You are on page 1of 34

EJES VERTICALES EJES HORIZ

EJE TRAMO LONGITUD EJE


A B 4.097
B C 2.000
C D 2.450
D E 3.950
A
E F 1.800
1 F G 1.350
G H 4.111
H I 1.143
I J 0.879
J K 1.480
TOTAL 23.260

B
D E 1.125
2 E F 1.800
TOTAL 2.925

A B 0.524
B C 2.000
C D 2.450
D
3 D E 3.950
E F 1.800
F G 1.350
TOTAL 12.074

D*
A B 0.524
4
TOTAL 0.524

E F 1.800
5 F G 1.350
TOTAL 3.150 E

B C 2.000
C D 2.450
6
D E 3.950
TOTAL 8.400
F

E F 1.800
7 F G 1.350
TOTAL 3.150
G
A B 4.097
B C 2.000
C D 2.450

8
D E 3.950
E F 1.800
8 F G 1.350
G H 4.111
H I 1.143
I J 0.879
J K 1.480
TOTAL 23.260

EJE TRAMO
B 1 6 8.182
C 1 3 3.551
D 1 6 7.282
E 1 7 7.882
G 1 7 6.682
H 1 3 3.551
I 3 6 4.220

1 B J 17.693
2 E G 3.150
3 B J 14.520
4 E G 3.150
5 E G 3.150
6 B J 14.543
7 E G 3.150

100.706 224.377
EJES HORIZONTALES EJES VERTICALES
TRAMO LONGITUD EJE TRAMO
1 2 1.993 1 A
2 3 1.800 2 D
3 4 1.400 3 A
4 5 1.850 4 A
5 6 1.124 5 E
6 7 1.000 6 B
7 8 3.818 7 E
TOTAL 12.985 8 A

1 2 1.993
2 3 1.800
3 4 1.400
4 5 1.850
5 6 1.124
TOTAL 8.167

1 2 1.993
2 3 1.8
3 4 1.4
4 5 1.85
5 6 1.124
TOTAL 8.167

3 4 1.075
TOTAL 1.075

1 2 1.993
2 3 1.8
3 4 1.4
4 5 1.85
5 6 1.124
6 7 1
TOTAL 9.167

1 2 1.993
TOTAL 1.993

3 4 1.4
4 5 1.85
5 6 1.124
6 7 1
TOTAL 5.374
EJES VERTICALES EJES HORIZONTALES
TRAMO LONGITUD EJE TRAMO
K 23.260 A 1 8
F 2.925 B 1 6
G 12.074 D 1 6
B 0.524 D* 3 4
G 3.150 E 1 7
E 8.400 F 1 2
G 3.150 G 3 7
K 23.260

76.743

123.671
TALES
LONGITUD
12.985
8.167
8.167
1.075
9.167
1.993
5.374

46.928
CLAVE CONCEPTO DIMENSIONES
PARCIA
UNIDAD PIEZAS
LARGO ANCHO ALTO L

PREELIMANARES
PRE- 001 ESTUDIO DE MECANICA DE SUELOS EN TERRENO TIPO II 1.00 LOTE

LIMPIA Y DESPALME DE TERENO POR MEDIOS MANUALES , INCLUYE MATERIALES Y MANO DE


PRE-002 23.26 12.99 1.00 M2 1 302.0
OBRAS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

TRAZO Y NIVELACION DE TERRENO POR MEDIOS MANUALES, INCLUYE PUENTEO REVENTON DE


PRE-003 23.26 12.99 1.00 LOTE 1 302.0
HILO, MATERIALES, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCCION

CONSTRUCCION DE BODEGA PARA MATERIALES Y HERRAMIENTA INCLUYE: MATERIALES MANO DE


PRE-004 1.00 LOTE 1
OBRA TODO LO NECESARIO PARA SU CONCRETA EJECUCION

ACARREO DE ESCOMBROS PRODUCTO DE LIMPIEZA Y DESPALME A TIRADERO MPAL.


