You are on page 1of 3

Muhammad Noman

Personal info
First name: Muhammad
Last name: Noman
Date of birth: 22/03/1991
Web: https://www.linkedin.com/in/muhammad-noman-91200682/
Nationality: Pakistani
Address: H.No 234, Mohallah Malik Nasarullah Jan, Rawail Gali, Nouthia Qadeem, Saddar Cantt,
Peshawar, Pakistan
Phone number: 0346-8482210
Email address: engr.muhammadnoman@gmail.com

Summary
A competent Electrical Engineer with comprehensive knowledge of quality Engineering design and practical experience of
site supervision of electrical power systems & components to the required speci cations, focusing on safety, reliability &
sustainability.

Presently I am working as an Electrical Design Engineer on Koto HPP (40.8 MW). Previously I have worked as Jr. Electrical
Engineer in Design nalization of 4 Hydropower Projects in public mode (Marala- 7.64 MW, Pakpattan- 2.82 MW, Chianwali- 5.36
MW & Degoutfall- 4.04 MW) wherein, I have also performed construction supervision of Electrical activities at site for
Pakpattan HPP along with complete Testing & commissioning of the same Project.

Work experience
Electra Consultants Electrical Design Engineer 01/2017 - present
Peshawar
Pakistan Detailed design review and nalization of Single line Diagram for Koto HPP.
Design review and nalization of Protection and metering drawings pertaining to the Generators,
Transformers, 132 kV Transmission lines, Busbars and Auxilliary Systems.
Design review of Electrical Layout Drawings e.g 132 kV O/D Switchyard, Powerhouse, Intake &
Sandtrap areas etc in compliance with Employer's Requirements and best design practices.
Earthing mesh calculations as per IEEE-Std 80-2000.
Detailed design calculations for Auxilliary Transformers, Standby Diesel Generators & DC
System.
Detailed Design review of Short circuit current calculations and cable sizing calculations as per
IEC 60909 & IEC 60364 respectively.

Punjab Hydropower Jr. Electrical Engineer 10/2013 12/2016


Consultants
Punjab Details of my job responsibilities are given as under;
Pakistan
Guarantee Test for Horizontal shaft Kaplan Turbine & Generating Unit as per IEC 60041 & 60043
respectively.
Detailed study and monitoring of Electrical & Mechanical parameters during 72 Hour Full Load
Run Test.
Analyzing transient behavior of power plant during Load Rejection Test.
Review SCADA designs for essential modi cations.
Supervised installation and testing of SCADA systems to ensure functionality & simpli ed user
experience.
Preparation of Test Reports for Employer pertaining to the E & M tests carried out at site.
Surveillance of compliance to quality standards & speci cations.
Testing & commissioning of 6.3 kV, Two (2) numbers of hydro generators with rated capacity of
1.41 MW each;
1. Start up and trial operation tests
2. Short Circuit Characteristic test
3. No load Characteristic Test
Work experience

Grounding test of power plant using earthing test set UNI-T UT 521.

11 kV, 6.3 kV & 0.4 kV cable tests;

1. Megger Test
2. High voltage A.C Test
3. High Voltage D.C Test

Factory acceptance tests of distribution transformers at PEL (Pak Elektron Ltd.) facility;

1. Measurement for Break down voltage of T/F Mineral Oil using Dielectric Tester
2. Measurement of short circuit impedance and load losses.
3. Measurement of voltage ratio and check of phase displacement
4. Measurement of no load losses & current
5. Separate source voltage withstands test / power frequency test.
6. Induced over voltage withstand test.
7. Measurement of winding resistance.

Detailed study and approval of design drawings, speci cations and technical documents.
Design review and approval of interconnection study report including load ow studies, transient
stability analysisand short circuit levels during single phase, phase to phase and 3 phase faults.
Performed voltage drop, ampicity and technical losses calculations for Transmission lines.
Transmission Lines Route survey and visits to interconnected grid stations for data collection.
Design & construction of single circuit & double circuit 11 kV overhead transmission line as per
WAPDA specs.
Design review and approval of Plan & Pro le Diagrams for double circuit & triple circuit overhead
transmission lines.
Design of 11 kV Incoming interconnected panels at Grid End as per WAPDA speci cations
devised in P-44.
Design and selection of surge arrestors for protection of transmission lines against lightning
stokes.
Detailed design review of setting calculations for Overcurrent protection (IDMT, De nite &
Instantaneous) for Step-Up Main Transformers and Transmission lines Feeder relay PCS 9611.
Design calculations and settings of Earth Fault protection for Transmission lines.
Testing and commissioning of power house bridge crane as per FEM standards.
Powerhouse building and Spillway AC lighting design as well design of emergency lighting on
DC system.
Performed detailed grounding mesh calculations for powerhouse as per IEEE Std 80- 2000.
Performed short circuit calculations as per IEC 60909.
Performed UPS & battery sizing design & calculations in accordance with IEEE 485-1997.
Detailed design calculations for 230 V & 400 V A.C distribution system as well as cable sizing as
per IEC 60364.
Detailed design calculations for generator protection as per IEEE C37.101.
Design of structural lightning protection as per BS EN 62305.
Design analysis for liquid immersed and dry type transformers as per IEC-76, IEC-600726.
Design review of 0.4 kV, 6.3 kV and 11 kV switchgear panels.
Performed electrical design calculations for the distribution transformers and standby diesel
generators.
Performed design review of power transformer installation drawings & lightning protection.
Performed selection and sizing of lightning arresters as per IEC & IEEE standards.
Conducted site visits to determine and validate eld dimensions.
Processing of Commercial Invoices of equipment imported from abroad. Check and verify the
consignments arrived atsite from abroad.
Detailed design review of internal & external lighting schemes.
Veri cation of interim payment certi cates (IPCs) of the contractors.
Meetings and frequent letter correspondence with Client and Contractor to settle down the
issues regarding designservices and installation of equipment at site.

Education
NWFP University of Electrical Engineering (POWER) 10/2009 09/2013
Engg & Technology Marks Obtained: 3.24 / 4 CGPA (81%)
Peshawar
Pakistan
Education
Islamia College HSSC (Pre-Engineering) 2007 2009
Peshawar Marks Obtained: 898/1100 (81.64%)
Pakistan

Islamia Collegiate SSC 2005 2007


School Marks Obtained: 898/900 (87.11%)
Peshawar
Pakistan

Skills
Languages Computer Pro ciency