Professional Documents
Culture Documents
, PATNA
(Registered Office, Vidyut Bhawan, Bailey Road, Patna)
(Department of Rura I Electrification)
S.K. Srivastava
Chief Engineer (Project-l)
To,
Mi shtrdt sat Etectrtcats Ltd.
Flat S 102, J.S.R.V. Plaza, S.R. Nagar
Hyderabad, Andhra Pradesh-500038
5ub:- Retardlnt approved GTP, Drawlnt of M/s Nalanda PSCC Poles, Chattra
Ref:- Your letter no.-55EuNBPDCLh6-t7 lPl001 dated 07.05,2016
Sir,
Please find enclosed herewith approved GTP/Drawing of following ltems submitted by you vide
letter under reference as per RECffS, 12rh Plan RGGVY work and valid type test report for Supaul District.
It may please be noted that approval of GTP/Drawing of subject material does not absolve you of
contractual responsibility in terms of its quality etc in case any problem/ issue with regard to material/vendor,
arises at any stage, NBPDCL reserves the right of withdrawal of this approval as well as ask the turnkey contractor
to replace the materials at their own cost immediately.
Encl:- As above
Yours faithfully
sd/_ l
(S.K. Srivastava)
Chief Engineer (Projectl)
Memo No.- Date-
Copy with a copy of approved GTP, Drawing forwarded to ESE, Electric Supply Circle, Saharsa/EEE
(Project), Electric 5upply Division Supaul for information and necessary action.
Encl:-As above sd/-
(s.K, srlvastava)
Chief Engineer (Projectl)
MemoNo.- 30t-l b oate-l(-5-16 ,/
Copy forwarded to Electrical Executive Engineer (ID,'North Bihar Power;Qistribution Company
Limited to upload this information and GTP & Drawing on NBPDCL wdbsite.
Encl:-As above
-$61lu
(s.K. srlvastava)
Engineer (Project-l)
W
\v
PROJECT RURAL ELECTRIFICATION WORKS IN SUPAUL DISTRICT OF BIHAR
N-xll/RE/NlT-161/14lSUPAU L-1419 / 4664 D ArE: 29.12.2014
LOA No
N-xlr/RE/NlT-161/14lSUPAUL-1419/465s DATE: 29.72.2074
CTIENT NORTH BIHAR POWER DISTRIBUTION COMPANY LTD
Sl.No Description
L Type of Pole Flat -
2 Top Section 145x90 mm .-
3 Bottom Section 290x90 mm -
4 Quantity of Concrete 0.157 Cubic Meter -'
5 Concrete Grade M-40 --
6 HT Steel Wire 4 mm Dia
13 Clear Cover 20 mm
-a
PLAN AT TOP
PLAN AT'A-A"
N
a-
r.)
f,')
-a
PTAN AT BOTTOM
LEGEND:
. OENOTES TENSIONED WIRES
X DENOTES UNTENSIONED WIRES
+ DENoTES possrBLE posmoN oF EARTH wrRE
NOTES:
1) ALL DIMENSIONS ARE IN MM.
(NOT TO SCALE)
&rrforra\6 -t" T.t'.
"{'t7't"?ao'
^91f Apgroved
Chdcked
i$
P-
CE ( ProJ ect- I )
E) ESE(RE) NBPDCL, Patna
*-
lesl
ELEVATION SIDE VIEW
x n orr PoLe- !h o,^o'{ U- &ne c^!. ftaT
DIA MEIER OF PRESTRESSING IVIRE
TION WORKS IN SUPAUL DISTRICT OF EIHAR
N-XIURE lT-161/14lSUPAUL-1419/4664 DATE: 29 12.2014
N-Xll/RUNIT-161/14lSUPAUL-1419/4665 DATE 29 12 2014 UINIMUM CUBE STRENGTH OF CONCRETE AT 2A DAYS