Generation and Reservoirs Statistics

March 2, 2017

PUBLIC UTILITIES COMMISSION OF SRI LANKA


Daily Generation Mix in MWh

720 170
2% 0%

2,290
10,260 6% 6,560
27% 17% CEB Hydro
CEB Thermal Oil
CEB Coal
IPP Thermal
SPP Wind
18,210 SPP Solar
48%

Total Generation 38,210 MWh


Note: Generation from other SPPs (Mini Hydro, small scale Solar and Biomass) is not included

Cumulative Dispatch

For Current Month

Category Dispatch (MWh)


CEB Hydro 4,830.0 6.33%
CEB Thermal Oil 13,450.0 17.62%
CEB Coal 36,830.0 48.26%
IPP Thermal 19,870.0 26.04%
SPP Wind& Solar 1,340.0 1.76%
Total 76,320.0

For Current Year

Category Dispatch (GWh)


CEB Hydro 236 10.48%
CEB Thermal Oil 431 19.15%
CEB Coal 1,057 46.97%
IPP Thermal 496 22.02%
Renewable 31 1.39%
Total 2,251
MW

50

0
100
150
200
250
300
MWh

0
1000
2000
3000
4000
5000
6000
7000
8000
Wimalasurendra
Old Laxapana Wimalasurendra
Canyon Old Laxapana
New Laxapana Canyon
Polpitiya New Laxapana
Kotmale Polpitiya
Victoria Kotmale
Victoria
Randenigala
Plant Dispatch on

Randenigala
Rantambe
Rantambe
Ukuwela
Ukuwela
Bowatenna
Bowatenna
Upper Kotmale
Upper Kotmale

Installed Capacity
Samanalawewa
Samanalawewa

Rated Generation Capacity


Kukule
Kukule

Plant Loading at Night Peak on


Inginiyagala Inginiyagala
Udawalawe Udawalawe
March 2, 2017

Nilambe Nilambe
Puttalam Coal I Puttalam Coal I
Puttalam Coal II Puttalam Coal II
Puttalam Coal III Puttalam Coal III

Available Capacity
Uthura Janani Uthura Janani
Sapugaskanda B Sapugaskanda B

Available Generation
Sapugaskanda A Sapugaskanda A
Barge CEB Barge CEB

March 2, 2017
Asia Power Asia Power
KCCP KCCP
Northern Power Northern Power

Night Peak Load


Westcoast Westcoast
Sojitz - Kelanitissa Sojitz - Kelanitissa
ACE Embilipitiya ACE Embilipitiya
Actual generation

KPS GT 7 KPS GT 7
KPS Small GTs KPS Small GTs
Agreko-Galle Agreko-Galle
Agreko-Hambantota Agreko-Hambantota
Agreko-Kurunagala Agreko-Kurunagala
Agreko-Pallekalle Agreko-Pallekalle
Contribution to the Night Peak in MW

46.1
2%
379.7
565.4 17%
26%
CEB Hydro
376.2
17% CEB Thermal Oil
CEB Coal
IPP Thermal
823 SPP Wind
38%

Night Peak 2,190.4 MW


Day Peak 1,854.4 MW
Minimum Demand 1,010.8 MW

Note: Contribution from other SPPs (Mini Hydro, Solar and Biomass) is not included

Reservoir Levels - as at 06.00 Hr on March 3, 2017

100% 160
149.2
90% 140
80%
120
70%
60% 100
89
50% 46% 80
40% 62.2 60
29% 34% 34%
30% 48.7
33% 40
20% 15%
27.1 26.1
10% 20

0% 0
Castlereigh Maussakelle Kotmale Victoria Randenigala Samanalawewa
% of Total Capacity Reservoir level (GWh)

Total Reservoir Level(GWh) 402.3


% of Total capacity 31.97
Comparison of Total Reservoir Storage Levels with Past Years
GWh
1400.0

1200.0

1000.0

800.0

600.0

400.0

200.0

0.0
1-Jan 1-Feb 1-Mar 1-Apr 1-May 1-Jun 1-Jul 1-Aug 1-Sep 1-Oct 1-Nov 1-Dec

2012 2013 2014 2015 2016 2017

Variation of Major Hydro Reservoir Levels in GWh- 2017

GWh
500.0

450.0

400.0

350.0

300.0

250.0

200.0

150.0

100.0

50.0

0.0
1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb

Castlereigh Maussakelle Kotmale Victoria Randenigala Samanalawewa


Variation of Demand 2017

MW
2500.0

2000.0

1500.0

1000.0

500.0

0.0
1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb

Nigh Peak Day Peak Minimum Demand

Comparison of Cumulative Dispatch

GWh
2,500
4.32
26 28.32

2,000 407 495.52


23 23
97

1,500 822
818 766
1057.25
1,000 155
96 225
415
500
879 430.91
776
492
235.8
-
2014 2015 2016 2017

CEB Hydro CEB Thermal Oil CEB Coal IPP Thermal Wind Solar
Daily Load Curve - March 1, 2017

2500

2000

1500

1000

500

CEB Coal CEB Thermal Oil IPP Thermal CEB Hydro


Power Station Capacity (MW) Primary Fuel
CEB Hydro
Victoria 210
Ukuwela 40
Kotmale 201
Randenigala 122
Rantambe 49
Bowatenna 40
Nilambe 3.2
Upper Kotmale 150
Old Laxapana 50
New Laxapana 115
Polpitiya 75
Wimalasurendra 50
Canyon 60
Samanalawewa 120
Kukuleganga 75
Inginiyagala 10
Udawalawe 6

CEB Thermal
Sapugaskanda 1 72 Heavy Fuel
Sapugaskanda 2 72 Heavy Fuel
Kelanitissa Small Gas Turbines 68 Auto Diesel
GT 7 - Kelanitissa 115 Auto Diesel
Kelanitissa CCY 165 Naptha & Diesel
Lakvijaya (Puttalam Coal) 285 Coal
Lakvijaya (Puttalam Coal) Stage II 285 Coal
Lakvijaya (Puttalam Coal) Stage III285 Coal
Uthuru Janani 24 Heavy Fuel
Barge CEB 60 Furnace Oil

Private Thermal (IPPs)


Asia Power 51 Heavy Fuel
Sojitz - Kelanitissa 163 Auto Diesel
West Coast 270 Low Sulphur Furnace oil
Northern Power 27 Auto Diesel
ACE Embilipitiya 100 Furnace Oil