CONSTRUCTION OF TWO HEALTHCARE CENTRES AT MUAITHER AND

AL-WAJBAH (PACKAGE 5)

SAMPLING AND TESTING REQUIREMENTS

DESCRIPTION REMARKS
SOIL INVESTIGATION

* Minimum 3 borehole per site


Borehole (for Building) * 1 borehole every 300m2
* Grid at mutual spacing of 20m

EXCAVATED MATERIALS/ EARTHWORKS

* Each Source
Gradiation (Sieve Analysis)
* 1 Test Every 1000m3

Atterberg Limits (Liquid Limit, Plastic Limit and * Each Source


Plastic Index) * 1 Test Every 1000m3
(Modified) Proctor Test - Optimum Moisture Content * Each Sourrce
(OMC) and Maximum Dry Density (MDD) * 1 Test Every 1000m3

* Each Source
Organic Mater Content
* 1 Test Every 5000m3

REINFORCING STEEL
Tensile Test * 1 Test per 30t (3 Test Pieces per Diameter)
Bend Test * 1 Test per 30t (1 Test Pieces per Diameter)
Re-Bend Test * 1 Test per 30t (1 Test Pieces per Diameter)
Chemical Composition * 1 Test per 30t (2 Test Pieces per Diameter)
PRESTRESSING STEEL, SHEATHS, ANCHORAGES, COUPLERS

* 1 Test for each reel of wire or strand


Tension, Yield, Elongation, Break Strength - Steel Wire,
* 1 Test per 1000 of wire or strand
Strand, Rod
* 1 Test per 30t for each rod sizes.

* 1 Test for each batch/ lot of wire or strand


Relaxation - Steel Wire, Strand, Rod
* 1 test per 30t for each rod size.

* 1 Test for each reel of wire or strand


Chemical Analysis - Steel * 1 Test per 1000 of wire or strand
* 1 Test per 30t for each rod sizes.

Bond Strength - 15.24mm Diameter Steel Prestressing * 1 Test for each reel of wire or strand
Strand * 1 Test per 1000 of strand

* 1 Test for each reel of wire or strand


Bending, Hardness - Steel Rods, Strands * 1 Test per 1000m of wire/ strand
* 1 Test per 30t for each rod size

* 1 Test per 60 couplers


Couplers
* As per Engineers request

CONCRETE TRIAL MIX


1 Day * 1 Cube Compression Test

3 Days * 2 Cubes Compression Test


7 Days * 3 Cubes Compression Test
28 Days * 3 Cubes Compression Test

* 3 Cubes (Rapid Chloride Permiability) (RCP)


* 3 Cubes (Water Absorption) (WA)
DURABILITY TEST FOR 28 DAYS
* 3 Cubes (Chemical Analysis) (Cl, S03)
* 3 Cubes (ISAT)

FF0000LEONILOJR - QA/QC ENGINEER


CONCRETE
7 Days Cubes * 3 Cubes Compression Test
28 Days Cubes * 2 Cubes Compression Test

Note:
One test per load of concrete delivered to the site, or one test per 10m3 whichever is the lesser for the first 50m3 of
concrete then at a rate of 1 slump test for the first 50m3 if concrete was consistent during production.

Samples shall be taken at the average rate of one sample every 30m3 of concrete or fractions thereof for the first
90m3, then one sample every 100m3 of concrete or fraction thereof when continuous concrete production reaches
up to 2000m3 and later of one sample every 200m3 of concrete or fraction thereof when concrete production
exceeds 2000m3. (AS PER QCS 2010, SECTION 5)