You are on page 1of 4

JIGCC Power Block Project (Package 4)

SEPCO Electric Power Construction Corporation

6600033163 (IK)
Contract No. : Document No : SES-PGB-CO-ITP-0058
6600033162(OOK)

ITP For Commissioning HRSG System


PB01B-HRS-001/002
PB02-HRS-001/002
PB03-HRS-001/002
PB04-HRS-001/002
PB05-HRS-001/002

Song Yanfeng& Mohammed Guan


0 27-May-2017 IFA Yu Chengyi
Iftikhar Baig Hamed Wensheng
Approved
Checked by Reviewed by by
Rev. Date Status Written by
(PCD&HSE) (QA/QCD) (Chief
Engineer)
DOCUMENT NAME SES-PGB-CO-ITP-0058
REV. No. 0
ITP FOR COMMISSIONING
HRSG SYSTEM PAGE 2of 4

Revision Information

Rev. Section No. Description of Main Changes

0 All First issue


DOCUMENT NAME SES-PGB-CO-ITP-0058
REV. No. 0
ITP FOR COMMISSIONING
HRSG SYSTEM PAGE 3of 4

Table of contents

1.0 Scope of work ............................................................................................... 4


2.0 Equipment list ............................................................................................... 4
3.0 ITP Form ........................................................................................................ 4
DOCUMENT NAME SES-PGB-CO-ITP-0058
REV. No. 0
ITP FOR COMMISSIONING
HRSG SYSTEM PAGE 4of 4

1.0 Scope of work


The ITP applies these work activity as follows:

SN. Description of work activity

1 Commissioning of HRSG System

2.0 Equipment list


The following equipment are included in this ITP

SN. Equipment code Details

1 HRSG Economizer Recirculation 167.0m3/hr 55.95kw


Pump(A10-G-1102A/B)
2 Burner

3 Condensate preheater

4 HP steam line

5 IP steam line

6 RH steam line

3.0 ITP Form


SATIP-CO-3014 Commissioning Inspection Plan of HRSG System

SAIC-CO-3014 Commissioning Inspection Checklist of HRSG System

SATR-C0-3014 Commissioning Inspection Test Report of HRSG System

ATTACHMENT1~9