCHITECTURAL WORKS
PLUMBING WORKS
FIXTURES
MASTER WATER CLOSET 1
MASTER LAVATORY 1
MASTER FAUCET/ TAP MIXER 2
MASTER WHIRLPOOL/BATHTUB 1
MASTER SHOWER HEAD AND VALVES 1
WATER HEATER (MULTI-POINT) 3
WATER CLOSET 4
LAVATORY 4
SHOWER HEAD AND VALVES 4
BATHROOM FAUCET/TAP MIXER 4
FLOOR DRAIN/ SHOWER DRAIN 9
HOSE BIBB / FAUCET 4
KITCHEN SINK 2
KITCHEN TAP MIXER 2
WATER TANK 1
ROUGHING INS 1
SUB-TOTAL PLUMBING WORKS

ELECTRICAL WORKS
ROUGHING INS 1
WIRES AND WIRING DEVICES
Wires and Cables 1
Convenience Outlet 35
Weather Proof Outlet 5
ACU Outlet 6
Electric Range 1
TV / Cable Outlet 4
Single Pole Switch 8
Two Pole Switch 15
Three Pole Switch 12
Three Way Switch 2

Special Design Spherical Drop Light 1.2,1.0 & 0.80 m. dia. 1


1-40w FF 0.30x1.20 Surface Mounted
with Prismatic Diffuser 34
Recessed Square Pinlight 3" 60
1x20w Ceiling Mounted Fluorescent Cove Lighting 38
1x20w Surface Mounted Fluorescent Cabinet Lighting 2
1x20w Fluorescent Strip Lighting for Mirror 4
Spot Light Par 38 Dual Type for Roof Eaves 7
Ceiling-Mounted CFL lighting 2
Exterior Wall Mounted Lighting 3

PANEL BOARD
PANEL BOARD (PP)
MAIN: 225AT, 225AF,2P 240V MCCB 1
Branches: 1-30AT 2PCB, BOLT ON 1
10-20AT 2PCB, BOLT ON 10
1-125AT 2PCB, BOLT ON 1
PANEL BOARD (LP)
MAIN: 125AT, 225 AF, 2P 250V MCCB 1
Branches: 17-20AT 2PCB, BOLT ON TYPE 17
1-30AT 2PCB, BOLT ON 1
SUB-TOTAL ELECTRICAL WORKS

MATERIAL CON

GRAND TOTAL PROJECT COST

Prepared By:

Arch. GENATO T.QUEV


PRC Reg. No:
TIN:
PTR No:
Issued At;
Date
CUTIVE VILLAGE,

UNIT UNIT COST AMOUNT

SQ.M. 350.00 23,364.00


CU.M. 700.00 3,245.00
26,609.00

BAG 220.00 23,364.00


CU.M. 550.00 3,245.00
CU.M. 700.00 8,260.00
PC 320.00 15,360.00
KG 60.00 373.80
50,602.80

BAG 220.00 9,725.76


CU.M. 550.00 1,350.80
CU.M. 700.00 3,438.40
PC 180.00 5,940.00
PC 125.00 1,000.00
KG 60.00 105.00
21,559.96

BAG 220.00 33,323.40


CU.M. 550.00 4,628.25
CU.M. 700.00 11,781.00
PC 320.00 112,320.00
PC 125.00 37,625.00
KG 60.00 1,233.00
200,910.65

BAG 220.00 44,405.46


CU.M. 550.00 6,167.43
CU.M. 700.00 15,698.90
PC 320.00 139,200.00
PC 125.00 45,000.00
KG 60.00 4,949.40
255,421.19
BAG 220.00 31,745.34
CU.M. 550.00 4,409.08
CU.M. 700.00 11,223.10
PC 125.00 17,217.50
KG 60.00 340.20
64,935.22
BAG 220.00 34,560.90
CU.M. 550.00 4,800.13
CU.M. 700.00 12,218.50
PC 125.00 56,750.00
KG 60.00 2,235.00
110,564.53

BAG 220.00 2,930.40


CU.M. 550.00 407.00
CU.M. 700.00 1,036.00
PC 320.00 5,760.00
PC 125.00 2,375.00
KG 60.00 69.00
12,577.40

BAG 220.00 3,623.40


CU.M. 550.00 503.25
CU.M. 700.00 1,281.00
PC 320.00 3,520.00
PC 125.00 1,000.00
KG 60.00 240.00
10,167.65

BAG 220.00 660.00


CU.M. 550.00 89.10
CU.M. 700.00 226.80
PC 125.00 1,375.00
KG 60.00 72.00
2,422.90

SQ.M. 1,200.00 201,600.00


SQ.M. 350.00 58,800.00
SQ.M. 90.00 15,120.00
L.M. 120.00 6,840.00
L.M. 300.00 17,100.00
299,460.00

pc 600.00 36,000.00
BF 15.00 18,000.00
BF 15.00 12,000.00
66,000.00
pc 15.00 38,863.13
BAG 220.00 46,192.19
CU.M. 550.00 9,621.47

PC 12.00 24,120.00
BAG 220.00 18,572.40
CU.M. 550.00 3,872.00

PC 125.00 38,375.00
KG 60.00 827.40
180,443.59
1,301,674.88
BAG 220.00 45,515.80
CU.M. 550.00 9,482.00
54,997.80

SQ.M. 200.00 184,000.00


SQ.M. 250.00 79,500.00
263,500.00

(EXCLUDING GLASS)
SET 15,000.00 15,000.00
SET 20,000.00 20,000.00
SET 20,000.00 20,000.00
SET 10,000.00 10,000.00
SET 10,000.00 10,000.00
SET 8,000.00 8,000.00
SET 8,000.00 40,000.00
SET 8,000.00 16,000.00
SET 8,000.00 24,000.00
SET 3,000.00 12,000.00
SET 2,000.00 2,000.00
177,000.00

SQ.M. 2,000.00 3,840.00


SQ.M. 2,000.00 2,400.00
SQ.M. 2,000.00 1,920.00
SQ.M. 2,000.00 1,800.00
SQ.M. 2,000.00 5,120.00
SQ.M. 2,000.00 5,120.00
SQ.M. 2,000.00 2,880.00
SQ.M. 2,000.00 2,880.00
SQ.M. 2,000.00 3,840.00
SQ.M. 2,000.00 1,600.00
SQ.M. 2,000.00 1,200.00
SQ.M. 2,000.00 720.00
SQ.M. 2,000.00 480.00
SQ.M. 2,000.00 17,280.00
SQ.M. 2,000.00 3,640.00
SQ.M. 2,000.00 6,720.00
SQ.M. 2,000.00 32,200.00
93,640.00
SQ.M. 700.00 43,036.00
BAG 220.00 4,057.68
CU.M. 550.00 845.35
KG 60.00 1,844.40

SQ.M. 400.00 17,500.00


BAG 220.00 2,887.50
CU.M. 550.00 601.56
KG 60.00 1,312.50
SQ.M. 400.00 7,900.00
BAG 220.00 1,303.50
CU.M. 550.00 271.56
KG 60.00 592.50

