You are on page 1of 3

Muhammad Noman

engr.muhammadnoman@gmail.com
+92 346 8482210 PEC Membership: Regd: ELECT/40886
Current Address: H.No.234, Mohallah Malik Nasarullah Jan, Rawail Gali, Nouthia Qadeem, Saddar Cantt, Pesh.
Skype ID: engr.muhammadnoman CNIC#: 17301 7442225 7
Date of birth: 22nd March, 1991 Marital Status: Single
Passport #: AG9202251 (Validity: 21 August 2018 )
PERSONAL SUMMARY
Competent electrical engineer with a comprehensive knowledge & experience of Hydropower plants design, Testing &
Commissioning of electrical power systems & components according to the required specifications and also focusing on
safety, reliability & quality.
ACADEMIC QUALIFICATION
Qualification Institute Passed In Marks
Bachelors in Electrical Power University Of Engineering Sept 2013 81.00 %
Engineering And Technology Peshawar (3.24/4 CGPA)
Pre Engineering / A Level Islamia College University July 2009 81.64 %
Peshawar (898/1100)
Matriculation / O Level Islamia Collegiate School July 2007 87.11 %
Peshawar (784/900)

PROFESSIONAL EXPERIENCE ( 3 Years & 8 Months )

Designation Organization Time Period Experience Projects

Electrical Design 2 Hydropower Projects:


Electra Consultants Oct 2013 Present 5 Months 1. Koto HPP (40.8 MW)
Engineer
2. Machai HPP (2.6 MW)

4 Hydropower Projects:
Jr. Engineer Punjab Hydropower 3 Yrs & 3 1. Marala HPP (7.64 MW)
Oct 2013 Dec 2017 2. Pakpattan HPP (2.82 MW)
(Electrical) Consultants Months
3. Chianwali HPP (5..36 MW)
4. Deg Outfall HPP (4.04 MW)

Electrical Design Engineer 5 Months ( Dec 2017 Present )


Electra Consultants

Project wise details of my job assignments/duties in capacity of Electrical Design Engineer with Electra Consults are as
follows;
Detailed design review of Main single line diagram with conformance to the design and required specifications of the
electrical equipments.
Reviewed and performed detailed design calculations pertaining to the adequate sizing of station service transformers
and standby diesel generators.

Page 1 of 3
Performed detailed design analysis of DC system in accordance with IEEE 485 - 1997 to select suitable capacity of the
battery system as per required load demand.
Design review of electrical layout drawings e.g. powerhouse, outdoor switchyard, control room & switchgear room etc
Reviewed & carried out Electrical cable size calculations as per IEC 60364 and analyzed the results of Short circuit
calculations in accordance with the guidelines specified in IEC 60909.
Reviewed the Earthing system design according to IEEE Std 80-2000 and recommended technical solutions to the
EPC Contractor regarding the selection of earthing material, size of earthing conductor and mesh etc for improved
system reliability and personnel safety in the event of different electrical faults.
Reviewed and checked design calculation of lightning protection system for 132 kV outdoor switchyard according to
the Rolling Sphere Method as specified in IEC 62305.
Design review of O & M Manuals and As Built Drawings of 2.6 MW Machai HPP.
Reviewed the testing & commissioning protocols of Machai HPP in line with guidelines as specified in IEC 60545-197

Jr. Engineer (Electrical) 3 Yrs. & 3 Months (Oct 2013 Dec 2017)
Punjab Hydropower Consultants
Details of my job responsibilities are given as follows;
1). Site Works Experience:
Guarantee Test for Horizontal shaft Kaplan Turbine & Generating Unit as per IEC code 60041 & 60043 respectively.
Detailed study and monitoring of Electrical & Mechanical parameters during 72 Hour Full Load run test.
Analyzing transient behavior of power plant during Load Rejection Test.
Reviewed SCADA designs for essential modifications.
Supervised installation and testing of SCADA systems to ensure functionality & simplified user experience.
Testing and commissioning of power house bridge crane as per FEM standards.
Grounding test of power plant using earthing test set UNI-T UT 521.
Testing & commissioning of 6.3 kV, 2 numbers of hydro generators with rated capacity of 1.41 MW each;
1. Start up and trial operation tests
2. Short Circuit Characteristic test
3. No load Characteristic Test
11 kV, 6.3 kV & 0.4 kV cable tests;
1. Megger Test
2. High voltage A.C Test
3. High Voltage D.C Test
Factory acceptance tests of distribution transformers at PEL (Pak Elektron Ltd.) facility.
1. Measurement for Break down voltage of Transformer Mineral Oil using Dielectric Tester (BAUR DTA 100 C)
2. Separate source voltage withstands test / power frequency test.
3. Induced over voltage withstand test.
4. Measurement of short circuit impedance and load losses.
5. Measurement of winding resistance.
6. Measurement of no load losses & current
7. Measurement of voltage ratio and check of phase displacement

2). Electrical Design Experience:


Surveillance of compliance to quality standards & specifications.
Page 2 of 3
Preparation of Test Reports pertaining to the E & M tests carried out at site.
Design review and approval of interconnection study report including load flow studies, transient stability analysis
and short circuit levels during single phase, phase to phase and 3 phase faults.
Performed voltage drop, ampicity and technical losses calculations for Transmission lines.
Transmission Lines Route survey and visits to interconnected grid stations for data collection.
Design & construction 11 kV overhead transmission line as per WAPDA specs.
Design review and approval of Plan & Profile Diagrams overhead transmission lines.
Design of 11 kV Incoming interconnected panels at Grid End as per WAPDA specifications devised in P-44.
Design and selection of surge arrestors for protection of transmission lines against lightning stokes.
Detailed design review of setting calculations for Overcurrent protection (IDMT, Definite & Instantaneous) for
Step-Up Main Transformers and Transmission lines Feeder relay PCS 9611.
Design calculations and settings of Earth Fault protection for Transmission lines.
Powerhouse building and Spillway AC lighting design as well design of emergency lighting on DC system.
Performed detailed grounding mesh calculations for powerhouse as per IEEE Std 80- 2000.
Performed short circuit calculations as per IEC 60909.
Detailed study and approval of design drawings, specifications and technical documents.
Performed UPS & battery sizing design & calculations in accordance with IEEE 485-1997.
Detailed design calculations for 230 V & 400 V distribution system as well as cable sizing as per IEC 60364.
Detailed design calculations for generator protection as per IEEE C37.101
Design of structural lightning protection as per BS EN 62305.
Design analysis for liquid immersed and dry type transformers as per IEC-76, IEC-600726.
Design review of 0.4 kV, 6.3 kV and 11 kV switchgear panels.
Performed electrical design calculations for the distribution transformers and standby diesel generators
Performed design review of power transformer installation drawings & lightning protection.
Performed selection and sizing of lightning arresters as per IEC & IEEE standards.
Conducted site visits to determine and validate field dimensions.
Processing of Commercial Invoices of equipment imported from abroad. Checking and verification of the consignments
arrived at site from abroad.
Detailed design review of internal & external lighting schemes.
Verification of interim payment certificates (IPCs) of the contractors.
Meetings and frequent correspondence with Client and Contractor to settle down the issues regarding design services
and installation of equipment at site

COMPUTER PROFICIENCY
MS office, AutoCAD, ORCAD 10.5, PSPICE, C, C++, MATLAB (Simulink),Proteus.

LANGUAGES
English, Urdu, Pashto

REFERENCES
Shall be provided on request.

Page 3 of 3

You might also like