UNIDAD METRADO P.U. (S/.

OBRAS PROVISIONALES, TRABAJOS PRELIMINARES,


1 SEGURIDAD Y SALUD
1 CONSTRUCCIONES PROVISIONALES
1.1 ALMACN M2 16.00 80.25
1.2 CASETA DE GUARDIANA M2 3.00 80.25
1.3 CERCO PERIMTRICO M 9.50 88.27
2 INSTALACIONES PROVISIONALES
2.1 AGUA PARA LA CONSTRUCCIN Glb 1.00 300.00
3 TRABAJOS PRELIMINARES
3.1 LIMPIEZA MANUAL DE TERRENO M2 446.50 3.54
DEMOLICIN DE FACHADA EXISTENTE
4 ELIMINACIN DE OBSTRUCCIONES
4.1 ELIMINACIN DE BASURA Y ELEMENTOS SUELTOS LIVIANOS M3 20.00 28.42
5 TRAZOS, NIVELES Y REPLANTEO
5.1 TRAZOS, NIVELES Y REPLANTEO PRELIMINAR M2 250.00 2.02
5.2 REPLANTEO DURANTE EL PROCESO M2 250.00 2.70
6 SEGURIDAD Y SALUD
6.1 EQUIPOS DE PROTECCIN INDIVIDUAL Und 6.00 40.00
6.2 EQUIPOS DE PROTECCIN COLECTIVA Glb 1.00 300.00
6.3 SEALIZACIN TEMPORAL DE SEGURIDAD Glb 1.00 100.00