PRE-005 AUTORIZADO INCLUYE: CARGA, TRASPALEO, MANO DE OBRA, TODO LO NECESARIO PARA SU 12.50 CAMION 1
CORRECTA EJECUCION

CIMENTACION

EXCAVACION DE CEPA DE CIMENTACION EN TERRENO TIPO II CON DIMENSIONES DE 0.75 M DE


CIM-001 FONDO Y 0.70 DE ANCHO, POR MEDIOS MANUALES, INCLUYE AFINE DE TALUDES Y FONDO, MANO 123.67 ML 1 123.7
DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

PLANTILLA DE NIVELACION DE CONCRETO POBRE F'C = 100 KG/ CM,HECHO EN OBRA, 5 CM. DE
CIM- 002 123.67 ML 1 123.7
ESPESOR, INCLUYE MATERIALES, MANO DE OBRA Y TODO LO NECESARIO PARA SU EJECUCION

ZAPATA CORRIDA ZC-1 DE 0.60 M DE PROFUNDIDAD POR 0.60 M DE ANCHO, MALLA DE 6*6-
4/DOBLE, 20 CM DE ESPESOR, CADENA ARMEX 15/-20-4, CONCRETO ARMADO FC= 200 KG/CM,
ENLADRILLADO TABIQUON PESADO 10X15X24, 2 HILADAS, Y CADENA DE DESPLANTE ARMEX 15-
CIM- 003 64.17 ML 1 64.2
15-4, RELLENO CON MATERIAL DE BANCO COMPACTADO A 95% P.V.S.M. EN CAPAS DE 2' CM,
HECHO EN OBRA,INCLUYE CIMBRADO Y DECIMBRADO, INCLUYE MATERIALES, MANO DE OBRA Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION
ZAPATA CORRIDA ZC-2 DE 0.60 M DE PROFUNDIDAD POR 0.40 M DE ANCHO, MALLA DE 6*6-
4/DOBLE, 20 CM DE ESPESOR, CADENA ARMEX 15/-20-4, CONCRETO ARMADO FC= 200 KG/CM,
ENLADRILLADO TABIQUON PESADO 10X15X24, 2 HILADAS, Y CADENA DE DESPLANTE ARMEX 15-
CIM- 004 59.50 ML 1 59.5
15-4, RELLENO CON MATERIAL DE BANCO COMPACTADO A 95% P.V.S.M. EN CAPAS DE 2' CM,
HECHO EN OBRA,INCLUYE CIMBRADO Y DECIMBRADO, INCLUYE MATERIALES, MANO DE OBRA Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION

ANCLAJE DE ESCALERA DE 0.25 M DE PROFUNDIDAD POR 1.20 M DE ANCHO, MALLA DE 6*6-4/


DOBLE, 20 CM DE ESPESOR, CADENA ARMEX 15/-20-4, CONCRETO ARMADO FC= 200 KG/CM,
CIM- 005 1.20 ML 1 1.2
HECHO EN OBRA,INCLUYE CIMBRADO Y DECIMBRADO, INCLUYE MATERIALES, MANO DE OBRA Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION

ZAPATA AHISLADA Z-1 DE 1.00 M DE PROFUNDIDAD POR 1.10X1.10 M, ARMADO DE VARILLA DEL
NO 3@20CM AMBOS SENTIDOS, 25 CM DE ESPESOR, CONCRETO ARMADO FC= 200 KG/CM,
DADO DE 0.30X0.30 M 8 VARILLA DEL NO 5 Y ESTRIBOS DEL NO 3@15CM, RELLENO CON
CIM- 006 PZA 6 6.0
MATERIAL DE BANCO COMPACTADO A 95% P.V.S.M. EN CAPAS DE 2' CM, HECHO EN OBRA,INCLUYE
CIMBRADO Y DECIMBRADO, INCLUYE MATERIALES, MANO DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION

ESTRUCTURA

COLUMNA C1DE 7.10 M CONCRETO HECHO EN OBRA FC 200KG/CM2, SECCION 30X30CM


ARMADA CON 6 VARILLAS DE NO.4 Y 2 VARILLAS DE NO 3 ESTRIBOS NO2@15CM, INCLUYE
EST-001 PZS 2 2.0
ANCLAJE CIMBRA DE MADERA, NIVELES Y PLOMOS, MATERIAL, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION

COLUMNA C2 DE 2.80 M CONCRETO HECHO EN OBRA FC 200KG/CM2, SECCION CIRCULAR


30CM DE DIAMETRO ARMADA CON 6 VARILLAS DEL NO 4, ESTRIBOS NO 2@11CM, INCLUYE
EST-002 PZS 2 2.0
ANCLAJE CIMBRA, NIVELES Y PLOMOS, MATERIAL, MANO DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION
COLUMNA C3 DE 2.80 M METLICA DE PTR, SECCION HSS 4"*4" 1/4" 18.2 KG/M, CON DOS PLACAS
BASE EN CONCEXION INFERIOR Y SUPERIOR DE 1/4" , 8 ANCLAS DE 7/8" DE 72 CM DE
EST-003 2.80 18.2 KG 3 153.0
DESARROLLO, INCLUYE MONTAJE, NIVELES Y PLOMOS, MATERIAL, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION

