Concrete Beams

Podium Tower Concrete Beams


Podium Tower
Basement Level Basement Level
Ground Level Ground Level
Entry Level 11,629 12,818 Entry Level 11,268 9,602
Level 1 9,000 9,049 Level 1 9,479 7,642
Level 2 9,625 10,905 Level 2 11,393 9,748
Level 3 5,833 10,561 Level 3 11,273 5,392
Attic Slab Attic Slab
Level 4 389 Level 4 705
Level 5 580 Level 5 851
Level 6 790 Level 6 875
Level 7 656 Level 7 857
Level 8 656 Level 8 857
Level 9 656 Level 9 857
Level 10 656 Level 10 857
Level 11 Level 11
Level 11 (Helipad) Level 11 (Helipad)
Level 12 Level 12
36,087 47,716 43,413 38,243
Total 83,803 kN Total 81,656 kN