2 ESTRUCTURAS
1 MOVIMIENTO DE TIERRAS
REFINE, NIVEL Y COMPACTACIN DE TERRENO NORMAL CON PISN
1.1 MANUAL M2 446.50 5.46
1.2 EXCAVACIN DE ZANJAS PARA SARDINELES M3 6.24 36.20
1.3 EXCAVACIN DE ZANJAS PARA CIMIENTOS M3 17.64 36.20
1.4 RELLENO CON CONFITILLO M3 2.55 45.00
REFINE, NIVEL Y COMPACTACIN DE TERRENO NORMAL CON PISN
1.5 MANUAL (VEREDAS Y RAMPAS) M2 151.68 5.46
UNIDAD METRADO P.U. (S/.)
1.6 ELIMINACIN DE MATERIAL MANUAL M3 10.00 24.14
2 OBRAS DE CONCRETO SIMPLE
2.1 CIMIENTO CORRIDO 1:10 + 30%P.M. M3 17.64 177.03
2.2 SOBRECIMIENTO
2.2.1 SOBRECIMIENTO.- CONCRETO 1:8 + 25%P.M. M3 2.10 277.09
2.2.2 SOBRECIMIENTO.- ENCOFRADO Y DESENCOFRADO M2 17.50 39.45
2.3 GRADAS
2.3.1 GRADAS - CONCRETO 1:10 M3 0.27 233.59
2.3.2 GRADAS - ENCOFRADO Y DESENCOFRADO M2 2.07 67.01
2.4 RAMPAS
2.4.1 RAMPA - CONCRETO 1:10 M3 2.65 233.59
2.5 SARDINELES
2.5.1 SARDINELES - CONCRETO 1:10 M3 1.30 233.59
2.5.2 SARDINELES - ENCOFRADO Y DESENCOFRADO M2 22.32 67.01
JARDINERAS (MURO PARA JARDINES Y JARDINERA CALLE)
JARDINERAS - CONCRETO 1:10
JARDINERAS - ENCOFRADO Y DESENCOFRADO GLB 1.00
3 OBRAS DE CONCRETO ARMADO
3.1 COLUMNAS
3.1.1 COLUMNAS-CONCRETO f'c=210 kg/cm2 M3 0.84 485.27
3.1.2 COLUMNAS-ENCOFRADO Y DESENCOFRADO M2 14.00 57.51
3.1.3 COLUMNAS-ACERO DE REFUERZO fy=4,200 kg/cm2 KG 96.00 4.75
PLACAS
3.2 VIGAS
3.2.1 VIGAS-CONCRETO f'c=210 kg/cm2 M3 0.30 352.42
3.2.2 VIGAS ACERO DE REFUERZO fy=4,200 kg/cm2 KG 20.00 4.75
3.3 LOSAS ALIGERADAS
3.3.1 LOSAS ALIGERADAS-CONCRETO PREMEZCLADO f'c=210 kg/cm2 M3 0.79 331.60
3.3.2 LOSAS ALIGERADAS-ENCOFRADO Y DESENCOFRADO M2 7.90 50.27
3.3.3 LOSAS ALIGERADAS-ACERO DE REFUERZO fy=4,200 kg/cm2 KG 40.00 4.75
3.3.4 LOSAS ALIGERADAS-LADRILLO HUECO 30x30x15 cm Und 50.00 2.44
UNIDAD METRADO P.U. (S/.)
3 ARQUITECTURA
1 MUROS Y TABIQUES DE ALBAILERA
1.1 MURO DE LADRILLO K.K. MEZCLA C:A 1:5 DE SOGA M2 186.38 54.59
2 REVOQUES Y REVESTIMIENTOS
2.1 TARRAJEO EN MUROS EXT. FROTACHADO 1:5 E=1.5 CM M2 41.00 25.09
2.2 TARRAJEO RAYADO PRIMARIO 1:5 E=1.5 CM M2 6.34 20.51
TARRAJEO DE JARDINERAS ML
2.3 CIELO RASO CON MEZCLA C:A 1:5 M2 9.94 33.05
3 PISOS
3.1 VEREDAS F'C=140 KG/CM2 E=0.10M M2 132.50 37.25
3.2 PORCELANATO M2 7.90 63.35
3.3 PISO DE ADOQUINES DE CONCRETO M2 28.80 62.41
4 ZCALOS
4.1 ZCALO DE PORCELANATO NEGRO M2 6.34 82.27
5 CARPINTERA DE MADERA
5.1 PUERTA DE MADERA M2 13.71 282.48
6 CARPINTERA METLICA Y HERRERA
6.1 TUBO RECTANGULAR DE 4"X4" M 3.00 161.27
7 CERRAJERA
7.1 CERRADURAS UND 1.00 81.96
8 VIDRIOS, CRISTALES Y SIMILARES
8.1 BLOQUES DE VIDRIO UND 34.00 -
9 PINTURA
9.1 PINTURA DE CIELO RASO AL TEMPLE M2 9.94 7.87
9.2 PINTURA DE MURO INTERIOR (BLANCO) M2 165.38 6.75
9.3 PINTURA DE MUROS FACHADA 2 MANOS M2 29.96 8.31
9.4 BARNIZADO EN MURO DE LADRILLO M2 165.38 -

4 INSTALACIONES ELCTRICAS
1 SALIDAS
1.1 SALIDA DE TECHO PTO 3.00 89.79
2 LUMINARIAS
UNIDAD METRADO P.U. (S/.)
2.1 LUMINARIAS EN TECHO UND 3.00 -
3 TABLEROS
3.1 TABLERO DE DISTRIBUCIN EMPOTRADO UND 1.00 -
3.2 INTERRUPTOR TERMOMAGNTICO UND 3.00 75.30

COSTO DIRECTO S/.


