You are on page 1of 7

SHEIKH JABER CAUSEWAY

Subcontract No. : KUSC-SC-S-0600

HEALTH & SAFTETY RISK ASSESSMENT FOR CABLE TRAY


Document Ref:: Rev. Prepared by: Date:

HSE Reviewed by: Signature.

Activity/Task : Installation of Cable Tray Date of assessment : Marine / Offshore

Onshore

Activity : Shifting, Fabrication and installation of cable tray & Supports.


Initial Risk
Residual Risk
(With existing Controls)
Significant Health and Saftey Hazard WHO or WHAT is at risk Mitigations / Controls Measures
Risk Risk
S L R S L R
Level Level
All Operatives and Engineers(for New/coming for the First
1 Unfamiliar to area Site Engineer/Operatives/Helpers 2 3 6 M Time on Site) must attend safety induction and go with 2 1 2 L
somebody who already know the site.

a.) Only adequately trained and qualified person are to use


and operate the equipment.

b.) A qualified person shall have routine check of all


2 Contact with Tools/Materials Electricians/Helpers 2 3 6 M 2 1 2 L
electrical equipment/tools.

c.) Use Proper and correct PPE for the said activity.

Must have Hot Work Permit and allow necessary safety


3 Hot work(use of grinder/chopsaw) Welders,fabricators,Supervisor 2 2 4 L 2 1 2 L
controls.

Inspection of tools to be conducted on regular basis and


4 Tools Failure Electricians/Helpers 3 2 6 M 2 1 2 L
inspection sticker is attach, use appropraite PPE'S.

a.) Proper safe work at heights must always observed.

b.)Provide proper work platform during work at heights


activities.

c.) Follow Scaffold and ladder safety.


5 Fall from Heights Electricians/Helpers 3 2 6 M 3 1 3 L
d.) Scaffolds must be inspected by a competent person.

e.) Check Full Body Harness each time it will be use.

f.) Secure area of work.


Use adequate and proper PPE'S

1 of 7
SHEIKH JABER CAUSEWAY
Subcontract No. : KUSC-SC-S-0600

HEALTH & SAFTETY RISK ASSESSMENT FOR CABLE TRAY


a) Proper inspection must be done before use of tools and
extension wires.
6 Use of Power Tools and Extension wires Operator and Electricians 3 2 6 M 2 1 2 L
b.) competent person must use all power tools

a.) Obtain Permit to Work(PTW).

b.) Do not use any kind of igniting tools any spark producing
Eletricians and operatives who are going materials and tools.
7 Working In confined space 3 3 9 M 3 1 3 L
inside confined space.
c.) Always follow the safe work on confined space.

D.) Ensure access/Egress is adequate for the task activities

a.) Ensure that all dangerous area are barriered off.

B.) Display warning signs

C.) Create a secure work area by using hazard tape, barriers

8 Condition of working area All workers involved 3 2 6 M d.) Appropriate lighting to work area 3 1 3 L

e.) Ensure access/egress is adequate for the task activities.

F.) provision of IITS ( Information,Instruction, Training &


Supervision

a.) All workers shall be brief and familiarized regarding the


site emergency evacuation plan ( Toolbox talk prior to
commencement to work)

b.) Provision of fire extinguisher (CO2 or ABC Dry powder)

c.) First Aid kit is available at all times.


9 In some emergency cases/Fire/Electric shock incident. All workers involved 3 2 6 M 3 1 3 L
D.) A list of all workers must be kept by HSE representative.

e.) provision of signage's and visible emegency contact


number.

f.) Supervision, Training for the use of Fire extinguishers &


provision emergency power switch off signage's

2 of 7
SHEIKH JABER CAUSEWAY
Subcontract No. : KUSC-SC-S-0600

HEALTH & SAFTETY RISK ASSESSMENT FOR CABLE TRAY


a.) Rest hours during peak hot time, seasonal project break
hours must be emplemented.

10 Heat stress/Heat stroke All workers involved 2 2 4 L B.) All workers to be advice minimum requirment of water 2 1 2 L
per day.

C.) Provision of chilled water on site.

3 of 7
SHEIKH JABER CAUSEWAY
Subcontract No. : KUSC-SC-S-0600

HEALTH & SAFTETY RISK ASSESSMENT FOR CABLE TRAY

Initial Risk
Residual Risk
(With existing Controls)
Significant Health and Saftey Hazard WHO or WHAT is at risk Mitigations / Controls Measures
Risk Risk
S L R S L R
Level Level

a.) Ensure that all dangerous area are barriered off.

B.) Display warning signs

C.) Create a secure work area by using hazard tape, barriers

8 Condition of working area All workers involved 3 2 6 M d.) Appropriate lighting to work area 3 1 3 L

e.) Ensure access/egress is adequate for the task activities.

F.) provision of IITS ( Information,Instruction, Training &


Supervision

a.) All workers shall be brief and familiarized regarding the


site emergency evacuation plan ( Toolbox talk prior to
commencement to work)

b.) Provision of fire extinguisher (CO2 or ABC Dry powder)

c.) First Aid kit is available at all times.


9 In some emergency cases/Fire/Electric shock incident. All workers involved 3 2 6 M 3 1 3 L
D.) A list of all workers must be kept by HSE representative.

e.) provision of signage's and visible emegency contact


number.

f.) Supervision, Training for the use of Fire extinguishers &


provision emergency power switch off signage's

a.) Rest hours during peak hot time, seasonal project break
hours must be emplemented.

10 Heat stress/Heat stroke All workers involved 2 2 4 L B.) All workers to be advice minimum requirment of water 2 1 2 L
per day.

C.) Provision of chilled water on site.


SHEIKH JABER
Subcontract No. : K

HEALTH & SAFTETY RISK ASSE


Document Ref:: Rev.

HSE Reviewed by: Signature.

Activity/Task : Installation of Cable Tray Date of assessmen

Activity : Shifting, Fabrication and installation of cable tray & Supports.

Significant Health and Saftey Hazard WHO or WHAT is at risk

15 Site Engineer/Operatives

16 Electricians

17 Electricians

18 Electricians

19 Electricians

20 Operator and Electricians

Eletricians and operatives who are going


21
inside confined space.
EIKH JABER CAUSEWAY
tract No. : KUSC-SC-S-0600

Y RISK ASSESSMENT FOR CABLE TRAY


Prepared by: Date:

of assessment : Marine / Offshore

Onshore

Initial Risk
Residual Risk
(With existing Controls)
Mitigations / Controls Measures
Risk
S L R S L R
Level
All Operatives and Engineers(for New/coming for the First
S 2 3 6 Time on Site) must attend safety induction and go with 2 1 2
somebody who already know the site.

- Operative must be properly trained in the use of tools.


S 2 3 6 - Use Proper and correct PPE for the said activity. 2 1 2
- Good House keeping on the area of work.

Must have Hot Work Permit and allow necessary safety


S 2 2 4 2 1 2
controls.

- Inspection of tools to be conducted on regular basis and


S 3 2 6 2 1 2
inspection sticker is attach, use appropraite PPE'S.

- Follow Scaffold and ladder safety.


S 3 2 6 3 1 3
- Check Full Body Harness each time it will be use.

Operative must be properly trained in the use of tools.


S 3 2 6 2 1 2
- Obtain Permit to Work(PTW)

- Obtain Permit to Work(PTW).


- Do not use any kind of igniting tools any spark producing
QC 3 3 9 3 1 3
materials and tools.
- Always follow the safe work on confined space.
Marine / Offshore

Onshore

Residual Risk

Risk
Level