SQ.M. 700.00 1,134.00


SQ.M. 375.00 607.50
BAG 220.00 213.84
CU.M. 550.00 44.55
KG 60.00 97.20

SQ.M. 375.00 877.50


BAG 220.00 154.44
CU.M. 550.00 32.18
KG 60.00 70.20

SQ.M. 400.00 832.00


SQ.M. 400.00 2,944.00
BAG 220.00 623.04
CU.M. 550.00 129.80
KG 60.00 283.20

SQ.M. 400.00 3,816.00


SQ.M. 400.00 2,944.00
SQ.M. 400.00 504.00
BAG 220.00 1,198.56
CU.M. 550.00 249.70
KG 60.00 544.80

SQ.M. 400.00 10,298.00


BAG 220.00 1,699.17
CU.M. 550.00 353.99
KG 60.00 772.35

SQ.M. 400.00 14,784.00


BAG 220.00 2,439.36
CU.M. 550.00 508.20
KG 60.00 1,108.80

SQ.M. 400.00 9,560.00


BAG 220.00 1,577.40
CU.M. 550.00 328.63
KG 60.00 717.00

SQ.M. 400.00 1,600.00


SQ.M. 400.00 4,176.00
SQ.M. 400.00 384.00
BAG 220.00 1,016.40
CU.M. 550.00 211.75
KG 60.00 462.00
SQ.M. 400.00 1,300.00
SQ.M. 400.00 1,728.00
SQ.M. 400.00 57.60
BAG 220.00 509.12
CU.M. 550.00 106.07
KG 60.00 231.42

SQ.M. 400.00 1,458.00


SQ.M. 400.00 5,784.00
SQ.M. 400.00 528.00
BAG 220.00 1,282.05
CU.M. 550.00 267.09
KG 60.00 582.75

SQ.M. 400.00 19,220.00


BAG 220.00 3,171.30
CU.M. 550.00 660.69
KG 60.00 1,441.50
189,777.70

L.M. 167.00 26,229.02


PCS 320.00 30,720.00
B.F. 37.50 42,487.50
PCS 1,200.00 20,400.00
PCS 500.00 10,000.00
L.M. 370.00 2,590.00
L.M. 370.00 1,376.40
LS 13,000.00 13,000.00
146,802.92

L.M. 45.00 5,098.50


L.M. 380.00 6,384.00
L.M. 120.00 1,980.00
LS 1,300.00 1,300.00
14,762.50

L.M. 100.00 15,706.00


L.M. 100.00 10,730.00
SQ.M. 250.00 10,316.25
LS 8,000.00 8,000.00
44,752.25
985,233.17
SET 7,500.00 7,500.00
SET 3,500.00 3,500.00
SET 2,500.00 5,000.00
SET 25,000.00 25,000.00
SET 4,000.00 4,000.00
SET 4,500.00 13,500.00
SET 2,000.00 8,000.00
SET 2,000.00 8,000.00
SET 2,500.00 10,000.00
SET 1,250.00 5,000.00
SET 175.00 1,575.00
SET 250.00 1,000.00
SET 2,500.00 5,000.00
SET 1,500.00 3,000.00
SET 10,000.00 10,000.00
LS 30,000.00 30,000.00
140,075.00

LS 1.00 30,000.00

LS 1.00 60,000.00
SET 140.00 4,900.00
SET 200.00 1,000.00
SET 250.00 1,500.00
SET 250.00 250.00
SET 130.00 520.00
SET 100.00 800.00
SET 140.00 2,100.00
SET 160.00 1,920.00
SET 130.00 260.00

SET 7,500.00 7,500.00

SET 600.00 20,400.00


SET 225.00 13,500.00
SET 175.00 6,650.00
SET 175.00 350.00
SET 175.00 700.00
SET 450.00 3,150.00
SET 100.00 200.00
SET 600.00 1,800.00

UNIT 4,000.00 5,000.00


PC 650.00 650.00
PC 500.00 5,000.00
PC 1,700.00 1,700.00

UNIT 6,000.00 6,000.00


PC 500.00 8,500.00
PC 650.00 650.00
185,000.00

TOTAL MATERIAL COST 2,611,983.05


LABOR COST 783,594.91
MATERIAL CONTINGENCY COST 78,359.49

3,473,937.45

pared By:

ch. GENATO T.QUEVEDO


12008
111-072-960
8132509
Quezon City
26-Mar-13
PROJECT: PROPOSED TWO-STOREY RESIDENCE
LOCATION: LOT 21 & 22,LOUISIANA ST., METROVILLE EXECUTIVE VILLAGE,
MAPULANG LUPA, VALENZUELA CITY

QUANTITY TAKE-OFF

I. Earthworks

I.1 Excavation
L W
F1 = 1.20 m. x 1.20 m. x
F2 = 0.80 m. x 0.80 m. x
WF1 = 80 m. x 0.40 m. x

I.2 Gravel Bedding


= 78.00 m. x 0.1 m. =

II. Structural Works

A Column Footing
L W
F1 = 1.20 m. x 1.20 m. x
F2 = 0.80 m. x 0.80 m. x

Mixture Class C 1:3:6


a Portland Cement
= [55/(1+3+6)] x 17
= 93.50
94.00 bags
b White Sand
= 0.028 x 94 x 3
= 7.90
8.00 cu. m.
c Crushed Gravel
= 0.028 x 94 x 6
= 15.79
16.00 cu. m.

e #16 G.I Tie wire = 132 208.34086


5.0001806
B Wall Footing
WF1 = 80 m. x 0.40 m. x

Mixture Class C 1:3:6


a Portland Cement
= [55/(1+3+6)] x 8
= 44.00
44.00 bags
b White Sand
= 0.028 x 44 x 3
= 3.70
4.00 cu. m.
c Crushed Gravel
= 0.028 x 44 x 6
= 7.39
8.00 cu. m.

e #16 G.I Tie wire =

C Concrete Columns
B D
C1 = 0.35 m. x 0.35 m. x
C2 = 0.25 m. x 0.25 m. x

Mixture Class C 1:2:4


a Portland Cement d
= [55/(1+2+4)] x 26
= 204.29
205.00 bags
b White Sand
= 0.028 x 205 x 2
= 11.48
12.00 cu. m.
c Crushed Gravel
= 0.028 x 205 x 4
= 22.96
23.00 cu. m.

Total Column = 428

Stirrups
1 @ 0.02m, 4 @ 0.05m, rest @ 0.15m
C1 = 4.75 10
0.32 4.51 30.07
0.72 40.07
1.2 48.08
96.16
16.026667
15

C2 = 4.75 10
0.32 4.51 30.07
0.72 40.07
1.2 48.08
625.04
104.17333
97

C3 = 4.75 10
0.52 4.51 30.07
0.52 40.07
1.2 48.08
144.24
24.04
23

265 pcs. 10mm bar @ 6m

1 roll per 10 m height


e #16 G.I Tie wire =

D Concrete Beams
B D
B1 = 0.25 m. x 0.40 m. x
B2 = 0.20 m. x 0.40 m. x
B3 = 0.15 m. x 0.40 m. x
B4 = 0.20 m. x 0.35 m. x
B5 = 0.15 m. x 0.45 m. x
RB1 = 0.20 m. x 0.40 m. x
RB2 = 0.20 m. x 0.40 m. x
Mixture Class C 1:2:4
a Portland Cement
= [55/(1+2+4)] x 12
= 94.29
95 bags
b White Sand
= 0.028 x 95 x 2
= 3.304
4 cu. m.
c Crushed Gravel
= 0.028 x 95 x 4
= 10.64
11 cu. m.
d 16mm Reinforcement Steel Bars BW. OC. =
(spaced @ 0.3m) =
106.05 / 04 = 265 pcs.
e #16 G.I Tie wire =