Castillo K-1 SECCION 15*15CM, armado con armex, 15-15-4, CONCRETO FC=200 KG/CM2,
EST-004 incluye cimbradO, descimbrado, plomos, materiales, mano de obra y todo lo necesario para su 2.80 ML 90 252.0
corrcta ejecucin

Castillo K-2 SECCION 15*30CM, ARMADO CON 6 VARILLAS NO 4, CONCRETO FC=200 KG/CM2,
EST-005 incluye cimbradO, descimbrado, plomos, materiales, mano de obra y todo lo necesario para su 2.80 ML 6 16.8
corrcta ejecucin

MURO DE TABICON PESADO 10X15X25 CM ASENTADO CON MORTERO CEMENTO DE ARENA 1:3
EST-006 EN 14, INCLUYE NIVELACION ,PLOMOS, MATERIALES MANO DE OBRA Y TODO LO NECESARIO PARA 123.67 0.40 M2 49.5
SU CORRECTA EJECUCION.

MURO DE TABIQUE ROJO 7X14X28 CM ASENTADO CON MORTERO CEMENTO DE ARENA 1:3 EN 14,
EST-007 INCLUYE NIVELACION ,PLOMOS, MATERIALES MANO DE OBRA Y TODO LO NECESARIO PARA SU 224.37 2.80 M2 628.2
CORRECTA EJECUCION.

CADENA DE CERRAMIENTO DE CONCRETO PREMEZCLADO Y BOMBEADO FC 200 KG/CM2,


EST-008 ARMADA CON ARMEX 15X20 CM, INCLUYE CIMBRADO Y DECIMBRADO, MATERIALES MANO DE 160.66 ML 160.7
OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

TRABE T1 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 35X20 FC 200


KG/CM2 ARMADA CON 4 VS # 4 Y 2VS#6, ESTRIBOS NO 2 @20 CM CENTRO @9 EXTREMO ,
EST-009 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 4.45 PZA 4.5
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,
TRABE T2 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 15X20 FC 200
KG/CM2 ARMADA CON 3 VS # 4 Y 2 VS# 3, ESTRIBOS NO 2 @20 CM CENTRO 8.5 EXTREMO ,
EST-0010 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 3.95 PZA 4.0
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T3 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 20X20 FC 200


KG/CM2 ARMADA CON 3 VS # 5 Y 1VS#4, ESTRIBOS NO 2 @20 CM CENTRO @8.5 EXTREMO ,
EST-011 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 1.80 PZA 1.8
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T4 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 25X20 FC 200


KG/CM2 ARMADA CON 3 VS # 6 Y 2 VS #4, ESTRIBOS NO 2 @20 CM CENTRO @9 EXTREMO ,
EST-012 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 5.40 PZA 5.4
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T5 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 15X30 FC 200


KG/CM2 ARMADA CON 4 VS # 5 Y 2 VS # 4, ESTRIBOS NO 2 @20 CM CENTRO @13 EXTREMO ,
EST-013 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 4.45 PZA 4.5
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T6 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 25X20 FC 200


KG/CM2 ARMADA CON 4 VS # 6 Y 3 VS # 4, ESTRIBOS NO 2 @20 CM CENTRO @11 EXTREMO ,
EST-014 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 4.20 PZA 4.2
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,
TRABE T6' DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 15X20 FC 200
KG/CM2 ARMADA CON 4 VS # 6 Y 3 VS #4, ESTRIBOS NO 2 @20 CM CENTRO @11 EXTREMO ,
EST-015 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 1.35 PZA 1.4
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T7 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 15X45 FC 200


KG/CM2 ARMADA CON 3 VS # 6 Y 2 VS #4, ESTRIBOS NO 2 @18.5 CM CENTRO @18 EXTREMO ,
EST-016 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 5.55 PZA 5.6
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T8 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 15X40 FC 200


KG/CM2 ARMADA CON 3 VS # 5 Y 2 VS #4, ESTRIBOS NO 2 @18.5 CM CENTRO @18 EXTREMO ,
EST-017 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 4.40 PZA 4.4
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T9 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 15X30 FC 200