GASTOS GENERALES (7%)
UTILIDAD (7%)
SUB TOTAL
I.G.V. (18%)
PRESUPUESTO TOTAL S/.
M.O. MAT EQU PARCIAL (S/.) M.O. MAT EQU

41.74 36.42 2.09 1,284.00 667.84 582.72 33.44


41.74 36.42 2.09 240.75 125.22 109.26 6.27
21.53 66.74 - 838.57 204.54 634.03 -

300.00 300.00 - 300.00 -

3.37 - 0.17 1,580.61 1,504.71 - 75.91

27.59 - 0.83 568.40 551.80 - 16.60

1.40 0.58 0.04 505.00 350.00 145.00 10.00


1.54 0.71 0.45 675.00 385.00 177.50 112.50

40.00 - - 240.00 240.00 - -


300.00 - - 300.00 300.00 - -
100.00 - - 100.00 100.00 - -

4.73 0.28 0.45 2,437.89 2,111.95 125.02 200.93


34.48 - 1.72 225.73 215.00 - 10.73
34.48 - 1.72 638.57 608.23 - 30.34
- 45.00 - 114.57 - 114.57 -

4.73 0.28 0.45 828.17 717.45 42.47 68.26


M.O. MAT EQU PARCIAL (S/.) M.O. MAT EQU
22.99 - 1.15 241.40 229.90 - 11.50

64.35 100.95 11.73 3,122.81 1,135.13 1,780.76 206.92

134.08 121.26 21.75 581.89 281.57 254.65 45.68


19.51 19.35 0.59 690.38 341.43 338.63 10.33

107.27 106.77 19.55 63.93 29.36 29.22 5.35


52.02 12.39 2.60 138.71 107.68 25.65 5.38

107.27 106.77 19.55 618.55 284.05 282.73 51.77

107.27 106.77 19.55 303.67 139.45 138.80 25.42


52.02 12.39 2.60 1,495.66 1,161.09 276.54 58.03

- - - -

225.13 223.12 37.02 407.63 189.11 187.42 31.10


31.21 24.74 1.56 805.14 436.94 346.36 21.84
1.19 3.44 0.12 456.00 114.24 330.24 11.52

112.56 221.35 18.51 105.73 33.77 66.41 5.55


1.19 3.44 0.12 95.00 23.80 68.80 2.40

95.32 221.21 15.07 261.96 75.30 174.76 11.91


26.01 22.96 1.30 397.13 205.48 181.38 10.27
1.19 3.44 0.12 190.00 47.60 137.60 4.80
0.78 1.64 0.02 122.00 39.00 82.00 1.00
M.O. MAT EQU PARCIAL (S/.) M.O. MAT EQU

26.60 26.66 1.33 10,174.48 4,957.71 4,968.89 247.89

18.27 5.91 0.91 1,028.69 749.07 242.31 37.31


14.97 4.79 0.75 130.03 94.91 30.37 4.76

27.40 4.83 0.82 328.52 272.36 48.01 8.15


- - - -
13.30 23.10 0.85 4,935.63 1,762.25 3,060.75 112.63
36.55 24.97 1.83 500.47 288.75 197.26 14.46
23.94 37.75 0.72 1,797.41 689.47 1,087.20 20.74
- - - -
54.81 24.72 2.74 521.59 347.50 156.72 17.37
- - - -
132.70 137.62 12.16 3,872.80 1,819.32 1,886.77 166.71
- - - -
59.75 95.54 5.98 483.81 179.25 286.62 17.94
- - - -
45.02 35.59 1.35 81.96 45.02 35.59 1.35

- - - -

7.20 0.45 0.22 78.26 71.60 4.48 2.19


6.00 0.45 0.30 1,116.32 992.28 74.42 49.61
6.43 1.69 0.19 248.97 192.64 50.63 5.69
- - - -

59.75 27.05 2.99 269.37 179.25 81.15 8.97


M.O. MAT EQU PARCIAL (S/.) M.O. MAT EQU
- - - -

- - - -
14.97 59.88 0.45 225.90 44.91 179.64 1.35

46,769.04 25,642.89 19,323.33 1,802.82


3,273.83
3,273.83
53,316.71
9,597.01 4,615.72 3,478.20 324.51
62,913.71 30,258.61 22,801.53 2,127.33