You are on page 1of 1

CONTRACT N : N-6524

Title : 400kV CABLE CONNECTION BETWEEN MOSG & CPTL Chapter 2


Page: 1/1

COMPARTMENT MOISTURE CONTENT, PRESSURE AND SF6 % FOR CABLE BOX

BAY N C02 BAY NAME : UGC; CPTL-1 EQUIPMENT : Gas compartment

COMPARTMENT G4
PHASE B

DATE 9/3/2017

TEMPERATURE (C) 24

ATMOSPHERIC PRESSURE (bar) 1.013

MOISTURE ABSORBER ACTIV OK

PPMV 128.5

MEASURED 3.586

SF6 PRESSURE (bar)

CORRECTED at 20 3.50

DEW POINT MEASURED(Atm) (C) -39.9

DEW POINT CRITERIA (Atm) (C) -19

SF6 % 99.5

S.N Test equipment Make Calibration due date


10-1014 SF6 ANALYSER 973 MBW 25/10/2017
ALS4886 Thermometer chauvin arnoux 22/03/2017
ALS5228 Digital pressure indicator druck 22/03/2017

Test Done by : GE/ALSTOM Witnessed by : LAHMEYER INTERNATIONAL Witnessed / Approved by : TRANSCO

Signature : Signature : Signature :

Name : Vishal TELANG Name : Name :

Date : 9/3/2017 Date : Date :

You might also like