KG/CM2 ARMADA CON 2 VS # 5 Y 5 VS #2, ESTRIBOS NO 2 @20 CM CENTRO @13 EXTREMO ,
EST-018 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 3.76 PZA 3.8
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T10 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 15X30 FC 200


KG/CM2 ARMADA CON 3 VS # 6 Y 2 VS #4, ESTRIBOS NO 2 @20 CM CENTRO @10 EXTREMO ,
EST-019 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 3.95 PZA 2 7.9
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,
TRABE T11 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 20X15 FC 200
KG/CM2 ARMADA CON 2 VS # 4 TEC - 60, ESTRIBOS NO 2 @20 CM , INCLUYE HABILITADO DEL
EST-020 HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, APUNTALAMIENTO, 3.78 PZA 2 7.6
CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T12 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 20X15 FC 200


KG/CM2 ARMADA CON 2 VS # 5 TEC - 60, ESTRIBOS NO 2 @20 CM , INCLUYE HABILITADO DEL
EST-021 HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, APUNTALAMIENTO, 3.20 PZA 2 6.4
CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T13 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 20X15 FC 200


KG/CM2 ARMADA CON 2 VS # 5 TEC - 60, ESTRIBOS NO 2 @20 CM , INCLUYE HABILITADO DEL
EST-022 HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, APUNTALAMIENTO, 3.20 PZA 2 6.4
CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T14 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 15X35 FC 200


KG/CM2 ARMADA CON 4 VS # 6 Y 2 VS #4, ESTRIBOS NO 2 @20 CM CENTRO @14 EXTREMO ,
EST-023 INCLUYE HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, 4.10 PZA 4.1
APUNTALAMIENTO, CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION,

TRABE T15 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 20X25 FC 200


KG/CM2 ARMADA CON 4 VS # 4, ESTRIBOS NO 2 @20 CM CENTRO @8.5 EXTREMO , INCLUYE
EST-024 HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, APUNTALAMIENTO, 3.15 PZA 3.2
CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION,
TRABE T16 DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO DE SECCION 20X20 FC 200
KG/CM2 ARMADA CON 4 VS # 4, ESTRIBOS NO 2 @20 CM CENTRO @8.5 EXTREMO , INCLUYE
EST-025 HABILITADO DEL HACER, ARAMDAO, ELEVACIONES, CIMBRA DE CONTACTO, APUNTALAMIENTO, 3.80 PZA 3.8
CURADO,DESCIMBRADO, NIVELACION, PLOMOS, MATERIALES, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION,

LOSA DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO FC 200 KG/CM2 SISTEMA VIGUETA Y


BOVEDILLA, A BASE DE VIGUETA DE CONCRETO PRETENSADO,BOVEDILLA DE POLIESTILENO DE
122X65X20 CM , ARAMADA CON MALLA ELECTROSOLDADA 6-6 10-10, CAPA DE COMPRESION DE
EST-025 5CM DE ESPESOR, INCLUYE SUMINISTRO, FLETES, ACARREO EN OBRA, ELEVACIONES, CORTES, 231.91 M2 231.9
TRASLAPES, CRUCES, AMARRES ,SILLETAS,DESPERDICIOS , COLOCACION,
NIVELACION,APUNTALAMIENTO,CIMBRA EN FRONTERAS ,ANDAMIAJE, CURADO,REGLEADO,
MATERIALES, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

INSTALACION SANITARIA

EXCAVACION A MANO PARA SEPAS DE TENDIDO DE TUBERIA, INCLUYE MANO DE OBRA, ACARREO,
ISA-001 MATERIALES, HERRAMIENTA, EQUIPO, LIMPIEZA Y TODO LO NECESARIO PARA SU PERFECTA 95.33 ML 95.3
EJECUCION

SUMINISTRO Y COLOCACION DE RED PRINCIPAL SANITARIA A BASE DE TUBO PVC DE NORMA 6"
DE DIAMETRO,INCLUYE COPLES,CODOS , CAMA DE ARENA,CONEXIONES,ALINACION,
ISA-002 25.85 ML 25.9
DESPERDICIOS, PRUEBAS DE FUNCIONAMIENTO,MATERIALES, MANO DE
OBRA,HERRAMIENTA,EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