B3 B3
@ 1.40 m @ 2.30 m
L/3 = 0.77
L/4 = 0.70 1.4
Cont. = 1.7 Cont.
Top 3.4 + 1.5
Bot 3.4 + 1.5
Total = 11.3 m

@ 3.90 m @ 7.50 m
L/3 = 1.60
L/4 = 1.95 3.9
Cont. = 4.2 Cont.
Top 8.4 + 3.2
Bot 8.4 + 3.2
Total = 27.1 m

@ 2.30 m @ 1.60 m
L/3 = 1.07
L/4 = 1.15 2.3
Cont. = 2.6 Cont.
Top 5.2 + 2.1
Bot 5.2 + 2.1
Total = 17.0 m

Stirrups
1 @ 0.05m, 3 @ 0.10m, 3 @ 0.15m, rest @ 0.20m
B1
@ 4.70 m
= 2.4 14 6.08
0 0.34 1.6 8.00 4.18
1 0.64 22.00 6.84
1 1.14 25.08 17.1
4.18
B2
3.2 14 7.62
0.24 2.4 12.00 7.8
0.64 26.00 8.14
1.04 27.04 4.14
4.51 10.74
4.51
42.95
B3
2.37 14 2.43
0.14 1.57 7.85 4.39
0.64 21.85 6.26
0.94 20.539 7.21
3.42 2.82
2.66
3.42
29.19

E Slab on Grade
GF S = 79.03 m. + 9.10 m. x

Mixture Class C 1:2:4


a Portland Cement
= [55/(1+2+4)] x 29
= 227.86
228.00 bags
b White Sand
= 0.028 x 228 x 2
= 12.768
13.00 cu. m.
c Crushed Gravel
= 0.028 x 228 x 4
= 25.536
26.00 cu. m.
d 16mm Reinforcement Steel Bars BW. OC. =
(spaced @ 0.3m) =
106.05 / 04 = 265 pcs.
e #16 G.I Tie wire =

F Second Floor Slab

S1 = 5.20 m. x 3.175 m. x
= 2.31 m. x 1.275 m. x
= 2.40 m. x 8.75 m. x
= 2.60 m. x 1.40 m. x
= 2.40 m. x 4.30 m. x
= 2.60 m. x 2.775 m. x
= 2.80 m. x 3.30 m. x
= 2.175 m. x 3.725 m. x
S2 = 0.15 m. x 0.40 m. x
GF S = 1.15 m. x 1.40 m. x

Mixture Class C 1:2:4


a Portland Cement
= [55/(1+2+4)] x 11
= 86.43
87 bags
b White Sand
= 0.028 x 87 x 2
= 4.872
5 cu. m.
c Crushed Gravel
= 0.028 x 87 x 4
= 9.744
10 cu. m.
d 16mm Reinforcement Steel Bars BW. OC. =
(spaced @ 0.3m) =
106.05 / 04 = 265 pcs.
e #16 G.I Tie wire =

G Concrete Stairs
0.38 0.55 1.2
Mixture Class C 1:2:4 0.56
a Portland Cement d
= [55/(1+2+4)] x 2
= 15.71
16 bags
b White Sand
= 0.028 x 16 x 2
= 0.896
1 cu. m.
c Crushed Gravel
= 0.028 x 16 x 4
= 1.792
2 cu. m.

106.05 / 04 = 265 pcs.


e #16 G.I Tie wire =

I. CANTILEVERED SLAB OVER WINDOWS


0.45
Mixture Class C 1:2:4
a Portland Cement
= [55/(1+2+4)] x 0.45
= 3.54
4 bags
b White Sand
= 0.028 x 4x 2
= 0.224
0.25 cu. m.
c Crushed Gravel
= 0.028 x 4 x 4
= 0.448
0.5 cu. m.
d 16mm Reinforcement Steel Bars BW. OC. =
(spaced @ 0.3m) =
106.05 / 04 = 265 pcs.
e #16 G.I Tie wire =

J. CONC. LAVATORY COUNTERS AND KITCHEN COUNTERTOPS

Mixture Class C 1:2:4


a Portland Cement
= [55/(1+2+4)] x 0.1
= 0.79
1 bags
b White Sand
= 0.028 x 1x 2
= 0.056
0.1 cu. m.
c Crushed Gravel
= 0.028 x 1 x 4
= 0.112
0.2 cu. m.

2.3
Slab on Grade

a 10mm Reinforcement Steel Bars


b Cement
c Sand
d Gravel
e #16 G.I Tie wire

Kitchen Counter

a Cement
b Sand
c Gravel
d #16 G.I Tie wire

2.4 Mezzanine Floor

a 16mm Reinforcement Steel Bars


b 12mm Reinforcement Steel Bars
c 10mm Stirrups
d Cement
e Sand
f Gravel
g #16 G.I Tie wire
h 1/2" Ordinary Plywood
i Lumber
2.5 Second Floor

a 2"x6"x2mm Thk. 6m C-Purlins


b 2"x2"x1/4" Thk. 6m Angle Bar
c 3/4"x6"x12' T & G Flooring
d 3/4" Thk. Steel Plate
e 1" Dia. Anchor Bolts
f 16mm Reinforcement Steel Bars
g 12mm Reinforcement Steel Bars
h 10mm Stirrups
i Cement
j Sand
k Gravel
l #16 G.I Tie wire
m 1/2" Ordinary Plywood
n Lumber
o Consumables ( Welding Rod, Screws, Drill Bit, etc. )

2.6 Stair and Railings

A. Stair Footing

a 16mm Reinforcement Steel Bars


b 12mm Reinforcement Steel Bars
c Cement
d Sand
e Gravel
f #16 G.I Tie wire

B. Stair / Stair Landing

a 16mm Reinforcement Steel Bars


b 12mm Reinforcement Steel Bars
c Cement
d Sand
e Gravel
f #16 G.I Tie wire
g 2"x6" Kiln Dry Wood Handrail
h 1" x 1 1/2" x 6m Tubular
i 1/2" Ordinary Plywood
j Lumber
k Consumables ( Welding Rod, Screws, Drill Bit, etc. )

2.7 Construction of Septic Tank & Catch Basin


A. Septic Tank

Wall Footing, Slab, Manhole

a Cement
b Sand
c Gravel
d 12mm RSB
e #16 G.I Tie wire

Perimeter / Partition Wall

a 5" thk. Chb


b Cement
c Sand
d 10mm RSB
e #16 G.I Tie wire

B. Catch Basin

a 800mm x 500mm Catch Basin including Steel Grating


b 500mm x 500mm Catch Basin including Steel Grating

3.0 Installation of Trusses and Roofing Materials

A. Roofing Materials

1 Long Span Roofing GA No. 26


2 Spanish Outside Gutter
3 G.A No. 26 Ridge Roll
4 P.E. Foam Insulation
5 Aluminum Duct Tape ( 4" x 50 yards length )
6 1"x10"x12' Tanguile Wood K.D Fascia Board
7 3" DIA. X 3m PVC Down Spout
8 2"x4"x2mm C Purlins
9 10mm Sagrod
10 2.5"x2.5"x1/4" thk. Double Angle Bar Top Chord
11 2.5"x2.5"x1/4" thk. Double Angle Bar Bottom Chord
12 2.5"x2.5"x1/4" thk. Double Angle Bar King Post
13 2.5"x2.5"x1/4" thk. Double Angle Bar Web Member
14 6mm thk. Hardiflex Roof Eaves, Ventilation as Detailed
15 6" DIA. X 3m PVC Drainage Pipe
16 Hardware Accessories
VI. Installation Of Exterior Walls and Interior Partition Incl. Painting Works

