A1 ASSIGNMENT: BAYFIELD
MUD COMPANY
QANT 610: OPERATION MANAGEMENT
Federica Pelloni Ziliani 1D#0852125, Ramadhianto Danang
1D#0898888, Dimpi Shah ID# 0905809, Vina Nimje ID-794260.Bayfield Mud Company
In order to verify the bag-weight problem, the quality control staff first collected the weights of bags for three different
shifts every day. We know six samples were weighted every hour, so sixis the size of the samples. To monitor the
variable’s data in this process we will use the x-bar chart and the range chart.
Instead of having the mean calculated by POM-QM we would also input the required mean which is SO as required in
the explanation of the case.
Before implementing all the samples in the software we also have to calculate the range since we have the smallest and
the largest our formula to calculate it for every samples in every shifts will be: largest-smallest.
FIRST SHIFT: MORNING
Smallest [Range
Sam_ 387 2
7am aa 2a
sam 7 49.6 18
3am 502 16
10am #92 Ba
(1Lam 48.6 3.1
12 pm 46.2 a2
[apm 46.8 36
6am 474 4.6
Tam 492 S22 3
Bam 49 52.4 3a
9am 49.4 SL 23
10am 29.6 518 22 |
[11am 49 523 — 33 _
12 pm [asa 52.8 36
1pm 49.4 53.6 42
am a5 a9 a
Tam 448 497 a9
8am 48 518 3.8
9am ae 52.7 —Tas
10am 48.1 55.2 7A
tam 495 54.1 46
12pm 48.7 50.9 22
1pm a6 512 —Faia eo ea
|. +) E_]
cam so
SoS] eral
eerie sel
Seautat a
ee eT
ay
"
ay
a
a
i
§
=
a
rH
a
a
a
i
A
a
a
aia oH So coat