You are on page 1of 27

Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 1 of 20

SCAFFOLDING BIN
STRUCTURAL INTEGRITY REPORT

Rev. Status Date Revision memo Issued by Checked by Approved by

00 IFR 23-Feb-2016 Issued for Review B. Layade Afolabi A. Walker


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 2 of 20

REVISION SHEET

Details of revisions made to this document after approval shall be recorded on this sheet.

Rev Section Description Page


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 3 of 20

TABLE OF CONTENTS
1. INTRODUCTION ........................................................................................................................... 5
1.1 GENERAL ..................................................................................................................................... 5
1.2 SCOPE .......................................................................................................................................... 6
1.3 REFERENCE DOCUMENTS ........................................................................................................ 7
1.4 LOAD SUMMARY ......................................................................................................................... 8
1.5 RESULT SUMMARY ..................................................................................................................... 8
1.5.1 MAXIMUM MEMBER UNITY RATIO ............................................................................................ 8
1.5.2 MAXIMUM DEFLECTIONS ........................................................................................................... 9
1.6 LOAD CASES................................................................................................................................ 9
1.6.1 BASIC LOAD CASES .................................................................................................................... 9
1.6.2 LOAD COMBINATIONS .............................................................................................................. 10
1.7 SOFTWARE ................................................................................................................................ 10
2. SACS MODEL PLOTS................................................................................................................ 11
2.1 4-POINT LIFT MODEL PLOTS ................................................................................................... 11
3. SACS RESULTS PLOTS ............................................................................................................ 14
3.1 SCAFFOLD BIN 4-POINT LIFT RESULT PLOTS ...................................................................... 14
3.2 SCAFFOLD BIN SIDE LOAD RESULT PLOTS .......................................................................... 15
3.3 FORK POCKET LIFT RESULT PLOTS ...................................................................................... 16
4. SACS OUTPUT LISTING ........................................................................................................... 17
4.1 4-PONIT LIFT .............................................................................................................................. 17
4.2 SIDE LOAD ................................................................................................................................. 18
4.3 FORK POCKET LIFT .................................................................................................................. 19

APPENDIX
Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 4 of 20

FIGURES
Figure 1-1: Scaffolding Bin 4-Point Lift SACS Model ..................................................................................... 5
Figure 1-2: Scaffolding Bin Side Loading SACS Model ................................................................................. 6
Figure 1-3: Scaffolding Bin Fork Lift SACS Model ......................................................................................... 6
Figure 2-1: Scaffold Bin SACS Joint Name .................................................................................................. 11
Figure 2-2: Scaffold Bin SACS Member Group Plot .................................................................................... 11
Figure 2-3: Scaffold Bin SACS Member Length........................................................................................... 12
Figure 2-4: Scaffold Bin SACS Member Effective Length ............................................................................ 12
Figure 2-5: Scaffold Bin SACS Member Yield Stress .................................................................................. 13
Figure 2-6: Scaffold Bin SACS Member Section.......................................................................................... 13
Figure 3-1: Scaffold Bin 4-Point Lift SACS Member UC .............................................................................. 14
Figure 3-2: Scaffold Bin 4-Point Lift SACS Joint Deflections ....................................................................... 14
Figure 3-3: Scaffold Bin Side Load SACS Member UC ............................................................................... 15
Figure 3-4: Scaffold Bin Side Load SACS Joint Deflection .......................................................................... 15
Figure 3-5: Fork Lift SACS Member UC ....................................................................................................... 16
Figure 3-6: Fork Lift SACS Joint Deflection ................................................................................................. 16

TABLES
Table 1-1: Maximum Member Unity Ratio. ..................................................................................................... 8
Table 1-2: Maximum Deflections. ................................................................................................................... 9
Table 1-3: Basic Load Cases ......................................................................................................................... 9
Table 1-4: Combined Load Cases................................................................................................................ 10

Appendix
Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 5 of 20

1. INTRODUCTION

1.1 GENERAL
This report presents the structural integrity check of the Scaffolding Bin for 4-point lift; fork pocket
lift, Impact (Vertical & horizontal) and Side Loading condition. With the exception of the impact
load check, which has been carried out with DNV spreadsheet offcon 1.001 (See Appendix) all
other analysis has been carried out in SACS software. The 4-point lift and the four pocket lift
conditions have carried out excluding door. All design has been checked in accordance with
DNV Standard for Certification for offshore containers-DNV 2.7.1, EN12079-1:2006 and EN
1993-1:2005-1.
The Scaffolding Bin is a 6.54m x 2.24m x 1.45m depth container with a Tare Mass of 4.42MT
and Payload of 6MT. Figure 1-1, Figure 1-2 & Figure 1-3 below shows the SACS model of the
various conditions respectively.