A. CHB Laying and Plastering for Exterior and Interior Walls


1) 6" thk. Chb
Area 1 = (4x5)x(6.4)-(16x1.2x1.2+1.5x1.2x2)
Area 2 = (9.57x8.26)-(2.1*2)
Area 3 = ((4x5)+2.5+5.76)x(7.65)
((58x0.3x0.3)+(8x1.2x1.2))
Area 4 = (14.2)x(7.55) -
((24x0.3x0.3)+(0.9x2.1x2)+(1.2x1.2))
Area 5 = (14.2)*(7.55) -
((32x0.3x0.3)+(0.9x2.1x2)+(1.2x1.2))

Total No. of 6" CHB


623 x 12.5 x 5% allowance
Cement
Total area = 577 sq.m

Mortar and Grout


577 x 1.526
Plastering (2 Faces)
577 x 2 x 0.45

Sand
Total area = 577 sq.m

Mortar and Grout


577x 0.0844
Plastering (2 Faces)
577 x 2 x 0.025

10mm RSB
Total area = 577 sq.m

Vertical bars
(577x 1.6) x (( /4 )x(10/1000)2) * 7850
Horizontal bars
(577 x 2.15) x (( /4 )x(10/1000)2) * 7850

#16 G.I Tie wire


Total area = 577 sq.m
( 577 x 0.024 )
2) 4" thk. Chb
Area 1 = (5.55+5.55+2.5+2.5+2.88+2.88+2.4+
1.95+2.88+5.55+1.12+1.12+1.8)x(2.1)
Area 2 = (5.76+5.76+5.55+1.12)x(2)
Area 3 = (5.55+5.55+2.5+2.5+2.88+2.88+
2.4+1.95+5.55+1.12)x(3.45)

Total No. of 6" CHB


233 x 12.5 x 5% aloowance
Cement
Total area = 233 sq.m
Mortar and Grout
233 x 0.792
Plastering (2 Faces)
233 x 2 x 0.45

Sand
Total area = 233 sq.m
Mortar and Grout
233 x 0.0435
Plastering (2 Faces)
233x 2 x 0.025

10mm RSB
Total area = 233 sq.m
Vertical bars
(233 x 1.6) x (( /4 )x(10/1000)2) * 7850
Horizontal bars
(233 x 2.15) x (( /4 )x(10/1000)2) * 7850

#16 G.I Tie wire


Total area = 233 sq.m
( 233 x 0.024 )
3) 1/4"x4'x8' Hardiflex
Area 1 (3.15+3.15+2.88+2.9+5.76+4+
4+4+4+5.55+2.8+5.12)x(2.1)
Area 2 (4+4+4+4+5.55+5.55+2.5+5.76)x3.45
No. of Pcs
( 229 x 2 ) / (1.2x2.4 )
2" x 3" lumber (joist and support )
Total area = 248 sq.m
Total Bd.ft of Lumber
229 x 7
CW Nails
Total area = 248 sq.m
Total Kgs of CW Nails
229 x 0.05
4) Painting Works
For CHB Walls ( Latex Paint )

1st Coat = (( 577 + 233 ) x 2) / ( 20 )


2nd Coat = (( 577 + 233 ) x 2) / ( 20 )
3rd Coat = (( 577 + 233 ) x 2) / ( 20 )

Concrete Neutralizer
( 85 / 2.5 )

For Wood Partitions ( Enamel Paint )

1st Coat = ( 229 x 2 ) / ( 20 )


2nd Coat = ( 229 x 2 ) / ( 20 )
3rd Coat = ( 229 x 2 ) / ( 20 )

Paint Thinner
( 72 / 4 )

VII. Installtion of Base and Overhead Cabinets, Ceiling, Ceiling Joist, Hangers Incl. Painting Works

A) Base and Overhead Cabinets


1) 3/4" Marine Plywood
Area1 = ((0.45x3)+(0.9x2)) x 5.6 x 2
Area2 = ((0.45x3)+(0.9x2)) x 5.6
Area3 = ((0.45x3)+(0.9x2)) x 4.0 x 4

No. in Pcs
104 / (1.2 x 2.4 )
2) 1.5" CW Nails
3) Painting/Wood Stain
4) Laquer Thiner
5) Paint Thiner
6) Brush
7) Sand Paper
B. Installation of Ceiling
Area1 = (28.51x8.4)+(8.51x5.85))x(2)
Area2 = (28.51x5.55)

1) Ceiling Joists & Hangers


Total area = 773.60378 sq.m
1.a) 2"x2"x10' wd. Ceiling Joist
Total Bd.ft of Lumber
773.6 x 4.597
1.b) 2"x2"x8' wd. Hanger
Total Bd.ft of Lumber
773.6 x 0.35
2) 1/4" thk. Marine Plywood
Total No of Pcs
773.6 / ( 1.2 x 2.4 )
3) 1" CW Nails
Total Weight in Kilos
773.6 x 0.0225
4) 2" CW Nails
Total Weight in Kilos
773.6 x 0.0225
5) 3" CW Nails
Total Weight in Kilos
773.6 x 0.05
6) Quarter round moulding
Total length
(53.1+6.6+12.75+10.81+10.71+19.61) x 3+
(61.57+28.22) x 2) /3
C. Painting Works ( Ceiling )
1) Enamel Paint for Ceiling (1st Coat )
Total area = 773.60378 sq.m
773.6 / 20
2) Enamel Paint for Ceiling (2 Coats Topcoat )
Total area = 773.60378 sq.m
( 773.6 / 25 ) x 2
3) Paint roller brush
4) Laquer thinner
5) Putty/Calsomine Powder
6) Sand Paper

VIII. Electrical Works

A. Electrical Works
1 Luminaire w/ 2 - 40w fluorescent
2 Luminaire - 20w fluorescent
3 Luminaire - 11w Pin Light
4 Luminaire - 11w Decorative Wall Mounted Light
5 3U Energy Saver Lamp
6 #14 Phelp Dodge THHN Stranded Wire
7 14.0 sq.mm THHN/THHN Copper Stranded
8 16.0 sq.mm 3m THHN/THHN Copper Solid
9 3 Gang Panasonic Wide Series Switch ( Illuminated )
10 2 Gang Panasonic Wide Series Switch ( Illuminated )
11 on
1 Gang
Meter Panasonic Wide Series Switch ( Illuminated )
12 Wall)
32 mm dia. x 3m PVC Conduit
20 mm dia. x 3m PVC Conduit
13 1/2" PVC Flexible Conduit
14 2"x4" PVC Utility Box
15 Convenience Outlet, Duplex, 10A, 2P
16 Aircon Outlet, 20A, Flush Type
17 Pullbox 0.15m x 0.20m x 0.30 GA#16 with Cover
18 Panel Board
19 Consumables ( Electrical Tapes, Elbows, Bushing etc. )
20 #22 / 3C jacketed Telephone cable

IX. Plumbing Works

1.) Kitchen Sink with Strainer


P-Trap with tailpiece
Kitchen Faucet with " x 6" G.I Pipe Nipple, " G.I Coupling and Teflon tape
T&B Faucet with " x 4" G.I. Pipe Nipple, " G.I. Coupling and Teflon tape
Water Closet with tank, tank fittings and toilet seat cover
Urinal
Flexible Supply Hose
Angle Valve
" x " Bushing, " Nipple and Teflon Tape
Floor Drain, P-Trap Type
Lavatory
4" dia Clean Out with Cover
2.) 20 mm Diameter x 6.0m Sch. 40 G.I Pipes
25% Misc. (fittings, nipples, Teflon tape, steel saw blades,
dies for pipethreader, pipe supports, etc.)