CONSTRUCCION REGISTRO SANITARIO 40X60XVAR MADIDAS INTERIORES, A BASE DE TABICON


PESADO 10X14X288 CM ASENTADO CON MORTERO CEMENTO ARENA 1:4 APLANADO DE 2 CM
CON EL MISMO MORTERO ACABADO PULIDO, PLANTILLA DE 7 CM DE ESPESOR DE CONCRETO FC
ISA-003 150 KG/M2 , HECHO EN OBRA, INCLUYE FORJADO MEDIDA DE CAA EN FONDO, MARCO Y PZ 6
CONTRAMARCO DE ANGULO DE 2", FORJADO DEL MISMO CONCRETO,
ACARREOS,DESPERDICIOS,MATERIALES, MANO DE OBRA HERRAMIENTA,EQUIPO Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.
SUMINISTRO Y COLOCACION DE BAJANTES PLUVIALES A BASE DE TUBO DE PVC DE 4" DE
DIAMETRO, INCLUYE INCLUYE COPLES,CODOS , CAMA DE ARENA,CONEXIONES,ALINACION,
ISA-004 7.50 ML 4 30.0
DESPERDICIOS, PRUEBAS DE FUNCIONAMIENTO,MATERIALES, MANO DE
OBRA,HERRAMIENTA,EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO E INSTALACION DE SALIDA SANITARIA A BASE DE TUBO DE PVC DE 2 " DE


DIAMETRO INCLUYE COPLES,CODOS , CONEXIONES,ALINACION, DESPERDICIOS, PRUEBAS DE
ISA-005 35.70 ML 35.7
FUNCIONAMIENTO,MATERIALES, MANO DE OBRA,HERRAMIENTA,EQUIPO Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION

SUMINISTRO E INSTALACION DE SALIDA SANITARIA A BASE DE TUBO DE PVC DE 4 " DE


DIAMETRO INCLUYE COPLES,CODOS , CONEXIONES,ALINACION, DESPERDICIOS, PRUEBAS DE
ISA-006 26.21 ML 26.2
FUNCIONAMIENTO,MATERIALES, MANO DE OBRA,HERRAMIENTA,EQUIPO Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION

INSTALACION HIDRAULICA

SUMINISTRO Y COLOCACION DE CUADRO HIDRAULICO A BASE DE TUBERIA TUBOPLUS DE 1/2",


INCLUYE: 3 CODOS DE 90GX1/2", 1 CODO RINCON DE 90GX1/2", 1 VALVULA CHECK DE BRONCE
HID-001 1.00 PZA 1 1.0
DE 1/2", 1 LLAVE NARIZ DE BRONCE, 2 TUERCA UNION DE 1/2" GALVANIZADA, CINTA TEFLON,
PRUEBAS DE FUNCIONAMIENTO, TRABAJO TERMINADO.

SALIDA HIDRAULICA AGUA FRIA Y AGUA CALIENTES, A BASE DE TUBERIA DE CPVC DIFERENTES
HID-002 DIAMETROS, UNIDA CON PEGAMENTO AMARILLO PARA CPVC, INCLUYE: COPLES, CODOS, TEES, 34.00 SAL 1 34.0
CONECTORES, PRUEBAS DE FUNCIONAMIENTO, TRABAJO TERMINADO.

SUMINISTRO E INSTALCION DE EQUIPO HIDRONEUMATICO MARCA EVANS CON BOMBA TIPO JET DE
1.5 HP MONOFSICA CON TANQUE PARA 86 GALONES Y RANGO DE PRESION DE 30 A 60
HID-003 1.00 PZA 1
PSI.LITRO, INCLYYE MANO DE OBRA Y EQUIPOS NECESARIOS PARA INSTALACION TUBERIAS DE
SUMINISTRACION Y LLEGADA A RED CON MATERIALES NECESARIOS.
SUMINISTRO Y COLOCACION DE CISTERNA HECHA EN OBRA DE 2.0 M POR 2.0 M LIBRES Y 1.20 DE
HID-004 PROFUNDIDAD., INCLUYE VALVULA DE LLENADO, VALVULA DE PIE MARCA URREA, TUBO DE 1.00 PZA 1
SUCCION, MANO DE OBRA Y EQUIPO NECESARIO PARA SU PERFECTA EJECUCION.