Figure 1-1: Scaffolding Bin 4-Point Lift SACS Model


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 6 of 20

Figure 1-2: Scaffolding Bin Side Loading SACS Model

Figure 1-3: Scaffolding Bin Fork Lift SACS Model

1.2 SCOPE
To check the structural integrity of the Scaffolding Bin for Lifting, Impact, Side Load and Fork
Pocket lift conditions.
Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 7 of 20

1.3 REFERENCE DOCUMENTS


[1] Design of Steel Structures-Part 1-1: General Rules and rules for building: EN 1993-1:2005-1
[2] Standard for Certification of Offshore service containers: DNV 2.7.1. Offshore Containers
June 2013.
[3] Offshore Containers and associated lifting sets- Part 1: Offshore containers-Design,
manufacture and marking (EN 12079-1-1:2006)
Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 8 of 20

1.4 LOAD SUMMARY


See Appendix for Details.

1.5 RESULT SUMMARY


All results indicate that the Scaffolding Bin is satisfactory under all Four (4) conditions being
assessed. Members and joints have been code checked to EN 1993-1:2005-1 (Ref [2) and DNV
2.7.1. All members have stress unity check less than unity and joint deflections are within the
allowable. Detailed results are presented in section 4 and in the appendix.

1.5.1 MAXIMUM MEMBER UNITY RATIO

S/NO DESCRIPTION MAXIMUM UC


1 4-Point Lift Condition (With Door) 0.86
2 Side Load 0.45
3. Fork Pocket Lift Condition 0.28

Table 1-1: Maximum Member Unity Ratio.


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 9 of 20

1.5.2 MAXIMUM DEFLECTIONS

DEFLECTION
S/NO DESCRIPTION JOINT REMARK
(mm)
1 4-Point Lift Condition 0012 20.60 OK
2 Side Load 37 1.42 OK
3. Fork Pocket Lift Condition 21 3.85 OK

Table 1-2: Maximum Deflections.

1.6 LOAD CASES

1.6.1 BASIC LOAD CASES

Load Case Description

100 Tare Mass


200 4-Point Lift Applied Internal Load
300 +Y dir Side Load
400 -Y dir Side Load
500 +X dir Side Load
600 -X dir Side Load
700 Fork Lift Applied Internal Load

Table 1-3: Basic Load Cases


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 10 of 20

1.6.2 LOAD COMBINATIONS

Basic
Load Case Load Factor
Case
100 1
2000
200 1
100 1
3000
300 1
100 1
4000
400 1
100 1
5000
500 1
100 1
6000
600 1
100 1.6
7000
700 1

Table 1-4: Combined Load Cases.


NOTE: Please note that DNV load factor for various conditions
have been pre-applied prior to application in SACS.

1.7 SOFTWARE
SACS 5.4 software has been used for this analysis.
Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 11 of 20