3.) 20 mm Diameter x 3.0m Water Line Pipes


25% Misc. (fittings, nipples, Teflon tape, steel saw blades,
dies for pipethreader, pipe supports, etc.)

4.) 100 mm dia. x 3m PVC Sewer pipes (Series 600)


Fitting (15%)
25% Misc. (Pipe Supports/Expansion Bolt/Drill Bits/
Saw Blades/Solvent Cement/Epoxy)

5.) 50 mm dia. x 3m PVC Sewer pipes (Series 600)


Fitting (15%)
25% Misc. (Pipe Supports/Expansion Bolt/Drill Bits/
Saw Blades/Solvent Cement/Epoxy)

6.) 20mm dia. Gate Valves


5% Misc.

7.) 20 mm dia. Water Meter


5% Misc.

X. Finishing Works

A. Tile Works at Ground Floor including Stair and Ladder


Area1 = ((4+4+4+4+4+2.5+5.76)x(5.73+2.35)+
(2.9+3.15)x(8.01)) - (3.1x5.76)
Area2 = ((2x5.5))+((2x1.5)) x 2

12"X12" Unglazed Ceramic Floor Tiles


Total No. in Pcs
286.95 / ( 0.30 x 0.30 )
Tile Grout
Total Weight in Kilos
286.95 x 0.5
Tile Adhesive
Total No. in Bags
286.95 x 0.11
10 % Consumables ( Cutting Disc, Screws, Drill Bit, etc. )

Tile Works at T&B Floor, Walls & Kitchen


Area1 = (5.76x3.05)x2+(2.5x1.3)
Area2 = ((5.76x2+3.05x3)x2+(2.5x2+1.3x2)) x 1.4

8" x 8" Ceramic Floor Tile


Total No. in Pcs
106.9 / ( 0.20 x 0.20 )
Tile Grout
Total Weight in Kilos
106.9 x 0.5
Tile Adhesive
Total No. in Bags
106.9 x 0.11
10 % Consumables ( Cutting Disc, Screws, Drill Bit, etc. )

B. Kitchen Counter
Volume
(4x0.6x0.2)+(0.9x0.2x0.6x3)

Cement
( 0.804 x 9 )
Sand
( 0.804 x 0.5 )
Gravel
( 0.804 x 1 )
10mm Reinforcement Steel Bars
(4x0.6)+(0.9x0.6x3)

(4.02x2.866x6)x(3.1416/4)x(0.01^2)x7850x1.05
#16 G.I Tie wire
1/2" Ordinary Plywood
( 4.02 / (1.2x2.4) )
2" X 3" Lumber
( 2 x 28 )

XI. Installation of Doors and Windows

A. DOORS
1 Panel Type Main Door 1.6 x 2.10
2 Panel Type Service Door with jamb 1.0 x 2.1
3 Panel Type Service Door with jamb 0.9 x 2.0
4 Flush Type Door with 3/16" Glass 1.0 x 2.1
5 Flush Type Door 0.8 x 2.1
6 (T/B DOOR) 0.70 x 2.10 PVC Door with louver,
jamb & hardwares such as door knobs etc.
7 PVC Type Door with Louver 0.6 x 2.1
8 PVC Type Door with Louver 0.7 x 2.0
9 Flush Type Door 0.8 x 1.55
10 Flush Type Door with Louver 1.8 x 1.85
11 Locksets and Hinges ( Bearing Type )
B. Windows
1-a Powder Coated Aluminum Framed Fixed Type Window
with 1/4" Glass, 1.20m x 1.50m
1-b Powder Coated Aluminum Framed Fixed Type Window
with 1/4" Glass, 1.20m x 1.50m
2 Powder Coated Aluminum Framed Sliding Type Window
with 1/4" Glass, 1.20m x 1.20m
2-a Powder Coated Aluminum Framed Sliding Type Window
with 1/4" Glass, 1.10m x 1.20m
2-b Powder Coated Aluminum Framed Sliding Type Window
with 1/4" Glass, 1.0m x 1.20m
2-c Powder Coated Aluminum Framed Sliding Type Window
with 1/4" Glass, 1.1m x 1.20m
2-d Powder Coated Aluminum Framed Sliding Type Window
with 1/4" Glass, 1.0m x 1.20m
3 Powder Coated Aluminum Framed Awning Type Window
with 1/4" Glass, 2.15m x 1.20m
4 Powder Coated Aluminum Framed Awning Type Window
with 1/4" Glass, 1.6m x 1.20m
5 Powder Coated Aluminum Framed Awning Type Window
with 1/4" Glass, 1.0m x 1.20m
6 Powder Coated Aluminum Framed Awning Type Window
with 1/4" Glass, 0.90m x 0.50m
7 Powder Coated Aluminum Framed Awning Type Window
with 1/4" Glass, 1.6m x 0.50m
8 Powder Coated Aluminum Framed Awning Type Window
with 1/4" Glass, 1.0m x 0.50m
FW-1 Powder Coated Aluminum Framed Fixed Type Cashier Window
with 1/4" Glass, 2.5m x 1.0m
FW-2 Powder Coated Aluminum Framed Fixed Type Window
with 1/4" Glass, 2.0m x 1.0m
FW-3 Powder Coated Aluminum Framed Fixed Type Window
with 1/4" Glass, 1.0m x 1.0m
FW-4 Powder Coated Aluminum Framed Fixed Type Window
with 1/4" Glass, 1.5m x 1.0m

XI. Construction of Perimeter Fence


Construction of fence 3m height incl. wall footing, column @ every 3m length with cyclone wire
1. Column / Column Footing
a) 12mm Reinforcement Steel Bars
((3.3x4) x 46)+((116x4)+(((116/0.2)+1) x 0.6)
(1421) x (( /4 ) x (12/1000)2) x 7850
b) 10mm Bar Lateral Ties
(3/0.2) x 1.04 x 46
(718) x (( /4 ) x (12/1000)2) x 7850
c) Cement
Area
((0.25 x 0.25) x 3 x 46) + (0.6 x 0.2 x 116)
( 25 x 9 )
d) Sand
(25 x 0.5)
e) Gravel
(25 x 1.0)
f) #16 G.I Tie wire
(1421 x 5.15 x 4 x 0.3) / 53
g) 1/2" Ordinary Plywood
Area
((0.25x2+0.25x2) x 46)+ (116x(0.2+0.2))
92.40 / (1.2 x 2.4)
h) 2" X 3" Lumber
Total Br.ft
( 32 x 28 ) + ( 6 x 7) + (6 x 31.57 )

