Professional Documents
Culture Documents
March 2, 2017
720 170
2% 0%
2,290
10,260 6% 6,560
27% 17% CEB Hydro
CEB Thermal Oil
CEB Coal
IPP Thermal
SPP Wind
18,210 SPP Solar
48%
Cumulative Dispatch
50
0
100
150
200
250
300
MWh
0
1000
2000
3000
4000
5000
6000
7000
8000
Wimalasurendra
Old Laxapana Wimalasurendra
Canyon Old Laxapana
New Laxapana Canyon
Polpitiya New Laxapana
Kotmale Polpitiya
Victoria Kotmale
Victoria
Randenigala
Plant Dispatch on
Randenigala
Rantambe
Rantambe
Ukuwela
Ukuwela
Bowatenna
Bowatenna
Upper Kotmale
Upper Kotmale
Installed Capacity
Samanalawewa
Samanalawewa
Nilambe Nilambe
Puttalam Coal I Puttalam Coal I
Puttalam Coal II Puttalam Coal II
Puttalam Coal III Puttalam Coal III
Available Capacity
Uthura Janani Uthura Janani
Sapugaskanda B Sapugaskanda B
Available Generation
Sapugaskanda A Sapugaskanda A
Barge CEB Barge CEB
March 2, 2017
Asia Power Asia Power
KCCP KCCP
Northern Power Northern Power
KPS GT 7 KPS GT 7
KPS Small GTs KPS Small GTs
Agreko-Galle Agreko-Galle
Agreko-Hambantota Agreko-Hambantota
Agreko-Kurunagala Agreko-Kurunagala
Agreko-Pallekalle Agreko-Pallekalle
Contribution to the Night Peak in MW
46.1
2%
379.7
565.4 17%
26%
CEB Hydro
376.2
17% CEB Thermal Oil
CEB Coal
IPP Thermal
823 SPP Wind
38%
Note: Contribution from other SPPs (Mini Hydro, Solar and Biomass) is not included
100% 160
149.2
90% 140
80%
120
70%
60% 100
89
50% 46% 80
40% 62.2 60
29% 34% 34%
30% 48.7
33% 40
20% 15%
27.1 26.1
10% 20
0% 0
Castlereigh Maussakelle Kotmale Victoria Randenigala Samanalawewa
% of Total Capacity Reservoir level (GWh)
1200.0
1000.0
800.0
600.0
400.0
200.0
0.0
1-Jan 1-Feb 1-Mar 1-Apr 1-May 1-Jun 1-Jul 1-Aug 1-Sep 1-Oct 1-Nov 1-Dec
GWh
500.0
450.0
400.0
350.0
300.0
250.0
200.0
150.0
100.0
50.0
0.0
1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb
MW
2500.0
2000.0
1500.0
1000.0
500.0
0.0
1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb
GWh
2,500
4.32
26 28.32
1,500 822
818 766
1057.25
1,000 155
96 225
415
500
879 430.91
776
492
235.8
-
2014 2015 2016 2017
CEB Hydro CEB Thermal Oil CEB Coal IPP Thermal Wind Solar
Daily Load Curve - March 1, 2017
2500
2000
1500
1000
500
CEB Thermal
Sapugaskanda 1 72 Heavy Fuel
Sapugaskanda 2 72 Heavy Fuel
Kelanitissa Small Gas Turbines 68 Auto Diesel
GT 7 - Kelanitissa 115 Auto Diesel
Kelanitissa CCY 165 Naptha & Diesel
Lakvijaya (Puttalam Coal) 285 Coal
Lakvijaya (Puttalam Coal) Stage II 285 Coal
Lakvijaya (Puttalam Coal) Stage III285 Coal
Uthuru Janani 24 Heavy Fuel
Barge CEB 60 Furnace Oil