2. SACS MODEL PLOTS

2.1 4-POINT LIFT MODEL PLOTS

Figure 2-1: Scaffold Bin SACS Joint Name

Figure 2-2: Scaffold Bin SACS Member Group Plot


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 12 of 20

Figure 2-3: Scaffold Bin SACS Member Length

Figure 2-4: Scaffold Bin SACS Member Effective Length


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 13 of 20

Figure 2-5: Scaffold Bin SACS Member Yield Stress

Figure 2-6: Scaffold Bin SACS Member Section


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 14 of 20

3. SACS RESULTS PLOTS

3.1 SCAFFOLD BIN 4-POINT LIFT RESULT PLOTS

Figure 3-1: Scaffold Bin 4-Point Lift SACS Member UC

Figure 3-2: Scaffold Bin 4-Point Lift SACS Joint Deflections


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 15 of 20

3.2 SCAFFOLD BIN SIDE LOAD RESULT PLOTS

Figure 3-3: Scaffold Bin Side Load SACS Member UC

Figure 3-4: Scaffold Bin Side Load SACS Joint Deflection


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 16 of 20

3.3 FORK POCKET LIFT RESULT PLOTS

Figure 3-5: Fork Lift SACS Member UC

Figure 3-6: Fork Lift SACS Joint Deflection


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 17 of 20

4. SACS OUTPUT LISTING

4.1 4-PONIT LIFT


************* SEASTATE LOAD CASE CENTER REPORT *************

RELATIVE TO STRUCTURAL ORIGIN

LOAD LOAD ********* X - DIRECTION ********* ********* Y - DIRECTION ********* ********* Z - DIRECTION *********

CASE LABEL FORCE X Y Z FORCE X Y Z FORCE X Y Z

(KN) (M) (M) (M) (KN) (M) (M) (M) (KN) (M) (M) (M)

1 100 0.00 0.00 -43.36 3.27 -1.33 0.41

2 200 0.00 0.00 -212.19 3.27 -1.24 0.13

3 1000 0.00 0.00 -255.55 3.27 -1.26 0.18

SACS-IV SYSTEM FIXED JOINTS REACTION FORCES AND MOMENTS

*** MOMENTS SUMMED ABOUT ORIGIN ***

********************* KN ******************** ******************** KN-M *******************

JOINT LOAD FORCE(X) FORCE(Y) FORCE(Z) MOMENT(X) MOMENT(Y) MOMENT(Z)

NUMBER CASE

46 1000 0.000 0.260 255.550 -0.238 0.000 0.000

***************** MAXIMUM JOINT DEFLECTION REPORT *****************

LOAD *** X-DIRECTION *** *** Y-DIRECTION *** *** Z-DIRECTION ***

CASE JOINT DEFLECTION JOINT DEFLECTION JOINT DEFLECTION

CM CM CM

1000 0002 0.8097 0019 0.7422 0012 -2.0598

* * * M E M B E R G R O U P S U M M A R Y * * *

API RP2A 19TH/AISC 9TH

MAX. DIST EFFECTIVE CM

GRUP CRITICAL LOAD UNITY FROM * APPLIED STRESSES * *** ALLOWABLE STRESSES *** CRIT LENGTHS * VALUES *

ID MEMBER COND CHECK END AXIAL BEND-Y BEND-Z AXIAL EULER BEND-Y BEND-Z COND KLY KLZ Y Z

M N/MM2 N/MM2 N/MM2 N/MM2 N/MM2 N/MM2 N/MM2 M M

G02 0006-0008 1000 0.21 0.0 -16.52 -31.19 4.91 149.78 280.66 252.15 252.15 C>.15A 1.5 1.5 1.00 1.00

G03 2- 11 1000 0.59 0.0 -7.95 45.07 84.85 91.87 111.38 244.19 244.19 C>.15A 6.5 1.0 1.00 1.00

G04 0030-0025 1000 0.13 0.0 3.40 -2.47 35.40 206.591848.10 233.92 330.54 C>.15B 1.1 1.1 1.00 1.00

G05 0010-0009 1000 0.51 0.0 0.61 14.06 42.48 206.59******* 242.87 242.87 C<.15 0.2 0.2 1.00 1.00

G06 0022-0012 1000 0.86 0.7 -47.35 72.96 1.27 113.62 150.96 213.77 242.75 C>.15A 6.5 0.7 1.00 1.00

G07 0003-0009 1000 0.31 1.2 4.73 62.92 39.41 207.002012.78 258.75 258.75 TN+BN 1.2 1.2 0.85 0.85

G08 0028- 17 1000 0.56 1.2 11.90 25.57-109.45 206.59 401.37 252.15 252.15 C>.15B 1.2 1.2 1.00 1.00
Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 18 of 20

4.2 SIDE LOAD


************* SEASTATE LOAD CASE CENTER REPORT *************

RELATIVE TO STRUCTURAL ORIGIN

LOAD LOAD ********* X - DIRECTION ********* ********* Y - DIRECTION ********* ********* Z - DIRECTION *********

CASE LABEL FORCE X Y Z FORCE X Y Z FORCE X Y Z

(KN) (M) (M) (M) (KN) (M) (M) (M) (KN) (M) (M) (M)