SUMINISTRO Y COLOCACION CALENTADOR DE PASO MARCA CALOREX DE 15 LITROS POR MINUTO,


HID-005 MODELO COXDP-15, INCLUYE MANO DE OBRA EQUIPO NECESARIO PARA SU INSTALACION Y 1.00 PZA 1
TUBERIAS DE SUMINISTRACION Y TODO LO NECESARIO PARA SU PERFECTA EJECUCION

SUMINISTRO Y COLOCACION TUBERA HIDRAULICA TUBOPLUS DE 1" DE DIMETRO , INCLUYE


HID-006 CONEXIONES, MISCELANEOS, MANO DE OBRA EQUIPO Y TODO LO NECESARIO PARA SU PERFECTA 129.58 ML 1 129.6
EJECUCION

SUMINISTRO Y COLOCACION TUBERA HIDRAULICA TUBOPLUS DE 3/4" DE DIMETRO , INCLUYE


HID-007 CONEXIONES, MISCELANEOS, MANO DE OBRA EQUIPO Y TODO LO NECESARIO PARA SU PERFECTA 44.87 ML 1 44.9
EJECUCION

SUMINISTRO Y COLOCACION TUBERA HIDRAULICA TUBOPLUS DE 1/2" DE DIMETRO , INCLUYE


HID-008 CONEXIONES, MISCELANEOS, MANO DE OBRA EQUIPO Y TODO LO NECESARIO PARA SU PERFECTA 26.90 ML 1 26.9
EJECUCION

INSTALACION ELECTRICA

SUMINISTRO E INSTALACION DE ACOMETIDA ELECTRICA CONSISTENTE EN COLOCACION DE BASE


SOQUET DE MEDICIN BIFSICA 2 FASES 3 HILOS MOD. MS1005J MCA. SWUARE D , INCLUYE
TUBO CONDUIT PGG DE 35 MM DE DIAMETRO Y MUFA DE 35 MM DE DIAMETRO, ELEMENTOS DE
FIJACION, CONEXIONES, FLETES, ACARREOS CUALQUIER ALTURA, COLOCACION DE VARILLA
ELE-001 PZA 1.0
COPPERWELL DE BRONCE 1/2" X 1M DE LARGO HINCADA EN PISO, INCLUYE CONECTOR DE
BRONCE DE 1.80 M DE CABLE CAL. 12, CONECTADA A BASE SOQUET DE MEDICION, PRUEBAS DE
FUNCIONAMIENTO,MATERIALES,MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCUCION.
SUMINISTRO E INSTALACION DE TABLERO DE CARGA QO12 PRINCIPAL MCA. SQUARE D, INCLUYE 1
INTERRUPTOR TERMOMAGNETICO 2 POLOS 30 AMPS MOD. FA22040 MCA. SQUARE COLOCADOS
ELE-002 EN GABINETE DE EMPOTRADO MOD. FA100FMX, CONEXIONES, FIJACION CUALQUIER ALTURA, PZA 1.0
PRUEBAS DE FUNCIONAMIENTO,MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO Y TODO
LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACION DE SALIDA ELECTRICA PARA APAGADORES , CONTACTOS, TV, VOZ Y


DATOS, INCLUYE RANURADO DE MUROS, CANALIZACION A BASE DE POLIDICTO DE 1/2"
ELE-003 CABLEADO CALIBRE 14 MARCA CONDUMEX, CHALUPA GALVANIZADA Y/ CABLE TELEFONICO 3 SALIDA 91.0
HILOS, CABLE COAXILA, MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACION DE CONTACTO DUPLEX POLARIZADO DE 180 WATTS, INCLUYE


ELE-004 CONEXIONES,, FIJACION, NIVELACION , PRUEBAS DE FUNCION,MATERIALES, MANO DE OBRA , PZA 29.0
HERAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACION DE CONTACTO DUPLEX POLARIZADO PARA INTERPERIE DE 180


ELE-005 WATTS, INCLUYE CONEXIONES,, FIJACION, NIVELACION , PRUEBAS DE FUNCION,MATERIALES, PZA 5.0
MANO DE OBRA , HERAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACION DE CONTACTO DUPLEX POLARIZADO DE 250 WATTS, INCLUYE


ELE-006 CONEXIONES,, FIJACION, NIVELACION , PRUEBAS DE FUNCION,MATERIALES, MANO DE OBRA , PZA 4.0
HERAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACION DE APAGADOR MARCA DUPLEX, MARCA QUINZIO LINEA DOMUS,


ELE-007 INCLUYE CONEXIONES,, FIJACION, NIVELACION , PRUEBAS DE FUNCION,MATERIALES, MANO DE PZA 10.0
OBRA , HERAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION
SUMINISTRO Y COLOCACION DE APAGADOR ESCALERA, MARCA QUINZIO LINEA DOMUS, INCLUYE
ELE-008 CONEXIONES,, FIJACION, NIVELACION , PRUEBAS DE FUNCION,MATERIALES, MANO DE OBRA , PZA 11.0
HERAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO E INSTALACION DE SPOT DE EMPOTRAR CONO GRANDE MARCA CONSTRULITA