2. Masonry Works
CHB Laying and Plastering for Perimeter Walls
a 6" thk. Chb
Area
(116 - (1.2+1.5+4)) x 0.6
Total No. in Pcs
( 65.58 x 12.5 )
b Cement
Total area = 65.58 sq.m
Mortar and Grout
65.58 x 1.526
Plastering (2 Faces)
65.58 x 2 x 0.45

c Sand
Total area = 65.58 sq.m
Mortar and Grout
65.58 x 1.526
Plastering (2 Faces)
65.58 x 2 x 0.45

d 10mm RSB

Total area = 65.58 sq.m

Vertical bars
(65.58 x 1.6) x (( /4 )x(10/1000)2) * 7850
Horizontal bars
(65.58 x 2.15) x (( /4 )x(10/1000)2) * 7850

e #16 G.I Tie wire


Total area = 65.58 sq.m
( 65.58 x 0.024 )

3. Metal Works
3.1 Fence
a) 2" dia. G.I Pipe
Total Length
(3+3+2) x 41
Total No. in Pcs
( 328 / 6 )
b) Cyclone Wire Fence ( 5" )
Total Length
116 - (1.2+1.5+4)
Total No. per Roll
( 109.3 / 10 )
c) 1" x 1" x 1/8" thk Angle Bar
Total Length
(3x2+2x4) x 41
Total No. in Pcs
( 574 / 6 )
2.2 Pedestrian and Vehicle Gate
a) 2" dia. G.I Pipe
Total Length
(0.9+0.9+2.4+2.4)x2+(1.25x3+2x4)+
((1.85x3+2x2)x2)
Total No. in Pcs
( 44.05 / 6 )
b) Cyclone Wire Fence
Total Length
(1.2 x 2)+(1.5+4)
Total No. per Roll
( 7.9 / 10 )
c) 1" x 1" x 1/8" thk Angle Bar
Total Length
(0.9x4+1.2x4) x 2+(0.4x4+1.1x8)+
(1.8x8+1.1x8)
Total No. in Pcs
( 50.4 / 6 )
d) 1" dia. Barel Bolt
e) Bolt Strap
f) 16mm dia. Bar Handle
g) Hinge
TIVE VILLAGE,

d sets vol.
1.20 m. x 27 = 46.66 cu. m.
1.20 m. x 6 = 4.61 cu. m.
0.50 lm x 1 = 16.00 cu. m.
Total = 78.00 cu. m.

8.00 cu. m.

t sets
0.35 m. x 27 = 13.61 cu. m.
0.35 m. x 6 = 1.34 cu. m.
Total = 17.00 cu. m.

d 16mm Reinforcement Steel Bars


F1
= (1.2 x 11) + (1.2 x11)
= 26.4
= 712.8
= 118.8
119.00 pcs. 16mm bar @ 6m
F2
= (0.80 x 10) + (0.80 x10)
= 12.8
= 76.8
= 12.8
13.00 pcs. 16mm bar @ 6m

132.00 pcs. 16mm bar @ 6m


0.20 lm = 6.40 cu. m.
Total = 8.00 cu. m.

d 10mm Reinforcement Steel Bars


WF1 = [(32.82 x 3) + (32.82/0.30) + 1)
= 507.666667
= 84.6111111
85.00 pcs. 10mm bar @ 6m

H sets
6.10 m. x 27 = 20.18 cu. m.
8.10 m. x 6 = 3.04 cu. m.
Total = 26.00 cu. m.

10mm Reinforcement Steel Bars


C1 = (1.5 + 6.1) x 8 x 27
= 1641.6
= 273.6
274 pcs. 16mm bar @ 6m

C2 = (1.5 +8.1) x 6 x 6
= 921.6
= 153.6
154 pcs. 16mm bar @ 6m

428 pcs. 16mm bar @ 6m


C4 = 3.85 10
0.42 3.61 24.07
0.42 34.07
1 34.07
102.2
17.03
19

C5 = 4.75 10
0.22 4.51 30.07
0.52 40.07
0.9 36.06
216.36
36.06
37

C6 = 4.15 10 =
0.22 3.91 26.07
0.52 36.07
0.9 32.46
389.52
64.92
65

3m = 1 kg tie wires

L
11.98 m. = 1.20 cu. m. B1
35.53 m. = 2.84 cu. m. @ 4.70 m
21.05 m = 1.26 cu. m. L/3
2.45 m = 0.17 cu. m. L/4
17.54 m = 1.18 cu. m. Cont.
42.41 m = 3.39 cu. m. Top
6.78 m = 0.54 cu. m. Bot
Total = 12.00 cu. m.

@ 2.70 m
L/3
L/4
Cont.
Top
Bot

@ 5.50 m
L/3
L/4
Cont.
983.40 163.90 Top
165 Bot

@ 1.70 m
L/3 = 1.07 L/3
L/4 = 1.15 2.3 L/4
= 2.6 Cont.
Top 5.2 + 2.1 Top
Bot 5.2 + 2.1 Bot
Total = 17.0 m

@ 2.47 m
L/3 = 2.80 L/3
L/4 = 3.75 7.5 L/4
= 7.8 Cont.
Top 15.6 + 5.6 Top
Bot 15.6 + 5.6 Bot
Total = 49.9 m

L/3 = 0.83
L/4 = 0.80 1.6
= 1.9
Top 3.8 + 1.7
Bot 3.8 + 1.7
Total = 12.5 m

B4
2.2 14
0.24 1.4 7.00
0.54 21.00
0.94 19.74
18 pcs 3.29

B5
3.5 14
0.24 2.7 13.50
0.54 27.50
0.94 25.85
4.31

43 pcs

30 pcs
110

0.125 m = 28.75 cu. m.


29.00 cu. m.
1 kg per sq m
#REF! #REF!
165

0.125 m. = 2.06 cu. m. 16.51


0.125 m. = 0.37 cu. m. 2.95
0.125 m. = 2.63 cu. m. 21
0.125 m. = 0.46 cu. m. 3.64
0.125 m. = 1.29 cu. m. 10.32
0.125 m. = 0.90 cu. m. 7.22
0.125 m. = 1.16 cu. m. 9.24
0.125 m. = 1.01 cu. m. 8.10
0.125 m = 0.01 cu. m. 0.06
0.125 m = 0.20 cu. m. 79.03
10.08

0.00 0.00
165

2
16mm Reinforcement Steel Bars BW. OC.
footing 16mm
=4 x 1 x 2 8 x 1.2 x 2 8 x 1.8 x 2 2.8 x 8
= 8 19.2 28.8 22.4
1.33 3.20 4.80 3.73
14.40
10mm 12mm 16
0.65 x 6 x 16 32 x 1
62.4 32
10.4 5.333333
11 6

0.00 0.00
165

3.3 1.9 23 14
1 1.4 8 11
56 9.33
10

0.00 0.00
165

0.1

0.6 3.0 4.95


1.65 8.3 4.95
10
1.66666667
1.2+1.5x1.2x2) = 102 sq.m
= 75 sq.m
- = 200 sq.m
+
= 100 sq.m
.1x2)+(1.2x1.2))
= 100 sq.m
.1x2)+(1.2x1.2))
577 sq.m

.5 x 5% allowance = 7573 pcs

= 881 bags
+
= 277 bags

1158 bags

= 49 cu.m.
+
= 29 cu.m.

78 cu.m.

(10/1000)2) * 7850 = 569.1888 kgs


+
)x(10/1000)2) * 7850 = 764.84746 kgs

1335 kgs
= 14 kgs

+2.88+2.88+2.4+ = 82 sq.m
2+1.12+1.8)x(2.1) +
= 37 sq.m
+2.88+2.88+ - = 114 sq.m

233 sq.m

.5 x 5% aloowance = 3058 pcs

= 185 bags
+
= 112 bags

297 bags

= 11 cu.m.
+
= 12 cu.m.