1 100 0.00 0.00 -43.36 3.27 -1.39 0.43

2 300 0.00 35.32 3.27 -0.12 0.75 0.00

3 400 0.00 -35.32 3.32 -2.36 0.80 0.00

4 500 35.32 6.54 -1.24 0.76 0.00 0.00

5 600 -35.32 0.00 -1.24 0.75 0.00 0.00

6 3000 0.00 35.32 3.27 -0.12 0.75 -43.36 3.27 -1.39 0.43

7 4000 0.00 -34.56 3.32 -2.36 0.80 -43.36 3.27 -1.39 0.43

8 5000 35.32 6.54 -1.24 0.76 0.00 -43.36 3.27 -1.39 0.43

9 6000 -35.32 0.00 -1.24 0.75 0.00 -43.36 3.27 -1.39 0.43

SACS-IV SYSTEM FIXED JOINTS REACTION FORCES AND MOMENTS

********************* KN ******************** ******************** KN-M *******************

JOINT LOAD FORCE(X) FORCE(Y) FORCE(Z) MOMENT(X) MOMENT(Y) MOMENT(Z)

NUMBER CASE

1 3000 13.148 -8.881 16.547 0.000 0.000 0.000

4000 4.325 9.434 2.497 0.000 0.000 0.000

5000 2.715 -1.550 8.002 0.000 0.000 0.000

6000 15.325 -1.153 11.139 0.000 0.000 0.000

4 3000 -13.146 -8.881 16.546 0.000 0.000 0.000

4000 -4.224 9.828 2.295 0.000 0.000 0.000

5000 -15.322 -1.152 11.138 0.000 0.000 0.000

6000 -2.715 -1.550 8.001 0.000 0.000 0.000

19 3000 17.290 -8.778 5.544 0.000 0.000 0.000

4000 26.390 7.526 19.594 0.000 0.000 0.000

5000 5.879 -0.180 9.310 0.000 0.000 0.000

6000 28.604 2.882 15.732 0.000 0.000 0.000

22 3000 -17.292 -8.776 5.548 0.000 0.000 0.000

4000 -26.492 7.772 19.799 0.000 0.000 0.000

5000 -28.588 2.882 15.735 0.000 0.000 0.000

6000 -5.897 -0.179 9.314 0.000 0.000 0.000


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 19 of 20

***************** MAXIMUM JOINT DEFLECTION REPORT *****************

LOAD *** X-DIRECTION *** *** Y-DIRECTION *** *** Z-DIRECTION ***

CASE JOINT DEFLECTION JOINT DEFLECTION JOINT DEFLECTION

CM CM CM

3000 0026 -0.0317 0000 0.3276 37 -0.1419

4000 0026 -0.0220 0040 -2.8350 0000 -0.0887

5000 3 0.0660 2011 0.0309 0025 -0.1129

6000 2 -0.0660 2009 0.0309 0018 -0.1129

* * * M E M B E R G R O U P S U M M A R Y * * *

API RP2A 19TH/AISC 9TH

MAX. DIST EFFECTIVE CM

GRUP CRITICAL LOAD UNITY FROM * APPLIED STRESSES * *** ALLOWABLE STRESSES *** CRIT LENGTHS * VALUES *