MODELO SLIM SUSPENDER OF8021 20 W, INCLUYE CONEXIONES, ELEVACIONES,
ELE-009 PZA 33.0
FIJACION,NIVELACION,PRUEBAS DE FUNCIONAMIENTO, MATERIALES, MANO DE OBRA,
HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO E INSTALACION DE LUMINARIA EMPOTRADA FIJO REDONDO, CONO CHICO MARCA


CONSTRULITA MODELO PRISMATICOS EMPOTRAR OF1021 32 W, INCLUYE CONEXIONES,
ELE-010 PZA 1.0
ELEVACIONES, FIJACION,NIVELACION,PRUEBAS DE FUNCIONAMIENTO, MATERIALES, MANO DE
OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO E INSTALACION DE LUMINARIA ARBOTANTE EN MURO INTERIOR PARA LAMPARA


COMPACTA DE 26 WATTS, BALASTRO ELECTRONICO 127-220 V MOD. RE201G MCA. CONSTRULITA,
ELE-011 INCLUYE CONEXIONES, ELEVACIONES, FIJACION,NIVELACION,PRUEBAS DE FUNCIONAMIENTO, PZA 7.0
MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION

SUMINISTRO E INSTALACION DE LUMINARIA ARBOTANTE EN MURO EXTERIOR PARA LAMPARA


COMPACTA DE 26 WATTS, BALASTRO ELECTRONICO 127-220 V MOD. H-945/B MCA. TECHNO
ELE-012 LIGHT, INCLUYE CONEXIONES, ELEVACIONES, FIJACION,NIVELACION,PRUEBAS DE PZA 7.0
FUNCIONAMIENTO, MATERIALES, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION

SUMINISTRO E INSTALACION DE LUZ DE CORTESA SENCILLO EN MURO MOD. CASTILLO H-930/B


MCA. TECHNOLITE, CON LAMPARA DE 15 WATTS, INCLUYE CONEXIONES, ELEVACIONES,
ELE-013 PZA 5.0
FIJACION,NIVELACION,PRUEBAS DE FUNCIONAMIENTO, MATERIALES, MANO DE OBRA,
HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION
SUMINISTRO Y COLOCACION DE ALARMA DUAL GSM INALAMBRICA DE SEGURIDAD DE CASA
ELE-0014 HABITACIN, INCLUYE CONEXIONES,, FIJACION, NIVELACION , PRUEBAS DE FUNCION,MATERIALES, PZA 1.0
MANO DE OBRA , HERAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACION DE SALIDA TELEFONICA MARCA DUPLEX, MARCA QUINZIO LINEA


ELE-015 DOMUS, INCLUYE CONEXIONES,, FIJACION, NIVELACION , PRUEBAS DE FUNCION,MATERIALES, pza 3.0
MANO DE OBRA , HERAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACION DE SALIDA PARA VOZ Y DATOS MARCA DUPLEX, MARCA QUINZIO
LINEA DOMUS, INCLUYE CONEXIONES,, FIJACION, NIVELACION , PRUEBAS DE
ELE-016 pza 2.0
FUNCION,MATERIALES, MANO DE OBRA , HERAMIENTA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION

SUMINISTRO Y COLOCACION DE SALIDA PARA TV MARCA DUPLEX, MARCA QUINZIO LINEA


ELE-017 DOMUS, INCLUYE CONEXIONES,, FIJACION, NIVELACION , PRUEBAS DE FUNCION,MATERIALES, pza 7.0
MANO DE OBRA , HERAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACION DE POLIDUCTO NEGRO NARANJA MATCH REORZADO DE 1" DE


ELE-018 DIMETRO, INCLUYE CONEXIONES,, FIJACION, NIVELACION , PRUEBAS DE FUNCION,MATERIALES, ML 379.5
MANO DE OBRA , HERAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