23 cu.m.

(10/1000)2) * 7850 = 229.85 kgs


+
)x(10/1000)2) * 7850 = 308.85521 kgs

539 kgs

= 6 kgs

+5.76+4+ = 107 sq.m


+
5+2.5+5.76)x3.45 = 122 sq.m
229 sq.m

= 168 pcs.

= 1603 bd.ft

= 12 kgs

= 85 gals
= 85 gals
= 85 gals

255 gals

= 36 liters

= 24 gals
= 24 gals
= 24 gals

72 gals

= 18 liters

gers Incl. Painting Works

= 35.28 sq.m
= 17.64 sq.m
= 50.4 sq.m

104 sq.m

= 37 pcs
= 20 kg
= 22 qrt.
= 15 bottles
= 15 bottles
= 10 pcs.
= 50 pc.

= 607.46175 sq.m
= 166.14203 sq.m

773.60378 sq.m

= 3557 bd.ft

= 1245 bd.ft

= 269 pcs

= 18 kgs

= 18 kgs

= 39 kgs

81+10.71+19.61) x 3+
= 183 pcs

= 39 gal

= 62 gal
= 10 pcs.
= 60 bottles
= 31 bags
= 100 pcs.

= 45 pcs.
= 9 pcs.
= 25 pcs.
= 3 pcs.
= 20 pcs.
= 5 box
= 1 roll
= 3 box
= 12 pcs.
= 20 pcs.
= 13 pcs.

= 2 pcs.
= 350 pcs.
= 150 pcs.
= 142.8 pcs.
= 79 pcs.
= 12 pcs.
= 10 pcs.
= 2 pcs.
= 1 lot
= 3 roll

= 1 sets
= 7 units
= 1 units
= 5 units
= 9 units
= 4 units
= 4 units
= 4 units
= 4 units
= 5 units
= 6 sets
= 11 pcs
= 8 pcs

= 14 pcs

= 33 pcs

= 8 pcs

= 1 units

= 1 units

= 258.9453 sq.m
+
= 28 sq.m

286.9453 sq.m

= 3348 pcs

= 151 kgs

= 34 kgs
= 38.386 sq.m
= 68.516 sq.m

106.902 sq.m

= 2807 pcs

= 57 kgs

= 13 kgs

= 0.804 cu.m

= 8 bag

= 0.402 cu.m

= 0.804 cu.m

= 4.02 sq.m

^2)x7850x1.05 = 45 kgs
1 kgs

= 2 pcs

= 56 bf

= 1 set
= 1 set
= 1 set
= 2 set
= 8 set
= 3 set
= 1 set
= 2 set
= 2 set
= 1 set
= 22 set

= 1 set

= 1 set

= 24 set

= 4 set

= 4 set

= 2 set

= 2 set

= 8 set

= 1 set

= 1 set

= 1 set

= 5 set

= 9 set

= 1 set

= 3 set

= 2 set

= 1 set
ngth with cyclone wire

= 1421 lm
= 1388 kgs

= 718 lm
= 487 kgs

= 25 sq.m
225 bags

= 13 cu.m

= 25 cu.m

= 166 kgs

= 92.4 sq.m
= 32 pcs

1130 bd.ft

= 65.58 sq.m

= 820 pcs

= 101 bags
+
= 60 bags
161 bags
= 6 cu.m
+
= 4 cu.m
10 cu.m

)x(10/1000)2) * 7850 = 65 kgs


+
4 )x(10/1000) ) * 7850
2
= 87 kgs

152 kgs

= 2 kgs

= 328 lm

= 55 pcs

= 109.3 lm

= 11 roll

= 574 lm

= 96 pcs

+(1.25x3+2x4)+ = 44.05 lm

= 8 pcs
= 7.9 lm

= 1 roll

.4x4+1.1x8)+ = 50.4 lm

= 9 pcs
4 pcs
24 pcs
4 pcs
18 pcs
0.30) + 1)]

mm bar @ 6m

164.7
48.6
213.3
7.05 10
0.22 6.81 45.40
0.52 55.40
0.9 49.86
49.86
8.31
9

B2
@ 2.70 m x 2
= 1.87 L/3
= 2.35 4.7 L/4
= 5 Cont.
25 + 3.7 Top
25 + 3.7 Bot
Total = 62.2 m

@ 2.80 m x 2
= 1.20 L/3
= 1.35 2.7 L/4
= 3 Cont.
15 + 2.4 Top
15 + 2.4 Bot
Total = 37.5 m

@ 3.0 m x 2
= 2.13 L/3
= 2.75 5.5 L/4
= 5.8 Cont.
29 + 4.3 Top
29 + 4.3 Bot
Total = 72.0 m
171.70
@ 3.08 m
L/3
L/4
Cont.
= 0.87 Top
= 0.85 1.7 Bot
= 2
4 + 1.7
4 + 1.7 @ 4.2 m
Total = 13.2 m L/3
L/4
Cont.
= 1.12 Top
= 1.24 2.47 Bot
= 2.77
5.54 + 2.2
5.54 + 2.2
Total = 18.0 m RB1
165.9 4.35
0.8
2.8
5.18
2.575
0.35
2.35
0.35
2.3
4.1
3.85
1.3
1.3
3.1
3.1
2.25
4 pcs 2.35
42.405

5.48
4.86
4.31
14.65 15 pcs

1 kg per sq m
27 17 89.1 93.5 14
13 8 19.5 20.8 7
13 45 117 121.5 7
14 8 22.4 23.2 8
13 23 58.5 62.1 7
14 15 42 43.5 8
15 18 52.5 54 8
12 20 48 48 7
2 3 1.2 1.2 2
7 8 11.9 11.6
462.1 479.4
941.5
156.91667
158
0
158

8x1
8
1.33

0
158

0
158
cu.m.

cu.m.

cu.m.
cu.m.

cu.m.

cu.m.
bottles
bottles

bottles
276.8013
@ 4.50 m x 2
= 1.20 L/3
= 1.35 2.7 L/4
= 3 Cont.
12 + 2.4 Top
12 + 2.4 Bot
Total = 63.0 m

@ 3.50 m
= 1.23 L/3
= 1.40 2.8 L/4
= 3.1 Cont.
12.4 + 2.5 Top
12.4 + 2.5 Bot
Total = 65.1 m

= 1.30
= 1.50 3
= 3.3
13.2 + 2.6
13.2 + 2.6
Total = 69.2 m

= 1.33
= 1.54 3.08
= 3.38
13.52 + 2.7
13.52 + 2.7
Total = 70.9 m

= 1.70
= 2.10 4.2
= 4.5
18 + 3.4
18 + 3.4
Total = 94.0 m

@ 2.175 m x 2
L/3 = 1.03 0.24
L/4 = 1.09 2.175 0.64
Cont. = 2.475 1.04
Top 7.425 + 2.1
Bot 7.425 + 2.1
Total = 42.3 m
@ 0.80 m
L/3 = 0.57
L/4 = 0.40 0.8
Cont. = 1.1
Top 3.3 + 1.1
Bot 3.3 + 1.1
Total = 9.7 m
@ 2.8 m
L/3 = 1.23 RB2
L/4 = 1.40 2.8 2.8
Cont. = 3.1 0.85
Top 9.3 + 2.5 1.85
Bot 9.3 + 2.5 1.275
Total = 26.3 m