ID MEMBER COND CHECK END AXIAL BEND-Y BEND-Z AXIAL EULER BEND-Y BEND-Z COND KLY KLZ Y Z

M N/MM2 N/MM2 N/MM2 N/MM2 N/MM2 N/MM2 N/MM2

G02 0009-0007 4000 0.04 0.0 9.66 -3.90 -0.39 206.59 303.79 252.15 252.15 C>.15B 1.4 1.4 1.00 1.00

G03 2- 11 3000 0.13 0.0 -0.57 13.00 -18.74 91.87 111.38 244.19 244.19 C>.15A 6.5 0.9 1.00 1.00

G04 0038-0020 4000 0.01 0.0 -0.09 -0.25 -2.95 186.741848.10 233.92 311.27 C>.15A 1.1 1.1 1.00 1.00

G05 5- 12 6000 0.17 0.0 -0.61 24.91 -4.05 94.20 142.53 174.58 174.58 C>.15A 6.5 0.9 1.00 1.00

G06 0008-0033 6000 0.05 0.0 -1.60 -7.24 -2.57 113.62 150.96 213.77 242.75 C>.15A 6.5 0.9 1.00 1.00

G07 0042-0009 4000 0.06 0.1 0.14 -14.46 -5.75 207.00******* 258.75 258.75 TN+BN 0.1 0.1 0.85 0.85

G08 2008-2009 4000 0.45 1.1 -3.05 3.66 107.33 172.44 499.56 252.15 252.15 C>.15A 1.1 1.1 1.00 1.00

4.3 FORK POCKET LIFT


************* SEASTATE LOAD CASE CENTER REPORT *************

RELATIVE TO STRUCTURAL ORIGIN

LOAD LOAD ********* X - DIRECTION ********* ********* Y - DIRECTION ********* ********* Z - DIRECTION *********

CASE LABEL FORCE X Y Z FORCE X Y Z FORCE X Y Z

(KN) (M) (M) (M) (KN) (M) (M) (M) (KN) (M) (M) (M)

1 100 0.00 0.00 -43.36 3.27 -1.33 0.41

2 700 0.00 0.00 -94.58 3.32 -1.20 0.13

3 7000 0.00 0.00 -163.97 3.30 -1.25 0.25

***** SEASTATE COMBINED LOAD CASES *****

COMBINED BASIC PERCENT DESCRIPTION

LOAD LABEL LABEL

CASE

3 1000 1.6 * 100 + 1.0 * 700


Document Identification Number

SCAFFOLD BIN STRUCTURAL INTEGRITY REPORT


Revision: 00 Status: IFR
Document Type: CAL System/Subsystem: 86 Discipline: STR Rev. Date: 23-02-2016

Contractor document number Page 20 of 20

MAXIMUM JOINT DISPLACEMENTS

LOAD *** X-DIRECTION *** *** Y-DIRECTION *** *** Z-DIRECTION ***

CASE JOINT DEFLECTION JOINT DEFLECTION JOINT DEFLECTION

CM CM CM

7000 0003 0.1815 0000 -0.0628 21 -0.3850

**********SACS-IV SYSTEM FIXED JOINTS REACTION FORCES AND MOMENTS******

********************* KN ******************** ******************** KN-M *******************

JOINT LOAD FORCE(X) FORCE(Y) FORCE(Z) MOMENT(X) MOMENT(Y) MOMENT(Z)