ALBAILERIA

APLANADO DE MEZCLA TERMINADO FINO APLANADO SOBRE MURO DE TABIQUE CON MORTERO
CEMENTO ARENA 1:4 A PLOMO, ESPESOR PROMEDIO 2 CM, ACABADO FINO ENBOQUILLADO Y
PERFILADO DE ARISTAS, PICADO EN LAS SUPERFICIES DE CONCRETO EN CASTILLOS Y CADENA;
alb-001 224.37 2.80 M2 1 628.2
INCLUYE SUMINISTRO DE MATERIALES ELABORACION COLOCACION DE LA MEZCLA A CUALQUIER
NIVEL, CARGAS, ACARREOS, RETIRO DE SOBRANTES, EQUIPO, HERRAMIENTA Y TODO LO
NECESARIO PARA SU PERFECTA EJECUCION.
APLANADO DE YESO PULIDO SOBRE MURO DE TABIQUE A PLOMO, ESPESOR PROMEDIO 2 CM,
ACABADO FINO Y PERFILADO DE ARISTAS; INCLUYE SUMINISTRO DE MATERIALES ELABORACION
alb-002 224.37 2.80 M2 1 628.2
COLOCACION DE LA MEZCLA A CUALQUIER NIVEL, CARGAS, ACARREOS, RETIRO DE SOBRANTES,
EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU PERFECTA EJECUCION.

FIRME DE CONCRETO PREMEZCLADO Y BOMBEADO EN SITIO FC 200 KG/CM2 ACABADO RAYADO,


ARAMADA CON MALLA ELECTROSOLDADA 6-6 10-10, CAPA DE COMPRESION DE 10CM DE
ESPESOR, INCLUYE SUMINISTRO, FLETES, ACARREO EN OBRA, ELEVACIONES, CORTES,
ALB-003 198.95 M2 295.8
TRASLAPES, CRUCES, AMARRES ,SILLETAS,DESPERDICIOS , COLOCACION,
NIVELACION,APUNTALAMIENTO,CIMBRA EN FRONTERAS ,ANDAMIAJE, CURADO,REGLEADO,
MATERIALES, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

PRETIL DE TABIQUE ROJO 7X14X28 CM ASENTADO CON MORTERO CEMENTO DE ARENA 1:3 EN
alb-04 14, INCLUYE NIVELACION ,PLOMOS, MATERIALES MANO DE OBRA Y TODO LO NECESARIO PARA SU 54.26 0.40 M2 21.7
CORRECTA EJECUCION.

RELLENO, ENLADRILLADO, ENTORTADO Y CHALPAQUE EN AZOTEA; INCLUYE MATERIALES MANO


ALB-05 1.00 M2 121.1
DE OBRA, HERRAMIENTAS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION

(un millon doscientos veintiocho mil ciento se


P.U. IMPORTE

$5,000.00 $5,000

$12.00 $3,624

$3,500.00 $3,500

$1,500.00 $1,500

$500.00 $500

SUBTOTAL $14,124

$85.00 $10,512

$140.60 $17,388

$1,123.38 $72,083
$954.84 $56,813

$477.42 $573

$2,848.00 $17,088

SUBTOTAL $174,457

$486.30 $973

$534.65 $1,069
$45.00 $6,887

$332.70 $83,839

$427.40 $7,180

$313.01 $15,484

$262.71 $165,044

$268.23 $43,094

$252.00 $1,121
$217.63 $860

$324.90 $585

$480.31 $2,594

$298.55 $1,329

$480.30 $2,017
$217.63 $294

$364.25 $2,022

$350.21 $1,541

$298.55 $1,123

$298.55 $2,359
$217.63 $1,645

$217.63 $1,393

$217.63 $1,393

$312.87 $1,283

$480.30 $1,513
$324.90 $1,235

$660.00 $153,061

SUBTOTAL $500,935

$60.00 $5,720

$176.45 $4,561

$1,425.81 $8,555
$145.32 $4,360

$565.59 $20,192

$145.32 $3,809

SUBTOTAL $47,196

$395.93 $396

$518.11 $17,616

$1,850.00 $1,850
$6,200.00 $6,200

$6,200.00 $6,200

$37.00 $4,794

$26.00 $1,167

$21.08 $566

SUBTOTAL $38,393

$2,151.68 $2,152

.
$1,407.62 $1,408

$472.15 $42,966

$100.05 $2,901

$123.50 $618

$143.53 $574

$79.53 $795
$55.21 $607

$275.17 $9,081

$165.71 $166

$3,781.00 $26,467

$357.51 $2,503

$345.88 $1,729
$3,018.00 $3,018

$178.94 $537

$210.87 $422

$88.37 $619

$15.87 $6,023

SUBTOTAL $100,432

$125.76 $79,007
$125.76 $79,007

$660.00 $195,228

$262.71 $5,702

$265.00 $32,084

SUBTOTAL $391,027
TOTAL $1,228,172

ntos veintiocho mil ciento setenta y dos pesos 00/1000)