Professional Documents
Culture Documents
H17/28 1/3
Section No. Rev.
Engine Maintenance General Clearances and Wear Limits
G09200 1B
st -0.01
1 ring A=5 -0.025 a = 0.15~0.195 0.5
st +0.17
1 groove A1=5 +0.14 5.37
nd -0.01
2 ring B=4 -0.025 b = 0.1~0.145 0.5
Piston ring
M31100
and groove
nd +0.12
2 groove B1=4 +0.09 4.32
-0.01
Oil scraper ring C=5 -0.025 c = 0.05~0.085 0.3
rd +0.06
3 groove C1=5 +0.04 5.20
Main
Crankshaft B=175 b = 0.149~0.233 0.3
bearing
M13250
Thrust
C=100 c = 0.1~0.335 0.5
bearing
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.08/YJH
Page
H17/28 2/3
Section No. Rev.
Engine Maintenance General Clearances and Wear Limits
G09200 1B
B
Camshaft b A=145 a = 0.130~0.211 0.26
bearing a
M25000 Camshaft
A
Camshaft thrust
B=10 b = 0.1~0.35 0.5
bearing
Intake/exhaust a = 0.4~0.9
rocker arm shaft A=34
and bearing a = 0.4~0.9
M21210
Valve
operating Tappet and
B=38 b = 0.05~0.082 0.2
mechanism tappet guide
and tappet
G
d g
Intake valve
(stem part) and A=14 a = 0.06~0.143 0.3
guide
M21130
Exhaust valve
(stem part) and A=14 a = 0.08~0.163 0.3
guide
Intake and
exhaust
valve Intake valve C=5.6
4.1
(face part) R1=30 R1= -05~ 0
Intake valve
R2=30 R2= 0~ 05
seat
M21200
Exhaust valve E=5.3
3.8
(face part) R3=30 R3= -05~ 0
Exhaust valve
R4=30 R4= 0~ 05
seat
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.08/YJH
Page
H17/28 3/3
Section No. Rev.
Engine Maintenance General Clearances and Wear Limits
G09200 1B
Timing gear
A
M35000 Backlash c = 0.15~0.4 0.5
a
Intake b 1) Valve
Clearance (a) 0.5 mm
Valve clearance is
with engine
cold.
M21210 2) (b) should
be set at 0
prior to the
Exhaust adjustment
Clearance (a) 0.5 mm of (a)
valve
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.08/YJH