NUMBER CASE

0018 1000 7.378 -13.892 40.810 0.000 0.000 0.000

0019 1000 83.128 13.694 45.210 0.000 0.000 0.000

0024 1000 -82.995 15.085 39.013 0.000 0.000 0.000

0025 1000 -7.511 -14.887 40.182 0.000 0.000 0.000

* * * M E M B E R G R O U P S U M M A R Y * * *

API RP2A 19TH/AISC 9TH

MAX. DIST EFFECTIVE CM

GRUP CRITICAL LOAD UNITY FROM * APPLIED STRESSES * *** ALLOWABLE STRESSES *** CRIT LENGTHS * VALUES *

ID MEMBER COND CHECK END AXIAL BEND-Y BEND-Z AXIAL EULER BEND-Y BEND-Z COND KLY KLZ Y Z

M N/MM2 N/MM2 N/MM2 N/MM2 N/MM2 N/MM2 N/MM2

M M

G02 0009-0007 1000 0.02 1.5 1.86 2.22 -0.94 206.59 280.66 252.15 252.15 C>.15B 1.5 1.5 1.00 1.00

G03 13- 3 1000 0.13 1.0 2.97 -26.77 -4.16 206.59 111.38 244.19 244.19 C>.15B 6.5 1.0 1.00 1.00

G04 0037-0030 1000 0.08 1.1 -0.99 3.70 21.92 186.741848.10 233.92 330.54 C>.15A 1.1 1.1 1.00 1.00

G05 0010-0009 1000 0.28 0.0 -1.68 1.96 -23.79 148.45******* 174.58 174.58 C<.15 0.2 0.2 1.00 1.00

G06 0014-0029 1000 0.19 0.0 12.00 -34.86 -0.13 206.59 150.96 213.77 242.75 C>.15B 6.5 0.8 1.00 1.00

G07 0003-0009 1000 0.05 1.2 -0.88 -12.01 2.56 193.312012.78 258.75 258.75 C<.15 1.2 1.2 0.85 0.85

G08 0032- 15 1000 0.31 1.2 0.72 3.18 -51.77 148.50 401.37 181.26 181.26 C>.15B 1.2 1.2 1.00 1.00
Appendix
OffCon Time: 11:56
Version 1.001 July 2006 Date: 23.02.16

About OffCon: OffCon is an MS EXCEL based checklist and calculation tool for verification of the design of
offshore containers. This program does not include any detailed analysis of the container framework. Detailed
frame analysis may be performed using DNV 3-D Beam or other beam calculation programs.
The program is copyright by Det Norske Veritas, and is based on the rule requirements of DNV Standard for Certification 2.7
1 January 2006. The program is available for clients applying for offshore container certification at DNV. Feedback and
comments are appreciated: e-mail: MTPNO876@dnv.com.

Identification
Client NIGERDOCK PLC Project No.
Project Name SCAFOLDING BIN 0

Max. gross mass 10420 kg Length 6540 mm


Payload 6000 kg Width 2240 mm
Tare mass 4420 kg Height 1450 mm
Asymmetric Sling Set Sling Leg Angle 45.0

Checklist: DNV Standard for Certification 2.7-1 Chapter 4


Design details Comment
1. Clean outline, no snagging hazard
2. Continuity of force transmission in primary structure
3. Full penetration welding of primary structure
4. Min. thickness requirements met
5. Material requirements met
6. Padeye design
7. Fork lift pockets: bottom plates/ sufficent shear area side rail
8. Fork lift pockets: Size and location
9. No unacceptable rust traps
10. Doors, hatches and other loose structures secured
11. Doors can be secured in open position
12. Unit able to withstand 30 tilt angle
13. Top protection for open containers

Calculations
14. Four point lift: 2,5xR (Only primary structure included)
15. Two point lift: 1,5xR for open frames (incl. all structure)
16. Fork pocket lift: 1,6xR
17. Frame analysis carried out (computer analysis)
18. Padeye stresses
19. Impact loads
20. Floor plate stress from internal loading: 2,5xP/A
21. Wall stress from internal loading: 0,6xP/A
22. Strength of intermediate deck
23. IMDG Requirements (DG tank containers)

Other Comments:

User Engineering
Design Loads
Client: NIGERDOCK PLC Time: 11:56
Project: SCAFOLDING BIN Date:
23.02.16
Project No.: 0

Main data for calculation


Max. gross mass 10420 kg
Payload 6000 kg
Tare mass 4420 kg
Sling leg angle 45
Enhancement factor 1.48252 - Table 8.1
The required strength of a container is found by performing calculations using the following design loads
4.2.3 Lifting Loads

4.2.3.1 4-point lifting


Load on structure F=(2.5xR)g = 255,550.5 N Internal load (2.5xR T)g= 212,190.3 N

4.6.3.3 2-point lifting


Load on structure F=(1.5xR)g = 153,330.3 N Internal load (1.5xR T)g= 109,970.1 N

4.2.3.2 Lifting with fork truck


Load on structure F=(1.6x(R+S))g 163,954.1 N Internal load (1.6x(R+S T)g= 94,577.8 N
Lifting Set Load = S = 25.6 kg

4.2.4 Impact Loads (static equivalent)

4.2.4.1 Horizontal impact


FHI=0.25xRxg = 25,555.1 N Corner post, external bottom frame
FHI=0.15xRxg = 15,333.0 N Other primary structure

4.2.4.2 Vertical impact


FVI=0.25xRxg = 25,555.1 N Bottom

4.4.7 Internal Loads on Side Wall

4.4.7 Load on walls


FW=0.6xPxg = 35,316.0 N

4.4.2 Loads on Intermediate Deck

4.4.2 Tween deck load


FW=0.5xPxxg = 88,290.0 N Standard load if deck is at half height. Other loads may apply.