@ 5.18 m
L/3 = 2.03
L/4 = 2.59 5.18
Cont. = 5.48
Top 16.44 + 4.1
Bot 16.44 + 4.1
Total = 46.2 m

@ 2.575 m
L/3 = 1.16
L/4 = 1.29 2.575
Cont. = 2.875
Top 8.625 + 2.3
Bot 8.625 + 2.3
Total = 24.5 m

403.2
67.204167
68
9 46.2 49.5
5 10.5 13
23 63 62.1
5 12.8 14.5
12 31.5 32.4
8 24 23.2
10 28 30
11 28 26.4
2 1.2 0.8

245.2 251.9
497.1
82.85
84
B4
@ 2.50 m
= 1.80 L/3 =
= 2.25 4.5 L/4 =
= 4.8 Cont. =
19.2 + 3.6 Top
19.2 + 3.6 Bot
Total = 100.2 m Total

B5
= 1.47 @ 5.30 m
= 1.75 3.5 L/3 =
= 3.8 L/4 =
15.2 + 2.9 Cont. =
15.2 + 2.9 Top
Total = 39.8 m Bot
Total
502.1
@ 4.50 m
L/3 =
L/4 =
Cont. =
Top
Bot
Total

@ 3.50 m
L/3 =
L/4 =
Cont. =
Top
Bot
Total

2.35 14 7.24
1.55 7.75 2.43
21.75 8.14
22.62 4.16
3.77 6.22
3.97
8.06
5,29
5.07
5.72
8.84
7.54
67.39
70

@ 2.8 m 2.8
L/3 = 1.23 0.24 2
L/4 = 1.40 2.8 0.64
Cont. = 3.1 1.04
Top 9.3 + 2.5
Bot 9.3 + 2.5
Total = 26.3 m

@ 0.85 m 0.85
L/3 = 0.58 0.24 0.05
L/4 = 0.43 0.85 0.64
Cont. = 1.15 1.04
Top 3.45 + 1.2
Bot 3.45 + 1.2
Total = 10.1 m

@ 1.85 m 1.85
L/3 = 0.92 0.24 1.05
L/4 = 0.93 1.85 0.64
Cont. = 2.15 1.04
Top 6.45 + 1.8
Bot 6.45 + 1.8
Total = 18.4 m

@ 1.275 m 1.275
L/3 = 0.73 0.24 0.475
L/4 = 0.64 1.275 0.64
Cont. = 1.575 1.04
Top 4.725 + 1.5
Bot 4.725 + 1.5
Total = 13.6 m
68.5
11.409722
13
= 0 bags
+
= 0 bags
= 0 cu.m.
+
= 0 cu.m.

0 cu.m.
1.13
1.25 2.5
2.8
8.4 + 2.3
8.4 + 2.3
= 23.8 m

2.07
2.65 5.3
5.6
16.8 + 4.1
16.8 + 4.1
= 47.2 m

1.80
2.25 4.5
4.8
14.4 + 3.6
14.4 + 3.6
= 40.5 m

1.47
1.75 3.5
3.8
11.4 + 2.9
11.4 + 2.9
= 32.2 m

119.8

@ 2.7 m x 2
L/3 = 1.20
L/4 = 1.35 2.7
Cont. = 3.05
Top 9.15 + 2.4
Bot 9.15 + 2.4
Total = 51.6 m
@ 4.1 m
L/3 = 1.67
L/4 = 2.05 4.1
Cont. = 4.4
Top 13.2 + 3.3
Bot 13.2 + 3.3
14 Total = 37.2 m
10.00
24.00 @ 3.85 m
24.96 L/3 = 1.58
4.16 L/4 = 1.93 3.85
Cont. = 4.15
Top 12.45 + 3.2
Bot 12.45 + 3.2
14 Total = 35.1 m
0.25
14.25 @ 1.30 m x 2
14.82 L/3 = 0.73
2.47 L/4 = 0.65 1.3
Cont. = 1.6
Top 4.8 + 1.5
Bot 4.8 + 1.5
14 Total = 27.7 m
5.25
19.25 @ 3.10 m x 2
20.02 L/3 = 1.33
3.34 L/4 = 1.55 3.1
Cont. = 3.4
Top 10.2 + 2.7
Bot 10.2 + 2.7
14 Total = 57.7 m
2.38
16.38 @ 2.35 m x 2
17.03 L/3 = 1.08
2.84 L/4 = 1.18 2.35
Cont. = 2.65
Top 7.95 + 2.2
12.81 Bot 7.95 + 2.2
13 Total = 45.2 m
PROJECT : A TWO-STOREY RESIDENCE W/ MEZZANINE
LOCATION: PORTO CIRCLE BRGY. BALON ANITO MARIVELES, BATAAN
OWNER : MR. & MRS. JOSELITO DOMINGUEZ
SUBJECT : BUDGETARY COST ESTIMATES

Item No. Descriptions Quantity Unit Unit Cost

I EARTHWORKS
Excavation 150 cu m 400
Gravel Base 15 cu m 850
Back Fill 80 cu m 350
Soil Poisoning 5 gal 2000
Sub Total : Item I

II Concreting Works
Cement 3000.00 bags 225
Sand 150.00 cu m 700
Gravel 300.00 cu m 850
Sub Total : Item II

III Steel Works


16 mm dia x 6 m rebars 1350.00 pcs 320
12 mm dia x 6 m rebars 950.00 pcs 185
10 mm dia x 6 m rebars 750.00 pcs 130
No. 16 tie wire 200 kgs 80
Sub Total : Item III

IV Formworks / Scaffoldings LS 150000

V Masonry Works
6" thk CHB 2100 pcs 10
4" thk CHB 1400 pcs 9
Cement 250 bags 215
Sand 25 cu m 700
Sub Total : Item V

VI Doors & Windows LS 80000

VII Carpentry LS 100000

VIII Tileworks LS 80000

IX Iron Works LS 150000

X Tinsmithry LS 275000

XI Plumbing Works
Roughing-ins LS 85000
Fixtures LS 45000
Septic Tank LS 50000
Misc. items LS 30000
Sub Total : Item XI

XII Electrical Works


Roughing-ins LS 90000
Switches & outlets LS 30000
Panel Board / Circuit Breaker LS 50000
Misc. items LS 75000
Sub Total : Item XI

XIII Painting Works


Enamel Finish LS 40000
Latex Finish LS 40000
Misc. items LS 50000
Sub Total : Item XII

MATERIAL COST

40% LABOR COST

TOTAL PROJECT COST

Prepared by:

Engr. DANILO A. RETOTA


Reg No. 0125207
PTR No. SJ 1029251
Date April 06, 2017
Place City of San Juan
TIN 406-240-283
Total

60,000.00
12,750.00
28,000.00
10,000.00
110,750.00

675,000.00
105,000.00
255,000.00
1,035,000.00

432,000.00
175,750.00
97,500.00
16,000.00
545,500.00

150,000.00

21,000.00
12,600.00
53,750.00
17,500.00
104,850.00

80,000.00

100,000.00

80,000.00

150,000.00

275,000.00

85,000.00
45,000.00
50,000.00
30,000.00
210,000.00

90,000.00
30,000.00
50,000.00
75,000.00
245,000.00

40,000.00
40,000.00
50,000.00
130,000.00

3,216,100.00

1,286,440.00

4,502,540.00

A. RETOTA
0125207
SJ 1029251
April 06, 2017
City of San Juan
406-240-283