DAY - 1 (Date: 26-Mar-2014) Visited the BIONE factory in Lecco REMARKS
No
1.2 Activities
XN125 Pay-off
XN125/6+1 Skip Strander test made in Mario Frigerio at 750 RPM
CC Load Cell
PRE-SHIPMENT INSPECTION ACTIVITIES - 2014
Grouting Specification
Electrical Cabinets
Safety Warnings and Residual Risks Seen by the team. Given the drawing of suggested CE protections on the line to
be made by NM
Software for the PC Strand line as been checked in a computer only for
1.3 Softwares Simulation.. Marco Castelletti promised to make a preventive maintenace
alarms to be pre installed
1.4 Pre-Threading / Set-up / Threading and Running Procedures All is in the manual
1.8 Spare and Wear Parts We are waiting for order from NM
1.9 Others
PC Strand Spray Water Provision..? (Post Forming Side) It is for die cooling when making the compacted strand
Induction Furnace Exhaust System Design Given "reference" drawing how to make them in KSA
2.2 Activities
PRE-SHIPMENT INSPECTION ACTIVITIES - 2014
AFTERNOON SESSION : - 02.00 PM - 06.00 PM
Anti-Vibration Rollers on Last Three Die Holders Ready to fit after final painting of the structure of the machine
Die Equipments Fit in a separate box
Final Block double Deck type with one Set of Wire Straighteners
BU125 Spooler
Pulling Dog Seen in the "accessories" box
Leveling Plates Are in machining stage to be ready tomorrow
Anchor Bolts Are in machining stage to be ready tomorrow
Important Notices and Residual Risks Seen by the team. Given the drawing of suggested CE protections on the line to
be made by NM
Software for the Wire Drawing line hasbeen checked in a computer only for
2.3 Softwares Simulation. Marco Castelletti promised to make a preventive maintenace
alarms to be pre installed
2.4 Pre-Threading / Set-up / Threading and Running Procedures All in the manuals
2.6 Spare and Wear Parts We are waiting for order from NM
PRE-SHIPMENT INSPECTION ACTIVITIES - 2014
Sl.
DAY - 3 (Date: 28-Mar-2014) at BIONE factory REMARKS
No
FORENOON SESSION : - 09.00 AM - 01.00 PM
Now on the capstans is fit an air/oil heat exchanger but NM said that on their
experience this might be clogged shortly due to environmental conditions:
MFL t send a suggetion how to swap it with Water/oil heat excnger in case in
future this will be needed.
MFL to tell how to control humidity in the ciontrol cabinet in case cabinet will
be switched off for long time
AFTERNOON SESSION : - 02.00 PM - 06.00 PM
NM made MFL note that the pull-in dog supplied with the drawing machines
Final verification of remaining points look s"small" to be used continuously with the 155 mm rod size. This is
coming from experience with previous supply of the same unit. NM says
anyway that is MFL responsibility and if it will fail..........
On wire drawing machine water drain fit a plate to close on which NM
plumber will weld what is needed.
Given a full set of printed manuals as per TCF No. 2803014
As soon as we
will have the
Mr.Marco Polvara Technician Mach foundation Inspection
VISA possibly in
10 days time
Mr - Marco Milani
- Luca Filippi
Electrical Technician 6-Jun-14
- Danilo Bernini
- Ivan Fioroni
Mr - Lorenzo Biasin
- Eugenio Sonda Induction Furnace Specialist 15-Jun-14
- Riccardo Falessi
MFL will send asap all documents for each technician to allow NM to make the invitation letters, or whatever is needed by latest regulations
PRE-SHIPMENT INSPECTION ACTIVITIES - 2014
Tested the spectrometer Mario Frigerio uses to test material at Quality control
Example of Packing list EVERY ITEM WILL BE NUMBERED and have this below on it