Distributed Loads on Floor


The following calculated distributed loads are ment to be applied to a model of the unit made using frame analysis software. The
length of the load bearing elements in the bottom frame should be entered into the cell below.

Total length of load-bearing members 6540 mm

Distributed Load Total Load


4 Point Lift
q=(2.5xR)g/l= 39.08 N/mm F=(2.5xR)g= 255,550.5 N
2 Point Lift/ Diagonal Lift
q=(1.5xR)g/l= 23.45 N/mm F=(1.5xR)g= 153,330.3 N
Fork Pocket Lift
q=1.6x(R+S)g/l= 25.07 N/mm F=1.6x(R+S)g= 163,954.1 N
Impact Loads
q=Rxg/l= 15.63 N/mm F=Rxg= 102,220.2 N
Impact Loads
Client: NIGERDOCK PLC Time: 11:56
Project: SCAFOLDING BIN Date: 23.02.16
Project No.: 0

Refrence: Section 4.2.4 Impact loads


Please note! Here beam deflection and stress is calculated using simplified beam theory. If stresses exceed the yield stress
of the material or deflections exceeds the calculated maximum, more detailed analysis needs to be performed.
3 simplified cases are calculated. Bot ends fixed, both ends free, and one end fixed and one free. Steel with E-modulus
2.1x10^5 MPa Assumed. Results are given for actual span (yellow cells) and actual span +/- 500 mm (blue cells)
Beam specification
Cross section dimensions (for rectangular hollow profile)
ID beam= SHS180
h= 180.00 mm
b= 180.00 mm
t= 8.00 mm
,

Cross section properties


I= 2719.71 cm4
W= 302.19 cm3

Beam span
L= 6540 mm
Yield strength of material
Re = 355 N/mm2

Maximum bending stress and deflections due to simulated impact in middle of span

Corner posts and side rails bottom structure: F = 0,25*R*g


Length Bending stress (N/mm2) Deflections (mm) Max. Allowable
deflection L/250 (mm) *
fixed - fixed fixed-free free-free fixed - fixed fixed-free free-free
6040 63.85 95.77 127.69 5.14 9.19 20.54 24.16
6540 69.13 103.70 138.27 6.52 11.66 26.08 26.16
7040 74.42 111.63 148.84 8.13 14.55 32.52 28.16

Other frame members of the side structure, including top rails: F = 0,15*R*g
Length Bending stress (N/mm2) Deflections (mm) Max. Allowable
deflection L/250 (mm) *
fixed - fixed fixed - free free-free fixed - fixed fixed - free free-free
6040 38.31 57.46 76.62 3.08 5.51 12.32 24.16
6540 41.48 62.22 82.96 3.91 7.00 15.65 26.16
7040 44.65 66.98 89.30 4.88 8.73 19.51 28.16
Impact Loads
Client: NIGERDOCK PLC Time: 11:56
Project: SCAFOLDING BIN Date: 23.02.16
Project No.: 0

Refrence: Section 4.2.4 Impact loads


Please note! Here beam deflection and stress is calculated using simplified beam theory. If stresses exceed the yield stress
of the material or deflections exceeds the calculated maximum, more detailed analysis needs to be performed.
3 simplified cases are calculated. Bot ends fixed, both ends free, and one end fixed and one free. Steel with E-modulus
2.1x10^5 MPa Assumed. Results are given for actual span (yellow cells) and actual span +/- 500 mm (blue cells)
Beam specification
Cross section dimensions (for rectangular hollow profile)
ID beam= SHS160
h= 160.00 mm
b= 160.00 mm
t= 8.00 mm
,

Cross section properties


I= 1878.15 cm4
W= 234.77 cm3

Beam span
L= 6540 mm
Yield strength of material
Re = 355 N/mm2

Maximum bending stress and deflections due to simulated impact in middle of span

Corner posts and side rails bottom structure: F = 0,25*R*g


Length Bending stress (N/mm2) Deflections (mm) Max. Allowable
deflection L/250 (mm) *
fixed - fixed fixed-free free-free fixed - fixed fixed-free free-free
6040 82.18 123.27 164.37 7.44 13.30 29.74 24.16
6540 88.99 133.48 177.97 9.44 16.89 37.76 26.16
7040 95.79 143.68 191.58 11.77 21.06 47.10 28.16

