Professional Documents
Culture Documents
o th ter es d
Serebryany Bor tunnel
Lower
2.4
1 13.9 m twin completed 2007 gallery
km
slide
Madrid M-30-North tunnel (left carriageway)
of the south bypass
W lane
width =3.5
Hard
shoulder = 0.50 each side
Lower
2.8
3 14.7 m twin completed 2010 gallery
km
slide
Wuhan, China
Lower
2.7
4 11.1 m twin completed 2008 gallery
km
slide
Lower
5 2 km 13.9 m twin complete 2005 gallery
slide
Lower
8.9
6 15.43 twin completed 2008 gallery
km
stairs
N Leng Diame Bor Finishe
Name status Escape
o th ter es d
SR99, Alaskan way viaduct replacement
Lower
3.2 Under Estimate
7 17.5 m twin gallery
km construction d 2019
stairs
Road
surface on
2.5 singl
8 13.9 m completed 2002 cross
km e
passage at
1.25km
N Leng Diame Bor Finishe
Name status Escape
o th ter es d
Waterview tunnel
4
ventilation
building
staircase
1 7.5 singl
10.7 m completed 2011 (up to
0 km e
shaft)
With 18
emergency
door
N Leng Diame Bor Finishe
Name status Escape
o th ter es d
A-86W East Paris
5
ventilation
building
1 9.9 singl
10.2 m complete 2008 staircase
1 km e
(up to
shaft)
4
ventilation
2.9 singl building
12.9 m completed 2007
km e staircase
(up to
shaft)