Other frame members of the side structure, including top rails: F = 0,15*R*g
Length Bending stress (N/mm2) Deflections (mm) Max. Allowable
deflection L/250 (mm) *
fixed - fixed fixed - free free-free fixed - fixed fixed - free free-free
6040 49.31 73.96 98.62 4.46 7.98 17.85 24.16
6540 53.39 80.09 106.78 5.66 10.13 22.66 26.16
7040 57.47 86.21 114.95 7.06 12.64 28.26 28.16
Padeye Design
Client: NIGERDOCK PLC Time: 11:56
Project: SCAFOLDING BIN Date: 23.02.16
Project No.: 0

Reference: Section 4.2.3.1 Lifting with lifting set and Appendix D. Design of pad eye.

Decomposed pad eye forces


Sling leg angles 45.0

Number of pad eyes n= 4 (b)


Resulting sling force
RSF @ 144,561.2 N
Fv = 102,220.2 N
Fh = 102,220.2 N

Pad eye strength


Plate Plate w/cheeck pl. Plate w/inserted boss

To enter data click the desired padeye design


Dimensions
Bolt hole diameter Dh = 32.00 mm
Outer radius H= 50.00 mm
Pad eye thickness t= 25.00 mm
Total thickness tc = N/A mm
p
Pipesection dia. Dpp = N/A mm

Yield stress of material Re = 355.00 N/mm2

Calculated stresses
Tear out stress 255.11 N/mm2
Contact stress, 6% clearence 319.15 N/mm2 Steel only

Shackle dimensions
Minimum bolt diameter
Dmin = 0,94xDh = 30.08 mm

Maximum shackle inside width at pin


Wmax = tc / 0,75 = 33.33 mm

Check if the pad eye input is suitable to any shackle as listed in EN 13889:2000

Nominal pin Nominal Dee - min. Bow - min.


WLL (t) diameter inside width inside length inside length
(mm) at pin (mm) S (mm) S (mm)

Pad eye dim too large


Match!
Pad eye dim too small
Remember that this check only give a preliminary indication if the pad eye is matching the shackle based on
pin diameter and pad eye thickness. Always remember to manualy verify that shackle and pad eye geometry
match. These calculation only check against Dee and Bow shackles listed in Table 2 in the EN 13889:2000
standard. Other dimensions may be acceptable

For DNV Type Approved shackles, please visit our website:


http://exchange.dnv.com/

->
> Approved
A d services
i ->
>PProducts
d t andd Manufacturers->
M f t >TType Approval
A l ->
> Containers,
C t i Cargo
C Handling,
H dli Lifting
Lifti
Appliances and Miscellaneous Equipment (S) -> Lifting Sets
Lifting Set Calculations
Client: NIGERDOCK PLC Time: 11:56
Project: SCAFOLDING BIN Date: 23.02.16
Project No.: 0

Reference: Chapter 8 Lifting Sets and Appendix E

Strength requirements for lifting sets


Rating 10420 kg
Enhancement factor x 1.483 Table 8.1
Working Load Limit = 15.4 t
Number of sling legs 4
Sling leg angle 45.0 Master link
Quad Assembly (Masterlink +intermediate links) requirements

Load on quad assembly 15.45 t Fore runner


Forerunner requirements
Load on forerunner 15.45 t
Wirerope sling, fibre core EN 13414-1 40 mm Quad assembly
Wirerope sling, steel core EN 13414-1 40 mm
Chain sling EN 818-4 23 mm
Sling leg requirements
Load per sling leg 7.28 t
Wirerope sling, fibre core EN 13414-1 28 mm
Wirerope sling, steel core EN 13414-1 26 mm Sling leg
Chain sling EN 818-4 16 mm
Shackle requirements
Load on each shackle 7.28 t
Recommended min.
standard shackle EN 13889 8.5 t Shackle

http://exchange.dnv.com/

-> Approved services -> Products and Manufacturers-> Type Approval -> Containers, Cargo Handling, Lifting
Appliances and Miscellaneous Equipment (S) -> Lifting Sets